§ 257-86 Chapter 257 Sewers

Permit required for significant industrial users; time frame for application.

View on eCode

All significant industrial users connected to or proposing to connect to or to discharge to the POTW shall obtain a wastewater discharge permit before connecting to or discharging to the POTW. Existing significant industrial users shall make application for a wastewater discharge permit within 30 days after the effective date of this chapter and shall either obtain such a permit within 90 days after making application or cease discharge of that wastewater.

Citation graph 0 links
Citation graph 0→ · ←0
This section cites

This section cites no others. It stands on its own.

Cited by

No other sections cite this one.

Most sections of the code stand alone, and this is one of them.