WEBSTER ZONING BOARD OF APPEALS MINUTES
Webster Town Board Meeting Building 1002 Ridge Road
September 8, 2026
7:00 pm
ABSENT:
Michael Short
Corrine Volo
James Spampinato
Chris Centola
Stacie Damelio-ALTERNATE
John Accorso
John DeMarco, Attorney
Katherine Kolich, Planning & Zoning Secretary
Erika Corsi, Planner of Community Development
Josh Artuso, Director of Community Development
Good evening and welcome to the Zoning Board Appeals meeting for the
September 8, 2026 meeting. We have three tabled matters for tonight and we have and 5
scheduled matters for tonight. Here’s proof of publication for all items.
Call Roli/Pledge of Allegiance
Summary of Application Outcomes
WATERVIEW APARTMENTS PHASE 3-NORTHWEST CORNER OF WILLOW
POINT WAY AND NAUTICAL MILE DRIVE
LEGACY DEVELOPMENT Co.
APPROVED WITH CONDITIONS: WORK WITH HIGHWAY & SEWER;
PROVIDE BUFFER ON MCEWEN; NO FURTHER CONSTRUCTION OR
DEVELOPMENT ALLOWED.
VERIZON CELL TOWER-LAKE ROAD
Applicant; ROBERT BURGDORF
TABLED TO 10.14.26
Pg. 159 September 8, 2026 Zoning Meeting
VERIZON CELL TOWER-WEBSTER NORTH 1222 WILDFLOWER DRIVE
ROBERT BURGDORF
TABLED TO 10.14.26
1. POLE BARN-1725 STATE RD
ROBERT BINGHAM JR.
APPROVED AS PRESENTED
2. POLE BARN-539 COUNTRYSIDE LANE
DOMINIC ZICARI
APPROVED AS PRESENTED
3. COVERED PORCH-522 HACKBERRY WAY
MIKE RITCHIE
APPROVED AS PRESENTED
4, CHIKEN COOP-1054 KLEM ROAD
ANGEL & SANDY LAGARES
APPROVED WITH CONDITIONS: NO ROOSTERS; ROOF WILL BE
CLEANED UP; THERE WILL BE A ONE YEAR REVIEW.
5. ADDITION-400 LAKE ROAD
MARK LOWENGUTH
APPROVED AS PRESENTED
(Erika Corsi, Town Planner presented a PowerPoint Presentation for each application and
read into the record)
WATERVIEW APARTMENTS PHASE 3: Located at the northwest corner of Willow Point
Way and Nautical Mile Drive. Applicant Legacy Development Co., Inc is requesting AREA
VARIANCES to allow a front setback of 18.7’ where 75” is required and to allow a single-
family district buffer of 38.5’ where 100” is required in association with the construction of (6)
buildings plus a community center (total of 56 units), each 2 stories in height on a proposed
13.15-acre parcel having SBL# 093.06-3-64.11 located in an MHR Medium High Residential
District under Section 350-14 of the Code of the Town of Webster.
Appearing before the board was Chris Nadler, General Counsel for MarkV Enterprises and I am
here tonight with Ed Martin from Passero, our design engineer team. Our goal tonight is a
renewal of the two variances that were granted by this zoning board in November of 2024. An
18.7 front setback where 75 feet is required and a 35.8 district buffer where 100 foot is required.
Pg. 160 September 8, 2026 Zoning Meeting
As you know, this project has gone through a lot of change. A lot of reduction. In early 2024,
late 23-24,early 24 MarkV started meeting with the town and presented applications original for
two 3-story buildings with 90 units. After 4 or 5 meetings with this board and five or six
meetings with the planning board, the project was reduced in scale and now features two-story
townhouse buildings with 56 units, a single driveway to McEwen and significant landscape
buffers. This board actually required the landscape buffers at it’s meeting. I just was looking at
the findings to increase total vegetation and buffer zone and work with the town to provide
buffering in McEwen Road right of way and Ed will tell you a little about the distances involved
and I mentioned them when I was here last, but the district buffer of 38.5 feet does not really
reflect the actual distances involved. The building to the border between the district is 38.5 feet
but then there’s another 22 feet between the district buffer and the edge of McEwen making the
total distance to McEwen 58.5 feet and the total distance to the closest house 152 feet.
Currently the town houses that we have in existence in phase two are as close as 66 feet to the
houses on McEwen. So, this is again the same just a renewal of variances that were granted by
the board in December 2024. No conditions have changed. This board has received significant
correspondence from our neighbors along McEwen Road. I don’t think that changes any of the
conditions that were in place or the situation that was in place when this board considered the
variance factors and granted these variances in December 2024.
So, what we are asking for tonight is that this board confirm that no conditions have changed and
renew our two variances. I am going to turn it over to Ed to explain one why some of this time
has passed and two, some of the reductions that were made in conjunction with this board and
with the planning board.
Ed Martin, Engineer with Passero Associates. As Chris mentioned, there’s quite a history to this
project and most recently dating back to 2024. The buildings were changed, reduced in size to
go from the two-45 unit buildings to these generally 10 unit, we have one six unit off to the west,
but to be more consistent with the units that you see to the east and to the south. And our initial
layout included individual driveways for the building accessing but the feedback from the town
was they wanted it to be more single family in natures and so we reduced it to that single access
point and pushed the building further to south to increase that space and added significant
plantings. There it’s north of 80 plantings along that right of way to create a nice buffer.
There’s another critical part to this whole story that I think this board needs to realize. In
January of 2025 the DEC initiated some changes in the storm water OR I’m sorry, the wetland
regs and they were challenged by developers across the state. The DEC subsequently filed an
appeal, and they were going to fight that to keep them in place. They have since revoked their
appeal and so we are literally operating under pre-January 2025 regulations for wetlands. Why is
that important? Because if that had never been in place in the first place, they would have
pursued construction. We would avoided this whole situation. So, literally nothing has changed.
There was this delay by the DEC. We complied with the town and said we’ ll wait for their
jurisdiction to come back. And by the way, it was for a pocket wetland offsite to the west. It was
not impacted whatsoever. But because of this lawsuit that got filed, an appeal that was filed by
Pg. 161 September 8, 2026 Zoning Meeting
the DEC and subsequently revoked, we are under pre January 2025 DEC wetland regs. And so,
as Chris said, the conditions truly have not changed whatsoever. So, we’re just asking you to
more or less reinstate the variances that have already been granted. And so, at this point, we’d
be happy to answer questions that you might have.
So, does staff know if the boards that tonight, is it the same board tonight?
It is not.
And who is not?
I wasn’t here.
I wasn’t here. I think John, Jim I don’t know if you were an alternate at that
point. I don’t know.
It’s safe to say that the two board members who were not here did not by any
chance review the original application....NO? Okay. So, the board and I don’t frankly
remember how comprehensive the first presentation was of course was versus tonight which
appears to be more summary in content. That’s my sense. I’m open to be challenged on that.
But the board should be treating this as a new application. But it is generally bound by its’
administrative precedent which granted these variances. However, if the board was to find some
change of circumstance, you know, we arguably it would need to be substantial so that it wasn’t
your decision if you changed it wasn’t or is not arbitrary or capricious. The change could be in
the zoning law, could be in neighborhood density, it could be environmental, it could be traffic.
Those are all options OR if the board found that they had to correct an error that it previously
made in terms of an abuse of discretion, or the board think it misinterpreted the law. So, J just set
that out there to give you some general guidelines in the terms of how to treat this in so much as
it was previously approved.. and the applicants approval expired and essentially it’s the same
application. So, P’ll defer to council. I just want....what J want to be certain that, I don’t
remember the specifics of the last application, and I could be conflating it to some degree with
your last visit here, but my sense is it was in greater detail. Maybe staff says we have the same
materials, but the presentation was briefer.
You know, I think that could be true. I am certain that’s true as of today. We
appeared in front of this board at least four or I think five times on the original so I’ve presented
on a 90 unit project; I’ve presented on an 88 unit project; and then several meetings where it was
this design but wiggling stuff around and coming to agreements on what would be appropriate
and what would pass the variance tests and what this board was comfortable with that would
satisfy those tests. Our application materials that Passero submitted I know probably about 3
months ago are identical. This board has those in front of them. I am happy to go further into
depth. Ed and I are happy to go further into depth. I think you have pretty much what I would
present.
Pg. 162 September 8, 2026 Zoning Meeting
So, let’s e clear on that. So, in terms of what the board has tonight or has been
directed to access wise, is that the entirety of the application? Because I’m not saying council
that you need t do a full-blown presentation.
I can go about an hour and a half if you want.
I just want to make sure that since there was some brevity tonight that
particularly those two board members that were not here for that that they were provided the
information that was within the prior application. Not the application that was changed but the
one that was approved.
One of the pieces of information that was missing with this particular application,
and I think it was one of the questions that we had last time, this was before this board two
months ago was in trying to determine how these building fit within the character of the existing
neighborhood. And we didn’t have any front elevations of the buildings. So, can we
pull....thank you Erika. Because that was one of the big questions especially for the two
members that were not present for this. The footprint is quite different than what the neighbors
across the street have to look at every day.
Understood. And here this is what it’s going to look like.
this would be the building across from McEwen?
That would be exactly the building across from McEwen.
Well, not exactly.
Except that there will be significant landscape buffering and not individual
driveways so or not individual driveways to McEwen.
You’d have an internal road with a single drive out onto McEwen.
Exactly.
So, 10 trees is substantial in your opinion.
I believe it’s
88. Chris Centola: Across McEwen.
In front of the 10 units across that face McEwen. There are 10 trees. I’m
not talking about site wise. I’m just talking about in front of McEwen.
Erika, can you go back to the graphic plan again? So, you mentioned 80
plantings. I’m assuming you’ re talking about the entire site. I guess the question.......
Pg. 163 September 8, 2026 Zoning Meeting
No, the 80 is just along the frontage of the road there.
Just McEwen....So, this graphic is not representative of the plantings, I
guess is the question or comment.
Well, you can look on the screen and count.
No, that’s a rendering. Our site plan that was submitted with the variance
application shows is a separate landscape plan.
Can you identify the map that you’re referencing with the 80 plans.
It’s sheet C106
Dated May of 2026
Yeah and this board when it was granted the variances directed as a
condition that to increase total vegetation in buffer zone to work I think that means and
work with town to provide buffering in McEwen Road right of way and so that increase
was made up to the 80 plantings and as we get closer to building permits, we’ li work with
the town and add plantings in the McEwen right of way.
So, I just want to chime in. So, we did share that with the various
departments at our project review committee meeting, and the sewer department
particularly expressed some concerns with planting of vegetation in the town’s right of
way especially in close proximity to underground utilities, such a sewer pipes. So,
it’s.,..while it was an initial condition of this board to encourage more buffering, the
town really doesn’t want to encourage vegetation in the highway right of way. So, I just
want to state that for the board’s consideration.
And we’ ve worked in a lot of towns where there’s the exact same concern.
There are things we can do. We’re happy to sit down with the sewer department and say,
you know, we can map the exact location of things and exact location of where they’re
going to put their equipment of they have to dig something up and there’s plants that can
be planted. We’re happy to still have that condition to work with them and figure
something out.
If you can just...for this board, the unit in the middle, what is the offset
from the property line, not from the road, but from the property line? And then if you can
also give it to me from the road edge as well as the property to the west as well.
Ed, ask which unit because you said the unit in the middle.
Yeah. So, I’m talking the middle one and this one and this one, right?
Because these two are the closest and then this one’s a little further away. So, why don’t
Pg. 164 September 8, 2026 Zoning Meeting
you give me all three of them?
So, working from west to east to McEwen, it’s 38.5 feet.
That’s to the road or to the property line?
That’s to the right a way. I’m sorry. Which is the property line? Then it is
44.8 for the middle one; and 54.7 for the eastern one. And those are all to the right
away.
Do you know what it is to the road edge?
It is another 22...about 21 feet to the pavement edge.
And that is the same for all of them?
Yes.
This is....I’m getting confused by what you’re saying on the setbacks are
because last time we were here two months ago, whatever it was, it seemed to me that the
setback you request or the easement you were requesting, was a lot more significant than
that.
Well, the setback for this because it’s on a residential is a 100 feet ...um,
so if they’re asking for 80 you know, at the most uh...where it is 50...65 feet.
So, they have a 35 feet setback as opposed to 100 feet.
Correct.
Okay.
Other questions from the board?
Is there...I’m trying to think, a road or another...I know there were
stop signs, right in this area that we requested, correct? And then another, like an area to
get out other than use McEwen.
(NOT USING THE MIC-HARD TO HEAR): You could go Willow or
Willow Point.
But not for the middle building.
(NOT USING THE MIC-HARD TO HEAR): Oh yeah, that’s true.
Is the middle building able to have an exit to the east?
Pg. 165 September 8, 2026 Zoning Meeting
No, I believe that was considered and the site...
The grade is........
(NOT USING THE MIC-HARD TO HEAR): The grade is significant
there. I mean we can push, and there’s no wetlands on that 22 acres that we own going
down to the lake. We can just expand the footprint, but I don’t think anybody wants that.
You know, it eats up a steep slope. We have room, but this is the better design that this
board wanted.
Understood.
Other questions from the board? Seeing none, Ill open it up to the public
for now and bring it back. I would like to hear if anyone wants to speak for or against
this project?
Charlie Johnson at 440 McEwen Drive: I sent you guys a letter. I just wanted to clarify
or at least summarize a couple of things. When the applicant claims that this new...a
different decision would be arbitrary and capricious. New York State law is clear. If the
material facts have changed, this board is obviously legal...is legally able to make a new
decision. They haven’t much. We had a formal request a response back on August 28"
about a positive jurisdictional determination for the wetlands for this area. They came
back and said this was a class one wetland which is the highest protective classification
we have in New York State. Um....looking at the...... Hang on, let me go to my notes I
have here.
If we just look at the five statutory standards that we have when you guys grant
variances. The first one is the undesirable change to the neighborhood. Squeezing these
buildings into such a small area. Specifically cutting down or the single 61% directly
robs neighboring homeowners of their privacy, quiet, enjoyment, and property values.
The second part, feasible alternatives. A developer desires to build 56 units is a financial
goal. It’s not necessarily a physical necessity. The obvious solution is to scale back the
project. Number three, the request is obviously substantial. You're talking about a 75%
reduction for the buffer and a 61% reduction for the other section there and about the
adverse environmental impacts the project has. The DEC’s positive jurisdictional
determination proves that the regulated wetlands and state protected 100 foot adjacent
areas exist on this site, okay. Which I believe requires that automatically, I believe
triggers a special use permit. I’m asking you to dig more or at least get more information
from the developers on the status of their current wetland determination and whether
they have a special use permit application in process. And then lastly, I'll just say that the
application pretty much fails all five of the balloting criteria that you guys use to make
area variances decisions.
Pg. 166 September 8, 2026 Zoning Meeting
One it dramatically alters the neighborhood character. Two, the requests are massively
substantial. The environmental risk is validated by a positive DEC determination and
there’s obviously feasible alternatives that exist and that is all that I have.
Mr. Johnson, you mentioned the environmental risk and then the
applicant said there was a pocket wetland that was nowhere near the project. Do you
recall that?
They did but because they’re using the entire property to obviously
meet the density requirements, they have to consider the wetland that’s down by the bay
there. That is the....again, I don’t know if you guys have a copy of this | can provide to
you, The date on the notice is incorrect. They said this determination shall remain valid
for five years from the date of this letter which is through 2022-2031, So I think what
they’re talking about is the area closer to they bay there.
Okay, thank you very much. Anybody else from the public want to speak
for or against the project. No additional comments, okay. Back to the board.
I was not on the board in 26 or 24 I mean, had I been on the board in 24, I
don’t think I would have approved it at that time. And I understand what Mr. DeMarco
was saying about it being we might be under some obligation, but as someone that wasn’t
here, is that hold for me also.
There was a question. Under our general Jaw and jurisprudence. I guess
the analogy would be, you know, someone sitting on the Supreme Court that says or a
lower court that says, I don’t, you know, I wasn’t on the bench when this higher court
made this precedent. Do I need to follow it? And short answer is yes. You don’t have
to. What I said at the beginning was we recognize the administrative precedence of the
board. So that if there’s going to be a change of this board’s determination, if the
applicant was to challenge it right, let’s not mince words. If this board was to deny this
application tonight and the applicant was to challenge it, they would challenge the
administrative precedence and say, “Look, you previously ruled on this. Now you’ re the
board, not individuals, but the board is now changing it’s ruling”. So, the question then
becomes is there change of circumstances present in the site in the application that this
board can hand their hat on and say we have now facts new circumstances and based
upon those the board can give specific reasons of our criteria that we always look at and
hang it’s hat on those factual changes. So, that’s what we’re faced with. If we want to
change, if the board changes position, ’m not saying it can’t, it can. I’m not saying it
shouldn’t but if it chooses to, it needs to articulate the change in circumstances at the site.
How is it today changed from how it was immediately prior to your last approval? Does
that make sense?
Pg. 167 September 8, 2026 Zoning Meeting
I understand what you’re saying. I’m just ...I guess I’m wondering what
obligation I’m under. I mean, if the board as a whole approves it, can it still have a
negative vote in there?
Of course.
Thank you,
Good question. Other questions from the board?
I find myself in a difficult situation because when we first...when I first
Saw it, uh.....let me commend the applicant for changing it to our request originally and
because it...I think it does look much better, and I apologize for questioning number
trees. I was going simply by the presentation drawing which was different from the
application drawing and that’s my fault. I apologize for that. But and like I said, I think
it’s much better than it was before you made those revisions. But having a lot more time
to look at it again, I try to look at it fresh again and thinking like, well, it’s better, but it’s
not something that I still feel comfortable with but, uh......if I feel that, uh...... I just want
to make it known that It’ll be yes, but it’s a reluctant yes, but I guess it doesn’t matter
whether it’s reluctant or not. Since I did vote it originally because it was an improvement
and I still think it is an improvement over what was originally presented to this board.
But the more I look at it, the more I start thinking maybe I didn’t vote properly last time
and that’s my error, not yours. And we certainly...I don’t want to put the board in any
predicament by me having more time to look at it and potentially changing my mind.
That is more of a statement than a question to you.
(NOT CLOSE ENOUGH TO THE MIC): That’s understood. I have a
response uh a two part response. One, uh and it ties into something that uh John said
earlier. This board had a lot more time to look at this application and took a lot of time.
You looked at it a ton. You looked at every single page of the application. You look, you
poured over this before and made that decision after five, four or five different meetings
and J mean I wasn’t up here I’ve been up here for 15 minutes and I was up here for an
hour and half every time with you drilling me with questions and everybody so you know
maybe you first instinct was correct because you...it did have...you did uh go deeper.
