WEBSTER PLANNING BOARD MINUTES
Webster Town Board Meeting Room 1002 Ridge Road
7:00 p.m.
September 1, 2026
ABSENT:
Anthony Casciani, Chairman Mark Giardina, Secretary
Dave Malta, Vice Chairman
Derek Anderson
Peggy Maltman
Drazen Gasic
Sven Vetter
Katherine Kolich, Recording Secretary
Josh Artuso, Director of Community Development
Erika Corsi, Town Planner
Frank Ciardi, Attorney
Welcome to the Planning Board meeting of September 1* , 2026. We have a
lengthy agenda this evening so bear with us and we will get through this.
Okay, question to the board Verizon has two applications so it’s going to be lengthy a little bit
but we have like four or five sign applications, is it okay with you folks if we do those first.
Pledge of Allegiance/Roll Call
1. VERIZON- 1222 WILDFLOWER DRIVE
ROBERT BURGDORF
TABLED TO 10.6.26
2. VERIZON -LAKE ROAD & MONROE
ROBERT BURGDORF
TABLED TO 10.6.26 (PUBLIC PORTION WILL REMAIN OPEN)
1, SUPERCUTS-WEGMANS PLAZA-900 HOLT RD-SIGN
PETER DERSE
APPROVED AS PRESENTED
2, PENFIELD-WEBSTER EMERGENCY MEDICAL SERVICES- 607 PHILLIPS
ROAD-SIGN
VITAL SIGN
APPROVED AS PRESENTED
Pg. 243 September 1, 2026 Planning Meeting
3. BLOOM & BLEND-790 RIDGE ROAD-LIGHTS
ALYSSA CONNORS
APPROVED AS PRESENTED
4. MONROE COUNTY WATER AUTHORITY-593 BASKET RD-SIGN
TONY SNOW
APPROVED AS PRESENTED
5. MCALPIN INDUSTRIES-865 HARD ROAD-SIGN
VITAL SIGNS
ALL SIGNS APPROVED AS PRESENTED
6. VITAL SIGN BUILDING ADDITION-764 RIDGE ROAD
THOMAS FITZGERALD
TABLED TO 10.6.26
VERIZON WIRELESS CELL TOWER “WEBSTER NORTH”: Located at 1222
Wildflower Drive. Applicant Robert Burgdorf for Bell Atlantic Mobile Systems d/b/a Verizon is
requesting PRELIMINARY SITE PLAN APPROVAL (
PUBLIC HEARING
) in association
with a 135-foot telecommunications tower with a 4’ lightning rod and associated ground-
mounted equipment on a 14.2-acre parcel having SBL# 065.05-1-48 located in the R-3 Single
Family Residential District under Sections 269-5 and 350-12 of the Code of the Town of
Webster.
Appearing before the board was Laura Smith and I’m with Nixon Peabody and I’m representing
this application. I know the town has received a report from their outside consultant, the RF
Engineer. I don’t know if we want t turn to that first or I’m happy to just kind of jump right into
my presentation, whichever is your preference.
So, just to remind us of where we have been with this application, this is a 135 ft tower to be
located at 1222 Wildflower Drive. This has been before the Planning Board, and I think this is our
third time before coming before the Planning Board with this application. Or I’m sorry, the second
time. There are several themes that we want to highlight as we’re going through the application
and the supplemental information. Should I move it closer? The supplemental information that we
provided on August 27", The first is to really hit home that there is a significant gap in coverage
in this area. Ad demonstrated in our exhibits, it’s F and Q of our applications and was
independently confirmed by the town’s RF Engineer. There is a significant gap in wireless
coverage in the Webster north cell.
This area is currently served by three distant and over burdened sites. It’s the Webster site, the
Four Mile creek site, and Webster Park. All three sites have terrain and foliage challenges and
result in significant gaps in both low band and mid-band coverage in this area.
Pg. 244 September 1, 2026 Planning Meeting
Moreover, the actual! utilization and data for the past year shows that several low key performance
indications have already exceeded 100% utilization. As I’m sure you can imagine that it is
Verizon’s goal to build a tower before utilization, before that 100% utilization is maxed out, before
the existing towers are exhausted. We are already there with these three towers as they serve
Webster North. So, that means that the existing network cannot meet current demand. This tower
is necessary in this neighborhood. The goal of the project is to increase network capacity, provide
reliable coverage to north central webster, and offload traffic from those existing overloaded sites.
