Planning Board Meeting
Planning Minutes 2026.07.07

Minutes

July 7, 2026 · 54 min read · extracted text · View original

WEBSTER PLANNING BOARD MINUTES

PLACE

Webster Town Board Meeting Room 1002 Ridge Road

TIME

7:00 p.m.

DATE

7 July 2026

PRESENT

ABSENT:

Anthony Casciani, Chairman

Dave Malta, Vice Chairman

Mark Giardina, Secretary

Peggy Maltman

Derek Anderson

Drazen Gasic

Sven Vetter

Katherine Kolich, Recording Secretary

Josh Artuso, Director of Community Development

Erika Corsi, Town Planner

Frank Ciardi, Attorney

Anthony Casciani

Welcome to the Planning Board meeting of July 7, 2026. Okay, it’s about

one minute to seven so we can get started a little early.

Pledge of Allegiance/Roll Call

Anthony Casciani

We have six items on the agenda this evening.

Summary overview of outcome:

TABLED MATTERS

:

SCHEDULED MATTERS

:

1. INVIO SIGN-855 PUBLISHERS PARKWAY

Applicant

STEVE STANLEY

Status

APPROVED AS PRESENTED (AS PER V.2 DRAWING)

2. BAY-RIDGE CORNER RESUBDIVISION 423,425 & 429 RIDGE RD AND 1036 &

1036A

Applicant

SCOTT MEASDAY

Status

APPROVED AS PRESENTED

3. 7 BREW-HARD ROAD

Applicant

BREW TEAM NY, LLC/DOUG BEACHEL

Status

APPROVED WITH CONDITIONS: VOLUME CONTROL; LIGHTS

SHIELDED; SUBJECT TO SUBMITTING SIGN PACKAGE; NO PLANTINGS

IN THE SWALE.

Pg. 204 July 7, 2026 Planning Meeting

4. ACCESSORY STRUCTURE-1052 LAKE RD

Applicant. AMANDA COSTANZA

Status

APPROVED WITH CONDITION: NO CONSTRUCTION UNTIL THE

THE LOTS ARE COMBINED.

5. SIENNA RESERVE-ORCHARD RD

Applicant

INSITE LAND DEVELOPMENT, INC.

Status

EXTENTION GRANTED-TO EXPIRE 7.7.27

6. BURGER KING SIGN-940 HARD RD

Applicant

JP LANGHENRY

Status

APPROVED AS PRESENTED

(MARK GIARDINA read each application into the record)

INVIO SIGN

Located at 855 Publishers Parkway. Applicant Steve Stanley, Vital Signs, is

requesting SIGN APPROVAL associated with the installation of one (1) internally

illuminated 60 SF wall sign on a 44.14-acre parcel having SBL #079.06-1-32.11 located in

the OP Office Park District under Section 265-7 of the Code of the Town of Webster.

Appearing before the board was Steve Stanely with Vital Signs at 764 Ridge Road. As the

gentleman just stated, a 60 SF internally lit channel letters with lexan face with applied translucent

applied to the faces. Construction from aluminum and internally lit with LED modules mounted

flush to the building and that’s pretty much it. And that one small change, from the original design

from the customer is the color of the vinyl. (NOT AT THE MIC. PASSING UPDATED

CHANGE OUT TO THE PLANNING BOARD)

A lighter blue and then the automation will be perforated vinyl so during the day it will!

show black and at night when it’s illuminated it will show white.

Anthony Casciani

If you didn’t give us this, I would not have known the difference.

LAUGHTER. [have a question; this is the Calvary building?

Steve Stanley

Correct. It’s the old Calvary robotics building.

Anthony Casciani

Is it the same company or what’s the deal?

Steve Stanely

I believe they sold or bought, but they are rebranding.

Anthony Casciani

But it’s still the same company. Same owners?

Steve Stanley

I cannot speak to it if it is the same owners. I am not a 100% sure they were either

bought or sold. It was Calvary.

Pg. 205 July 7, 2026 Planning Meeting

Anthony Casciani

Same type of manufacturing?

Steve Stanley

I believe so, yes.

Mark Giardina

Could you tell me about the sign located to the right on the top there. I am curious

as to why it’s all the way over to the right.

Steve Stanley

That is exactly where the placement of the current sign is.

Anthony Casciani

Are you comfortable with that Josh? It’s the same type of an operation.

Josh Artuso

Yes, as long as the material nature of the business isn’t changing that’s fine.

Anthony Casciani

And you have it according to code so. Alright, anybody have any questions

on that?

Derek Anderson:

INVIO SIGN

The Town of Webster Planning Board considered the request by Applicant Steve Stanley from

Vital Signs to install one (1) internally illuminated 60 SF wall sign on a 44.14-acre parcel having

SBL #079.06-1-32.11 located at 855 Publishers Parkway.

The Planning Board classifies the proposed action to be a Type II Action under Section

617.5(c)(9) of the State Environmental Review (SEQR) Regulations and therefore is not subject

to further review.

RESOLUTION 26-043 Derek Anderson made a motion for TYPE II

SEQR which was seconded by Mark Giardina,

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr. Vetter AYE

Pg. 206 July 7, 2026 Planning Meeting

RESOLUTION 26-044 Mark Giardina made a motion for

SIGN APPROVAL as per drawing

V.2: Located at 855 Publishers

Parkway. Applicant Steve Stanley,

Vital Signs, is requesting SIGN

APPROVAL associated with the

installation of one (1) internally

illuminated 60 SF wali sign on a 44.14-

acre parcel having SBL #079.06-1-

32.11 located in the OP Office Park

District under Section 265-7 of the

Code of the Town of Webster which

was seconded by Dave Malta.

(APPROVAL AS PER DRAWING V.2 DATED 7.2.26)

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr. Vetter AYE

BAY-RIDGE CORNER RESUBDIVISION

Located at 423, 425 & 429 Ridge Rd and 1036

and 1036ABay Rd. Applicant Scott Measday, LS. is requesting FINAL SITE PLAN

APPROVAL in association with a proposed re-subdivision (lot line adjustments) of 5-single-

family residential lots into 4-single-family residential lots on 2.5 acres having SBL# 078.18-2-9,

SBL# 078. §8-2 -10.2, SBL# 078. 18-2-10.1, SBL# 078.18-2-11.11 and SBL# 078.18-2-11.2

located in the R-3 Single-Family Residential District under Sections 269-11, 296-14 and 350-12

of the Code of the Town of Webster.