Second, and this is something MarkV does will all our projects but, uh, we’re going to
prove you wrong. If you’re hesitant about it, we will prove you wrong. This is going to
be a great project. It’s going to be buffered adequately. The neighbors on McEwen, I get
it. They don’t like it. They’re not even going to notice it three years from now. That’s
what happens with every single one of our projects. Um, I talked to board, we go back
into towns, you know, this is not our only development in the Town of Webster. I’m
going to see you in three years and you’re going to say, “oh, yeah. Yes, that’s a great
project. We will prove you wrong on that.
Pg. 168 September 8, 2026 Zoning Meeting
I look forward to that.
Can you help me understand how? Right. So, I heard Josh just say uh the
town does not want the um vegetation in the right of way. Um I like hearing it, but I’ve
had salesmen sell me on things before and it doesn’t come true, right?
Second slam on sale. (LAUGHTER)
So, help me understand, help me understand and help the residents of
McEwen understand how they’re not going to notice this. And you’re right. I mean, we
poured over this and I remember us talking about can we pull the...pull that road in even
more SO we can get more vegetation, right? So, there was a lot of discussion because
asking for the setback of 35 feet, 55 feet from a 100 feet, it’s not insignificant right I
mean it’s you know so how do we.....how do you....how do we get assurances in a
comfort level um because I think the board that was here previously there were
reluctances, but we felt comfortable enough after the last time. Uh, hearing that the town
does not want the vegetation in there leaves me a little concerned. Um, because at the
end of the day, the town does have to maintain, you know, any of those utilities in there
and everything else. So, I would hate to leave here with those conditions. The town
doesn’t want it. And now all of a sudden I have three buildings on McEwen that are
visible and whatnot. So, he me understand how we’re going to get over that.
Um....so Josh uh is I believe correct. You know that sewer department
from an initial standpoint and they always, all sewer departments say we don’t want it
anywhere near our easement. Um you know some easements, they’re very familiar with.
This one down closer to the lake, they, you know, they can map it out, you know, off the
top of their head. They’re so familiar with it. This one, it’s a standard side of the road
easement. They don’t know exactly where the pipe is. They’d have to go in the file and
look for it. Um, we can work with them, our engineers, our design team will work with
the town and find places where, you know, shallow rooted plants can thrive. Um...the
answer to and I want to be clear, we’re not going to hide this, but the neighbors on
McEwen won’t notice it as, you know, uh...the threat to their way of life that they think
it’s going to be right now. Um...it’s not going to be hidden. It’s going to blend. It’s
going to become a part of this neighborhood. And ...uh, the real answer to it is we rent
these things. We have to sell them, and it sounds like a salesman, but you can’t sell
junk. You can’t sell stuff that doesn’t here..I, you can’t sell stuff on McEwen Road that
looks like an apartment complex. We’re gonna make it look like McEwen Road. That’s
the way to rent it and rent it for the you know quite frankly the prices that a great
neighborhood like this deserves.
And these are...you said two things in you last statement. Rend and sell.
So,...
Pg. 169 September 8, 2026 Zoning Meeting
No, I’m being a...the salesman. Leasemen....,I guess we have to sell them
to tenants. None of these will ever be sold. This will operate as one functional property.
As an apartment complex.
Yep..
Okay. The resident had talked about in his letter, storm water; soil
erosion, can you talk about the storm water for this complex? Is all storm water going to
be handled on site?
It will be and this is subject to the DEC storm water permit GPO-25-00001
that is not impacted by the regulation changes that I referred to earlier. Uh....prior to the
start of construction, perimeter erosion control will be put in place. A stabilized
construction entrance will be put in. Storm water management facilities installed,
including sedimentation basins, so that when storm water leaves the site, it does...it never
occurs at a rate higher than it occurs today for various storms up to and including the |—
year event, which is significant. That’s flooding. Um.....and sediment will be contained
on site. So, downstream receiving waters, offsite properties will not be impacted by that.
And then, that’s it’s subject to a weekly inspection.
During construction?
Correct.
When you say sediment is going to be maintained on site, again, during
construction?
Both. During construction and in the completed state also.
Um...who is maintaining the storm system after it’s complete? I mean, I
I hate to say it’s you know...patients can get filled up and no longer function.
We operate....we own and operate our own properties. That’s us. We will
operate it in perpetuity. Um...this is an interesting one. I forgot there’s a big giant storm
chambers on this one. Um...it’s new for us. So, we'll get a tech, you know, the...you
know the technicians out and they’ll train our on-site maintenance personnel. We have
on-site maintenance personnel on site at all of our properties. They’ll lean how to do
what they have to do and then I’m assuming it has an annual or biannual bigger
maintenance that we have to hire somebody to do.
Okay.
Pg. 170 September 8, 2026 Zoning Meeting
So, once construction’s completed this is subject to an annual inspection that
gets provided to the town and so any kind of repairs are noted in that and so they would
make them.
Okay, um....can you talk to soil erosion both during construction and post
construction as well?
Yeah. So, we’re going to employ pretty standard measures between uh what’s
called silt fence. You’ve seen this at any construction site. Uh...and that gets again
inspected weekly.
We’re talking during construction right now.
Correct. And those ...that fencing has to be removed before the permit can be
closed out the construction portion of it. And that can only come out once all the surfaces
have stabilized either through a minimum of 80% uh...density growth or by a
construction service put down like an asphalt or concrete sidewalk.
Okay. Uh....each one of those driveways, if you will, is a single family
resident. If you, I guess best way for me to put it right. Is that... So, on McEwen I’m
looking at 1,2,3,4,-8 apartments if I’m counting that correctly.
The ends are doubles.
Okay, thank you. Thank you Erika,
Comment? Um.....] understand we came from years ago an 8-story
building and then 2-3 story buildings that were ridiculously long to the town houses
which are probably the least impactful other than just building single family homes that
we can come to. Um, and I also know it’s really not the privy of this board, but I don’t
like all the extra traffic that this is potentially dumping onto McEwen. Um....putting the
traffic inboard onto Willowpoint makes it, I won’t say at least...less impactful to
McEwen. It’s not ever going to be unimpactful to them. Um....I understand we have
only the one driveway coming out of the building that’s closest to McEwen, but it seems
like this whole end of the complex is going to dart out there and be a lot of extra traffic
on a street that right now has 5 houses on it, so maybe 10 cars.
So, the site plan included a seeker review for potential impacts like that. It
was deemed to be to not have a significant impact whatsoever.
90 addition or I’m sorry. 56 additional...
Is negligible. Yes, so it was considered at the planning board level.
Pg. 171 September 8, 2026 Zoning Meeting
I understand that, but I question it.
So, and I’m going from memory here, but I believe that the traffic study
that....this board and the planning board and staff and the town’s engineers reviewed and
agreed with, I believe it said that this project will dump one car every either 8 minutes or
12 minutes and I don’t remember which it is, and I apologize for that, but it’s not one car
every minute, every two minutes. It’s one or one car every like 8 to 10 minutes.
Oh, I understand that. But I have and it’s not going to be one every 8 to 10
minutes because there’s going o be a dump between say 7 and 8 o’clock and then a dump
coming in between 4 and 6 o’clock but right now I’ve got 5 house, 6 houses on McEwen
with maybe two houses and grandma and grandpa coming over on the weekends or two
cars per house. So, it is going to be an impact regardless of what the traffic study says.
That’s not going to be, you know, high volume traffic, but it’s additional traffic. And I
just...’m struggling of how do we make it attractive for people to want to go out the
Willowpoint entrance and not out the McEwen? That’s what I struggle with, and I know I
voted for this project the last time just because it’s so much better than where we started.
But it is a significant impact to the people that live there now and don’t see the other 56
residences worth of cars or even half of them. Say, half of them go in half of them. So,
what....I just ....be cognizant of that when you’re doing this, if you get the approval to
make it least impactful traffic-wise for the kids that right now probably play in the street.
Well and absolutely and understood. Um.....one of the nice things that
I’ve seen happen, um...sometimes through planning board meetings, um...but we have
on-site property management. We also have our tenants who have children playing in the
streets. If somebody can or wants to lodge a complaint with out property on-site property
manager, and say it’s a red car, she’ll figure out which one it is, and we’ll violate them.
We'll tell them they got to knock it off or they can find somewhere else to live. Um...so
of there’s a traffic problem, uh, you know, if people are driving their through, uh, too fast
through McEwen, uh, we hope our neighbors contact us and let us know. You know,
they’re going to know if it’s turning into our, uh, complex or you know, onto Maritime
Drive and we hope they reach out and tell us.
Any other questions? THE BOARD HAD NO OTHER QUESTIONS.
Uh...Webster’s was sanitation or what was it?
The highway and sewer department.
They’ ve worked with other builders prior to this.
I’m not aware of a specific example where a project has spilled out into the
right away, if you will.
Pg. 172 September 8, 2026 Zoning Meeting
Erika, do you have the um.....the engineering plans, not the rendering?
Because I believe the rendering shows the roadway a little closer to the......
The rendering isn’t the most accurate set of plans.
The um.....the right away is those two lighter triple dash or quadruple
dash lines. Is that correct?
The right away is the darker one in the middle of those two. The other
two lighter ones are easements.
Um.....so, we do have....they do have space for vegetation on the
property before the easement based on this plan. Am I reading that correctly? Uh...do
we have an understanding of how much space this is? Looks like 16 feet. Well, it get
worse as you get closer.
15.4
Uh...and then take off. 5 or 6 feet for the easement. Because if I
remember correctly, we asked to shorten those driveway so that they could have more
space inside the on the property instead and stay outside the easement if ] remember
correctly. Uh...back in 2024. So, there is space on the property proper to do that.
Applicants speaking to one another.
The other thing is this is a 12 or 18 inch sewer main running through a 22
foot right away. There’s room and if they really don’t want it, we'll put the ....we’ll find
some other way to buffer that’s suit....that’s acceptable to the town. Um...but you know,
we can do uh....planting boxes, We’ve seen um....that don’t you know, dig down that
you don’t plant in the soil. You put a box and then uh.....plant a tree in that.
Where are the driveways lengths right now?
So, to the interior driveway, it’s 20 feet.
From the.....
From the front of the garage to the close edge of the interior road.
It’s 22 feet.
It’s 20 feet. Really a bare minimum.
Pg. 173 September 8, 2026 Zoning Meeting
OTHER QUESTIONS FROM THE BOARD ? NO. Uh....one last
question I have for you. Uh.....special use wetlands permits, uh, not required. [ think it
what you were saying?
Correct.
Um....you are looking at the entire parcel uh.....for so the resident was
talking about the density factor of this uh....using one portion versus the wetlands portion
as I was trying to listen to it. Can you speak to any of that by any chance?
Honestly, I don’t know if we use that area to determine density, but it’s a
small, isolated pocket wetland that is outside that we’re not touching whatsoever. So,,
I’m not sure, cuz passive space is often used for density. I’m not sure what the concern
is.
We took out...we knew that was a wetland when we did the or Passero
knew when they did the density calculation. So, I’m sure that wasn’t included.
Okay. All right. If there’s no more comments from the board, I’m going
to make a motion. Any further comments?
Um....I just want to make sure I understand this is the last development
that’s planned for the Willow Point complex, right?
Yes, absolutely.
RESOLUTION 26-0042 Michael Short made a motion TYPE II
Corrine
Volo.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
(MICHAEL SHORT)
The request is not out of character in the neighborhood. So, over the course of several years, the
applicant has looked to reduce the imposition of the high density housing on this property to
scalable residential feel so that would fit within the neighborhood itself eliminating, maintaining
the character of the neighborhood. The property itself is a wooded lot with housing on the north
side of it. So, the neighborhood itself will change, but the applicant has modified over the course
Pg. 174 September 8, 2026 Zoning Meeting
of years to come up with a design that will mimic a single family residential type look not imposing
a difference in character for the neighborhood. Determent created by...to nearby properties, this
project does include additional drive and vehicle access to nearby properties. Uh...again, the
roadways themselves um....able to handle it based on traffic reports that were provided by the
applicant previously. Uh...so limiting any detriment to nearby properties. Achievable by other
means. The property is uniquely graded so relocating moving some of the facilities elsewhere is
difficult. The applicant would have the opportunity to eliminate some of the structures to achieve
said goals um....but due to again, grading property and it ends up being difficult to achieve the
goals of the project any other way. There are no adverse physical or environmental impacts to the
site or the neighborhood based on wetland, current wetland codes and all the SWPPP storm water
practices that are being put into place for this site. There are no environmental impacts to the site.
The request is not substantial. If you look at our code, any of you are looking at a single family
home on the same property as well as looking at duplexes, multifamily dwellings on the same
property. Offsets would be 35 versus the current required 50 feet or 100 feet next to a residential
area so again the applicant is making these units look and feel like a single family type unit so the
desire, the request is not substantial.
I think I covered all of them. Anybody else want to add anything?
1. This request is not out of character in the neighborhood:
2. There will not be a detriment created to nearby properties:
3. The benefit is not achieved by any other method:
4. This request is not substantial:
5. There are no adverse physical or environmental impacts to the site or neighborhood:
6. The difficulty is not self-created:
7. This is not an undesirable change:
RESOLUTION 26-0043 Michael Short made a motion to Located at
the northwest corner of Willow Point Way
and Nautical Mile Drive. Applicant Legacy
Development Co., Inc is requesting AREA
VARIANCES to allow a front setback of
18.7’ where 75’ is required and to allow a
single-family district buffer of 38.5’ where
100° is required in association with the
construction of (6) buildings plus a
community center (total of 56 units), each 2
stories in height on a proposed 13.15-acre
parcel having SBL# 093.06-3-64.11 located
in an MHR Medium High Residential
District under Section 350-14 of the Code of
the Town of Webster which was seconded
by James Spampinato.
Pg. 175 September 8, 2026 Zoning Meeting
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso NAY
Mr. Centola AYE
CONDITIONS:
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire September 8, 2027
e No additional development will occur within this Willowpoint Development-this is
the final phase of development for this total property.
I would like to thank all you for your thoughtful consideration. I know this wasn’t
easy, but I appreciate. You’re going the right thing and like I said, we will do our best to prove
you wrong or prove your reservations wrong. We look to do a really good project here and keep
our neighbors as happy as we can.
And for the residents that did speak about the project, as you heard him say, any
issues, call the property management. Thank you. Next up we are going to start with Lake
Road. For this, we are going to have Verizon speak. Give us your thoughts, describe...um, I’m
going to have honestly both projects and then I believe we have the town consultant here and
then we'll hear from the town consultant before we go any further.
VERIZON CELL TOWER “LAKE ROAD”: Located at Lake Road and County Line Road.
Applicant Robert Burgdorf for Bell Atlantic Mobile Systems d/b/a Verizon is requesting an AREA
VARIANCE for the height of a communication tower of 125ft with a 4’ lightning rod (129’) where
the maximum height allowed is 100ft on a 7.8-acre parcel having SBL# 037.03-1-44 located in the
LL Large-Lot Residential District under Sections 130-10 and 350-13 of the Code of the Town of
Webster.
Appearing before the board was Laura Smith. I’m here with Nixon Peabody and I’m here
representing this application, both the Lake Road application as well as the Webster North.
As we discussed, I’1l start with the Lake Road application. There are similarities between this
and Webster North, but ll focus on an overview of the applications in their entirety and then go
into some specifics about the Lake Road application. I first want to note we have been before
the planning board several times with this application, but I believe it’s our meeting with the
zoning board of appeals on this matter. I'l] note that wireless telecommunications are treated as
public utilities for land use and zoning purposes in New York State, which entitles them to a
dished standard of review rather than the standard criteria applicable to area variances. Under
this public necessity standard, a wireless carrie must demonstrate these, only three elements.
Pg. 176 September 8, 2026 Zoning Meeting
First, that there is a gap in wireless service. Second, that the location in the proposed facility will
remedy those gaps. And that the facility presents a minimal intrusion on the community and is
more feasible than other options. I’ll also note that wireless facilities are highly regulated by the
FCC and the Telecommunications Act of 1996 which sets out a separate standard for the concept
of effective prohibition and not permitting a wireless communication services to fill a coverage
gap. Pll not for this Lake Road application, there is a significant gap in coverage. We have a
pretty sizable application, but in demonstrated in exhibits F and Q, and as demonstrate by
Professor Johnson, the town’s independent RF consultant, there is a significant gap in wireless
coverage in this lake road south. This are is currently served by three distinct overburden sites.
The first is four mile creek. Second is East Webster and the third is Ganea . All three of these
sites are terrain and foliage challenge which results in a significant gap in both low band and mid
band coverage.
Moreover, actual utilization data for the past year shows that several key performance indicators
for these three sites have already exceeded 100% utilization. It is the goal for RF, and it is the
goal of network to ensure that we’re providing coverage in looking for land use approvals before
those KPIs are met. Here for those three sites, we are already showing overage and capacity
exceeding 100% utilization at these three sites. That means the existing network cannot meet
current demand. Josh, I know we’re going to go quickly, but 7 and eight of exhibit F. I’m sorry,
7 through 9 on exhibit F. The goals of this project is to increase network capacity, provide
reliable coverage to the Lake Road service area in northwestern Webster, and offload traffic
from those overloaded sites. And here the mid-band coverage is particularly significant. We'll
see in the other site it’s more of the low band, but here the mid band coverage is very weak in the
lake cell. What’s shown in your application is that the existing mid band coverage shows that
there is no reliable mid band coverage in this area instead and it also shows the low band
coverage is akin to a rural or suburban and incar applications. However, because that mid band
coverage has no coverage, those users then have to switch to low band showing and that results
in a very low capacity in our low band coverage. So, it is although there is low band coverage
here the lack of mid band coverage in this area is what’s over taxing and putting these sites at
over capacity for that low band coverage.
You'll hear from your independent consultants since we had the pleasure of also meeting at the
planning board last Tuesday that here there is a capacity in it a capacity issue more so than
necessarily a coverage issue. But from both the FCC’s standpoint and from case law, those two
items are treated the same when looking at is there a significant gap in coverage. Next, I'll not
that the proposed height is the minimum necessary to provide effective coverage. That’s the
item that is before the ZBA with this application. It is an area variance to seek going from the
100 foot height that’s permitted under the code to go to 125 feet for this location. This is shown
in exhibit R and V in our application and again confirmed by the town’s RG consultant that
supplemental propagation plots compare coverage at the proposed 120 feet center line against a
reduced height of 95 feet. I’m going to pause and explain that concept a little bit.
