Skip to content
Part II General Legislation

Chapter 257 Sewers

185 sections

Article X Discharge Permits and Pretreatment Requirements
§ 257-82 Wastewater discharge permit required; wastes subject to pretreatment. § 257-83 Wastewater discharge reports. § 257-84 Notification to industrial users. § 257-85 Compliance with permit. § 257-86 Permit required for significant industrial users; time frame for application. § 257-87 Permit required for other industrial users. § 257-88 Authority of state to issue permits for discharge to storm sewers. § 257-89 Application for wastewater discharge permits. § 257-90 Permit modifications. § 257-91 Permit conditions. § 257-92 Wastewater discharge permit appeals. § 257-93 Permit duration. § 257-94 Permit reissuance. § 257-95 Permit transfer. § 257-96 Revocation of permit. § 257-97 Reporting requirements for permittee. § 257-98 Accidental discharge/slug control plans. § 257-99 Flow equalization. § 257-100 Monitoring stations (control manholes). § 257-101 Design and maintenance of facilities and monitoring stations. § 257-102 Vandalism; tampering with measuring devices. § 257-103 Sampling and analysis. § 257-104 Pollution concentration determination. § 257-105 Volume determination. § 257-106 Pollutant concentrations disputed by user. § 257-107 Pretreatment. § 257-108 Fats, oil and grease; oil and sand interceptors. § 257-109 Gas detection meters, alarms and shutoff valves. § 257-110 Accidental discharges. § 257-111 Posting of emergency notification procedure. § 257-112 Sampling and sample splitting. § 257-113 Access to information. § 257-114 Inspections and testing; access to property. § 257-115 Access to records of users. § 257-116 Access to easements. § 257-117 Denial of permit by Chief Plant Operator and/or Superintendent of Sewers. § 257-118 Property damage protection. § 257-119 Violation of permit. § 257-120 Wastewater from property owners in other jurisdictions. § 257-121 Intermunicipal agreements with other jurisdictions. § 257-122 Bypass.