Appearing before the board was Walt Baker with DSB Engineers and with me is Scott

Measday, the surveyor for the project. As the board will recall we were here last May with a

couple revisions that had to be done and prior to that meeting and we received preliminary

approval in May with the condition that we go to the Zoning Board and seek the variances

which were noted on the plan based on the fact that the property lines from 1920’s, 1930’s

somewhere around there go right through buildings so. Obviously in order to sell the property

the property lines had to be corrected so we were calling it a lot line revision/adjustment, and

we showed that on the maps. We did receive preliminary from the Planning board with the

condition of going to the Zoning Board, which we did last month. We were at the ZBA, and

they agreed with all the revisions that we proposed so they also gave us a final approval for

that and the condition with the Planning Board is we had to come back after the Zoning Board

Pg. 207 July 7, 2026 Planning Meeting

meeting for final approval, site plan approval and then ah, we can take the map to the county

for filing and get the lot lines corrected.

Anthony Casciani

Yes, we had this a few times and it’s something that was done years ago

and God only knows how they came up with the design of that thing. I think one of the biggest

concerns that we had was the septic systems and you re did them all. That’s all in good shape

now and other than that, I don’t have any concerns. Does anyone ?

Walt Baker

There was an issue with the drainage to the south property owner....

Anthony Casciani

What’s that??

Walt Baker

The guy to the south had concerns because he had ponding in his yard, so we met

with him and we revised that and put a culvert under our driveway to drain into the creek

channel, and the gentleman is real happy now.

Anthony Casciani

Okay. You got all your variances and everything, so you are set with that.

Walt Baker

Yes.

Anthony Casciani

Alright, this is for final, so we don’t need to do a SEQR on it. Does

anybody have any concerns or does someone want to make a motion for approval on this?

RESOLUTION 26-045 Anthony Casciani made a motion for

FINAL SITE PLAN APPROVAL:

Located at 423, 425 & 429 Ridge Rd and

1036 and 1036ABay Rd. Applicant Scott

Measday, LS. is requesting FINAL

SITE PLAN APPROVAL Jin

association with a proposed = re-

subdivision (lot line adjustments) of 5-

single-family residential lots into 4-

single-family residential lots on 2.5 acres

having SBL# 078. 18-2-9, SBL# 078.18-

2-10.2, SBL# 078.18-2-10.1, SBL#

078.18-2-11.11 and SBL# 078.18-2-11.2

located in the R-3 Single-Family

Residential District under Sections 269-

11, 296-14 and 350-12 of the Code of the

Town of Webster which was seconded

by Mark Giardina.

Pg. 208 July 7, 2026 Planning Meeting

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr. Vetter AYE

7-BREW: Located at Hard Road. Applicant Brew Team NY, LLC/Doug Beachel is

requesting FINAL SITE PLAN APPROVAL in association with the development of a

510 SF prefabricated double drive-through only coffee stand on a 0.73-acre parcel having

SBL# 079.15-1-1.313 located in the HC High Intensity District under Sections 269-11 and

350-19 under the Code of the Town of Webster.

Appearing before the board was Doug Beachel with Brew Team NY, LLC. We are a franchise of

7 Brew coffee. Here seeking final site plan approval for our 7 Brew Coffee Shop on Hard Road.

We have made some modifications since out last appearance with the bio-retention facility in front

and a couple other Engineering concerns that we believe we have addressed early with the

Engineering staff.

Anthony Casciani

There were...I don’t know, we want to go through them all, but I guess Josh as

far as the PRC Comments, they sent back all the revisions and modifications. Is Engineering all

okay with that stuff.

Josh Artuso

Yes, the understanding is the Engineering Department has accepted the responses and

the additional information that was provided.

Anthony Casciani

And with that, has anybody gone through....are you alright with them. I was

over there the other day after we had that heavy rain and that swale that is in the front that goes

across the properties, I wanted to see how that was working. And I went there Sunday morning

after Saturdays rain and it was working. The water had subsided. This is nothing to do with you

but the project next door Popeyes there, they have white birch trees, beautiful trees probably 3 or 4

inch caliper and they planted them right in the center at the bottom of the swale. Why is beyond

me. And the water was laying there; they are not going to survive. They are going to die, I’m sure.

They are setting right in water. Now, back to yours, hope your not doing the same thing.

Doug Beachel

No, our revision in that added landscaping to that has additional trees to sort of

mimic what they’re doing but they’re on an up slope.

Anthony Casciani

On the sides.

Doug Beachel

Yes.

Pg. 209 July 7, 2026 Planning Meeting

Anthony Casciani

And then part of what Popeyes did actually, they infringed onto your site

by...gosh, I don’t know, probably like 20 feet or so with there landscaping. If you look at it and

look where the lot line is, it’s about 20 feet of it.

Doug Beachel

Yes, ultimately, we are going to connect...

Anthony Casciani

Yeah, see it right there.

Doug Beachel

Yes, so there’s other trees that do spill over.

Anthony Casciani

So now your site is going from there and going down just continuing

landscaping but nothing in the bottom of the swale. Right?

Doug Beachel

Correct. There will be a structure in, down there with a pipe that connects over to

the structure to the north of Popeyes.

Anthony Casciani

Have we got a landscape drawing of that. Has that been presented? I think it

was something we asked at preiiminary that should be done for final.

Erika Corsi

I sent the most up to date version of these plans to all of the Planning Board members

via email, so you should have received that.

Drazen Gasic

I think it’s right there. Then there is a table to the right, that identifies...

Anthony Casciani

Yep, yep, okay.

Doug Beachel

I think there is actually...I think we had a revision past that, that we sent that showed

at least 4 trees in the front and we eliminated some of that landscaping around the berm in order

to....at the end of the drive thru to kind of accommodate larger trees. That may or may not have

been submitted.