So, the height of the tower will be at 125 feet. That’s at the very top. And then there’ll be a
lighting rod attached that’s 4 feet high. However, when we’re looking at cell phone coverage,
Pg. 177 September 8, 2026 Zoning Meeting
the measurement that is used is the antenna center line, the ACL. So, when we’re talking about
how high up the antennas need to be, the concept is an ACL line rather than necessarily the
height of the towers. So, our 120 Foot tower would have a ....I’m sorry, our 125 foot tower
would then have a 120 foot antenna setter line then comparing in order to have a 100 foot tower
that center line that ACL would then be at 95 feet. So, that’s the reasoning between those
comparisons of why although seeking 125 foot tower we compare the 120 ACL and then as
confirmed in those exhibits and as also confirmed by the town’s consultant the 90 foot ACL
tower is too low to overcome the terrain and foliage and does not allow for the necessary
coverage improvements capacity overload and network densification. Again, that’s shown in
exhibits R & B of the Lake Road application.
I'll also not that we’ ve conducted an exhaustive alternative site analysis and no viable
alternatives exist. This is an item that we have worked extensively with the planning board to
review potential viable alternative sites that could still offer that improved the coverage that we
need to fill the coverage gap and then also have the ability to provide that an improved visual
impact.
First, Verizon undertook a comprehensive site analysis evaluating a total of seven candidate
parcels within and immediately outside the search area. That’s shown on page 9 of exhibit G, and
I'll note the search area is primarily comprised of one owner. It’s a farm owned by Windmill
Farms. As documented in our March 31“, 2026 supplemental application, Verizon engaged in
extensive negotiations with the landlord for permission to be on any other location on the
landlord’s property, including two sites that were identified by the planning board. The planning
board requested Verizon to go back and have discussions with the landlord. Specifically, one
was towards the south western portion of the property so that it would be along the tree line and
less visible as cars are going past on Lake Road. The other was on the southeastern side also
along the tree line trying to move back from that corner parcel. From Verizon’s perspective, we
need to be in an area within the search area that will meet the coverage needs, and the coverage
gaps we’re trying to solve. But beyond where within the search area as long as it works for RF
needs it’s not unreasonable cost or unreasonable very clear that there are no other locations our
tenno would interrupt. There’s also some subterrain in infrastructure that they use that is not
possible to put us on another place on the farm.
Candidly, they provided a letter to the town that is more than we typically get from landlords
really. We just need to and they....we can’t force them to lease to us. So, typically once they say
no, they’re not required to explain to the town what their logic or reasoning is. But I'll note our
landlord did go above and beyond, provided a letter to the town explaining all the restrictions on
his property and the reasons that he will not lease other locations and cannot lease other locations
to Verizon. We also reviewed two additional candidates. Those are shown on exhibit S.
They’re noted as H and I also identified by the planning board, but those failed from an RG
perspective. We also re evaluated the search area as directed by the planning board. That re
evaluation is set forth in exhibit U and that was to determine whether or not there were any other
places that the search area could be expanded or moved to try to bring in new properties to
review. As shown though in exhibit U, the search are cannot be expanded and it was properly
Pg. 178 September 8, 2026 Zoning Meeting
sized in the initial analysis. The remaining property owners within the search area decline to
participate in lease negotiations with Verizon. And again, these decision are solely within the
landlord’s discretions. We have no authority to compel any property owner to enter into a lease
agreement. So, to the extent there are, where there were other opportunities to engage with the
town or I’m sorry, engage with the landlord, we did so at the town’s request. I'll also note the
landlord came in for a conversation with the town and the planning board chair and really
hammered through are there other places on that windmill farms complex that this site can be
located and that answer and the conclusion both the landlord and Verizon came to was no. That
leaves the selected site which is the only candidate that’s both technically viable and available
for lease for this particular project. We will also note that the project will have no adverse
environmental or community impacts. This is a key part of that telecommunications act of 1996.
The perceived health effects of this project and we’ll say the same for Webster North and we’ ve
heard very passionate testimony at the planning board. You may hear the similar concerns
tonight, but the science and the law are both very clear on perceived health effects for
telecommunications towers.
Local boards are expressly preempted from denying or conditioning approvals of wireless
facilities based on health or environmental effects of RF emissions where the facility complies
with the FCC standards. Here we provided that evidence to the town. It is exhibit P to the
application that the proposed facility will operate in full compliance with all applicable FCC
regulations. The ZBA as well as the planning board and the town board is therefore without
authority to consider RF related health or environmental concerns when reviewing this
application. Moreover, we'll note that this project will not pollute. It does not create noise. It
does not increase traffic. It does not create or demand additional needs on governmental
services. It’s an inert facility that will enhance emergency communications for police, fire, and
other responders.
Last, I’ll not that the application does meet the requirements of state and federal law. Again,
going back to the opening comment about this being a public utility and a wireless facility that’s
regulated by the FCC and the Telecommunications Act of 1996. This is a public utility, and this
site is important to fill the coverage gap. As noted most recently by the FCC in an order that was
put out, it’s the matter of reducing barriers to network improvements and service changes,
accelerating network modernization, which was released on March 27". The FCC noted that as
of December 2024, there’s approximately 390.9 million mobile voice subscriptions in the United
States. And according to preliminary data from the Center for Disease Control and Prevention as
of December 2023, approximately 76% of adults were living in and relying on wirelessly
household with adults in lower age groups more likely to live in wirelessly households.
To me, even Wednesday’s storm speaks to the importance of having wireless facilities and
wireless facilities in these coverage gaps. When electricity is out, when internet is down, people
are relying on their cell phones during an emergency. And even candidly, people are relying on
cellphones because they don’t have landlines in their home. So again, the importance of this is a
public utility. It has to be located where the need is. Verizon did work very extensively with the
planning board and the town and the landlord to try to determine another location for this to be
Pg. 179 September 8, 2026 Zoning Meeting
located and are now coming with this application fully vetted by the town, fully vetted by the
town’s independent RF consultant. That there is a coverage gap. This solves the coverage gap
and there is no other feasible location where it can be located.
With that, I'll pause to take questions.
You brough up last weeks storms. Does the cell towers have generators?
They do.
Um....internal or external because you also said the site does not create any
additional noise.
It is an external generator. The site plan is located in the application materials. It
is under exhibit Q and there is a 50 kilowatt generator shown on the site plan.
How frequently does that generator run?
It runs for testing purposes. It’s my understanding that it’s tested about once every
other week. I think the typical time is Tuesdays at 9:00 a.m. It’s meant to be identified at a time
that would be the least impactful to the neighborhood. It is tested twice a week. It’s about tested
for ..... sorry, It’s tested about every other week. It’s tested for 15 minutes and then it goes off.
Certainly, during an emergency that generator is going, but several other generators are going at
that time as well.
So very similar to an automatic generator at somebody’s house.
Exactly. Right.
You said that they would have no utilities to it, but you do have...you will be
powered. Are you planning on......
There will be. Yes, there are utilities going to the site. It’s both fiber and
electricity.
Generators. Not that I guess not that it matters. I don’t know why I’m asking the
question. Is diesel operated then? Not gas?
Yes.
The tower actually, will it serve others besides Verizon?
This is being constructed for Verizon but pursuant to the town’s collocation policy
up to it will be designed and constructed for up to two additional carriers to be located on the
tower.
Pg. 180 September 8, 2026 Zoning Meeting
Has any inquired about it? Any other carriers yet or is too early?
Candidly, I don’t know. I believe it’s too early for inquiries but certainly Verizon
has a need and it’s required under the town code to allow two other users.
So, there might be another carrier that would be perfectly okay with a 100 foot
ASL but so their antennas are better than Verizon’s because they don’t need the additional
height.
So, each you know, candidly each carrier is different. I can’t speak to their
network. We need to be at this location and at this height because it is the correct location
between those three sites. You know, think of cell phone coverage. It’s almost like a flashlight
going up and down. It can’t be too close to the other towers that are already existing or else
there’ll be interference. It also can’t be too high or else the signal won’t go where it’s needed
and it can’t be too low down because the signal won’t go as wide as needed. Which is how we
get to the 120 foot site. I will also note that Verizon has 60% of the market here in the Town of
Webster. So, what other cell phone carriers need is difficult. You know, I certainly can’t speak
to that.
So.....um, I almost....Pd like to maybe hear about the other site because I do
want to hear from the expert. This way we can ask questions once.
Can I ask you one question real quick? So, the capacity issue, right? You said in
the end of the gap and the capacity issue, my words I guess not yours, are interchangeable now I
terms of what the courts have ruled that triggers this lower standard if you will in terms of what
you have to demonstrate.
Correct. It is both coverage and capacity.
And when you talk about capacity earlier you were talking about these different
zones. What happens when the capacity breaks down like. What's the net effect of that?
So, those are shown it’s in exhibit F of the application. It’s section...it’s pages 7,8,
and 9, They’re essentially graphs showing that the capacity utilization..............
I would much rather listen to you than try to figure out those graphs.
So, there’s three items those charts are showing. The first is if there is too many
devices trying to download from the cell phone tower then the download capacity goes
much....very slow. So, if you..........
Let me just stop you right there. So, is it fair to say at the Lake Road location. If
capacity was not an issue the coverage is sufficient? In other words, do you need capacity in
your opinion to get where you want to go?
Pg. 181 September 8, 2026 Zoning Meeting
Correct and from our perspective those are a symbiotic relationship. So, although
the low band is showing some coverage on the map you’ll see that it’s rural and suburban for in
car coverage. So, it’s showing if you go from yellow or I’m sorry, white being no coverage to
yellow being adequate coverage; orange being a little bit better and green being the best. I’m
sorry, no coverage is white, orange, yellow, and green is the very best.
Lt’s say it’s level of five, one being the worst and five being the best.
Yeah. So, so we’ re right about a 3 for low band coverage.
So, with there capacity issue... would that be sufficient as a standalone?
That would not be sufficient for a standalone. You would still have dropped calls.
You would still have slowed down coverage because there’s only so many users that can be on
that low band coverage. So, by having essentially because there is limited capacity on the low
band the result of that one it becomes overutilized is no coverage. So, whether you don’t have
coverage because there’s too many users, I’m sorry, regardless if you cannot connect to a cell
phone, so you’re dialing up and it says, you know, no service, whether that is due to the fact that
there’s too many users currently on that low band coverage or that there’s zero coverage
whatsoever, the impact to you is the same that you can when that low band is overutilized and
taxed out, it will either slow down so much that you can’t download materials, you know, you’re
driving down Lake Road and you’re trying to find an address and it won’t be able to connect or
you will be dropped. Your call will be dropped. There will not be sufficient coverage for your
call to go from this cell phone to the other cell phone. So, as you’re driving, right, you go from
cell phone tower to cell phone tower cell phone tower. You're passed along as you’re driving
down Lake Road. You would come from Webster speaking to someone on low band and then if
you hit this area and there is not sufficient capacity, that call will be dropped because there won’t
So then is there a frequency upon which the dropping has to occur or just the fact
that it occurs at all.
Those are shown in the KPI from a network perspective. The goal is to have no
dropped calls right and the goal is to identify no dropped calls before the tower is built here we
are already over utilization.
I guess that’s my point is look on the one end Verizon wants to provide a
superior service, right?
Yes, it wants to be able to fill this coverage gap. That exists in Webster.
There’s a gap and there’s a capacity issue.
Correct.
Pg. 182 September 8, 2026 Zoning Meeting
At some point we get to a minimum level, right? And then over that level is a
five start rating for Verizon. So, I was just trying to understand on the capacity level is that a
quantitative failure point.
Perhaps your question is you know, is five drops calls okay or is it six drop calls
right and that’s something the courts haven’t spoken to. It is known as a coverage gap this is a
coverage gap, and it is the health and safety of the network to ensure that there are no coverage
gaps.
And then you got to my last point which I guess as I understand like the third
circuit court of appeals has made this standard and J don’t know if the second has or not where
we sit but they don’t quantify that bar.
So, we in the second circuit we have what’s know as the will standard. We have to
show that there is a significant gap in coverage and this is the least intrusive means to fill that
coverage gap. That’s the standard that’s..............
So, it’s significant in terms of capacity as well. Interchangeable.
Correct. Capacity and coverage the FCC has identified as being...this is the items
and......... That are a coverage gap.
And the significancy, I don’t know if that’s a word at 9:20... LAUGHTER. On
the capacity size there’s not a quantitative formula for that.
Correct. There are standards that we can show, and I want to make sure I’m being
clear. There are standards that we can show through those KPIs that these three existing towers
are at capacity and reaching exhaustion. There is not a court case that says It’s okay if 4 calls are
dropped.
Understood. Key performance indicators... KPI.
Correct. Well, the three sites that are currently servicing this area at exhaustion.
They are at capacity and those are that.....is what’s shown on the graphs within our RF
justification that those three sites.
When you say at exhaustion as a professional in the industry I mean I don’t
know if that’s a term of art, but you think by any reasonable measure people would say they’ re
exhausted. ..similar experts.
Correct and that point of exhaustion is when you see slowed coverage or dropped
calls or inability to access the network.
Thank you.
Pg. 183 September 8, 2026 Zoning Meeting
Thank you. I did not bring up my other materials. So, if you’ll excuse me, I'll go
get our Webster North material. So, for Webster North, this is a slightly different history and
also slightly different coverage and capacity gap that I'll go into in more detail. For this Webster
North site, I first want to acknowledge that this has been before the town, and we have been
working with the town for many years to try to solve a real coverage gap in the Webster North
cell and in this neighborhood. It started about 2 years ago, maybe by now 3 years ago, working
with the town to try to identify sites that could be for locations for a telecommunications tower
that could serve and solve the coverage gap in this neighborhood. There is a town owned
property that is well suited. It’s in this neighborhood. Verizon entered into lease negotiations
with the town to lease the property from the town. Last summer, we were before the town board
to approve that lease. The Town Board ultimately decided not to lease to Verizon, but that is a
legislative act that is fully within the town board’s discretion. Just as we were talking about the
landlord for Windmill Farms having full discretion whether or not to lease to us, the town of
Webster as a landlord like wise has full discrepancy whether or not to least to us. The town board
decided voted no again complete within their right. But I do want to make that distinguishment
between what the town board decided in a legislative act whether or not to lease to Verizon
versus what is before the zoning board of appeals tonight for a zoning decision.
Just out of curiosity and maybe it’s an inappropriate question. If it is, you don’t
have to answer. The sense is that at the end of the day, if this new tower is more than likely to go
up somewhere to address this coverage area and by the town previously determining legislatively
for those not aware the first time the town had the ability to say no because it was a question
threshold question of ownership just like you said about the Windmill Farm ....somebody
doesn’t want to lease it, you can’t force them but the inevitable fact through it seems that this
tower is going to go up covering the same area that the town previously legislated and says no
we don’t want to lease it the reality of that occurring and what I suspect will be residents at the
new proposed location being as equally opposed as to the prior location that the town owned.
Has Verizon considered approaching the town again or renewing the application in light of the
town’s....... and I’m not saying that it’s a good idea, bad idea, or I have any inside baseball
information, but was that part...... I guess the town recognizing that this is going to go
somewhere, would they reconsider it given the fact that Verizon hasn’t given up, if you will, of
putting this within the same coverage area. It’s another bad questions at 9:20, but do you
understand ?
No, I do understand. Candidly, that was part of the discussion with the town board
last year of that...there is a coverage gap in this neighborhood. There is a real need for a cell
phone tower. If it is not here, it will be somewhere in this search area. And the ability for the
town board to put in restrictions or concepts is available to them as a landlord that is not
available to them as a zoning authority. So, that was very clearly stated to the town board. It was
very clearly stated during all of the discussions and in going over the lease. So, to us, this was
very well explained, and it was very transparent. We were very clear with the town board. It
will go somewhere in this neighborhood.
Pg. 184 September 8, 2026 Zoning Meeting
Ultimately, is from Verizon’s standpoint is that proposal still today given all the
criteria at least from your side of the ledger preferable to what you’re proposing at what’s the
second?
Yeah, the 1222 Wildflower. You know, I think candidly no we’ ve....where we
started out initial conversation with the town was the town offered and again, you know, it was
very collaborative relationship, and it was over a course of several years that these conversations
were happening. When the town and Verizon first started the discussions the question was only
about that parcel so there was no site selection and there was no comparison of other locations.
There were no you know, going through the analysis of is there an alternative site because the
town had offered that as an option. Now doing the comparison between the other sites. After
last summer when the town declined to enter into a lease, Verizon looked at 11 other sites within
that area and found a location that is I think preferable to Verizon to be so....certainly,
Including the town site?
Correct. Yes. Because...we after having the ability to go through the selection
process, this was you know deemed to be a more preferable site.
Great. That’s helpful. Thank you.
So here, I'll go. ...you know, I again won’t go over that public utility standard, but
the same criteria apply here that is a diminished standard of review rather than the standard
criteria set forth for an area variance. Here the significant gap in coverage and also in our
application it’s exhibit F and Q and again independently confirmed by the times RG consultant
there is a significant gap in wireless coverage in the Webster North cell. This area is currently
served by three distant overburden sites. The two are the same servicing as Lake Road. It is
Webster and Four Mile Creek. And here the third tower is Webster Park. All three sites have
terrain and foliage challenges resulting in significant gaps in both mid low band and mid band
coverage here, Moreover, as we discussed on the Lake Road site, actual utilization data for the
past year shows that several key performance indicators have already exceeded that 100%
utilization, which means the existing network cannot meet current demand. The goal of this
project is to increase network capacity, provide reliable coverage and to offload the traffic from
those overloaded sites.
Interestingly, we had one member of the public testify at a planning board meeting that she has
no cell coverage in her home and must leave her neighborhood to make a phone call. And her
testimony illustrates the exact problem that we’re trying to solve with these coverage charts. In
exhibits F and Q specifically, this is page
14. It’s showing that Webster North cell the existing
low band coverage is akin to the type of coverage one would have on a rural highway subject to
variable conditions such as fading and seasonality gaps. That means you know items such as in
home use is very difficult if not non existent in this area. Likewise, there is little to no reliable
mid band coverage in this area. And with this project, again, as demonstrated in our application,
the area would have wireless service that’s appropriate for suburban single family residential.
Pg. 185 September 8, 2026 Zoning Meeting
So, this unlike the Lake Road site, that the midband coverage was lower here in the north,
webster north cell, the low band coverage is weakier. Like the Lake Road site, we did review if
this is the proposed height is the minimum necessary to provide effective coverage. Here again
demonstrated on page 23 and 24 of exhibit Q and again confirmed by the town’s RG consultant.
The supplemental propagation plots compared coverage at the proposed 130 foot antenna center
line. So again, as we discussed, it’s a 134 foot tower. That ACL then would be at
130. We
compared the 130 center line against a reduced height of a 111 ft antenna center line and a 91 ft
antenna center line. In each scenario, both low band and mid band coverage are materially
compromised due to area clutter from the dense old growth forests in these neighborhoods.