I’]l note one of the members during a public meeting testified that she had no cell coverage in her
home and must leave her neighborhood to make a phone call. That’s the exact problem we are
trying to solve. If you’re looking through your application on exhibit F and Q, page 14 in both
exhibits show that the existing low band coverage in this neighborhood is akin to the type of
coverage one would have on a rural highway subject to variable conditions such as fading and
foliage and seasonality gaps. Page 18 of exhibit F and Q demonstrate there is little to no reliable
midband coverage in this area. And then as demonstrated on page 15 and 16 of exhibits F and Q
this project with this area will have wireless services appropriate for suburban single family
residential homes.
Next, I will note in our application, and the proposed height is the minimum necessary to provide
the effective coverage as demonstrated on page 23 and 24 of exhibit Q and was confirmed by the
town’s RF independent consultant. These supplemental propagation plots compared coverage at
the proposed 134 foot antenna center line against a reduced height of 111 feet and 91 feet. So
again, comparing what the RF coverage would be if we had a lower tower with an antenna center
line of 110 and an antenna center line of 91 feet . In each scenario, both the low band and mid-band
coverage are materially compromised due to area clutter from dense old growth forests in these
neighborhoods. The town’s independent RF consultant also confirmed that the reduced height
operations would create or expand the weak signal area to the north of the site along Schlegel
Road, Shoemaker Road to the west, and the surrounding residential neighborhoods. I'll also note
that we provided to the planning boards question, I believe at the prior meeting about why we need
to go up higher. Are the trees growing? And the answer was yes. We provided drone imagery
showing that the tree canopy and area clutter reaches as high as 110 to 115 feet in this
neighborhood. That foliage is what this line of sight needs to overcome, We need to be higher
than the tree line.
The proposed 130 foot antenna center line would pre place the antenna about 10 to 15 feet above
that tree line which is typically the minimum clearance needed to maintain the effective RF
performance which we need under these slight specific conditions. Third, I wanted to draw the
boards attention to the fact that Verizon has conducted an exhaustive search for an alternative site
and there’s no viable alternatives that exist. The record clearly demonstrates that there’s no viable
alternatives that would offer or improve visual impact and still serve our RG needs. Verizon has
worked to resolve the significant coverage gap for years, including pursuing a lease for town
owned property located in the neighborhood, and despite sustained good faith efforts, the town
board declined to lease the property to Verizon last summer. That is within their legislative
purview. They are allowed to decline leasing to Verizon. That is a different ask before you today
Pg. 245 September 1, 2026 Planning Meeting
from a zoning perspective. What was before the town board is not for a lease is not comparable to
what’s before the planning board today for zoning approvals.
Following the town boards declination to enter into a lease with Verizon, Verizon then undertook
an exhaustive site selection analysis looking at 11 parcels within and immediately outside the
search area. That was since last summer. As shown on page 12 of exhibit G, the search area is
heavily wooded. As we mentioned before, the tree cover consists of predominantly smaller
residential lots where a cell phone tower would not be appropriate to be located and there’s
wetlands which severely limit the available locations for this tower to be located. The selected site
at 1222 Wildflower Drive is the only candidate that is both technologically viable and available for
lease. The parcel also meets all applicable setback requirements, which is important when doing
an analysis for appropriateness for a tower. The remaining candidates, the remaining of those 11
candidates were eliminated due to parkland or wetland constraints, unwilling land owners, or an
inability to satisfy RF coverage objections from locations outside the search area. As you may
recall from a prior meeting, the ideal location would be to be in the center of a search area ring.
However, to ensure that we were uncovering every stone and looking at every possibility, Verizon
did Jook at sites that were outside of it’s search ring, although not necessarily assumed to be ideal
for RF. Went through a full RF analysis and confirmed those sites do not meet the coverage needs
that are necessary for this neighborhood.
Last, I’ll mention that the project will not have an adverse environmental effect. We have
previously testified on this fact and want to again stress that although there has been testimony in
the past about perceived health effects for this project for both this project and for Lake Road and
you may hear similar concerns tonight from the public, but the science and the law are very clear
on this issue. Boards are expressly preempted from denying or conditioning approvals of a
wireless facility based on health or environmental effects of RF emissions. Where the facility
complies with FCC standards. We have provided tis evidence. It is exhibit O in the application
materials that the proposed facility will operate in full compliance with all applicable FCC
regulations. That means the board is without authority to consider RF related health or
environmental concerns when reviewing this application.