Anthony Casciani

When that whole project initially came in with Dairy Queen; Taco Bell and so

on, that was one of the things Engineering showed was that swale going through there and

landscaping it and so far, it’s looking pretty decent. I’m okay with that, are you guys okay with it?

They have addressed all the Engineering details. Oh, I got a couple of things. I was...we brought

up at preliminary. The lights are extremely bright.

Doug Beachel

What we have now is we have shielding so it’s basically sort of an aluminum shield

that goes over the front of those so that will make it down lit. We can no longer dim them because

they flicker with that particular LED module, so the shielding is used and the municipalities like

the less bright option and those. ...that detail is typically on our elevation drawings and it is on these,

I checked last week. However, I would make that a condition of our building permit that they’re

captured in the building drawings.

Pg. 210 July 7, 2026 Planning Meeting

Anthony Casciani

And also, I think we brought up the speakers. You can dial those down if they

become extremely concerned by people because with car dealers, when they used to put the

speakers. ..you know, Charlie, we need you. Blah, blah, blah, and everyone around the site would

say what’s going on with this. So, that all got changed so the bottom line is ....... everyone is kind

of queued up with that so you will do the same?

Doung Beachel

Yes.

Anthony Casciani

Okay, that’s great. I guess were good with it.

Drazen Gasic

Tony, he has also mentioned that we want to make sure that any approval, if there is

an approval, that we mention that right revision because the updated plans that Erika

circulated. ....again, those berms in the back, they are not there but there are four trees and then he

also has a storm piping to collect the snow storage which is the part that we asked him to count for

so there is extra piping there where the curb is and a catch basin there as well so that’s why there is

not landscaping, small berms there. So, I just want to make sire that we say it’s revision....I think

it’s 5 is the most up to date version that accounts for the updated landscaping plan.

Anthony Casciani

Okay, you are good with that then. Alright, anything.

Board

No

ESOLUTION 26-047 Dave Malta made a motion for FINAL SITE

PLAN APPROVAL

requesting FINAL SITE

PLAN APPROVAL in association with the

development of a 510 SF prefabricated double

drive-through coffee stand on a 0.73-acre parcel

having SBL# 079.15-1-1.313 located in the HC

High Intensity District under Sections 269-11 and

350-19 under the Code of the Town of Webster

Which was seconded by Drazen Gasic.

FINAL APPROVAL CHECKLIST WITH CONDITIONS:

Subject to PRC comments.

Subject to Parks and Recreation fees (if applicable)

Subject to Preliminary Approval Conditions.

Subject to all applicable governmental fees.

Subject to Department of Public Works approval

Significant construction shall occur within one year, as deemed by the Planning Board, to

expire on 7.7.27

The conditions of Preliminary and Final approval are depicted on the cover page of the

final designed plans.

Aw fbwWhH =

a

Pg. 211 July 7, 2026 Planning Meeting

8. The Engineer for the proposed project shall provide a Letter of Certification that all

proposed work was completed, as per Planning Board resolution of final approval before

a Certificate of Occupancy will be issued.

9. A Letter of Credit to the Town for the project shal! include the fee for the Engineer’s

final certification inspection of the site.

10. All storm water facilities are to be constructed first

11. All downspouts to be connected to the storm sewer system.

12. Subject to resolution of the final approved minutes.

13. Approvals are subject to Drawing No:____ Dated: 6.29 REVISED DATE.

14. No outdoor volume

15. Lights shielded.

16, Applicant must submit sign package.

17. No plantings in the swale.

Mark Giardina

I have a minor point, is there a sign for 7 Brew and if there is, can we have a

numerical number or address put on it.

Anthony Casciani

Do you have a sign application too?

Doug Beachel

Typical the sign package is our building mounted signs, is there a request of an

address. I think that we have an addressed assigned to this, so we have to research that because

there is gap between us and popeyes and then it goes from 929 to

935. So, this individual parcel,

as far as I can tell, doesn’t have an address.

Mark Giardina

What does the rest of the board think? You should make an effort ?

Anthony Casciani

I don’t know Josh, have a separate...

Josh Artuso

So yes, since they are not proposing a monument sign there is a requirement

anyway for emergency services that the address be located somewhere on the front of the

building and once the assessor officially assigns the address that would be a requirement

anyway.

Anthony Casciani

So, what do we now in regard to the sign then.

Dave Malta

Well, it doesn’t necessarily have to be on the sign.

Anthony Casciani

But the sign is already included, isn’t it....we don’t know,

Josh Artuso

The sign on the building, correct?

Anthony Casciani

Right, that’s what I’m talking about. What does sign on the building actually

look like.

Pg. 212 July 7, 2026 Planning Meeting

Doug Beachel

They are on the E elevation drawing. Part of the initial application. I am not sure

if the are part of the revised so yes, there is a circular sign on he front of the building and there’s

a sign on each side of it and then there is a couple of directional signs down low that you see

typically and then there’s these chevrons on two sides of the building that are basically an arrow

that are directional as well and they say this way for cawfee. I forget what they say now to me

honest. fam drawing a blank. But there’s two of those and typically they don’t usually factor in

the calculations.

Mark Giardina

Should we ask the applicant to come back in with a drawing so we can get an

idea of what it looks like.

EVERYONE SPEAKING AT THE SAME TIME

Doug Beachel

A 1.1 aand A 1.2

Anthony Casciani

Okay, that’s the sign that’s going to be going on the building?

Doug Beachel

Yes.

Anthony Casciani

Okay and you have one on either side.

Doug Beachel

Yes, if you scroll down to the next page there is one on both sides. The side

entrances and then if you scroll up again,...

Anthony Casciani

Are they meeting code or are they excessive by code.

Josh Artuso

In terms of the size in relation to the facade of the building, we’d have to do some

calculations to confirm.

Anthony Casciani

Generally, you are going to need a sign showing entrance, you know,

exit...different signs. Like fast food place has. Maybe we should have, you know, just approve

that as a separate package.

Doug Beachel

Is that separate then building permit? For signage, is there a separate permit

then...

Anthony Casciani

I think you can....BOTH PARTIES SPEAKING AT THE SAME TIME. We

could give a final approval but just make it subject to... within the next month, just send a

drawing to the town of whatever signs, because I don’t know how many you’ ve got there, it’s

hard to tell. Where you are going to place them.