Also, confirmed by the town’s independent RG consultant that the reduced height operates
would create or expand even a weak signal area north of the site along Schlegel Road to the east,
Schumacher Road to the west, and within the surrounding residential neighborhoods. This is
because in that neighborhood there is significant tree coverage and we demonstrated in our
application. We had a drone go up to measure actually where the tree canopy is. And the
surrounding tree canopy and area clutter reaches as high as 110 to 115 ft in this neighborhood.
The proposed antenna is necessary to get above that foliage so that we can get across the clutter
and provide sufficient coverage to this area. It is the minimum clearance that’s needed to
maintain the effective RF performance under these sight specific conditions.
As we discussed, Verizon did conduct an exhaustive alternative site analysis after the town board
declined entering into a lease with Verizon last summer. We went through a site selection
analysis evaluating 11 candidates 11 parcels within and immediately outside the search area.
Interestingly, I’m sure you’re familiar with these areas. These parcels are usually residential
parcels. They’re quite small. There are wetland considerations back in along the creek that’s
going up though the neighborhood. So, there are a lot of sight constraints when looking at how
to service and how to best serve coverage in this neighborhood. And this is all shown again in
exhibit G that the search area is heavily wooded and consists predominantly of those smaller
residential lots and wetlands which again severely limit the available options in order for a site to
be placed to meet the setbacks. The selected site at 1222 Wildflower Drive is the only candidate
that’s both technically viable from an RG perspective and was available for lease. This parcel
also meets all the applicable setback requirements. The remaining candidates, so those other 10
candidates were eliminated due to parkland or wetland constraints. The landowners were
unwilling to enter into negotiations, or they weren’t able to satisfy the RF coverage objections
from the locations and those candidly are predominantly the areas located outside the search
area. They were not sufficient to meet the RF needs.
We've collaborated with municipal staff and stakeholders over several years and conducted an
exhaustive search that extended beyond the defined search area and identified and evaluated
every technically feasible site that we could locate in the vicinity. The record contains no
evidence of alternatives sites that have not already been thoroughly reviewed and considered. As
we discussed for the Lake Road site the project will have no adverse environmental or
community impacts. Again, local boards are expressly preempted from denying or conditioning
approvals of wireless facilities based on health or environmental effects of RF emissions where
Pg. 186 September 8, 2026 Zoning Meeting
facilities comply with the FCC standards. Here those standards similar to the other application
are evidence in exhibit O to the application.
We'll also not that that tree height that mature tree cover that is necessitating needing this area
variance to go up to the 135 ft tower that also provides coverage through and screening of the
tower from residents. If you think when you’re in a densely forested area or an area that has a lot
of tall tree growth, when you are in the neighborhood itself, you will be looking up through the
trees, which will certainly screen the effect of looking at the antenna when you’re actually
located in the neighborhood. As shown in those photo simulations, you will be able to see the
tower from a distance, but from the neighborhood itself, that tree coverage should provide some
substantial natural screen of the tower from the area residents. Again, like the road site, the
project will not pollute, it does not create noise, it does not increase traffic, it does not create a
demand on governmental services. It is an alert facility that enhances emergency
communications and allows the residents to make a call from their house and really solve a
coverage gap that is real and existing in this neighborhood and has been an area we’ ve been
working on for many years.
Do you have any questions on this particular application?
Um....so, as I’m looking at the simulations, Um,.....and Erika, do you mind
going to the simulations, the image simulations?
It is exhibit K of the original application.
So, where in the photo is the cell tower?
There’s two red balloons between the two trees. Right in the middle.
Yeah, so you’ll see the orange balloons. There’s a leader balloon, and then the
second balloon is actually where the tower height wiil be. So, it’s the top balloon is just holding
up this the second balloon, but the second balloon is where the........ (recording skipping and
board member speaking at the same time) is up there first.
Top is just helped from a distance.
So then, yeah. So, this first page in the photo simulation showing the balloon that’s
simulating the height of the tower. Again, it’s that second balloon down that showing that tower
height. And then the following page is a phot simulation of what the cell phone tower would look
like shown at that height from that distance. And then that’s repeated from different angles.
Thank you. Yeah, different angles and where the locations of the photos are taken is on the first
page of the exhibit K.
One of the neighbors in a letter to the town raised a question about the height
given the tree, the canopy....the tree canopy and what happens if the tree canopy gets higher?
Pg. 187 September 8, 2026 Zoning Meeting
We are here because the tree canopy is higher than 100 feet. So, your code is
reflective of tree heights that are no longer prevalent. I am not an arborist. I don’t know what
the extent of the tree height would be. There’s only so much higher that we can do and
demonstrate that need. I’m certain we would welcome a taller tower at this time but, you know,
we are trying to be respectful and mindful of only ask for the height that is needed to meet the
RF needs and the coverage gap that exists today. So, the 135 ft is demonstrating what is needed
to meet the RF coverage today. I don’t know what the future is 20 years from now if it will need
to be extended, but certainly from today’s RG needs. Being below that tree line is not meeting
the RF coverage. Being at 100 feet is not meeting the RF coverage. Being at that 135, that’s
what’s going to provide a meaningful RF coverage solution for many years to come.
So, I have a guess.....I guess it’s a question. Um.....what....all the data now is
showing this is needed. Firsthand experience, used to live in this neighborhood, don’t live in this
neighborhood anymore. Used to call Verizon on a regular basis. No cell phone service. Their
response was, “you have perfect cell phone service. You shouldn’t have an issue. I had to go
and I had to leave my house, go down to the end of the street to get cell phone service.” So,
what...you are not telling me they don’t have cell phone service, you know they don’t have
coverage. They were telling me they did have coverage. Which is it right, I mean I guess is
where my struggle is to have a corporation tell me which you should be fine there shouldn’t be
any issues. Well, now they want something and now they’re here saying, well we don’t have
coverage. So again, years have passed right. So, I understand that there’s more cell phone usage
now. The technology has changed. I get all that. But help me understand how they go from it’s
no problem, which I could ...I can tell you completely different from drop calls and everything
else to now they want something and now they need it.
No, you know, you're exactly right. Years have done by. Capacity and usage is
very different even where we were 5 years from now. You know, I don’t want to speak to what
the answer was when you called the salesperson, right? That’s our villain today, right. But here,
you know, we do have an RF need. We have an RG coverage gap. We have that evidence before
the ZBA. We have the evidence that it was then supported by the RF consultant. But you’ re
exactly right to ask those questions. Those are very typical of a municipality to ask. It is what
the planning board asked of why should we believe you? We’re just looking at your data and
that’ exactly why the planning board and then the planning board asked the town board and then
the town board engaged an independent RF consultant for that exact question. It is typical of
municipalities to ask, it’s certainly a fair question to ask, but that has resulted in the RF
consultant being engaged by the town. Why you were told there was coverage year ago, I don’t
know, but I can very confidently say, as you experience. You’re not being gaslight. There is a
coverage problem in this neighborhood . You are correct.
And they’ re trying to upgrade.
Yes.
What a good segue to bring in the town.
Pg. 188 September 8, 2026 Zoning Meeting
Yes, I think uh unless anybody has any questions for this site, lets bring out the
town expert.
I have been hired as the technical expert on these two sites. Uh...my
colleague, Professor Stephen Chikarelli and I, we don’t advocate for towers. We also don’t
lobby against them. We try to make sure that the planning boards and zoning boards having the
information in a factual manner that allows them to then do an even handed analysis of the
situation. I wanted to go back to attorney DeMarco’s question. I just want to be sure that was
answered. You asked the question about the Lake Road site that if capacity had not been the
issue would there be a need for a tower at this site. The answer to that is no but that’s not the
situation. The situation ts there is a capacity issue and the number of users in that area are over
using the existing adjacent sites. So, in order to fix that problem, it isn't adding radio frequency
coverage. That's a solution. It’s drawing traffic from those sites to a more localized tower
which will then support those particular users. So, I hope that perhaps you had your question
answered but I wasn’t sure that it was put in those sort of terms.
No, I appreciate that and it was that coupled with the quantitative measurement if
there is one or it’s kind of you know it when you see it type of thing.
Yeah, on that particular point, so in wireless communications terms, it’s sort
of a soft failure. Okay, it isn’t like all of a sudden you have no service at all, but when you start
hitting capacity at a site, everybody has to share the same bandwidth, which means everybody
gets less time on that particular base station. And then when that gets to be too reduced, that’s
when this saturation problem starts to happen. So, it’s possible in both of these locations that at
times during the day particularly talking about webster north site, there is no strong server in
that area either at low band or mid band but that doesn’t mean that somebody might be able to
getacall. They may be holding their phone to the right ear and the base station’s over here
whereas if they spin around, they're going to be facing the base station. So, the cranium does
absorb some of the electromagnetic energy and can make a difference between a call that goes
through or doesn’t go through. If you're sitting in an automobile trying to make a call, of
course, with your hands-free device, a truck or another vehicle pulls up alongside you waiting at
an intersection, that may be the difference between a call that it goes through or doesn’t go
through. So, it’s a soft failure that occurs. So, it’s....there’s no hard and fast rule, but the
metrics that come out of those soft failures are what are documented on those plots, right.
You're seeing times that it spikes and you’re seeing times that it drops down again below the
100% level. So, it ....you know, it doesn't mean it’s always impossible to make a call. It’s just
that it becomes less and less likely to get that kind of reliability.
So, if I have less in my cranium, that’s a reason why I’ve never missed a call.
(LAUGHTER)
That's why you and I can make phone calls very well. Some of our colleagues
staff....yeah, so I guess we will just leave it at that. We won’t go too deep. So, attorney Smith
has made a very good presentation. I was hearing a lot of the jargon that was in my report, and
Pg. 189 September 8, 2026 Zoning Meeting
you know of course it's a common, you now wireless is something that they work in every day
and something that professor Chickarelli and I work in every day too. So not surprising that
there's some connection between these two. It probably would be easiest if you had questions for
me that I can try to answer. I have no disagreement with anything that attorney Smith told you.
Professor Chickarelli and I have looked at the changes in height for the proposed tower. We
have met twice online with Verizon's radio frequency engineers and we talked engineering,
right? What can be done? What’s going on? Where's the really important non negotiable areas?
And, you know, some of that is actually on the shore of the lake. If I had a flashlight and I was
trying to shine it over a piece of furniture, if I was close to that piece of furniture, I really don’t
have to go very high. But if I get back away from that escarpment and I try to reach over the top
of that sofa. I have to get higher in order to do that. Terrain is certainly an issue. Loss of signal
inside foliage that’s around where the tower is located, that’s an issue. All those things are
called clutter. So, terrain and obstacles are clutter to the radio frequency signal. It has to get
up above those in order to be very effective in terms of collocation. The sites are being built to
have two co locators. Very perceptive question and I forgot who asked that question. That
means that if someone comes in to co locate they’re going to have to go lower. And you will see
the effect in the propagation plots of what that looks like. It reduces the footprint, the area that
the base station can service, and they would have to deal with that, or they would have to
propose another tower or put an extension on the existing tower to get it up above so that they
would get a bigger footprint and that would be a question for the planning board. It would be a
question for you to go and look through this again to try and figure out what’s appropriate to do.
Are there other way that these could be solved? If you were in an airplane and you were looking
at you know from 20,000 feet up you would see a bunch of base stations that are you know,
scattered throughout the area. There’s nothing that says you could put 7,10, 15,100 foot towers
90 foot towers in an area. It would be essentially the same cost per tower to put that in. So, I’m
not going to get into the finances of it. Okay, but you’re putting, you know, you're not ....you’re
not putting something just on a pole that’ s 10-15 feet up in the air. You're putting a tower that’s
probably going to be up in the 80 to 90 foot range to cover a parochially small area because of
the trees and because of the radio frequency obstacles. And every single one of those sites,
you’re going to be having a hearing like this and you’re going to have opposition from residents
for those. So, you know, minimum impact on the community, and possibly the feasibility of doing
something like I just described, those have to be balanced, and they have to weigh on. Okay, this
site is a single site. It will provide the coverage that Verizon needs to have. There is a gap
whether it's capacity or coverage in both of those locations. And the heights that Verizon is
proposing from an engineering point of view looking at the propagation plots seems to be that
those are the minimum heights that they actually need to get those kind of service. And one last
comment before I stand by, the question is is there really a gap here or is because we're looking
at Verizon’s information, right? We're looking at propagation plots. We're looking at
information that comes from about the key performance indicators. There’s a lot of that
information that you or I can’t independently generate. Okay, I don’t have access to get inside
their switch. I wish I did, but I’m not a hacker. But if I could get in there and look at those key
performance indicators myself, then my guess is | would probably see what they presented to us
tonight. There is a website that’s called OPENSIGNAL.COM All one work, open signal. And
Pg. 190 September 8, 2026 Zoning Meeting
you can load that onto your smartphone and there are features on that where you can actually
look at a map and see what the coverage is for the various carriers. So, Professor Chickarelli
and I did that because we just do that as a matter of course trying to look to see, you know, is
there an independent confirmation? It matches pretty well to what's happening in Webster
North. Now, we don’t have that information at Lake Road and County Line Road and that’s
because there already are some existing sites that are there. So, there are actually some calls
that are actually going through there is radio frequency coverage, but what I can tell you is the
Webster North site shows.....1 actually put their propagation plot and the information from
opensignal.com over the top of each other and it almost predicted what Verizon has produced.
So, professor Chickarelli and I, even though he's not here tonight, I’m going to speak for him
that we're very convinced that the information you're looking at is valid information and it could
be independently confirmed, but I don’t think you need to do that. I’ve been involved with doing
this type of work probably for the last 30 years or so, and early on it that propagation tools were
not very accurate. Uh, currently the propagation tools compared to an actual drive test where
you put an antenna on the roof of a car and run it around the roads. We can’t get into people's
backyards, but we can be on the main roads. If you put those things over the top of each other,
like the opensignal.com exercise that I described, you see a very good correlation in present day
between what is being shown in the simulation and what’s actually real work measurements. If
we were having this conversation 30 years ago I wouldn’t be able to be quite that authoritative
about it. There was big discrepancies between the propagation tools and the actual
performance. But these days, the reliability of that information is pretty good. So, | hope that
helps you and I be happy to answer questions if you have them.
thank you for that because that was actually going to be one of my questions is
where did you get the data from? Okay, came from Verizon. But you were able to at least one
of the sites do an independent confirmation and that lined up pretty well. Over the course of your
career doing this, how well does Verizon’s data play nicely or line up? You know, follow what
I’m asking?
I follow what you are asking. So, when you do this type of work and you
engage with the technical folks at on the other side of the fence with Verizon you do develop with
some familiarity with who the people are that you're dealing with. So, we do have some very
honest conversations about these sort of things about how accurate ts this and where are things
settling in. Verizon has been very good you know at least at talking to their technical folks which
is you know where professor Chickarelli and I spend our time is talking to their engineers,
There has always been a collaborative you know pretty much; they're not scared to show us
what they can show us. You know, sometimes they show us some good stuff that you know,
perhaps wasn’t actually entered into the record. Like we've seen the video for the drone flight,
right? It was not still photographs, but it was actually a rotating drone video that showed us
what the tree heights were, which is why we're fairly convinced that to go lower than that
proposed height would now Start to put those antennas down into the tree line. You've got four
Photographs. We've got a north south east and west photograph but those are very
representative of what the actual video shows but I don’t think they can easily put that video into
record to do that but professor Chickarelli and I did look at those things and there’s other things
Pg. 191 September 8, 2026 Zoning Meeting
like that that we try to just cross check so I have a very high confidence that the material that
you've been provided is good not that just for this particular case but for the last couple of
decades they’ve been very straightforward.
Thank you. I think this has already been answered, but I’m going to ask it
anyway. Tower height and the lease. Ultimately, take the lease aside, regardless of if Verizon
decides to lease out or not, the height that is proposed is the height that is necessary for the
coverage that has been identified to be able to um. ....to increase coverage, to increase capacity.
Correct? Anything lower really isn’t going to meet the needs of the area.
Yeah, that’s our opinion and we actually asked for that material to be put in
the record so that you had it so that you could also see the comparison, but that’s the same
materials we looked at. We didn’t look at anything different than what you're seeing.
Perfect.
So, what they’re asking for is the absolute minimum to provide coverage, not
necessarily for the densification of the network.
Yeah, this is yea, those heights that are being proposed are at or near, you
know, I try to fudge that just a little bit, right? It if was two feet lower or two feet higher, it’s not
going to make a huge difference, right? That antenna center line is what they need off load the
adjacent sites for capacity issues, but particularly in Webster North to provide new coverage
because there’s areas there that just don’t have any coverage at all.
Does...... you know, you drive through the Adirondacks; the Catskills um there
are cell towers that have provided awful aesthetic but aesthetic enhancements to try and hide
them, Um.....do those enhancements affect the coverage area?
If we’re talking low band, it doesn’t affect it so much. It's feasible to do that.
There are a lot of stealth sites that are in the area at low band. Now when you go to the mid
banc, it’s higher frequency. So, putting the artificial limbs on the trees and putting leaves out in
Front of the antennas. So, you know these are plastic, right? So that they don’t actually absorb
the energy, but it turns out that those do enough things with refraction of the radio waves to
disrupt how the antenna was designed to perform. So, there is some degradation, and we have
Verizon, | say we, Verizon put a site in in Pittsford. It’s a stealth site that in a bell tower in the
Town of Pittsford and was a very nice site and works pretty well for low band, but for the
midband there are some problems. There's problems when you have a dielectric material, plastic
material;, and you try to shoot a signal sideways through that material. If you’re shooting
straight on, it’s radar systems, you see those rotating, you know, radar beams or the big domes
that are the weather radar, that signal is shooting straight through that plastic material, but
when it shoots through at an angle, there’s very bad things that happen to the radio signal but
that’s part of the RF engineering and that’s one of the reasons why stealth sites are not
preferred. But if they're necessary, there’s some degradation in technical performance for the
Pg. 192 September 8, 2026 Zoning Meeting
advantage of an aesthetic improvement. A 135 foot artificial tree, okay, maybe a little bit
questionable. OR 125 foot artificial tree might be a little bit questionable standing by itself, but
that’s a matter for the planning board and for you folks to consider.
Understood. Other questions from the board before I open it up to the public?
I would say that any type of at that height, if you’re going to create a fake tree it’s
going to stick out as fake tree anyhow. In my opinion, worse than a monopole would be, but
that’s an opinion, not a question.
So, I’d like to open it up to the public whoever may want to speak for or against
this project. Can I have them come up and just specify which site John?
Yeah.
Okay, so just specify what site you are speaking for or against.
Before the public starts? We just....for the minutes, I think it’s cleaner if we keep
them separate for the public hearings.
Okay. Then let’s do Webster North then first since you’ re the first one up.