Last, I will note that tree cover also provides a substantial natural screening of the tower from area
residents and the high distance of the trees really serve as a screening from the tower itself from the
residents that are immediately close to it. The project doesn’t pollute. It doesn’t create a noise. It
doesn’t increase traffic. It doesn’t create demand on governmental services, and it enhances
emergency communications for police, fire, and other first responders.
Pil conclude with the importance of wireless technology and as a designation as a public utility
under New York State Law and the federal protections that are given under the
telecommunications Act of 1996. As of December 2024, that is pursuant to an FCC order that was
released just March of this year. So, just a few months ago, the FCC noted that based on their
review, which was from December of 2024, there were approximately 390.9 million mobile voice
subscriptions in the United States. And according to preliminary data from the center for disease
control prevention as of December 2023, approximately 76% of adults were living in and relying
Pg. 246 September 1, 2026 Planning Meeting
on wireless only households with adults and lower age groups more likely to live in wireless only
households. That means 76% of Americans don’t have a home phone. And those residents that
are living in this area that do not have coverage need to be afforded the coverage to make calls, to
make emergency calls, to call family and friends. That is why we were given the protection of a
public utility. Public Utilities and infrastructure need to be in a specific place to serve a specific
function, and I think as you go through this application and hear from the Town’s independent
Engineer, you will hear that we have satisfied all of those requirements of demonstrating there is a
need. This does satisfy the need and there are no alternative ways or sites to satisfy this need.
So, with that I will pause. I know that’s a lot of information. I can take questions.
Well, we received a whole lot of this information just in the past couple days
even, you know, so I spent and I’m sure some of the board members have spent most of today
going through it and trying to understand a lot of it, but a lot of the information that we’ve got is
from the consultants that have been involved and I think they’ ve done a really thorough job with it,
but there’s a lot of it here to verify what you’re saying and based on the to be honest with you, I
think we should probably slow down a little bit with this and maybe table this until everybody gets
a chance to reaily respond and understand what all the verbiage is here. It is a public hearing. We
will open it and | will acknowledge that we did get a bunch of comments from neighbors in
Wildflower area and we’ll enter that into he record. We’ll keep that for sure. But I don’t know if
any board has any questions specific you want to bring up right now.
And if I may as a point of order is....I believe the next step would be a referral from
the Planning Board to the Zoning Board of Appeals. Understand the planning board would like
more time, We would be back before the planning board at the ...oh goodness, the first week of
October. May we ask for the planning board to at least move us to the zoning board of appeals so
we can continue through the approval process and the review process while the planning board is
continuing its review of the materials.
I don’t know. Can you do that...they can do that, couldn’t they? Would that be
all right to do that. Go to the zoning board.
They are on next week’s agenda for a preliminary introduction of the project to the
zoning board. So, I think that would be appropriate to allow it to at least continue moving through
the process.
Yeah. I don’t see this being any problem.
Board agreed.
All right. Then continue on to your meeting next week with the zoning board
then and then you will be back here first of the month.
Pg. 247 September 1, 2026 Planning Meeting
Excellent. Are there any questions at this time that I might address to the planning
board?
I know there’s a lot of....there is a lot of stuff here.
When I was reading through the information that we received, it seems like it
addressed all the comments that we had before and the concerns for coverage and it really does
demonstrate that the places that were selected are the appropriate locations. Personally, I’m
satisfied with the information that we received and that it’s complete.
Yeah, we got one as current as today.
Yeah, I’m not sure that’ it’s necessary to delay it.
I agree with you. I think what they have done has...they’ve really done
homework on this. Everything that you could possibly as for, I think they’ ve addressed.
They’ ve addressed and we’ve got the response. It makes sense. I’m not sure
what another 30 days is going to give you. Personally, I would have the same conclusion.
You’re aware of it and I am but I don’t know if anybody if everybody’s gone
through it all, too because again, we just got some of the stuff today.
I appreciate that Derek, but I do think it gives others in the community an opportunity
to review the same information, and I think we should afford that opportunity.
Why don’t we do this. Let’s...if anyone wants to speak in regard to this one.
So, this is the first one on Wildflower. Just go up to the mic and give us your name and address. If
you have something, please do it in three minutes because after that I kind of lose track of
everybody. Okay, anyone wish to speak to us?