Doug Beachel

I have a package J can put together.

Anthony Casciani

Okay, let’s do that.

Pg. 213 July 7, 2026 Planning Meeting

Doug Beachel

Show square footage and where they are on the particular site plan.

Anthony Casciani

So, in the resolution there’s no signage included Dave, right?

Dave Malta

Right.

Anthony Casciani

We had landscaping. Snow storage? We ask for that.

Doug Beachel

There’s snow storage along the perimeter of the property basically we put a

gravel shoulder between the curb and the property and then we have an underdrain that will

help with the mitigation and the dispersions of water. And then we have a note on the site plan

and for, right there circled in red basically saying that if there’s any time that the lanes are

blocked or excessive snow, there would be loaded and trucked of sight.

Anthony Casciani

Alright, anything else.

Drazen Gasic

Just one thing, the new landscaping plan does have a birch tree in the swale. Just

cause you mentioned it. I’m bringing it up. If you want to move it outside of the swale area but

right now you have two trees that are right in the swale area.

BOTH PARTIES SPEAKING AT THE SAME TIME.

Anthony Casciani

Maybe you should put that in there. No plantings directly in the swale.

Doug Beachel

I thought they were on the first Topel line, I guess ....

Anthony Casciani

Okay, that’s a motion?

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr. Vetter AYE

Anthony Casciani

Yeah, if you can just get your signage plan in and give it to Josh prior to.

Doug Beachel

Yes, I can bring those around.

Anthony Casciani

How’s everything going there?

Doug Beachel

Yes, Saturday was our caffeine for a cause day, and we give away free drinks in

Pg. 214 July 7, 2026 Planning Meeting

exchange for donations. I haven’t followed up with the results of that and I’m not sure of what

the local charity was.

Anthony Casciani

This is free commercial time.

Doug Beachel

The technical day is the 13".

ACCESSORY STRUCTURE

Located at 1052 Lake Road. Applicant Amanda Costanza,

AIA is requesting PRELIMINARY/FINAL SITE PLAN APPROVAL (PUBLIC

HEARING) in association with the construction of a 615 SF accessory building on a 0.55-

acre parcel having SBL #049.11-1-15 located in the R-1 Single-Family Residential District

under Section 350-36 of the Code of the Town of Webster.

Appearing before the board was the home owners. We are Kim and Wayne Gandy. Amanda

Costanza is our Architect who is in Hawaii celebrating her mothers birthday today so. We

didn’t make her come here so hopefully we can answer all of your questions effectively.

Anthony Casciani

Wish her well for us.

Kim Gandy

So, the project consists of demolishing the existing two story structure at 1052

Lake Road and combining the lot with our lot at 1050 Lake Road and building an accessory

structure using part of the foundation and of the existing home in a much smaller format. We

have already received review by the Army Corp as well as the permit from the DEC and

Amanda has worked very closely with the town regarding the various variances that we have

to get and we were before the Zoning Board in May and got those variances approved so now,

we are here at the Planning board to get this approved as well.

Anthony Casciani

Okay, anybody any issues with that? What is it, 600 and some sf I think it

was. Applicant: Yes, the indoors.

Wayne Gandy

Speaking but not close enough to the mic.

Anthony Casciani

Okay, are the materials on it similar to the house?

Kim Gandy

Yes

Anthony Casciani

And it is strictly for storage? And things like that?

Kim Gandy

Yes

Pg. 215 July 7, 2026 Planning Meeting

Anthony Casciani

No apartment or any living space or anything like that.

Kim Gandy

No and that’s one of the reasons why we were interested in purchasing it. Just to

prevent an Airbnb from taken over,

Mark Giardina

This application is a public hearing.

Anthony Casciani

Are you okay with it? And you guys are all right with it too. Again, this is

a public hearing. So, if there is anyone here, neighbors or anyone wishing to speak for or

against it. Not seeing anybody. Then we’ll close the public hearing and bring it back up to the

board. It looks good to me. Nice area. The only thing I'd suggest, is probably have to....you’re

going to demolish the house, the current house. Then you’re going to combine that to lot 1050

okay and then you’re going to start the project. So, you really should combine it because you

can’t put this thing on that lot as it stands today.

Kim Gandy

Right.

Anthony Casciani

So, you’re going to need to combine the lots together and then you can put

the building up.

Drazen Gasic

The landscaping boulders that are being put in are those in the water as in you’re

going to be doing work in the water or outside the water?

Wayne Gandy

This is on the south side. So, actually were taking the driveway out so there’ Il

be actually more green space. So, there’ll be less water runoff. So, that’s another add.

Derek Anderson:

1052 LAKE ROAD

The Town of Webster Planning Board considered the request by Applicant Amanda Costanza,

AIA to construct a 615 SF accessory building on a 0,.55-acre parcel having SBL #049.11-1-15

located at 1052 Lake Road in the R-1 Single-Family Residential District.

The Planning Board classifies the proposed action to be a Type II Action under Section

617.5(c)(2) of the State Environmental Review (SEQR) Regulations and therefore is not subject

to further review.

RESOLUTION 26-049 Derek Anderson made a motion for TYPE II

SEQR which was seconded by Mark Giardina.

Pg. 216 July 7, 2026 Planning Meeting

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr. Vetter AYE

PRELIMINARY and/or FINAL APPROVAL

1. The lot is restricted to one accessory building

2. The building is to conform to the size and location presented on the plan

3. The placement of the building shall conform to all setback requirements

Dave Malta

Is that building going to be placed closer to the road than you house?

Kim Gandy

No

4.

eons

9. The building shali not be placed nearer to the front property line than the rear

line or footprint of the main building or residence upon the lot.

No point on the building will be higher than the existing structure

No commercial use shall occur on the parcel

The accessory building shall be used for personal use only, as defined by Town

Code

Significant construction shall occur within one year, as deemed by the Planning

Board, to expire on 7.7.27.

Comply with all requirements of any State, County, and Town agency

10. All site work is to be in compliance with the standards of the Town of Webster

11. Subject to all engineering and governmental approvals

12. Subject to all appropriate governmental fees

13. Subject to resolution of final approved minutes.

Anthony Casciani

You probably should put in there, Dave, that no construction of the building

until the two lots are combined.