Geraldine Breschard at 632 Pinelakes Trail (DID NOT SIGN IN) I’m here tonight to speak on
behalf of Webster Presbyterian Church. They have heard of the opposition to this cell phone
tower. No one really wants it in their backyard. They understand that and they are very
sympathetic to the community and they would like to make this offer to both the town, zoning, the
planning board and Verizon that the Webster Presbyterian Church located at 550 Webster Road
would be very open to the cell phone tower being put on their property. With that, I hope you
consider. They have a decent sized piece of property, and it would really virtually affect very
limited amount of houses. I think only one home and even that’s questionable. So, I hope this
board takes that into consideration and Verizon does as well because this is a very generous
offer from my church and it might help alleviate some of the anxiety that homeowners are
having. Thank you for your time.
Others who want to speak for or against Webster North?
Barbara Robbins at 1205 Wildflower Drive: I had submitted a petition with 95 signatures to the
town planning board, and I actually was the only person who walked around the neighborhood
and spoke to all the residents and obtained signatures from people. And the individuals that had
problems with their cell phone coverage were all Verizon customers. There were no other
carriers that expressed individuals that expressed issues with their coverage other than Verizon.
I know a few people, after talking with Verizon, they offered them the additional boosters to put
into their homes so that it would help them. There were other individuals that said no matter if
they had something in their house or not, if they stood in the corner, they couldn’t get coverage
unless they walked out their front door. It’s not that we don’t want people in our neighborhood
Pg. 193 September 8, 2026 Zoning Meeting
to have coverage because I feel that’s important for anybody who wants to have a cell phone, but
our neighborhood is made up of very large trees. And that is part of why we purchase the home
that we did 24 years ago. My husband, when we were looking to move from the Maplewood
neighborhood out here to Webster, he didn’t want to look for a new development because we
didn’t want a six foot tree in our yard, we wanted a tree that was taller than our home. And we
don't want to see, you know, the trees be cut down or in a few years if this tower that’s 139 feet
you know, 39 feet above what the town has right now as the height for towers and things. Are
they going to have to go in and cut down trees? The gentleman over here, John, he asked
attorney Smith a question about what happens when the trees continue to grow. It really meant
that Verizon didn’t need to come back and ask for additional approval if the height of the tower
or the pole was increased. It would be that they could just increase it at random. When I walk
out my front door at 1205 Wildflower Drive, I’m going to see that tower across the street. We
thought that having it camouflaged was going to be an option. We had not heard nor have I read
anything where it ever stated, you know, that it impeded the radio frequency. So, that in and of
itself is another concern. I know people that live up the street from us, and they have a pool in
their backyard. Um.....this tower is going to be right off the side of their yard. They own about
three and half or 4 acres and it’s just not something that’s really conducive. We don’t even
realize if where this tower is looking to be built, are they going to be clearing out a lot of the
trees that are in that property in order to get this back in there?
So, one thing I want to address, if Verizon has to go taller, they do have to come
back to the zoning board to go taller because the motion will be for us for this particular tower
will be for a height of it was I think it’s a 139 feet...Um. So, if they want to another 10 feet taller
because the trees have grown they will have to come back to the zoning board for that. They
probably don’t have to go to the planning board, but they will have to come back to the zoning
board because the height.....the zoning board is restricting it to that height.
And because they are leasing the land from the owner, I doubt whether their lease
give them approval to trim down the trees whatever heights they want but that would be between
Verizon and the land owner, but it’s unlikely that they would.
Barba Robbins at 1205 Wildflower Drive: I would very much encourage though for them to look
at the Presbyterian site. I mean, we do walk around the block and probably something that still
could be seen, but it wouldn't be in the direct area, and it wouldn’t have all kinds of forest that’s
going to affect it.
Does anybody else want to speak for or against the north site?
Town of Webster, why don't we just make a local law that says that the town
boards can do whatever they want around here? I haven't seen this many theatrics around a
town board in well, probably a few weeks. But you guys are doing this big theatrical
performance tonight, I guess about whether to approve a 39 foot variance or an area variance.
You guys know what you have to do because the town code dictates what your decisions have to
be. So, I knew the outcome of this meeting prior to coming into this meeting, and you guys know
Pg. 194 September 8, 2026 Zoning Meeting
the outcome of this meeting prior to coming into this meeting. So, why the 3 hour long theatrical
performance, I suppose, is my question. It’s not really being fair to folks. Now, we do have to
make sure that we supplement the record and that it's diligently pursued, for lack of a better
term. So, I think that you guys are required to go and inspect the Presbyterian Church on
Webster Road to determine whether it’s less intrusive. There’s a real hardship here regarding
the residents over on Wildflower. All the neighboring houses are going to have their property
values diminished because of the aesthetics and because of the perception of the cell phone
tower, So, the least that you could....that you folks can do, and I know there’s a lot of talking
from Verizon. There’s....we have an independent contractor with lots of information. But what
you guys need to do is actually very simply, which is deny the height variance for these folks
because I’m looking at you guys and I’m thinking these guys work for the developers. That’s
what I think when I see you guys here and I look at you guys. I think these folks work for the
developers because it’s so clear in our town code that there is a maximum height allowance of
developments in the town of Webster for 100 feet but somehow the town code doesn’t apply to
Verizon Wireless. And there's a discussion; well, more micro towers produce more hardship if
they build micro towers to fulfill to fill in the coverage gap. I don’t think that’s the point that the
resident are trying to make. I think they’re saying first of all, follow the town code as it's
written, which is really like you number one job description and follow the town code. Second,
fulfill....make sure to diligently fulfill the record, which yea, i.e. go and inspect the press. I think
you’re actually required to go and inspect the Webster Road Presbyterian church site at this
point. So, when you know.......g0 and do that, please. Because if that results in less hardship,
that’s what you need to be doing. The third issue, and I’m just going to restate it before closing,
is as far as the 39 foot height variance we should end that argument, end that whole discussion
right now. Absolutely not. Because again, our town code says 100 foot max. So, what's the deal?
Why are you having this argument saying the developers and you guys shouldn’t have to follow
our town code? It is so....it could not be clearer. Follow our town code. And guess what? We're
going to have to change our town code so that cell towers cannot be built on residential
properties because that’s what cased this whole dilemma for these residents to begin with. For
some reason, the town code says that the cell towers can be built on residential properties.
Can you limit your comments to the application?
Sure, John. What comment is not related to the application?
I’m not answering your questions. I’m asking you to limit yours because it’s
10:
10. We can call the meeting rather than have the public be heard. So just keep your
comments limited to the application. It would be helpful.
What comment was not limited to the application?
Unfortunately, I don’t have to answer your questions, but I’m asking if you
would....
You're answering John. You’re answering a question right now. I didn’t ask.
Pg. 195 September 8, 2026 Zoning Meeting
Kevin, do you have any more comments?
Call the next speaker.
Do you guys understand what is expected of you tonight?
Kevin, we understand what’s expected of us. Do you have any more comments
for us?
I'll trust that you guys will do the right thing. Thank you.
Any additional comments for Webster North?
Mark Robbins at 1205 Wildflower Drive: I’m Barb’s husband. And I just wanted to clarify
something for John. You asked a question earlier about the town’s location on Wildflower
Drive. I guess there’s a water treatment plant that was originally considered. That's only about
250 or so feet away from what's being proposed now. And it’s not clear to me and I would like
an answer specifically why the town rejected that. I mean, it’s their right, you know, it’s, you
know, as was stated legislatively, but we didn’t get an answer technically why that was turned
down from that particular site initially. So, I just wanted to clarify that. It’s only a few hundred
feet away from what's being proposed.
So, when the town board voted, they didn’t....each board member didn’t have to
give his or her reasons, right? My guess is if you went back and you looked at the tape, you
could probably surmise, if not individually, collectively what the stated reasons were. And it
may very well be if you were to call the individual town board members, at least two of which
are new, I believe, I don’t believe voted on that. So, three of them, if you were to call them and
ask them, they may tell you. I don’t know whether they will or not. But the reason why I had
asked the question was if the town considered to revisit it and I’m not saying that they’re
interested or not interested, how it compares with the proposed site. And I guess for whatever
reason, I was surprised to learn that apparently the proposed site from Verizon standpoint and
coverage and capacity apparently is superior. I don’t know by how much, it’s just slight or it’s
significant to what they’re proposing now.
SOMEONE FROM THE AUDIENCE SPEAKING OUT AND I CAN NOT HEAR VERY
WELL......... at this Wildflower site. I think there was a difference of 10 feet, wasn’t there?
Well, we’re going to allow the applicant to come back and answer any of the
questions that they choose to.
Any additional comments for Webster North? So, we’ll stick with Webster
North. Um.....let’s see, (CONVERSATIONS BEING HELD BETWEEN MICHAEL SHORT
AND JOHN DEMARCO. ...can not really hear it) Let me ask the board. Does the board want to
hear comments for the other...... Lake Road? Again, I’m trying to get all the comments in so
wee can move this along.
Pg. 196 September 8, 2026 Zoning Meeting
Let me make a suggestion. It’s 10:15, I think, out of courteousness to the public,
why don’t we switch gears and let the public speak on the other site. So, at least if we have to
close the public hearing because of the lateness of the hour, we can do that and hopefully the
applicant will have enough time this evening or if not, at the next date to answer any concerns.
But I think.....1 don’t know if the public wants to come back again. To me it would make more
sense to let them speak now.
Are we okay with that, Josh and Erika?
I think in the interest of clarity for the minutes moving forward, you should make a
determination to close the public hearing for the Wildflower Drive and then go into the Lake
Road.
Yeah, absolutely. So, with that, we’re going to close the public hearing or public
session for Webster North. Will open up public comments for Lake Road. So, does anybody
want to speak for or against Lake Road? Come on up.
Show of hands of how many people are going to speak on Lake Road. Okay, so
one more.
David Rasmmanson at 1090 Lake Road: I’m an attorney and I’m representing my daughter-in-
law and son, Kelly and Daniels Rasmmanson and they live at 1890 Lake Road. Kelly’s here in
the audience. They live at 1890 Lake Road which is directly across the Lake Road proposed
facility, Um....couple comments and I recognize the lateness of the hour. The planning board is
still deliberating on this. Council made a comment that has been fuily vetted, and I don’t know if
she intended it, but I think that the insinuation was that it’s all done before the planning board.
It isnot. It is being vetted. It is being argued. It is still being presented and there has been no
decision made. So, I would suggest to you that any decision by this board at this point would be
premature and unless and until the planning board make some deliberation or some decision on
it or if you were to make a decision that you would do so conditioned upon what the planning
board may or may not do. I certainly wouldn’t want anything prejudicial to happen here with
respect to the planning board’s deliberative process. Now, one of the test that council and I
agree with her that they have to meet is that the project as proposed must have a minimal
intrusion on the community. They haven't even addressed that. They are so far from being able
to establish minimal intrusion on this site. This site has maximum intrusion. It’s out in the open.
It’s out there for the whole neighborhood to see. There are no trees, no buffering, no nothing on
it. Plus, it’s situated right on the corner of the National Scenic By way, the Great Wake Scenic
Trail. It is a National Scenic Highway, and this is going to be built right on it. Now, the scenic
byway is administered by the New York State Department of Transportation. I’ve spoken to
them... I’ve given the information to Mr. Artuso, and I believe he has reached out to DOT.
They're concerned about it. They have concerns about this being on the National Scenic Byway.
Also, when there’s an intrusion on an aesthetic resource such as this, the National Scenic Byway
is defined as an aesthetic resource. The DEC strongly recommends that any deliberative process
include a visual impact study that's very detailed to minimize the visual impact of the project.
Pg. 197 September 8, 2026 Zoning Meeting
That hasn't been done as far as I know. The lead agency in the secret process would take
responsibility for that and I think it should be done here.
Finally, I think Windmill Farms controls the search area. I think more inquiry needs to be made
into what availability they have. They've cited a conservation easement. I’ve researched the
conservation easement. It doesn’t preclude this use. It could be taken out of the conservation
easement, and this use could be put farther back on the property. So, I think a lot more due
diligence needs to be done on this search area. So, with that, I’ll close my comments for tonight,
thank you.
Thank you.
Bob Jansen at County Line Road: I live directly across from where this is going to be. If you
could fine the picture, I think it's either 140 or 125 in the pages. Um...give you a sense of what
I'll be looking at. Um...it is a visual intrusion. Um....In 1996, 30 years ago, the Federal
Communications Commission has hearings and came up with recommendations um....on cell
phone tower placement. Um....their recommendation 30 years ago was 1,600 feet from a
residence. My house will be about 300-325. Uh....the Rasmmanson’s probably about the sane
given where they’re going to locate this thing right at the corner. Um....the issue of coverage,
Um... have the exact difference from what your coverage is. I’ve got Verizon telling me I don’t
have coverage and I have coverage every day. I use my phone all day long. I was out on my
mower all afternoon, got headphones on, Wi-Fi and I'm listening to music off Verizon. I’m a
Verizon customer. So, I don’t understand and my neighbors tell me they use their phones, they
work from home, they’re getting coverage all day long. So, the idea that there’s no coverage is
kind of specious. Most importantly, if you look at the maps they’ve got, um you look at their
marketing map, they tell everybody that wants to buy Verizon, we got great coverage. 5G, I’m
sitting in 5G and 4G is all the area south and east of me. All of in Ontario, the other side of
County Line Road from where this tower is going to be. And if we look around, we’ve got a
tower on Dean’s Parkway. Milk Plant's got a tower; Boulter’s got a tower; Four Mile Creek’s
got a tower; Ganea’s got a tower; if they build a tower at the corner of Lake Road, 50% of the
coverage for that tower is Lake Ontario. Not many people out there.....1 realized it from Boers
probably needed maybe an emergency, but the reality is 60 maybe more percent is south and
east of where the maps show that...what they want to call a dead zone. But you can’t have it
both ways. You either have coverage and the maps they market it with and sell with say fine, we
got all the coverage you need till you buy the coverage and it's oh well you don’t have coverage
there. And I think it’s time to get that straight. I’m not quite untechnical, but I don't know low
band, mid band, and I doubt that any of you do really understand it either. I was out in my yard.
I have five acres. I’m surrounded by trees, a lot them dead ash, but I’ve got a lot of huge
cottonwood trees, big ones, tall ones and I never lost coverage once. I can drive around in my
car all the time out there and I can have all the coverage I want. I think the argument that
there’s no coverage and it’s maxed out and it’s not available just and I understand there’s been
a study done looked at Verizon's data. Well, if you’re looking at their data, what do you expect
to find? You're going to find them saying this is the problem. And I’m not saying they’re lying,
but I’m not saying either that it’s true. I think there needs to be an actual coverage done and
Pg. 198 September 8, 2026 Zoning Meeting
check it. Take their word for it. That’s fine. But I think they did it by having all the equipment.
Let's get someone to do it and show with real equipment. Yes, they're absolutely right but I can
tell you I use my phone all the time; my neighbors do; and they all tell me they use good
coverage. And something's wrong. I don’t know who to believe, but it’s not Verizon.
Thank you. Does anybody want to speak for or against...uh, Lake Road? Okay,
Um....I do have a question, Steve, right.
Is that Mr. Jensen?
It’s Johnson.
You mentioned earlier when you talking that you know, if Verizon kept with the
100 foot towers they’d have to put more in basically to hit the same coverage. I know.....I’m
pretty sure we weren't ...you weren’t asked to study how many more towers, but you’ ve done
this a long time. If you were to throw a dart at a wall, how many more towers would be
necessary to make the same coverage? Again, it’s a guess and I understand that, but how many
more towers?
Yeah, so one of the things that has been done when they have to densify and
this is for any of the carriers, right? If they have one particular tower, what they would do is
lower the height of that tower and put six more around the periphery. So, you know, lacking
information, right? That probably we would take one tower and make it into seven.
Gotcha. So, with that right from an impact one could argue, one tower at 139 feet
is less impactful then seven towers at 100 feet. So, okay.
And there would be also I mean keep in mind, there’s a cost implication here
too which you know, something you need to consider because they are public utility and there is
case law from the New York court of Appeals that speaks to those kind of issues. It was about a
nuclear power station that was never built but a municipality wanted to do some improvements
to that particular power station. It increased the cost to I think 20% more than what it was being
proposed. New York Court of Appeals struck that down. The site was never built okay but that’s
probably the closest we have to you know something dealing with a public utility and the
increased cost. Would a 5% increase be reasonable? I don’t really know the answer to that
question. That’s all speculation.
Mr. Johnson, I want to go back to the Verizon data for a minute. Have you
ever...... I think you may have spoke in your first presentation about that there’s a trust factor.
Have you ever had an occasion to request the data that would address the figures that they’re
showing in the exhibits?
In this particular case you mean?
No, ever in the 30 years that you have been doing this?
Pg. 199 September 8, 2026 Zoning Meeting
So, the present individuals were not involved in a case that goes back probably
20 years ago. There was a site that was being proposed in the town of Lockport out to the west
of here. It was a huge tower. If | remember right, it was about 150 feet-180 feet tall and the
propagation plots that were supplied were not convincing me that actually....that that was what
was needed. And I pushed back on that quite a bit and it was an attorney who was representing
the site from out of the area and a different RF engineer than who was involved here and I got a
phone call one day from one of the other RF engineers and said he was taking over that site and
I asked him, you know, what had happened? Why are you, you know, swapping in and things?
He said, “Let's just leave it at the fact that I'm on the case now.” And he sent me some
propagation plots and if I’m going to remember, it was like 120 feet, maybe 110 feet was what
they were going to propose because that would actually accomplish the goal.
Well, my question is, have you made that request in other cases that you ...
Yes
And have the carriers readily provided them to you? Forget about the work
readily for a minute. Have they been provided to you?
Yes....so, particularly Verizon.
But in this case, you did not request them.
I’m trying to understand what data you're referring to. Your talking about for
lower height analysis.
No, the data that...uh, the capacity and the coverage data.
That was the information that was provided in the application materials.
So, I’m trying to address the last gentleman that was opposed. And we talked
earlier about data that you were relying on that you didn’t have visibility to. Right? Which data is
that?
Okay, that would be the coverage. So, we’re talking about Lake Road with that
particular comment. My report said that there is ubiquitous coverage of 700 megahertz. That's
low band but at times, capacity for the number of users that are trying to use that particular
spectrum is being exceeded. So, right now he'd be drawing signal off of one of the adjacent
towers. When you’re listening to music, there’s a buffering that occurs, right? Is that when the
system is available to do it, it will download, you know, ahead of where you're actually listening.
And then, when there’s a drop, the buffering actually starts to catch up with the point where the
Phone has stopped downloading that information, but the music keeps playing but during that
period of time, it can re-buffer when the system becomes available, and it will buffer some more
a little bit further out. So, from a user’s point of view, it may not be all apparent that the
connection was dropped for a substantial period of time.