Barbara Robbins at 1205 Wildflower Drive: I also submitted a petition to the board to Josh on
Friday with 95 residents in our neighborhood. One of the things that we’re concerned about is
that they talk about the tree canopy. What happens as the tree canopy continues to grow? Are they
going to come in and start cutting down trees in our neighborhood so that you know the rod
doesn't have to continue to go upward? Nobody seems to be able to answer that. I know that's a
question that was asked multiple times along the way because they state right now that, you know,
it has to be a clear opening for those radio frequencies to work. That's not something that unless
you're going in and cutting down the trees completely. And our neighborhood has a lot of older
trees that are very beautiful and that’s part of the reason that a lot of the residents, you know, are
in that neighborhood when they first purchased homes. They like that. It's not like anew
development where you are going in and the trees are, you know, five, six feet high. So, that’s
something that we would like answered. If the board does approve this, are they willing to make
Verizon camouflage that tower as they've done in Pittsford where they make it into that monopine
Pg. 248 September 1, 2026 Planning Meeting
because it was just stated that we aren't going to see the tower, that’s not true. There are very few
pine trees in that neighborhood. They are all going to be bare in fall, winter, and early spring.
And I’m one of the people that will walk out of my house and be able to see that. I don’t want to
see a tower in my neighborhood. That's not why we bought our home 24 years ago. So, I think that
needs to be considered. There are people in the neighborhood that have recently put homes up for
sale and there have been neighbors that have run into individuals who were going to put in offers
on homes and they've stated, “We don’t want to put in an offer on this house, not knowing what
Verizon is going to do. If the tower is going to go in is it going to, you know, make out home
values decrease? Who's going to guarantee that that isn’t going to happen? Would you want it to
be in your backyard? Thank you.
Okay, thank you.
Cameron Cox at 1257 LaBaron Circle: Opposing view. I’ve been a wireless cell phone for
probably 35 years and the last three years because of all the building. My business has suffered
because I can’t take a cell phone call in my own home, my office. I understand they’re unsightly. I
think there’s ways that they can camouflage it. But I just want to remind the board that this is
something that’s been going on for years. The need is excessive. It's damaging businesses. It’s
damaging residents. I can’t even get a hold of my parents in their 90’s in my own house. So, from
my point of view, it’s something that is infrastructure that needs to be done. That’s it.
Rick Storace at 1491 Providence Drive: Concerned about the fact that we have to continually
fight this process. We beat the cell tower last year and they keep coming back. There’s a claim,
the attorney claims that there are no health issues. We've stated; I’ve given to the board at least
50 incidences around the country where there are health issues. I am sure there are 50 or 100
incidences or research reports that show that there aren’t health issues. But we’re not sure. We
don't know. We don’t know if there’s a health problem. We'll know 50 years from now. None of
us may be here. All right? But our children, our grandchildren will be here, right. We should
worry about them. So that’s something. They also talk about coverage. They talk about coverage
over and over again. But I got three instances where they got cell towers on top of each other.
There one in Irondequoit or two; all right, Empire and Winton. All right. Right across the street,
there’s one on top of the Helendale office Building. When you’re coming down 590 or I’m sorry,
when you're coming down 104 heading east and you're crossing over 590, there's two cell towers
less than 100 feet apart. Okay! Right here in Webster. Hard Road where the buses park, there's
two cell towers in that parking lot less than 100 feet apart. What are we talking about coverage? I
think we’re being slightly misled. Can the town deny this? Yeah, I think the town has the ability to
deny this. All right. They did it before. I think they can do it again. As far as the issue of we need
the cell towers there to provide coverage because people need cell phones. People need to be able
to communicate; people make a choice. They make a choice, I’m going to have a cell phone or I’m
going to have a landline. Landlines are still available. All right. Landlines don’t hurt anybody.
Cell phones, we don’t know yet. So, we should consider that. If your business is suffering or if you
can’t get a hold of loves ones, put a landline in your house. I got one in my house. It’s available. I
use a cell phone ail the time. By the way, I live right around the corner from where the site is
proposed. I don’t have any coverage issues, and I don’t live on that street. That’s ail I got to say.
Pg. 249 September |, 2026 Planning Meeting
Please think about the residents, not about Verizon.
Christina McEwen at 1217 Wildflower Drive: You may remember me. I was 38 weeks pregnant
here last time in May. Since I had the baby and that’s part of the reason why I’m here. I just
really want to emphasize the fact that those regulations that were brought up were done in 1996.