14. No construction until lots are combined.

RESOLUTION 26-050 Dave Malta made a motion for

PRELIMINARY APPROVAL:

Located at 1052 Lake Road. Applicant

Amanda Costanza, AIA is requesting

PRELIMINARY APPROVAL

Pg. 217 July 7, 2026 Planning Meeting

(

PUBLIC HEARING

) in association

with the construction of a 615 SF

accessory building on a 0.55-acre

parce] having SBL #049.11-1-15

located in the R-1 Single-Family

Residential District under Section

350-36 of the Code of the Town of

Webster which was seconded by

Mark Giardina.

FINAL APPROVAL as

1. Subject to all preliminary approvals.

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr. Vetter AYE

RESOLUTION 26-050 Dave Malta made a motion for

FINAL APPROVAL

Located at

1052 Lake Road. Applicant Amanda

Costanza, AIA is requesting FINAL

APPROVAL in association with the

construction of a 615 SF accessory

building on a 0.55-acre parcel having

SBL #049.11-1-15 located in the R-1

Single-Family Residential District

under Section 350-36 of the Code of

the Town of Webster which was

seconded by Dave Malta.

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr, Vetter AYE

Pg. 218 July 7, 2026 Planning Meeting

SIENNA RESERVE

Located on Orchard Rd. Applicant Insite Land Development, Inc. is

requesting a 1-year FINAL SITE PLAN AND SUBDIVISION APPROVAL

EXTENSION (

PUBLIC HEARING

) associated with the creation of ten (10) single-

family lots on a 5.94-acre parcel having SBL# 080.05-2-2.1 located in the R-3 Single

Family Residential District under Section 269-10, 296-27, and 350-12 of the Code of the

Town of Webster.

Appearing before the board was Mike Bogojevski with BME Associates with me tonight also is

Rudy Neufeld from Insight Land Development. The summary of the project covered it pretty

well. Rudy’s looking for a one-year approval extension. The Sienna Reserve was a 10 lot

subdivision that was approved in August of 2025 and he’s basically just looking for the approval

extension just to allow his construction scheduling to work out for them... So, no changes to the

project are proposed. Just looking for the approval extension tonight.

Anthony Casciani

That project was under an HOA homeowners association, wasn’t if. I

believe?

Rudy Neufeld

(from the audience) Yes

Anthony Casciani

And the sewer, you’re okay with all the sewer connection coming though.

You got all that.

Mike Bogojevski

Yep. That’s

Anthony Casciani

So, you’re good with that? All right.

Mike Bogojevski

No changes to the site.

Anthony Casciani

There’s nothing other than just a one-year request for extension. Anybody

any issues?

SOMEONE SPEAKING FROM THE AUDIENCE AND CAN NOT HEAR.

Anthony Casciani

Well, it’s not a public hearing, but if you want ...

Mark Giardina

It is a public hearing.

Anthony Casciani

I’m sorry, it is. [ take that back. It is.

Cliff Kane at 781 Blue Creek Drive: And I have some questions as far as the water in the

retention pond here and then also they have a spillway and also where is the waste water ?

Where ts that going? Because right, currently the way it is right now if we have excessive rain

we've got excessive flooding in our backyard so, how....when you look at this spillway and also

Pg. 219 July 7, 2026 Planning Meeting

this retention pond and then the spillway, it actually will spill right over into those properties on

Linda Lane and it’s already a swamp back there when we get excessive rain. So, has that been

addressed?

Anthony Casciani

Boy, I don’t recall off the top of my head now with it but had to have been

addressed somewhere back in there. But you’re bringing up a legitimate question.

Cliff Kane at 781 Blue Creek Drive: Because at the past two years, we've had two floods in our

backyard where we get 3 of water and the water gets within about 15 feet or our house.

Anthony Casciani

Okay, so part of that would be resolved by the development of the detention

pond. That’s the purpose for the pond. You probably got more water running off of the property

right now than once that pond is developed because that’l! hold the water. It’! fill and release it

slower than what it was.

Cliff Kane at 781 Blue Creek Drive: So, you think there’s going to be less water going towards

our property then?

Anthony Casciani

It’ll go slower. It’s going to be as much water ultimately.

Cliff Kane at 781 Blue Creek Drive: Because it looks as though they're grading the whole...all

the homes are being graded towards that. So, my concern is that now...that is how it is currently

graded? And then when they change the grading, will that even increase the amount of water

that’s going towards those properties? I don’t have the answer to that, but that’s just a question

I have.

Anthony Casciani

We could have your Engineer respond to it.

Cliff Kane at 781 Blue Creek Drive: The other question just had to do with the storm drain

where they tie into the storm drain because we have a storm drain at a corner, back corner of

our property and then when we get that excessive rain, that storm drain can’t handle it and

that’s where we get the flooding. So, | was wondering if you're tying into the existing storm

drains also that could be problematic with heavy rains also.

Mike Bogojevski

So, the subdivision design that was approved back in August includes a storm

water management facility in that northwest corner. That is basically designed...it’s to handle

the storm water runoff for the proposed subdivision but also work with the existing draining

patterns. So, we’re not changing existing drainage patterns. But we are proposing the storm

water facility to handle any of the runoff from the roadway and new houses that are proposed.

Eventually it does go to the northwest. I believe there’s an existing storm sewer and section that

it all flows to that’s in the rear yards of some of the houses on Blue Creek Drive. But that’s not

being connected to. The pond itself will discharge daylight into the existing swale, but then it

flows north into that existing storm sewer to the north. And those. The SWPPP...the storm water

Pg. 220 July 7, 2026 Planning Meeting

pollution prevention plan along with the design of the pond was all reviewed back with the

original approval.

SOMEONE OUT IN THE AUDIENCE SPEAKING BUT CAN NOT HEAR.

Cliff Kane at 781 Blue Creek Drive: When you put in these properties, you’re putting in roads

and driveways and you’re taking away a lot of the green that’s right now that prevents some of

the probably some of the flooding, I think you’re just going to exasperate the issue with rain and

water going towards Linda Lane and where in the back of those properties on Blue Creek where

we're already having water issues when we get excessive water, especially, you know, springtime

when you get the winter melt and then heavy rains. So...thank you.