Pg. 200 September 8, 2026 Zoning Meeting
Was there any data from Verizon that you would have like to have had but didn’t
receive or has not asked for?
No, that....no, the information that was provided in the application is what we
typically asked for. We asked for cleaners plots because we wanted to be able to read the
captioning. We wanted to actually see what the numerical information was, and they provided
cleaner plots of those data, but it wasn’t different data.
So, substantive data that Verizon relied upon for their conclusions that you
verified you were not without any of the underpinning if you will, the data upon which
conclusions were.
We don’t have the raw data because that’s what comes from the switch but
that raw data is plotted on those plots.
But also that data that was provided to you, there was no red flags that you saw in
that data as you did 20 years ago with the other project.
That's correct.
I think that’s what you were asking, right. So, so you didn’t need to ask Verizon
for any additional information because the information that you had, you were able to verify at
least the one site which gave you a comfort level for both sites.
Correct. Although, I have to add this that we didn’t try to generate that
empirical data to compare it to. We're looking at the information. When you have saturate
sites, and this is a very typical scenario on a lot of locations, when you have saturated sites, you
start to see those key performance indicators start to ramp up and start to either go over or
substantially go over the 100% mark.
And you were able to verify that against the Opensignal.com which is
open.....readily available data as well.
That’s right.
At least for the one site. I think the other side you weren’t able to is what you
mentioned,
Right, because again those are sample points. I mean when you do
crowdsource data you're calling a lot of information from a lot of users to try to
establish....okay, what's the typical statistical performance of the system in that area. We
couldn’t see the type of information we'd have liked to see for Lake Road from open signal
however, when I looked at open signals information for Webster North, there was almost a
match,
Pg. 201 September 8, 2026 Zoning Meeting
Understood.
When you...what is the criteria that one of the neighbors spoke about as well as
Miss Smith, this minimal intrusion does.....is that part of your expertise or is it not?
That is an aesthetic judgment that has to be made by the planning board.
That’s why I’m asking that question. So, it’s a lay person’s.....Well, it’s not
necessarily your daily wick.
Correct because my perception of minimal intrusion might be I want to have
really great cell service.
Well, I think minimal intrusion it’s two-tiered. There’s minimal intrusion in the
area where that’s lacking the capacity and the coverage and then there’s a second tier at the
actual site that was determined to be minimally intrusive how minimally intrusive it is what
they’re putting up and but on the first tier that is in your wheelhouse, right?
Yeah, if there is a need for wireless services, so that would be the
establishment of a significant coverage or service gap in the area. That's what Professor
Chickarelli......
Did you opine that out of, and I forget what Miss Smith said for each location
how many there were to choose from, but you’re opining that the sites that were here for tonight
were the most minimally intrusive of ..........
No, according to the application materials of all the sites that Verizon looked
at, there was only one that was viable either technically or landowner agreement. Right, so we
pushed them on that particular point. In fact, in our first report, we moted that the boards were
being presented with only one option that there were no other options. And when you’re talking
about something being minimally intrusive, 1 mean, the implication is you’re comparing it to
something, right and there’s nothing else to be comparing it to because that was the only site
that was available. Now there comes the question is the minimally intrusive height is that the
minimum height for performance? So, we looked at that, and we gave you a finding on that.
I have a follow up question, but I'll ask Miss Smith. So, could I just follow up on
this minimally intrusive? You probably have a list that you want to go and respond to what I’m
assuming.
I’m happy to start with your questions.
And I could be easily the densest one in the room here, so forgive me.
I’m sure that’s not true.
Pg. 202 September 8, 2026 Zoning Meeting
We did find out that cell phone service...........
I’ve never dropped a call. It goes right through my ears. The....one the minimally
intrusive following up on what Mr. Johnson just said, if there was a site where you couldn’t get a
lease, maybe you didn’t want to pay what the land owner wanted is a take away possibly that that
site could have been less intrusive but for Verizon’s unwillingness to pay a price? I don’t know if I
did a good job with that question.
No. And I, you know, I think I'll note, you know, we have gone through exercise and
maybe I'll say it differently, right? I think there’s no disagreement that being on the tree line in the
back of the farm would be less intrusive than the site that’s being proposed. Right, so there is, you
know, I don’t believe that we take issue with that of having the tower so abuts the tree line would be
a better position for it to be in and candidly, we don’t want a controversial site, right? We would love
to go where it is easier to build but the landlord declined and said we couldn’t go there for farming
operations or conservation easement operations. So, you know, from Verizon’s perspective, we want
to be in easy sites. We want to be in sties that are easy for a planning board to say yes to or easy for
the ZBA to say yes to.
You’ re indicating though that on the Windmill farm site the undesirable piece of it
or the....it was blocked because of other reasons not dollars and cents. It was a conservation
easement; there is some other reason.
Correct and candidly what the reason is we have to defer to the landlord. So....I’m
using right ....... we have more reasoning on the Windmill farms.
Let me ask you the question this way. Were there other sites where you weren’t
deferring to the landlord, but Verizon was making a business decision. I don’t want to ...... we don’t
want to pay X. The land owner wants too much.
So, there is....in the record there is a site selection analysis that goes through the reason
why those choices declined to lease with us. Often they don’t want to engage in lease negotiations.
There are instances where they never respond when you knock on the door and leave a card and send
a certified mail. So, they are for a variety of reason that are not just.............
And were there reasons in this selection process where Verizon chose not to
negotiate based upon terms.
I don’t want to mis speak; it is set forth in the record. My understanding is no. There
were on instances that .... I’m saying that in a negative way. Either the landlords did not respond or
did not engage in negotiations with Verizon. They said no in this particular instance.
Last question on this issue. When you talk in terms of case law, Verizon or a utility
reserves the right that even though a location might be less intrusive, they reserve the ability not to
Pg. 203 September 8, 2026 Zoning Meeting
be required at that location based upon the three criteria that you gave us if they are paying a price
they don’t’ want to pay.
There is very strong case law that a telecommunications provider does not have to pay
above market rates or something that does not make the business case work. Whether it’s a lease a
length term that’s not acceptable. If it’s a rent that’s above market. So yes, there is strong case law
that says and I’m saying this to be transparent, not in a negative way, but a zoning board can’t dictate
business terms that a telecommunications provider goes with.
You’ re representing to the best of your knowledge in this case.
Correct. Yes.
There wasn’t a more minimally intrusive location that Verizon turned away from
because it was greater than market rate.
Correct. But I do have our site selection specialist that can talk about the site selection.
Again, I’m not trying to invite more information than we need. It’s late. I just as I
understand this more refined. I just wanted to see whether.............
Nico Facey (DID NOT SIGN IN) Ihave the unfortunate job of trying t find sites. I think what you’re
trying to ask was there another, you know, landlord interested but wasn’t able to get a deal because
of finances. The short answer is no. The farm is the only interested party. We contact people the
same way. Everyone is the same. Knoeck on the doors; we leave letters in their mailboxes; we send
certified mail. People who aren’t interested, they just most times they don’t contact you. People who
have some interest, they’ll call you. They’li try to solicit more information and then the ones that
are interested, they’ll call you right back and say, “Hey, let’s talk about this”. But in this case, the
only interested party was the Windmill farms, so the short answer is no. There was no one else that
was interested and we couldn’t get a deal done because of finances.
What happens in an area, say you have 10 lots or land that you want to go look
at. Everybody turns Verizon down. How do you start back at square one?
We just don’t stop. The problem doesn’t go away because we don’t find a location right
away. And you know, case in point, Webster North has been around for we’ ve been trying to solve
it for.....we’ve been working with the town for three years. So, because the problem exists, it’s not
going to go away. So, Verizon kind of has to fix it. So, short answer is, we have to stay you know.
We go back and we try again you know, maybe somebody sells their property...you have a new
owner someone e you know, may be interested at a later time. So, some sites take longer but we...it
just...the problem doesn’t go away. It doesn’t solve itself so we have to kind of stay on the case until
we can find something.
Pg. 204 September 8, 2026 Zoning Meeting
So, quick question, looking at the graphic up on graphic up on the screen, the circle
represents the ideal location. Somewhere inside that red circle represents the ideal location for the
cell tower. Is that correct?
Correct.
Okay. So, to....one of the residents that came up speaking about the Presbyterian
Church, the Presbyterian Church was outside of that red circle. So, it was not in an ideal location for
the Verizon tower.
Correct. So, the church is outside and we actually, like I said, because we’ve been
working on the site for so long for Webster specifically, we looked at multiple locations outside of
the search area, which we typically do not do. But that church was vetted by our RF engineer and it
simply doesn’t work. It’s way too far outside the area.
PEOPLE FROM THE AUDIENCE SPEAKING OUT.......... 0... ccccccccceeeecseeeeeeeesaseeeeeeeaes
No, this one does not. No, I understand that. But when the graphic was up here, I
took a look to see where the Presbyterian Church was in relation to that circle and it didn’t.....that
circle didn’t cross
250. John Accorso: I have a question regarding the conservation area. Did you...I don’t know if this
gentleman that spoke a while ago said that you can build a cell tower in a conservation area. I don’t
know whether that’s true or not. I’m basing it on what he just said, and I don’t know if you know if
that’s true or not. But if....I’m thinking that if the farmer is of the opinion that he can’t do anything
with that because it’s a conservation area. I’m wondering if this gentleman over here is correct,
could we have a discussion? Is it possible to have a discussion because it....everybody seems to have
admitted that the conservation area would be a better location for the tower.
What I can say is that the landlord has come in and actually met with the board regarding
his entire property. So, I mean Verizon can’t force him to put us in a location, right? We’ re leasing
a small area of his property and where we are is the only area that he has available for lease.
I’m not....I don’t think ’'m making myself clear. I think if I’m understanding this
correctly, he may not think that he can lease that piece of that conservation area to you because it is
in fact a conservation area.
So, he has told us no based on and we have a supplemental letter as well. So, we’ ve
already asked him multiple times about that areas and he said no.
If I could also speak to minimal intrusion exhibit K of the....1 know, we’re like
bouncing around. Exhibit K of the Lake Road application and in no way do I want to minimize the
testimony that you heard but I do want to note that the area that this is located does have a significant
Pg. 205 September 8, 2026 Zoning Meeting
amount of electrical utilities. Um...transversing the area. So, this is not.....you know, I guess I also
don’t want to give the impression of there is nothing on this parcel but for the cell phone tower that’s
about to be there. There are other utilities that are located on this site and that is part of the view
shed when one is driving down Lake Road. So, it’s not um....it’s not uncluttered. It is a cluttered
area where a cel] phone tower will also go in to the extent of you know landscaping around the base
to hid the equipment that is done routinely. But you know when looking at these various sites I do
just want to raise that note of its not a completely empty field and the cell phone tower is the only
thing that will be in it. There are other utilities and electrical lines that are in that viewshed.
It will be the only thing that is over 100 feet taller.
Very true. Right. I just don’t want you to have the impression of there’s nothing there
and there and there will be something there.
I mean it’s typical telephone poles that are there currently.
Yes.
Transformers and things of that nature.
There are no other 125 feet, but it is...... there are other infrastructure that’s located on
this parcel.
pOMEeN It’s a 7.8 acre plot at the very end of the farm. It’s leased out every year to another farmer
for planting. Worst comes to worst...I didn’t get a chance to show you the picture that I’1l be looking
at. Talk about intrusion. This tower could easily be moved south 100-200 feet more where it doesn’t
sit right next to the road it doesn’t intrude exactly in our 125 feet.
ae te tet members of the farm to not have to look at that tower. Well,
that’s...they dumped it off to us. And from the minimal intrusion issue, the real estate hit the people
who live right next to that tower is estimated to run from 10 to 30% of the value of their property.
In my case, that’s 20 to 150,000 when I go to sell my home. So, there is a maximum intrusion. It’s
going to affect all values. One developer has already lost one sale of the development that’s trying
to do on Lake Brook right across the street. There’s a lot of impact here. It isn’t that we don’t want
a tower............
And it’s...... that’s what we’re trying to weight and I appreciate the comments.
Um...... other questions from the board. I don’t mean to cut you off but obviously.....it’s late right?
Pg. 206 September 8, 2026 Zoning Meeting
(NEVER SIGNED IN) Project Manager for this project. We’ ve been through this
conservation easement issue with the Planning Board. We have taken the Planning board’s
comments about the conservation easement which was very extensively explained in a letter to that
board. We have taken that and met again with the property owner on site to try to see if there was
any way that we could move that tower. We have gone above and beyond. We have taken the
property owner to meet in a work session with the chairman of the Planning Board, the town
supervisor with Verizon and he has extensively explained why he cannot put this tower on any other
portion of his property. We have tried; we have tried multiple times. It is not a financial issue. There
are things that you cannot see that are in the ground related to irrigation that prevent this from going
anywhere else. We have exhausted that conservation easement. Out attorneys have looked at it. We
have spoken extensively with all of the parties about it. Obviously we wouldn’t be here for either
one of these facilities if it wasn’t necessary. Verizon doesn’t expend the capital on something that
isn’t necessary.
Appreciate that.
You recognize we have a job to do, right?
I completely understand and I understand your questions, but I wanted you to
understand that we have already met with the town, ....
Right. But it sounds as though...... I don’t know if you appreciate, we have a job to
do.
I do understand your job.
We’re an independent board from the Town Board and the Planning Board. So,
we’re performing our due diligence.
And I just wanted to add to that. I wanted you to know how extensively we have
researched that conservation easement.
Do you mind? I mean, can you summarize the reason why the conservation easement
area i$ not .........
It’s all explained in that letter, There’s a letter. I don’t have it in front of me. It’s
all explained in the letter. Was that supplied to this board?
Yes, exhibit T of the application, the supplemental materials that was dated March 31
st. So, that’s the letter from the landlord.
And even after that letter came out, we went and met with him to the work session
so that he could explain.
Pg. 207 September 8, 2026 Zoning Meeting
For this board, can you summarize just quickly summarize?
I’m wary of doing so because I don’t want to misspeak what the conservation easement
says, but the crux of the letter is there’s infrastructure in the ground. There are farm operations that
they are renting right, leasing to us. They will never lease to us in an area that will impede their
farming operations. That’s their going concern. They also have conservation easements I believe
both with the USDA and then also with private companies that they contract with. I think they
mentioned KURG Dr. Pepper is one of the entities that they contract with and they have to abide by
certain standards and certain procedures.
So, by them allowing the tower on their contract with that entity essentially is broken
and then they would lose that....whatever the benefit of that is.
And to the extent of could that be amended is there ways around it you know I don’t
want to speak to that, but I can’t imagine leasing to Verizon and they would make that business
decision vs KURG Dr. Pepper or you know a 100 by 100 foot lease area versus KURG Dr. Pepper
or the conservation easement. So, I guess I wouldn’t want the impression of they can’t break the
conservation easement or it is in such a way that it can’t be interpreted one way or the other but
(BOTH PARTIES SPEAKING AT THE SAME TIME} there’s no business case for that.
Regardless they’ re not willing to.
Yeah, exactly.
Okay, thank you. We don’t have to get any further into it unless anybody on the
board wants to.
I think Miss Smith had something she wanted to address.
I think, candidly the one I had was the 550 Webster, but I believe that Nico tied that
up nicely.
Okay. I do have a question regarding uh.....Webster North, the trees. Uh.....there
was a question of how many trees are potentially going to be cut down to accommodate the cell site.
So, where it’s located and it’s on the site plan which I think is Q to the big application.
There, it was chosen on the site....there’s a clearing on the site. So, it was chosen on the site to
minimize the tree clearing was cited in such a way and the goal is not to cut down trees. The goal is
to preserve the trees. It’s an.....candidly, an additional expense to remove trees. So, the goal of the
construction is always to make as little impact as possible.
And looking at the aerial in that area is fairly open.
Pg. 208 September 8, 2026 Zoning Meeting
We did meet out on site with your environmental specialists. ...
The Conservation Board....
We did meet in the rainy evening in the spring, and we did mark the trees that
were to be removed. There were a handful. Not very many at all.
The other question I have is the scenic byway. I don’t know what kind of impact
that has with New York State. I’m assuming, some due diligence has happened by Verizon. Can
you explain that?
Yes and we actually...... we do provide the visual addendum that’s put out by the DEC.
Trying to see my tile straight.
Sorry, bouncing al! over on you on the two.
It feels like a pop quiz. So, in the seeker form, which is exhibit H to the environmental
assessment form, we do supply a visual addendum...............
Different site Erika, you’re on Webster North. You got to go to Lake Road.
The Lake Road application, the one that we have on the drive is not the full drive, so I
can’t pull that up right now.
So, the visual addendum that was reference that is provided, it is noted as being near
the byway, but there is other infrastructure that’s in the byway and would be part of the SEQR
determination, which is their potential for significant adverse environmental impact on a protected
viewshed and for small portion and again, I’m not minimizing the impact felt by the neighbors but
to the small portion of the national byway of having one of very many cell phone towers. The Ganea
Tower is also visible from there the byway. It is one of the areas we’re trying to serve. From the
visual addendum to me the only logical conclusion would be there is no potential for significant
adverse environmental impact to that view shed but. That is something that would be considered as
part of the SEQR determination.
Also, when you are considering a byway, it’s because it a sequential; thing. It’s not
a site. It’s generally a roadway, Route 66 or the Seaway trail where it’s sequential. And if you’re
traveling at it at 55 miles an hour, there’s a lot different visual impact than if you’re living across the
street from it. So, that’s the basis for when you determine something in a byway, not necessarily if
you stop and look at it. Its what’s the impact as you’re going with the speed limit up and down the
road.
So...um, I asked I think is it Dr. Johnson um.....regarding...um....aesthetic
improvements. Um, right. So, being out in an open field, is there screening, whether it be vegetative
Pg. 209 September 8, 2026 Zoning Meeting
screening or other types of screening that would be utilized to help improve visual impacts,
uh....specifically for Lake Road because Webster North is going to be surrounded by vegetation.
Um....but is there anything being provided for visual impact support for Lake Road?
Certainly, having vegetative screening around the equipment base as you correctly
pointed out we can’t screen right the entire tower but it very common to put landscaping around the
equipment location. There. ..it will be screened by a fence, but additional vegetation arborvitaes can
be planted on the exterior of the fence to help even further mitigate that visual impact. So, certainly
that’s something that is done with regularity. Um...I can’t point you exactly whether it is proposed
here but could be a condition of an approval to have that screening put in as a vegetative screening
around the equipment.
Thank you. Um, I heard that having the uh........ this stealth tower, if you will, which
you know, you see a 120 foot tower with uh....sparsely...uh placed branches uh sticks out like a
sore thumb, but so does a gray tower. Um, I don’t know the answer to this other than so, I’m going
to ask it. Does color help with cell tower or um, aesthetics if you will, as you’re driving by on a
byway?