Nothing has been updated since 1996. The laws and what's required. So, although there has been
studies done since then, the requirements have not changed, and a lot of technology has. So, I
really want to keep that in mind. Also, you can see we have so many people from our neighborhood
here. We’re really trying not to have this. We've already fought it once and we’re coming back
again, We’re very passionate about where we live. We have a great community, and I just really
want you guys to consider that like the previous residents have said. Thank you.
Justin Jenner at 1512 Providence Drive: Right next to Rick. I was here last year when this was
all going on, and I wanted to come this year. I have four kids, all under the age of seven. I realize
that the legality of this is we can’t win on the health concerns of the town’s people. However, a
couple things | just want to reiterate. On top of what Rick said and what Christina said before me,
many townships in Europe are taking a precautionary approach on cell towers because the data is
inconclusive on what it does from a health perspective to its towns people. They have more power
in the European Union to have that type of decision making. We don’t have that here, right? But
that's something that we shouldn’t dismiss because they are still looking at understanding exactly
what those health issues are that are potentially being caused by this. I have four kids and I do not
want them to grow up next to a cell tower, and they would be very close to the cell tower. I
understand that folks have issues about not having coverage and things like that. You have other
options. You can get wireless internet that'll connect to your phone to make calls. You can get a
landline. You can go with satellite cell coverage. Those are three inexpensive options and if it’s
for your business, you can write that off as a taxable deduction. Right? There’s many options. If
you put that cell tower in the proposed area, my only option if I don't want to be there is to sell my
house. And I know that there’s many people in that area that have the same exact feelings that I do
because they have young kids that do not want to grow up next to a cell phone tower. So, I
understand what the FDA says. I understand what the regulations say, but guess what, legislation
is always usually slower to the cause that what making things right than what actually is set in
stage right now right? So, if you think about lead, we used to have lead in gas. We used to have
lead in paint. You don’t have that anymore. Right? Many of many examples of things that we
originally had is products that we used readily that then we came back and said, “wait a second,
these things cause too many issues”. So, I want you to think about that. I reiterate what Rick said.
This is the town's people. I know some people want it, but the majority of us don’t because I don’t
want my kids growing up next to it. Thank you.
Dennis Gorlick and I am speaking on behalf of the Conservation Board. I know that we did a...we
typically do site reviews of places that might have some issues. Sometimes they do, sometimes the
don’t. On the 29" of April, we did conduct a site review. This site with the cooperation of
Verizon who arranged for us access to this site because it’s a private property site. And I’m not
sure if this is the appropriate time to talk about it. Maybe we wait until we get further along.
Pg. 250 September 1, 2026 Planning Meeting
I would rather, Dennis, I would rather we hold off on that. Okay. Let the board
review this thing too. We just....I just got this thing yesterday.
Just want to mention a few things for people who are in the audience. We do
look at things like would there be a significant erosion or effect on wetlands by this site being
built? So, we do look at that and we make recommendations. We do also look at whether or not
there might be any significant damage to the mature trees and we did make a recommendation
that’s probably can be followed in terms of identifying some mature trees. When and if this is
approved. We look strictly at environmental issues. We don’t look at anything else. There are
things that the town engineer looks at and there are a lot of evidence that a lot of the trees we look
at whether the trees are used by significant groups of animals and if they are we ask that they mark
some of those trees and if at all possible, keep them there when they do construction. It look like
they’ re in the perimeter and also avoid taking any trees down during the months of the year that’s
all active.
Why don’t we give everybody a chance to review this because we’ ve got a
long...
No, that’d be great. We just want to let everyone know that this is part of the
process and we had our wetland biologist member of the team look at this. So, great. Thanks.
Did everyone get a copy of the....you all got them? Okay. Get a chance to
look at them then and you did some good work on it. There’s some deep research on it for sure.
Okay, is there anyone else wishing to comment?