Anthony Casciani

That pond should take care of the drainage from that site. That was the

purpose.

Kevin Lockhart at 100-3 Kittleburger Park: I see that the development is adding a new Street,

Whispering pines...what is it called? So, I think what a lot of people are sensitive to was the

proximity to the bird sanctuary trail. I know when you walk down the sanctuary trail that the

developments can affect the sanctuary trail and is the town, | believe that is the towns property,

the sanctuary trail.

Frank Ciardi

Yeah, we’re not open dialogue. You can just say whatever you’ ve got to say and

then we’re not going to answer questions, but if you....it’s an open forum. You can say

whatever you need to say. We’ll take that into consideration.

Anthony Casciani

What was your question? Is bird sone the part. Is that parkland?

Kevin Lockhart at 100-3 Kittleburger Park: Yes. So, I suppose what people are sensitive to is

the proximity of the development. The geometry of the development or cuts into or at least is

adjacent...runs directly parallel to the bird song trail and so I just wonder if there’s enough

scrutiny being looked into the setbacks and the....

Anthony Casciani

Well Kevin, those are good points, but these are all the issues when this thing

came in time after time after time to reach this point and it received final approval. So, right

now, that’s all been approved. And again, this is like any other subdivision. You know, we all

love the trees but, there’s......

NO ONE IS WAITING FOR OTHERS TO FINISH SPEAKING.

Drazen Gasic

I think the other thing to note there is that they did voluntarily add a conservation

easement on that site, a 65 ft conservation easement. They did that back then. Exactly, so

there’s that built in as a buffer and protection against the trail.

Pg. 221 July 7,2026 Planning Meeting

Anthony Casciani

And that was the purpose. Good point too. That was the purpose when we

approved it to save that piece. All those lots go back, but they can’t build anything in there on

them. If you see the drawing, you see that space in the back.

Drazen Gasic

Yeah, they have physical markers at the property lines indicating a conservation

easement that you’re not allowed to clear or build anything in that conservation easement. And

that’s 65 feet from landowners property line inwards.

Kevin Lockhart at 100-3 Kittleburger Park: Great, so I will let people know that you guys did

your due diligence not to encroach on the bird song trail.

Anthony Casciani

No, it won’t do that at all. Okay, thanks, Kevin. Okay, anybody else?

Dan Drmacich at 789 Blue Creek Drive: neatly buffering the Sienna project. So, I’m not raising

any additional issues because my understanding is that everything is pretty much remaining the

same. However, the issue that Cliff is raising in terms of the flood, possible flooding, I get

flooding as wee. My understand from Rudy, with the initial plans was that the retention pond

would deal with the overflow of water that I currently get right now from right through the

woods. You know, it just pours in so that...I’m pretty close to what Cliff is describing as far as

water in the backyard. So, I guess I’m up here for the purpose of clarifying a definitive answer to

Cliff’s concern is indeed, and if Rudy could respond to this or one of the engineers, will indeed is

the response to that concern that the retention pond will deal with the overflow or are we subject

to the possibility that it could still flood. How are we going to be sure that all that water is taken

care of, that we won’t be flooding again? So, that’s the question. And I think before you move on

to another agenda item, that question should be dealt with.

Anthony Casciani

Okay, thank you. Do you want to address that. There’s kind of a berm going

across there. It’s at 390 at the high side and it’s all pitching down toward the pond which is like

38 like 388 or something. It’s dropping down. So, the water is flowing to the pond according to

what I’m looking at. And again, this got beat up pretty good back then and that’s why we

designed it the way we did that. A lot of that woods is till there. The trees will still be in there.

They won’t be cut down, and the pond should technically take care of the flow from that site and

contro! the outflow.

Mike Bogojevski

That is correct. The main thing to consider is the storm water facility is

designed to handle the runoff from the subdivision itself. It’s not designed to handle the runoff

from the existing houses. There are existing swales and storm sewer end sections that receive

some of that run off around those rear yards of the existing subdivision to the north. The main

factor for the proposed subdivision is the runoff from the new houses and roadways, and the new

development is mitigated with the proposed storm water facility. That facility is meant to handle

the runoff from the development and then release it at slower rates like you said. So, there’s a bit

of a...there’s two factors to consider the runoff from the proposed development and then existing

runoff from the existing subdivision to the north as well. The pond itself is designed to handle

the runoff from the subdivision and then maintain existing drainage patterns,

Pg. 222 July 7, 2026 Planning Meeting

Drazen Gasic

And just to note, what you mean by that is you’re detaining the water to existing

flows or less from what if was before. You have a deep pool system here with aquatic benches.

So, it’s going to store water on site permanently too over time, to some extent. But something to

note is just...like you mentioned, you’re managing looks like stuff items that are the water

quality, water quantity that’s within your footprint of your project. But there is like you

mentioned a bypass swale that is an existing swale...last name is Gentle and Flammia out there

on the west side that goes all the way to the road. So, it looks like there’s an existing swale there

already that has drainage coming from the road bypassing your buyer retention and then going to

those neighbors that are here with the concern of flooding too. So, I. yeah....

SOMEONE FROM THE AUDIENCE SPEAKING OUT AND CAN NOT HEAR.

Drazen Gasic

Yeah, I am not sure if you can see it up in the screen right next to the bio

retention. You’ll see the contours there, the lines. It’s a swale it looks like right there that goes

all the way from the road and then goes up that way.

Anthony Casciani

Actually, this came in and was allowed to build with the smaller lots and that’

how we created that conservation easement in the back on both sides and the pond falls into

under the HOA’s jurisdiction to maintain. That’s why we allowed that pond to be on those

combined lots. Like there were there with more than a lot, but...

Mike Bogojevski

That’s correct. And part of utilizing...so it was a cluster subdivision. Part of

utilizing that cluster subdivision was to maintain the wooded buffers on either side. That

clustering helps to reduce the overall footprint of the development, thus also helping to reduce

some of the runoff. It’s one of the design factors of the subdivision.

