Permit modifications.
A. Wastewater discharge permits may be modified by the Chief Plant Operator and/or Superintendent of Sewers, upon 30 days' notice to the permittee, for just cause. Just cause shall include but not be limited to:(1) Promulgation of an applicable National Categorical Pretreatment Standard;(2) Revision of or a grant of a variance from such categorical standards pursuant to 40 CFR 403.13;(3) Changes in federal or state pretreatment standards or requirements or, in general, discharge prohibitions and local limits as per § § 257-75 and 257-76 of this chapter;(4) Significant alterations or additions in the operation or processes used by the permittee, or changes in discharge volume or character, since the time of wastewater discharge permit issuance;(5) Change in the POTW that requires either a temporary or permanent reduction or elimination of an authorized discharge;(6) Discovery that the permitted discharge causes or contributes to pass-through or interference;(7) Changes in the nature and character of the sewage in the POTW as a result of other permitted discharges;(8) Information indicating that the permitted discharge poses a threat to the Town of Webster's POTW, Town personnel, or the receiving waters;(9) Violation of any terms or conditions of the wastewater discharge permit;(10) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting;(11) To correct typographical or other errors in the wastewater discharge permit; or(12) To reflect a transfer of the facility ownership or operation to a new owner or operator.
[Note: Modification for this purpose may not be allowed unless the permit is transferable as provided in § 257-95. ]B. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance as set forth in § 257-89A (13)(a). Within nine months of the promulgation of a National Categorical Pretreatment Standard, the wastewater discharge permit of users subject to such standards shall be revised to require compliance with such standard within the time frame prescribed by such standard. Where a user subject to a National Categorical Pretreatment Standard has not previously submitted an application for a wastewater discharge permit as required under § 257-82 , the user shall apply for a wastewater discharge permit within 90 days after the promulgation of the applicable National Categorical Pretreatment Standard.
In addition, the user with an existing wastewater discharge permit shall submit to the Chief Plant Operator and/or Superintendent of Sewers, within 90 days after promulgation of an applicable National Categorical Pretreatment Standard, the information required by § 257-90 herein.