Final acceptance and bulkhead removal.
Final acceptance of sewers not constructed by the Town of Webster contractors shall be granted by the Commissioner of Public Works and/or Chief Plant Operator and/or Superintendent of Sewers only after approval of test results which have been certified by a licensed professional engineer, a letter from a licensed professional engineer certifying that sewers have been constructed in accordance with standards and specifications in this chapter, and as-built drawings which have been prepared by a licensed professional engineer or land surveyor, all of which have been submitted by the builder of the sewer.
Only after final approval is granted by the Commissioner of Public Works and/or Chief Plant Operator and/or Superintendent of Sewers may the bulkhead at the point of connection with the Town's sewerage system be removed and flow discharged into the Town's sewerage system.
Citation graph 0 links
This section cites no others. It stands on its own.
No other sections cite this one.