Better question is, is there a way to camouflage the tower itself via paint?
So, as a Rochester native, I’m sad to say this, but the gray sky actually is the
camouflage. It is....it does typically blend into our gray sky. So, the galvanized, that color is chosen
to blend in with the gray sky. I can’t think of a color that would be less intrusive than that. And of
course, at night time, you wouldn’t see it. It’s not lit; it’s not over 200 feet. I think from....I think
Kathy’s going to speak to this from a stealthing perspective, I think Kathy’s heard every choice or
question under the sun. It is difficult to identify a structure that is actually stealthed and then the
added weight of the tree infrastructure makes it bulkier.
Okay, we you have to understand too that if your talking about a tree, you’re
actually going to put 10 feet more onto the height of the tower because you have to make the tree
look realistic with a cone above the antennas. So, you’re adding 10 feet to the top of the structure
automatically. And that’s a pretty tall tree to begin with. Um.....so that’s it doesn’t really, I don’t
think, jive with what you are trying to accomplish. Stealthing is very specific to the situation. It
only works in certain instances.
Excuse me Mr. Chairman, It’s now 11:00 p.m. so, I’m requesting that the board, if the
board doesn’t feel comfortable making a decision tonight that we table this until the next meeting,
at this point, the questions are repeating. So, if no decision, if the board’s not comfortable, I request
that we table until next month’s meeting.
So, I guess um....thank you. I’ll ask the board if they have um.....any additional
questions first. Um...at this point, the public...public session is closed. Um...does the board have
any additional questions that they want to ask tonight?
Pg. 210 September 8, 2026 Zoning Meeting
I’m good for tonight, but I....there’s a lot more that needs to be discussed.
Okay, so you have more discussion you want to go through then, Chris?
There might be more to help me make a better decision. I for one would like to know
what the pianning board is, what planning board changes might be occurring to the site which might
impact any decision we make tonight if we were to vote on it.
Okay, does anybody else have other um.....I guess ultimately most of my questions
have been answered. Are there.....does the board have other questions that they want to ask? If so,
then I would agree that we should table the remaining portion of this till the next meeting.
I'd like it tabled only because of what Chris just said. I'd like to hear what the
planning board has to say about it.
So, If I haven’t closed, I think I’ve closed both...I have closed both. So, public
hearing. ...public comment has been closed on both. Um....we are going to table this until next
month’s uh....so October’s meeting. So, I make a motion to table the Verizon Cell Tower, Lake
Road and Verizon Cell Tower Webster North until October 14%,
This so called shot clock is it was it 150 days?
It is 150 days. We have extended it and you'll note our application. One of them is
January. We have extended until I believe after the town board meeting in October with the
expectation of returning to the planning board and then perhaps the ZBA meeting this. We also need
a special permit from the town board. So, you’ ve tracking.
So, zoning board is October 14", (EVERYONE COMMENTING AT THE SAME
TIME) The planning board is October
6. Laura Smith: I’m sorry, the second town board meeting of the month.
Of September.
I’m sorry, you’re right. You’re speaking of the planning board. The planning board
would be the Tuesday before the ZBA meeting. We have agreed to extend the shot clock to after
the second town board meeting of the month in October but do request and we’ll note we expressed
this at the planning board meeting that the FCC and the Telecommunications Act of 1996 is put into
place because this is a difficult choice, right? It’s put into place because this is a controversial topic.
But congress and the rules promulgated by the FCC, the goal of the Telecommunications Act was to
encourage rapid deployment of telecommunications facilities across the country. So, we have things
like preemption for RF or perceived health effects of RF on health. That’s been fully preempted
because that is an area that the telecommunication that congress and the FCC have identified as this
Pg, 211 September 8, 2026 Zoning Meeting
is something that is universal across the country and something that cannot be addressed. So, the
shot clock is one of those items of............
(NEED TO MOVE CLOSER TO THE MIC) Do you have the authority as the
applicant to stay extended.
We do have the authority, and we have done so but the note being we are appreciative
of the town continuing to move through this process and request it continues at a good clip as this
has been.
The applicant believes the town’s acting in good faith at this point.
Of course, yes.
So, this is being tabled.
Until October 14".
RESOLUTION 26-0044 Michael Short made a motion to TABLED
TO 10.14.26 which was seconded by: John
Accorso,
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
VERIZON CELL TOWER “WEBSTER NORTH”: Located near 1222 Wildflower Drive.
Applicant Robert Burgdorf for Bell Atlantic Mobile Systems d/b/a Verizon is requesting an AREA
VARIANCE for the height of a communication tower of 135ft with a 4’ lightning rod (139’) where
the maximum height allowed is 100ft on a 14.2-acre parcel having SBL# 065.05-1-48 located in
the R-3 Single-Family Residential District under Sections 130-10 and 350-12 of the Code of the
Town of Webster.
RESOLUTION 26-0045 Michael Short made a motion to TABLED
TO 10.14.26 which was seconded by: John
Accorso.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Pg. 212 September 8, 2026 Zoning Meeting
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
Located at 1725 State Road. Applicant Robert Bingham Jr. is requesting an AREA
VARIANCE to allow a side yard setback of 12ft where 15ft is required in association with the
construction of a new garage on a 0.68-acre parcel having SBL# 081.03-1-21 located in an LL
Large-Lot Single-Family Residential District under Section 350-13 of the Code of the Town of
Webster.
Please speak into the mic and go through and explain your project to us.
Appearing before the board was Robert Bingham Jr. at 1725 State Road. Basically, my project
consists of I took down my old, dilapidated garage. It was falling apart. It had a bunch of holes
in the foundation. It would be to repair than it was to replace it. So, I’m coming here today to
seek a variance to go, 2 feet closer OR 3 feet closer to my property line making so that I can
make my pole barn attached to the house 40 x 40, which is a more conventional size. It was
easier to order that way and more room for the stuff that I have. And that’s it basically what I’m
here for today. Seeking that variance to go closer to my property line.
Do you know what the distance will be off the property line?
12 feet sir.
It will be 12 feet off the property line?
Yes, sir.
Other questions from the board?
Is this one story or two stories?
One story.
How tall will it be at the peak?
The ceiling height on the inside is 11 feet, and the rafters are 412 pitch, I
think.
Any utilities inside the garage?
Yes, sir. Utilities will be brought in through the basement and then into the
garage. So, just the electric. I’m going to put a couple outlets out there.
Pg. 213 September 8, 2026 Zoning Meeting
What’s the pole barn going to look like as far as an elevation? Is it just going to
be the metal pole barn? Are you going to side it similar to the house or ?
It’s going to be like a gray metal exterior and then my hope is to match the
siding to it in the coming years, next year or two. The siding on my house is not the best. So, I
figured I'd get the barn where I wanted it and then attach the siding up to that.
And this is all for personal use? The size of it, not for any commercial use.
Yes, Ma’am. I have an old truck that I don’t drive in the winter. Two trucks
I don’t drive in the winter and a plow truck that I just like to keep inside and four-wheelers and
stuff like that. I am running our of room at my old place.
Any other questions? I'd like to open it up to the public to speak for or against
this project. Please come on up. Seeing none, I will bring it back to the board. Any other
questions for the board?
I’m going to ask the question one more time. What’s the distance off the
property line? I didn’t write it down.
It’s 12 feet off the property line.
RESOLUTION 26-0046 Michael Short made a motion TYPE II
Chris
Centola.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
(CHRIS CENTOLA)
The proposed action, if approved, will not result in a change in the essential character of the
neighborhood. I don’t think it will create a detriment to nearby properties. You’re replacing an
existing garage in at best fair condition with a new pole barn and he stated that he will try and
match the siding with the house when he resides the house. Based on the applicants proposed he
choosing the size based on the commercial availability and the need to store additional and
personal items. So, there’s not any real alternates considered for this because there was an available
one and it needs to go where the garage is currently. The variance isn’t substantial in any way,
shape or form. It’s similar to other garages in the general area as far as setback 12 feet off the side.
There aren’t any potential impacts or physical or environmental conditions based on the provided
material. And while the project is self-created there’s no really other place to put a pole barn the
size he needs to meet his requirements any other way.
Pg. 214 September 8, 2026 Zoning Meeting
I was just going to add that it’s not out of character for the neighborhood and the
property is in a more agricultural area of the town of Webster.
I would also excuse me add that there was an existing garage there so it’s just
replacing the existing attached garage to the house. It’s just larger.
1. This request is not out of character in the neighborhood:
2. There will not be a detriment created to nearby properties:
3. The benefit is not achieved by any other method:
4. This request is not substantial:
5. There are no adverse physical or environmental impacts to the site or neighborhood:
6. The difficulty is not self-created:
7. This is not an undesirable change:
RESOLUTION 26-0047 Michael Short made a motion to Located at
1725 State Road. Applicant Robert Bingham
Jr. is requesting an AREA VARIANCE to
allow a side yard setback of 12ft where 15ft
is required in association with the
construction of a new garage on a 0.68-acre
parcel having SBL# 081.03-1-21 located in
an LL Large-Lot Single-Family Residential
District under Section 350-13 of the Code of
the Town of Webster “which was seconded
by Corrine Volo.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
CONDITIONS:
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire September 8, 2027
Located at 539 Countryside Lane. Applicant Dominic Zicari is
requesting an AREA VARIANCE to allow a front setback of 49.2ft where 60ft is required on a
corner lot in association with the construction of a garage addition on a 0.84-acre parcel having
SBL# 063. 14-2-30 located in an R-2 Single-Family Residential District under Section 350-11 of
the Code of the Town of Webster.
Pg. 215 September 8, 2026 Zoning Meeting
Appearing before the board was Dominic Zicari and I own 539 Countryside Lane. I am looking
for an area variance of 49 feet and 2 inches where 60 feet is required. I’m on a corner lot, so I
have two fronts for all practical purposes I’m trying to put an addition on my existing of 30 x
48. It’s going to blend in with the neighborhood and I’m going to use the existing vinyl siding
and math the metal roof that I already have on my house.
Questions from the board?
I’m going to ask the same question I asked the other gentleman. What’s the
height of this building? Is it one story or two stories?
It is going to be a single story total to the peak and will be 21 feet, 17 foot walls.
Will there be any screening on the Bay Road side of the building?
This is on the corner side on the corner of Bay and Countryside. So, it’ll be
facing well, the siding will be on Bay Road. There’s a 5 foot berm with mature pine trees on the
back corner and other pine trees lining up on Bay Road. So, that’s why I figured the best place to
put it will be shielded pretty well. So, it’}l blend right in with the rest of the house and the rest of
the neighborhood and having those mature pine trees, the neighbor behind me won’t be able to
see it. My other neighbor on the opposite side won’t be able to see it. So, it'll just be well, the
people across the street really won’t be able to see it out there because it’s covered by pine. So,
itll only be coming from the lake down Bay Road and on the countryside.
This is just to be for your personal use, not a commercial use.
Correct.
I'd like to open it up to the public. If anybody wants to speak for or against this
project, please come on up. Seeing none will bring it back to the board. Any other questions? I
want to thank you for getting support from your neighbors. It’s greatly appreciated having these
letters in here. So, thank you for that.
RESOLUTION 26-0048 Michael Short made a motion TYPE II
Chris
Centola.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
Pg. 216 September 8, 2026 Zoning Meeting
(JIM SPAMPINATOQO)
It will actually look good with that size of a building going up and being hidden by Bay Road.
There are not many alternatives where that, I will say building can go due to the jocation in the
corner lot. There is not much of a significant setback from 60 feet and you’re going down to 49
Correct. There’s no potential impact for any physical or environmental conditions and although it
is self-created it does improve his home and makes senses for what he needs it for the extra storage.
Does anybody want to add anything further to it?
I would just add that if it were not a corner lot the variance would not be required.
It’s only required because Bay, the side, what’s traditionally the side setback is also considered a
front setback because it’s on Bay Road and it meets the front and rear setback. So, that’s the only
impact.
This request is not out of character in the neighborhood:
There will not be a detriment created to nearby properties:
The benefit is not achievable by any other method:
This request is not substantial:
There are no adverse physical or environmental impacts to the site or neighborhood:
The difficulty is not self-created:
This is not an undesirable change:
ee
RESOLUTION 26-0049 Michael Short made a motion for AREA
Located at 539 Countryside
Lane. Applicant Dominic Zicari is requesting
an AREA VARIANCE to allow a front
setback of 49.2ft where 60ft is required on a
corner lot in association with the construction
of a garage addition on a 0.84-acre parcel
having SBL# 063.14-2-30 located in an R-2
Single-Family Residential District under
Section 350-11 of the Code of the Town of
Webster of which was seconded by Chris
Centola.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
Pg. 217 September 8, 2026 Zoning Meeting
CONDITIONS:
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire September 8, 2027
Located at 522 Hackberry Way. Representing agent Mike Ritchie, P.E is
requesting an AREA VARIANCE to allow a rear setback of 43ft where 50ft is required in
association with the construction of a covered porch on a 0.34-acre lot having SBL# 065.02-5-10
located in the LMR Low-Medium Residential District under Section 350-15 of the Code of the Town
of Webster.
Is Tom Thomas in the audience?
Is anybody here representing 522 Hackberry Way?
Appearing before the board was Dean Salvaggio (DID NOT SIGN IN) I was under the
impression that the builders or the engineers were going to be here to present. I am the father of
the owner. He’s on his way here from work. Should be here momentarily.
If you want to state your name for the record.
My name is Dean Salvaggio.
Do we want to table this until the applicant arrives?
Being that you are not the applicant or one of the representatives we’ ll table it
until he gets here.
Does someone need to be here?
Somebody needs to be here to present. Yes.
I wasn’t sure if just based on the information you had, you could approve or
not.
We are just putting it further down the schedule for tonight.
I understand. So, it’s required for him to come here as opposed to going home
to his three kids right now.
Correct. Unless one of his representatives would be here which obvisioyly they
are not here right now.
I will make sure he gets here.
Pg. 218 September 8, 2026 Zoning Meeting
So, with that, we’re going to move on to 1054 Klem Road. If applicants Angel
and Sandy want to come on up. {GO DOWN/T11054 KLEMROAD APPLICATION)
Austin Salvaggio and I just purchased the home. Builders told us it would be no problem to put
an addition onto the property. Obviously finding out that there’s a variance for everything.
Thankfully, my dad knows a little bit about this, but we got young kids and just want more space
in the house. It’s more important to us than having outside space because we don’t get to use it
all the time.
Questions from the board? NONE. That’s a brand new house already doing an
addition.
Austin Salvaggio:: We knew it was too small and they’re were like, “hey, yeah, we can put this
addition on, no problem. So, fun news.
And here you are.
Austin Salvaggio:: And with no builders to show up. I love that.
Gotta love sales people.
Erika, is this a cluster subdivision?
I would have to double check, but I believe it is.
Okay, just cuz they seem condensed.
Yes, this is an LMR inside of a single family residential.
Three season? So covered porch, what is it three seasons screened in?
Austin Salvaggio:: We plan to screen it in eventually. They’re just going to cover it though.
So just a roof?
Austin Salvaggio:: Yes.
So, you mentioned you were looking for more space for the house being outside.
Can you elaborate a little bit more on that.
Austin Salvaggio:: I mean the house....I don’t want to sound like that but it’s 1500 square feet.
We moved from a house that was 1500 feet. It’s the same exact size and it’s split differently.
But this is outdoor space. This is not indoor space, right?
Pg. 219 September 8, 2026 Zoning Meeting
Yes, exactly.
You said the intention eventually is to potentially is to screen it in. Again, that’s
not what you’re doing now, but that’s...
Austin Salvaggio:: Yes. Maybe finish it. I don’t know, whenever.
Questions from the board? NONE. Does anyone from the public want to speak for
or against this project? NO... have you had any discussion with any of your neighbors? I drove
through the neighborhood. It is definitely very visible where it is. So, any dialogue with any of
your neighbors?
Austin Salvaggio:: I haven’t really. I mean, we just moved in and we have one neighbor to our
side at the moment and seems nice, but.
Okay, fair enough. Comments from the board?
I just say the odd shape of the lot really, if he had a normal rectangular lot, I don’t
think he’d even be here.
Well, and that’s a feature and perhaps maybe the builder excluded it on this
particular home, but when we get this type of subdivision, typically that little covered porch is part
of the back of the home on I'll say 80% of them. And I imagine this won’t be the last one that we
see within this subdivision. Even if you look down Arrowwood, there’s a couple of them already
that already exist. Um, but because it’s a corner lot, which makes the backyard smaller than normal,
there’s nothing that this applicant could add here without a variance.
Which I had no idea about to be completely honest with you.. That’s all dad.
RESOLUTION 26-0050 Michael Short made a motion TYPE II
Corrine
Volo.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
FINDINGS OF FACTS:(CORRINE VOLO)
I’m going to say that the request is not of character in the neighborhood and that some of the homes
already on Arrowwood have that feature built in, an external covered porch. There will not be a
detriment created to nearby properties. Right now, that side of the street is fairly unbuilt. It looks
Pg. 220 September 8, 2026 Zoning Meeting
like they’re working on developing it, but it’s not going to impact anybody. It’s certainly not going
to hurt anybody’s line of sight. It’s not too close to anybody’s house. Achievable by any other
method ? No, not in this instance. In that the um....the back of the house is the logical location and
it’s a very short backyard. Um...no adverse physical or environmental impacts to the site or to
neighborhood. That’s as stated. Um...the difficulty is or is not self-created. I’m going to say it’s
really not self-created in that it’s the size of the lot. Um.....and the builder obviously didn’t include
it because he didn’t want to come here and get a variance before he built the house. So,
um....certainly not an undesirable change. We get such a short season that you want to be able to
have a covered area to be able to enjoy a little bit more of the non-snow weather without rain or
excessive...not that we get excessive sun, but it does make sense. So, anything else anyone would
like to add to that?
1. This request is not out of character in the neighborhood:
2. There will not be a detriment created to nearby properties:
3. The benefit is not achievable by any other method:
4. This request is not substantial:
5. There are no adverse physical or environmental impacts to the site or neighborhood:
6. The difficulty is not self-created:
7. This is not an undesirable change:
RESOLUTION 26-0051 Corrine Volo made a motion for AREA
Located at 522 Hackberry
Way. Representing agent Mike Ritchie, P.E is
requesting an AREA VARIANCE to allow a
covered porch area that has a rear setback of
43ft where 5Oft is required in association with
the construction of a covered porch on a 0.34-
acre lot having SBL# 065.02-5-10 located in
the LMR Low-Medium Residential District
under Section 350-15 of the Code of the Town
of Webster of which was seconded by
Michael Short.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
CONDITIONS:
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire September 8, 2027
Pg. 221 September 8, 2026 Zoning Meeting
Located at 1054 Klem Road. Applicants Angel and Sandy Lagares are
requesting a SPECIAL USE PERMIT to allow a6’ X 9’ chicken coop and no more than 8 hens on
a 2.2-acre parcel having SBL# 064. 16-1-3 located in an R-2 Single-Family Residential District under
Section 350-40 and 350-103 of the Code of the Town of Webster.
