Town Board Workshop
Town Board Attachment 2024.09.19

Swmp Plan REV2

September 19, 2024 · 4 min read · extracted text · View original

TOWN OF WEBSTER Stormwater Management Plan SWMP • Pat Stephens • Stormwater Management Coordinator • pstephens@websterny.gov

Town of Webster Department of Engineering

NYSDEC SPDES General Permit for Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4s)

Part IV. “Stormwater Management Program (SWMP) Requirements,” : MS4 Operators must develop, implement, and enforce a SWMP. The SWMP must be retained in written format, hardcopy or electronic. The written SWMP is referred to as the SWMP Plan (Part IV.B.). The MS4 Operator must use the SWMP Plan (Part IV.B.) to document developed, planned, and implemented elements of the SWMP.

Town of Webster Department of Engineering

Permit & Coverage

Special Conditions

SWMP Requirements

Record Keeping, Reporting, & Evaluation Minimum Control Methods (MCMs) Town of Webster Department of Engineering

Permit Authorization The Town of Webster has been authorized by the NYSDEC to discharge stormwater and must comply with all requirements contained in the MS4 GP, GP-0-24-001

Exemptions and Limitations The Town of Webster’s MS4 Operator Type is “Traditional Land Use Control” and must follow all conditions outlined in Part I through Part VI of the MS4 GP, GP-0-24-001. The Town must also follow conditions in Part VIII as there are Impaired Waterways with the Towns Watershed. The Town is EXEMPT from Part VII as we not considered a “Traditional Non-Land Use Control & NonLand Traditional MS4 Operator”. The Town is also exempt from Part IX “Watershed Improvement Strategy Requirements for TMDL Implementation” as there are no TMDL impaired waterways in the Towns watershed. Town of Webster Department of Engineering

Special Conditions For MS4 Operators whose outfalls and additionally designated area MS4 outfalls (ADA MS4 outfalls) discharge to waters impaired for phosphorus, silt/sediment, pathogens, nitrogen, or floatables (Appendix C), the MS4 Operator must develop and implement the pollutant specific best management practices (BMPs), listed in Part VIII, targeted towards the pollutant of concern (POC)causing the impairment.

Impaired Waterways Minor Tribs to Irondequoit Bay (0302-0338) Rochester E-bayment – East (0302-0002)

Must follow outline in Part VIII of MS4 Permit Town of Webster Department of Engineering

SWMP Requirements • Alt Implementation & Staffing Plan • Availability of SWMP • Minimal Control Measure (MCMs) • Mapping (GIS) • Legal Authority • Enforcement Measures & Tracking

Town of Webster Department of Engineering

Recordkeeping, Reporting, & Evaluation • Records must be kept for five (5) years • Records are available to the public • Annual Reports filed electronically • Interim Progress Report – Twice a year • SWMP must be evaluated every five (5) years • effectiveness • deficiencies • status of requirements Town of Webster Department of Engineering

MCM1: Public Education and Outreach Program

MCM2: Public Involvement / Participation

Minimum Control Measures (MCMs)

MCM3: Illicit Discharge Detection and Elimination

MCM4: Construction Site Stormwater Runoff Control

MCM5: Post-Construction Stormwater Management

MCM6: Pollution Prevention and Good Housekeeping

Town of Webster Department of Engineering

MCM1

MCM 2

Public Education and Outreach Program

Public Involvement / Participation

• Stormwater Coalition

• Leaf pickup

•

Newspaper/Radio

• Pharmaceutical Collection

•

Storm Drain Markers

• E-Waste Drop off

•

H20 Hero

•

Pamphlets

•

Yearly Report

• HHW

MCM 3 Illicit Discharge Detection and Elimination •

IDDE

•

Enforce by Town Code Chpt. 285 Storm Sewer

• How to identify • How to eliminate • Report Forms

Town of Webster Department of Engineering

MCM 4 Construction Site Stormwater Runoff Control

Post-Construction Stormwater Management

•

Applicability

•

Public vs Private

•

Public Complaints

•

•

Construction site inventory

Inventory and Inspection tracking

•

Inspection and maintenance Program

• •

Construction site inspections

MCM 6

MCM 5

Site Close out

Town of Webster Department of Engineering

Pollution Prevention and Good Housekeeping •

Minimize Exposure

•

Preventive Maintenance Program

•

Spill Prevention & Response

•

SOPs

•

Facility Inventory

Questions Engineering@ci.webster.ny.us

Town of Webster Department of Engineering

End of document