I recognize that Verizon has presented evidence of a legitimate
need for improved wireless coverage and capacity in North Webster. Tonight, the planning board
is considering preliminary site plan approval for a telecommunications tower at 1222 Wildflower
Drive in an R-3 single family residential property. I ask the planning board to focus on the
operating standards Webster has already adopted to ensure the public record contains the
evidence necessary to apply each one. The first is to establish the exact height. Section 130-10 of
the zoning code establishes a maximum cell tower height of 100 feet including antennas,
extensions, and other devices extending above the tower and that’s a recommendation by them that
the planning board does not have to approve. Verizon’s January zoning drawings identified a 135
foot monopole and a highest height of approximately 139 feet above ground level. Tonight's
planning board agenda describes a 125 foot tower with a 4 foot lighting rod. That revision needs
to be clearly established on the public record. What the question is now, is what is the exact tower
height now proposed and what is the antenna center line and what is the maximum overall height
of the tower including the lighting rod. Second, we need to establish....the planning board needs
to establish why this amount of height ts justified. Verizon has presented comparisons at
approximately 134, 111, and 91 foot antenna center lines and argues that reducing the height
materially compromises coverage, but Webster’s standard is still 100 feet. The record should
establish exactly what happens at those intermediate heights closer to the 100 foot standard and
what does Verizon achieve at 100 feet that makes it insufficient? And what about 110, 120, or 125
Pg. 251 September 1, 2026 Planning Meeting
feet? The question should not be whether a taller tower performs better, the record should
demonstrate the technical justification for the amount of height actually requested. The third issue
is the location. Section 130-12 of the zoning code establishes a preference for higher intensity
property where a technologically feasible and available alternative exists. Existing structures
suitable for collocation receive the highest preference, followed by commercial property and then
government property before residential categories. R-3 zoning is legally permissible, but it’s by no
mean preferred. Verizon said it examined I] alternative parcels and concluded that Wildflower is
the only site both technologically viable and available for lease. The public record should
demonstrate that conclusion candidate by candidate. Which preferred locations were unavailable,
which were technologically infeasible, and which simply produced les desirable radio frequency
performance. Those are different findings that the record should clearly distinguish between. The
fourth that I mentioned issue that I mentioned is the collocation. Section 130-12 states that at all
times shared use of existing towers are preferred to the construction of new towers. The code
requires an inventory of existing towers, consideration of shared use opportunities, and
documentation concerning good faith efforts to obtain shared use. So, the record should specially
establish why existing towers or structures cannot reasonably accomplish the network objective.
Ther record should demonstrate why the collocation......
Kevin, actually the things you’re saying, this is really what this whole thing has
been about. They have gone and we’ ve, the town has gotten, you know these outside engineers to
come in and research all of their findings and some they agree with and some they question and so
on and so forth. That’s.............
I understand that Tony and I do appreciate you clarifying that. I know a lot of
this is redundant, but I’m just pushing back to make it as difficult as possible for the planning
board to approve the project, that’s all.
Time is up, Kevin but thank you.
The last one I was going to talk about was the visual impact.
Okay. Thanks, Kevin. Anyone else wishing to speak?
Jill Marefka at 1191 Scandia Drive: We own three and a half acres, and our backyard butts up to
where they’re going to put this because it is the 1222 Wildflower Lane. So, they’re going to take
down the trees in the forest, which now is going to make if very visual for us to see, and it’s going
to be close enough to our property line that when we sit in our backyard, we're not only going to
see it, but we're also going to hear it. And we are residential. We bought our home there 13 years
ago because we were in a rural community, We had wonderful property. There’s a creek and
there's all these trees and yes, they are mature trees and if there’s a 100 foot that you’re not
supposed to go over why would we allow, why would the town allow them to just go higher than
the trees. They need to find another location. It doesn’t work there. If you have to eliminate what
is there to put this tower, then it shouldn’t be there and not only is it a residential area with this
giant tower that you’re about to put up there. It’s gong to be an eyesore for people even further
Pg. 252 September 1, 2026 Planning Meeting
because it’s going to be even bigger. And I’m sorry your don’t have service, but where this tower
is going is my backyard and I have service. We worked for, you know, the better part of COVID.
My husband and I both, 10 hours a day from our computers. We don’t have a landline. I have
never had a problem getting a call. And I'm like again I’m sorry you don’t but maybe is should be
closer to your house because I mean, I’m not trying to be mean...I was not like, but I mean if you
can't get it, and Iwas just saying for his coverage. I do feel back of people that don’t have
coverage with their cell phones. I know that you know the landline has been you know made a little
redundant for some people. But I just wanted to say I’m very con with this project. Thank you.