Anthony Casciani

I believe is this....did you see them on there? Similar drive. I think we had

markers for the

BOTH PARTIES SPEAKING AT THE SAME TIME

Mike Bogojevski

Yes, there open space markers.

Anthony Casciani

Okay. Because that....the idea of those markers is to preserve that land. So,

nobody that buys a house in there is going to go beyond that and start increasing their yard.

Even though they own the piece of property, they can’t go in there and cut the trees. Okay. All

tight. So, anyways, the whole purpose of this evening is a one-year extension request.

SOMEONE FROM THE AUDIENCE SPEAKING OUT. CAN NOT HEAR.

Anthony Casciani

Wait a minute, if you want to talk, first of all, you have to come up to the

microphone. But we’re not going to redesign this whole project. It’s been done and we’re

rehashing old stuff now.

Pg. 223 July 7, 2026 Planning Meeting

Gregor Schuler at 793 Blue Creek Drive: I have concern if you’re going to be regrading the

trees that you're trying to save, you put dirt over their root system, they die over time. So, how

are you going to regrade without killing the trees that we're trying save?

Anthony Casciani

Because there’s no grading being done back there whatsoever.

Gregor Schuler at 793 Blue Creek Drive: Then all the water is going to keep coming into my

yard and my neighbors yard because we're like this much higher...lower than the property. So,

it’s just....if you’re not going to grade it, it’s just going to come in.

Frank Ciardi

Thank you. Is there any thing else you have other than to add on? Perfect, thank

you. Okay, you have a one minute comment. We’re not going to answer questions. Just a quick

comment.

Kevin Lockhart at 100-3 Kittleburger Park: In the interest of preserving these people's interests

and their home values and so on and so forth on Blue Creek. It occurred to me that there does

not appear to be a gradient map and so when they talk about there....when they talk about the

grades and the gradients. I can’t reaily follow along but I think because there’s no gradient map.

Anthony Casciani

The maps show all of that stuff. There’s elevations all over the maps.

Kevin Lockhart at 100-3 Kittleburger Park : While I’m looking at this...oh wait, is this not

uploaded to the agenda packet for tonight? So, is that not...I’m not looking at that. I’m looking

at something very similar to that. So, where would people be able to access that same document.

EVERYONE SPEAKING AT THE SAME TIME.

Frank Ciardi

We’re not going to answer any questions. We got your concern. Is there any other

concern that you’d like to make?

Kevin Lockhart at 100-3 Kittleburger Park: Yeah, my concern is that I’m not sure where people

would be able to....like let’s say these residents want to go back home to Blue Creek and they

want to examine the gradient map. Where could they gain access to that?

Frank Ciardi

We’re not answering questions. I know your concern.

Kevin Lockhart at 100-3 Kittleburger Park: That’s fine. I appreciate you, Frank. But can you

make sure that these folks get a copy of that just for their reference?

Anthony Casciani

If there’s anything that they’re interested in, they can go up to the town hall

and see Erika, maybe in this case and she will show you the map. But the thing is, it’s already

been an approved subdivision. Nothings going to change.

Pg. 224 July 7, 2026 Planning Meeting

Kevin Lockhart at 100-3 Kittleburger Park: Well, if it’s approved, why was it approved if they

still have concerns tonight?

Anthony Casciani

They had concern before and they had to address them.

Kevin Lockhart at 100-3 Kittleburger Park: Did you guys properly address their concerns?

Frank Ciardi

We’re going to stop. We’re going to stop. Do you have anything else to add.

Kevin Lockhart at 100-3 Kittleburger Park: Yeah, I want to just make sure that these folks

concerns with the gradients, and the drainage is being properly addressed by you guys prior to

moving forward.

Frank Ciardi

Okay, thank you.

Audience Member

Just to comment on the whole process of the decision making and what we

could label I guess unintended consequences that we're not really sure you know if this is going

to work 100% in terms of preventing the runoff and increasing the water that will be in our

backyard. So, I guess what I’m warning you about as a Planning Board is the unintended

consequences. And if they happen, who's going to be responsible for dealing with those. Is it

going to be the HOA? Is it going to be Rudy and his company? OR is it going to be the Town of

Webster that’s going to come in and say, “well, we need bigger sewer drainage, I guess, in terms

of going out, you know, toward Lake Ontario or whatever.” But somebody should be asking that

question in terms of unintended consequences of more water being in our backyard.

Anthony Casciani

These questions were questions that were answered at sketch plan;

preliminary and final approval which were several meetings along the way. All these things. I

don’t know if you attended them. Were you living there at the time too or...Okay, they you

probably were here. Well, I probably was.

Audience Member

I was definitely

Anthony Casciant

It’s the same drawing

BOTH PARTIES SPEAKING AT THE SAME TIME

Audience Member

(NOT CLOSE ENOUGH TO THE MIC) I would hope you as......we heard

you with concerns that citizens have and as opposed to putting us down and saying that’s a good

question. We ought to be able to deal with that as....that’s all I’m saying.

Anthony Casciani

Thank you. Anybody else? Nothing, okay I’m going to close the public

hearing and bring it back up to the board.

Pg. 225 July 7, 2026 Planning Meeting

Mike Bogojevski

I’m going to look to the board for...if you guys have any questions that you

want me to get addressed, further details, if there’s any other questions on Rudy’s construction

schedule, the original approved plans, anything like that.

Anthony Casciani

Well, I think we spent a lot of time when this was approved. I remember that.

There were a lot of concerns, a lot of questions asked and a lot of redesigning and so on and so

forth. And the size of that pond was to control the water flowing off that property. Now,

elevations and stuff, I’m sure they’re accurate and the low point is right where the pond is so,

that’s the generic of the little bit of review I’m looking at right now.

Frank Ciardi

On a time scale, when do you think the pond....will the pond be done within the

year extension or when do you...is there a time period for when the pond starts?

Anthony Casciani

I think you put in the resolution all infrastructure to be put in before you start

building.

Mike Bogojevski

Yeah, and so from a construction sequencing standpoint, I think this might

answer your question a little bit better. From a construction sequencing standpoint, the pond is

the first thing to go in.