Appearing before the board was Angel and this is Sandy Lagares. We’re just applying for a
permit to have some chickens.
So, you’re asking for 7 chickens, why?
For eggs to eat.
Why 7?
He had bought 6 and my mom gave me one. So, that’s how I got
7. Michael Short: So, you have the
7. I have been to the property. I am asking the questions so I
can bring it out to the public is what it is. But yes, Okay. So, the coupe is a pre-existing coupe.
It’s there currently. Questions from the board?
How long have you had the chickens?
To be honest, about 5 years.
Do we know of any complaints?
Erika, any complaints that we know of?
We did not received any complaints for the chickens for this property.
Are you going to top if off at 7 or do you think you might want more?
I think we will probably keep it at seven.
Just chickens and no roosters.
No roosters.
I know the couple has been there for years. I’m familiar with the area and with
one of the neighbors and there’s like a tarp on the front of it are you going to re-do that and clean
it up, so it looks a little tidier?
Pg. 222 September 8, 2026 Zoning Meeting
I wanted to go through this to get the permit so I can put probably a metal roof
on top of that and make it look cleaner.
Just because I know when I was at the property it is visible from the neighbor on
either side of you . So, just cleaning it up and they were making....I’ll say chicken noises when I
was there, but it was not............
They laid an egg and they sung that chicken song.
It was not loud whatsoever because I know we’ ve had neighbors of previous
applicants mention the noise and I wasn’t that far away. I don’t think I would have heard it if I
were in the driveway.
So, the record is complete. Could you demonstrate the chicken noise?
LAUGHTER. .............0000008
Okay, any other questions or comments? Seeing none, I would like to open it up
to the public if anyone would like to speak for or against this project? Nope. Back to the board.
Any other questions?
No other questions. We did get one letter from the adjacent neighbor, and I believe
that they were in support of the chickens. But I think there was one cleanup item from the barn.
I think once your accessory building was complete, you were going to eliminate the old building
in the back.
Yes, I’m in the process of doing that.
Okay. All right.
So, I believe what is circled in red is the building that’s going to be eliminated,
and the chicken coop is in front of it. Correct?
Correct.
RESOLUTION 26-0052 Michael Short made a motion TYPE II
Chris
Centola.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
Pg. 223 September 8, 2026 Zoning Meeting
FINDINGS OF FACTS OF SPECIAL USE PERMIT (CORRINE VOLO)
(1)The use will not prevent the orderly and reasonable use of adjacent properties or of properties
in adjacent use districts.
(2) The public health, safety, general welfare or order of the Town will not be adversely affected
by the proposed use in its location
(3) The use will be in general harmony with and promote the general purposes and intent of the
most recent Comprehensive Plan of the Town and the Zoning Ordinance (Chapter 350).
(4)The proposed use will not interfere with the preservation of the general character of the
neighborhood in which such building is to be placed, or use is to be conducted and that the
proposed use will, in fact, be compatible with its surroundings and with the character of the
neighborhood and of the community in Sars particularly with Se to visibility, scale and
overall appearance.
(5) The physical characteristics and topography of the proposed site make it suitable for the
roposed special use.
(6)The proposed special use provides appropriate landscaping and/or other forms of buffering to
protect surrounding land uses.
(7)The property has sufficient, appropriate and adequate area for the use, as well as reasonably
anticipated operation thereof.
(8)Access to facilities is adequate for the estimated traffic generated by the proposed use on
public streets and sidewalks so as to assure the public safety and to avoid traffic congestion.
(9) Adequate parking and internal traffic circulation can be accommodated on the property in
compliance with other sections of the Code, taking into account adequate buffering and
landscaping.
(10)Adequate facilities exist or can be integrated into the site development to properly deal with
stormwater runoff, sanitary sewers, fire protection, electrical power needs, refuse or other waste
that may be generated, odors, noise or lights which may go beyond property boundaries.
(11)The natural characteristics of the site are such that the proposed use may be introduced on
the property without undue disturbance or disruption of important natural features, systems or
processes and without negative impact to groundwater and surface waters on and off the site.
Pg. 224 September 8, 2026 Zoning Meeting
(12)The proposed use can and will comply with all provisions of this chapter and of the Code
which are applicable to it and can meet every other applicable federal, state, county and local
law, ordinance, rule or regulation.
RESOLUTION 26-0053 Corrine Volo made a motion for SPECIAL
USE PERMIT Located at 1054 Klem Road.
Applicants Angel and Sandy Lagares are
requesting a SPECIAL USE PERMIT to
allow a 6’ X 9’ chicken coop and no more than
8 hens on a 2,2-acre parcel having SBL#
064.16-1-3 located in an R-2 Single-Family
Residential District under Section 350-40 and
350-103 of the Code of the Town of Webster
of which was seconded by Chris Centola.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
A maximum of 7 hens. So, a maximum of | year?
So, we have historically, we put a control on it. Not that we have to, but we
have.
I would recommend that the permit would be good for one year initially. The
applicant will come back to this board after that one year and if the use works with the
neighbors and no complaints then at that time you can apply to have it extended. The maximum
the permit can go for is 5 years before you would have to reapply for it.
Okay.
So, if this is approved tonight then a year from now you have to come back.
Okay.
CONDITIONS:
e To have no more than 7 hens on a 2.2 acre parcel.
e The applicant at no time will have any roosters. It will be just chickens on the
property.
Roof will be reconstructed and cleaned up so that it just blends a little bit better.
* Applicant to return after one year.
Pg. 225 September 8, 2026 Zoning Meeting
Located at 400 Lake Road. Applicant Mark Lowenguth is requesting an
AREA VARIANCE to allow the alteration or extension of a pre-existing non-conforming single-
family home in association with the construction of a 460SF addition on a 0.45-acre parcel having
SBL# 063.06-1-19.1 located in an R-1 Single-Family District under Section 350-10 and 350-95 of the
Code of the Town of Webster.
Appearing before the board was Mark Loweguth at 400 Lake Road. We are asking for a
variance to put an addition on a pre-existing non-conforming single family home which we
constructed in 2011. We’ve taken considerable pains to blend the addition into the rest of the
house. We’ve done setbacks that are further from the property line. There was non-conforming
on the south side as well as on the lakeside. And the finishes with the designer and the architect
wili match the roof line as well as the materials with stucco stone and wood so it does not look
like an addition. The lower floor would be a screened in porch and a storage room. And the
upper floor, which is contiguous with the rest of the house, would be a laundry room, kind of a
flex room, and some closet space.
There will be no access to the second floor one except as part of the main
bedroom suite then?
Yes. The only access to second floor is the main bedroom suite.
Have you had any discussions with your neighbor? Any issues?
Well, the closest neighbor is my brother who was supposed to be here but
unfortunately he had a fire in his cabin last night which was destroyed which he just built and so
he is not here. The next neighbor is my other brother. And on the other side there’s a home
which nobody has lived in over 15 years.
I’m assuming you get along with your siblings. I don’t know if my siblings
would approve.
Most to the time. The home now where the addition is going to be positioned
you can’t see ...... you would not be able to see it from the west side. You won’t be able to see it
on the south side. Really the only area you will be able to see it from is the lake and my
brother’s home would be able to see a portion of the roof when the leaves are off.
Any other questions from the board? Anybody want to speak for or against this
project?
Philip Migloioratti at 382 Lake Road: I am about 5 houses to the west of the Loweguth residence
going on Oklahoma Beach. I’ve lived there about 10 years. Loweguths are good neighbors and
they have a lovely property. I have no concerns over what they're doing. It’s not going to affect
anybody. Not going to affect anybody’s lake views, which everyone is always concerned with
Pg. 226 September 8, 2026 Zoning Meeting
down there. And lastly, if there is any while the work is being done, construction work, if there is
they are....we are on a common driveway there, If the truck has to get in there and is going to be
blocking for any more than a few minutes, I’m more than happy to my gate on my.....1 have a
private driveway that goes out to Lake Road and I’m more than happy to open the gate so other
residents have access or for emergency access. Thank you.
(Webster Resident/did not sign in) I submitted a letter. I don’t know if you had an
opportunity to read it. I submitted a response online and I dropped another item off this morning
at the main desk.
Erika, do you have that.
Erika, it’s not on your drive.
It is not on the drive. It was sent to all this morning via email, but it’s right here on
the screen.
I have it right here. Ii] read what I have in front of me.
This is what he submitted online.
Do you want to summarize what you wrote
The property that I have at 390 Lake Road has been in the family about 100
years. I have owned it for 40 years. Over my time there, I worked a number of years ago with
Katherine Thomas to help in the sewer project. The initial request was not approved. So, I was
part of a small group to go out in campus homeowners in the Oklahoma Beach area in the
sandbar area to get additional votes to get the sewers approved. I was involved in getting
Senator Schumer down to Oklahoma Beach because we are suffering severe erosion problems. I
started in 1992 to try to work with the Department of Transportation so the Oklahoma Beach
property owners could acquire the abandoned railroad. And when those options were made,
that opportunity was made by the Department of Transportation, four of us and the addresses
from 390 to 390 whatever. Those offers were rescinded because two property owners refused to
sign a release document.
So, we're in a situation and I hope to, I guess create a condition as their grandfather wanted to
do and that is to get access to the railroad property because for me in the years that I’ve been
there it’s been a very, very difficult situation. If you read the letter or look at pictures, we got
flooding in the yard. When I came here with a request to expand the property, and I have a
picture to show you. The board suggested or they told me that I couldn’t get closer than 15 2
feet to the access road because I would block the view of my neighbor looking her kitchen
window. So, for me, it’s been a very, very difficult and long tenure. At 390 Lake Road and I feel
I deserve the same opportunity that other people along the Sandbar and those at Oklahoma
Pg. 227 September 8, 2026 Zoning Meeting
Beach and that is to acquire the railroad property.
The relevance of your concerns tonight as related to the applicant’s request. Can
you tie those together? (APPLICANT COULD NOT HEAR QUESTION) Given the comments
that you’ ve made tonight, how do those relate to the applicants request for the variance this
evening?
The two, one of the two applicants, both of them refused to sign a release
document so we could acquire the railroad property. The railroad property offer was
extended......
So, the fact that the applicant refused to sign that are you asking us to deny the
application?
(NOT SPEAKING AT THE MIC, HARD TO HEAR) There were the two brothers
who refused to sign a release document allowing four of us to acquire the railroad company.
That’s correct.
Okay, and that’s the basis upon which you’ re asking the board to deny the
applicants request this evening.
(NOT SPEAKING AT THE MIC, HARD TO HEAR) That is part of it. The other
thing that I would like and that is at my age I had no idea whether or not Sarah is going to
remain in the property, but I would like to eliminate some of the issues that we’ve been dealing
with. If you take a look at the pictures we get our driveway and parking area flooded 2/3 coming
up. So basically, I don’t have a good place to park in storms. If I acquired the railroad property
it would give me an option to park on the south side of the road.
Is that opportunity still exist?
(NOT SPEAKING AT THE MIC) HARD TOHEAR) I don't know. 1 first of all,
what I would have to get and that is a release signature by the two bothers that said in fact we
can acquire the railroad property.
Okay. Very well. Thank you.
Does anybody else want to speaks for or against this property? Is there anything
else you want to add after both of the residents made comments.
I am not really very familiar with much of what he said, The whole railroad
property has been very nebulous. I think my grandfather actually spearheaded much more than I
believe he did. But I don’t want to argue about that. With regard to the neighborhood itself, I
would say that is certainly anything we’re going to do is only going to enhance the overall
Pg. 228 September 8, 2026 Zoning Meeting
quality of the neighborhood. The landscaping will be as appropriate as the rest of the house is.
You were there yourself. You know, it’s a nice home and we tend to keep it consistent with the
rest of the house.
Out of curiosity, Mr. Loweguth, Did you refuse to sign?
I don’t know anything about it. What he’s talking about.
This is the first time you're heard of it?
No, I haven’t.
No, I said, “Is this the first time that you’ ve heard of this situation?”
I have heard of my brother not wanting to sign it. Nobody really approached us
about signing it.
Do you know what the basis was for that?
No, I don’t . He’s 408 if you look, he’s up even further.
Did you see the pictures of his property flooding?
Our property flooded as well.
My question was, did you see the pictures of his property flooding?
No but we all flooded.
I guess my question is, do you know whether that’s causally related to this issue
with the railroad?
No, I would say that the flooding is caused by the high lake levels.
So, the railroad has no impact on it?
No, in my opinion, no. And I would say that the engineers would say so as
well,
The railroad property, the park to stay out of the flooded areas is what I think he
was looking for.
Pg. 229 September 8, 2026 Zoning Meeting
Yes. Everyone else along Lake Road has had the opportunity to purchase the
property that’s across from the lane that goes to the houses along Oklahoma Beach, which has
allowed some of them to actually do a driveway through to get them to Lake Road or extend the
building of their house or give them additional spaces to park when the lake does come up
because the lake does come up and the shoreline gets a little bit smaller every year. So, my
concern when I visited the property, the construction is actually going to be on the side of your
house that is away from the access to the remaining 13 addresses on Oklahoma Beach. Is there a
means for construction crew to make sure that they don’t block that bridge and that access?
There is a two car parking spot down next to the home. On the garage and then
on the entrance road to the property, which is about 300 feet . It’s mowed on both sides and
when we constructed the home, when Phil constructed his home, then there’s been three other
homes constructed there in recent years, that where people park. So, if somebody ...we do have a
good construction manager as well as a good contractor who make sure if...I mean they’re very
attentive to peoples needs. If a trucks going to be there more than 5 minutes, they’ ll move it.
Phil said if there was an emergency, they would open his driveway as well.
Because that was one of the concerns I had just from even just and emergency
response point of view was.
The fire department comes down routinely to make sure that they can get
around that corner. And even when we had construction that we had a dumpster there, they
came down to make sure that they could get underneath the underpass and around the corner.
They’re brining a small truck down there. There not bringing the big trucks?
No.
It’s probably not you but that overpass, who maintains that.
The walls are the engineers told us not take down the wall. They didn’t know
what would happen to the bank, and the top is blocked off.
But the top...I was a little concerned walking under it when I was around the
property because it is a little. It’s old. It’s old and it just look like there were pieces of it that
could fall.
There have been and the ties could be removed but the risk with that is you
have to maintain the metal or the wall could collapse.
But no one maintains that. That’s...
No. It’s posted not to walk across it.
Pg. 230 September 8, 2026 Zoning Meeting
Let me ask you this. If the opportunity came up again where the railroad
property become available, would you sign off on those properties being able to purchase that?
Again, it’s al hypothetical at this point.
I don’t know much about it. I would have to look at it. I mean, I don’t frankly
know why they couldn’t before. So, I don’t want to speak to something I don’t know. I really
don’t know anything about that. As I said, when I talked to Josh, my grandfather acquired their
property in bits and pieces over the years. So, the original house was where out home is and then
he acquired and one piece and then another piece and then another piece over the course of 50
years.
RESOLUTION 26-0054 Michael Short made a motion TYPE II
Chris
Centola.
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
(CHRIS CENTOLA)
The addition will not impact the essential character of the neighborhood or be a detriment to nearby
properties. It jnostly won't be’visible to the general public at all and
if approved. Based on the applicants needs, there were no other real alternates because it needed
to go as an expansion of the master bedroom suite and then using the space underneath it as a
covered porch area. So there really were no other alternatives considered. The request is not
substantial or contextually significant from the zoning required. It will not increase any type of
adverse effect or impact the physical environmental conditions in the neighborhood or the district
and more importantly to the immediate neighbors. And although the difficulty is self-created, it is
the minimum relief necessary to allow the applicant to do what he needs to do with his property.
I will just add that the Views! of the lake are!not going to be affected with this
variance being provided. The addition is not going to be visible from basically any other properties,
surrounding properties. It'll be at the property to the, I guess it would be the southeast we’ll be
able to see the roof of the addition that the variance is being required for. The location of the
addition is limited to the location that it’s at just due to the unique shape of the property as well
and how close it is to the water’s edge not being able to provide, get any closer to the water’s edge
as well. This is a non-conforming building. Does anybody want to add anything else to it?
Um, I just have a question. Do you have approval from the DEC for this or the
Army Corps of Engineers yet?
Pg. 231 September 8, 2026 Zoning Meeting
We contacted them and as long as we’re not going closer to the lake, that’s why
we deliberately set it back 6 feet from the existing north wall of the existing house which would
...was where the exact two inches inside of where the existing....the original house were two
inches inside of that and now were 6 feet back from that.
Okay. All right, so they don’t need any further permits for this from the DEC.
Anyone want to add to this? The only condition I’m going to add to it is during
construction the construction manager and the owner are responsible for maintaining drive the
drive access through the property.
This request is not substantial:
The difficulty is not self-created:
This is not an undesirable change:
iy a ge ie LS be
RESOLUTION 26-0055
VOTE:
This request is not out of character in the neighborhood:
There will not be a detriment created to nearby properties:
The benefit is not achievable by any other method:
There are no adverse physical or environmental impacts to the site or neighborhood:
Michael Short made a motion for AREA
Located at 400 Lake Road.
Applicant Mark Lowenguth is requesting an
AREA VARIANCE to allow the alteration or
extension of a pre-existing non-conforming
single-family home in association with the
construction of a 460SF addition on a 0.45-
acre parcel having SBL# 063.06-1-19.1
located in an R-1 Single-Family District under
Section 350-10 and 350-95 of the Code of the
Town of Webster of which was seconded by
Chris Centola.
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso AYE
Mr. Centola AYE
Pg. 232 September 8, 2026 Zoning Meeting
CONDITIONS:
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire September 8, 2027.
Approval of minutes for August 11, 2026 (VOLO/SPAMPINATO)
VOTE:
Mr. Short AYE
Mrs. Volo AYE
Mr. Spampinato AYE
Mr. Accorso RECUSE
Mr. Centola AYE
Since there are no further applications before the Board, Michael Short adjourned tonight’s
meeting at 11:00 PM
CA A OA
Corrine Volo, Secretary
Katherine Kolich, Recording Secretary
OCT 14 "26 av10:19
FAILED WEBSTER THN CLK
cae \
{ ns (\
(Pate Nee y \\ \ Yorn
Pg. 233 September 8, 2026 Zoning Meeting