Change Order

May 1, 2025 · 1 min read · extracted text · View original

Change Order #10 Cost Break Down CO #10 Part A Storm Sewer Installed (including out of scope storm sewer) Installed QTY 1523 50 12

12" HDPE 18" HDPE Storm Inlets

Bid Qty 1400 0 11

Unit Price Over 123 $ 19.20 50 $ 50.00 1 $ 9,823.00

CO #10 Part B Storm Sewer Lateral Connections Qty Over Storm Sewer Lateral Connections 15 0

Item # 10 15 29

CO #10 Part C School Sanitary Lateral Qty Adjust.

Description

Trench Excavation, Bedding, and Backfill 6'-8'. (includes haul off of excess material) 18" PVC Sanitary Sewer SDR-26 ASTM F-679 (115 psi) (Excludes excavation bedding and backfill) Re-Establish vegetation (includes topsoil, seeding, and maintance of lawn)

Out of Scope Cost $ 2,361.60 $ 2,500.00 $ 9,823.00

Total Over

$

14,684.60

Unit Price $ 3,100.00

$

Total Cost 46,500.00

$

46,500.00

Unit

Unit Price

Cost Extension

150

L.F.

$

114.00 $

17,100.00

150

L.F.

$

70.00

$

10,500.00

500

SY

$

9.60

$

4,800.00

$

32,400.00

CO #10 Part D Paradigm Asbestos Monitoring Credit Manhole S4 to S12 Paradigm Daily Cost

$ (690.00) per day

53 days Total Credit

$

(36,570.00)

Change Order #10 Total $

57,014.60

Morsch Pipeline, Inc. 3929 South Avon Road Avon, NY 14414 Town of Webster 1000 Ridge Road Webster, NY 14580

Costich Engineering, DPC 217 Lake Avenue Rochester, NY 14608

March 28, 2025

Change Order

Storm Lateral Connections

Installation of new storm laterals and connections to existing laterals per MCDOT Specs. Materials: • Inserta-Tees • Clean-outs • Sheer Band Ferncos • Steel Lids (locating purposes) • Stone (installed around lateral pipe 20 +/- Laterals $3100.00 per lateral