Frank Ciardi

And I understand that you have a time period right now maybe to alleviate some of

the concerns of the people that are living there, especially right now actually had a pretty rainy

summer to begin that pond. Is there any time schedule?

Mike Bogojevski

I believe with the approval extension that would allow Rudy to get into

construction within the next year.

Frank Ciardi

So, you don’t have....next month or you don’t have anything set right now.

Mike Bogojevski

I think that’s really why he’s here tonight to ask for the extension, so it allows

him to work out his construction schedule.

Josh Artuso

Does he intend to break ground within the year extension?

Mike Bogojevski

Yes.

Anthony Casciani

Okay but Frank, yeah, that pond would be one of the first things to go in

Frank Ciardi

I was hoping that perhaps they had...

EVERYONE SPEAKING AT THE SAME TIME.

Anthony Casciani

There would be no sense in putting a pond in and going in disrupting the soil

now just to put a pond in.

Pg. 226 July 7, 2026 Planning Meeting

Mike Bogojevski

As far as the existing drainage patterns to the rear yards to the north, the pond

itself is designed to handle the runoff from the development itself. There are other drainage

patterns to the west, to the north that don’t come into play with the proposed development.

There is as mentioned, the culvert under Orchard Road to the west of the development that’s not

being changed. That flows to the north to those rear yards as well and theirs drainage from the

east to the north of the property that flow from the existing subdivision to the rear yards goes

into the existing storm system as well. So, this development, the proposed development itself,

has been designed to handle it’s own storm and then not discharge above existing rates to the

north. So, hopefully that helps kind of answer that question.

Anthony Casciani

Just hoping all the engineering was done properly to alleviate any of the

drainage. And again, that was one of the issues that came up when the project was is the proper

drainage of that site to that pond. So, ! have to assume that is what the current engineering is

about. So, based on that, the applicant again is in here for one-year extension on this site.

Anyone want to make a motion to that?

RESOLUTION 26-051 Anthony Casciani made a motion for FINAL

SITE PLAN APPROVAL

Located on Orchard

Rd. Applicant Insite Land Development, Inc. is

requesting a l-year FINAL SITE PLAN

APPROVAL EXTENSION (PUBLIC

HEARING )associated with the creation of ten

(10) single-family lots on a 5.94-acre parcel

having SBL# 080.05-2-2.1 located in the R-3

Single Family Residential District under Section

269-10, 296-27, and 350-12 of the Code of the

Town of Webster which was seconded by Dave

Malta.

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr. Vetter AYE

BURGER KING SIGN MODIFICATIONS

Located at 940 Hard Road. Applicant JP

Langhenry is requesting SIGN APPROVAL associated with the installation of three (3) wall

signs totaling 73.65 SF on a 17.03-acre parcel having SBL #079.15-1-3.1 located in the HC

High-Intensity Commercial District under Section 265-7 of the Code of the Town of Webster.

Pg. 227 July 7, 2026 Planning Meeting

Appearing before the board was Rana Cassiss at 6699 Old Thompson Road. I am here

representing Cassiss Pier Designs and we’re going to be doing the work installing the signage.

We’re working with Blair Image Elements and Burger Kin. Basically, it’s just a rebranding of the

store and just updating the signage to their new branding look. They currently have two sets of

illuminated channel letters. We'll be replacing it with one set of channel letters, adding a building

logo to the east elevation. Adding a building logo sign facing the street where there isn’t signage

now. Just one internally illuminated logo with an embossed face. The amount of light that goes

though the face rather that a regular channel letter face. Then on both sides of the building, there’s

going to be adding a crown fixture, light fixture, light fixture to each side as well. And then they’re

going to be replacing the drive-through elements just to update the, you know, technology inside

of those because they’ve been up for a long time. Pretty much like for change, just updated

technology on the inside so.

Anthony Casciani

Looks attractive. Are they changing any of the exterior of the building or you

don’t know that?

Rana Cassiss

I think they are modifying it slightly. If you see that elevation. They’re changing

some stuff where that building logo goes. There is going to be a wall instead of having that window

there.

Anthony Casciani

Okay, does anybody have any issues with the sign? We got enough paperwork

here. This looks like.... LAUGHTER thought Fairlife was coming back. Anybody any concerns

about the sign? It’s just an improvement on it. It’s modification. Same building, same

everything.

Derek Anderson:

BURGER KING SIGN MODIFICATIONS

The Town of Webster Planning Board considered the request by Applicant P Langhenry to

install three (3) wall signs totaling 73.65 SF on a 17.03-acre parcel having SBL 079.15-1-3.1

located at 940 Hard Road in the HC High-Intensity Commercial District.

The Planning Board classifies the proposed action to be a Type II Action under Section

617.5(c)(2) of the State Environmental Review (SEQR) Regulations and therefore is not subject

to further review.

RESOLUTION 26-054 Derek Anderson made a motion for TYPE II

SEQR which was seconded by Mark Giardina.

Pg. 228 July 7, 2026 Planning Meeting

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr. Vetter AYE

Anthony Casciani

Just changing some signs and color and so on and so forth. Anybody?

RESOLUTION 26-055

Drazen Gasic made a motion for SIGN

APPROVAL

Located at 940 Hard Road.

Applicant JP Langhenry is requesting SIGN

APPROVAL associated with the installation

of three (3) wall signs totaling 73.65 SF on a

17.03-acre parcel having SBL #079. 15-1-3.1

located in the HC _ High-Intensity

Commercial District under Section 265-7 of

the Code of the Town of Webster. which was

seconded by Mark Giardina.

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Mr, Vetter AYE

ADMINISTRATIVE MATTER:

e Approval of minutes for: June 2, 2026. Motion: (CASCIANI/MALTA)

VOTE

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mrs. Maltman AYE

Mr, Gasic AYE

Mr. Vetter AYE

Pg. 229 July 7, 2026 Planning Meeting

With no other applications before the Board this evening Anthony Casciani concluded tonight’s

meeting at 8:10 PM.

espectfully Submitted,

s

Dated “y ih 2026

Mark Giardina, Secretary

Katherine Kolich, Recording Secretary

Sig

AUG 6 *26 a9:23

_-FILED WEBSTER TWN CLK

Pg. 230 July 7, 2026 Planning Meeting

End of document