This is one of the big issues we’ ve had right from the beginning. It’s a cell
tower, The sites are selected and not by the town by any means. And if it goes here, the people
complain there. Where would you want it to go? Over there. Oh, then it’s bothering somebody
else. No matter where you put a cell tower, it’s impacting someone. And all’s we can do is the
best we can do. I should say is deal with as we just did. We hear it, we listen to it all from the
Verizon people and went to the extent of hiring an outside consultant to do all the homework on
this here look you want to see. This is just part of the papers just for this one and now there’s
another cell tower too and a lot of this we just got. I mean I can read pretty good, but I can’t read
all this in a couple hours’ time. So, it’s got to be absorbed and a lot of it are the comments, the
rebuttals from the organization that’s doing the review on it. They’re giving us the report and it’s
interesting, but it’s....there’s a lot there to be read, a lot to be understood. So, that’s why I’m
suggesting, I mean you know, that we table this thing.
Excuse me, Mr. Chairman, before we move on, I just want to remind the board that
the third party RF Consultant is in attendance tonight and is prepared to speak to his analysis and
findings.
William Johnson and I am Professor Emeritus from Rochester Institute of Technology. My
colleague, Professor Steven Chikarelli and I have gone over both this application and the one at
Lake Road so I would be glad to give you a quick rundown. We could spend hours doing this and
if any of my students are in the audience, I know that they’re trembling right at the moment
because they know that this could take some time. There’s a lot of moving parts to these
applications. So, fll try to focus just on the Webster North site at this point. So, as I’m listening to
the comments, and I wasn’t this isn’t part of our report, I wanted to just share this with you. I've
been through hundreds of these analysis through many municipalities throughout New York State;
Pennsylvania; and on the West Coast. One of the problems that all municipalities deal with is that
you're saddled with the burden of federal law that requires the you respond to the
Telecommunications Act of 1996 and the multiple court decisions that followed on that particular
piece of legislation. I would suggest if it’s helpful to you to refer your residents the place that they
should be registering their complaints is with the senator representatives from New York State and
the House of Representatives folks. The representatives in the house because they are the ones
who are the shepherds of the Telecommunications Act of 1996. They could change that legislation
and they could make it either easier for you to deny an application if it doesn’t fit into a community
or as is presently the case, the Federal Communications Commission has a proposed rulemaking
that would largely take all of the jurisdiction and discretion that you have to deny these sites off the
Pg. 253 September 1, 2026 Planning Meeting
table and would remove that essentially between the FCC and the service providers. They would
leave very little for you to do. Now, that has not gone to the point of being written in code and it
has not gone to Congress for legislation, but I would ask you to keep that in mind because that is
going on in the back room right now and there’s been a proposed rule making comments have
come in and gone out. There's over 3,000 comments that went to that particular piece of
legislation. So, | would respectfully suggest to the residents that are here, the place if you’re going
to speak to this board. Okay, this board has a Jurisdiction right now to look at did the applicant
identify a significant service gap; Is the proposed solution going to be something that will actually
remedy that gap? And the third thing is, is it the least intrusive approach that could be
accomplished technically feasible that includes: land control; anything you can think of in terms of
feasibility. If they have met that burden, right now, that’s what the current law requires.
So, you and I defer of course to your attorney to give you that advice. I happen to also be an
attorney, but that’s not my role here tonight. My role here tonight is to speak to you about the
technical merits of the site.
So, having said that those three thresholds the identification of a significant gap, my colleague
and I have looked at the propagation plots from Verizon, and they definitely do show a service gap
in both coverage and in terms of capacity. And what happens is when neighbor sites that are
already serving in an area have so many users that are trying receive and transmit data and
receive and make phone calls that there’s only so much bandwidth that the FCC has allocated to
the service providers. When that bandwidth is exceeded, everybody's service level starts to drop.
You try to make a phone call; it won’t go through. Even though you show five bars on your phone,
the call won’t go through because there's not available capacity at the serving site to be able to
handle the traffic.
This proposed site will drop a what's called a dominant server into the area where there currently
is very week coverage, but there's some coverage, but that some coverage is being provided by the
adjacent neighbor cells and those neighbor cells are being saturated already by users that are
trying to make and receive phone calls and receive data. So, that ‘s really what the problem is
right now. So, there's a significant gap. It's both coverage radio frequency signal and capacity
because the existing neighbor sites can't handle that traffic. Dropping a new site in would add
more capacity will place the stronger signal in the area where right now the adjacent sites are
trying to serve the area and it would solve for the time being until the demands continue to grow
and they have for the decade now. The demand has continued to grow for wireless, and I would
expect that that sort of thing would continue but that’s a question perhaps for another day.
So, this particular site is a 135 ft monopole with a lighting rod that’s on the top. There are two
different dimensions that show up in this application. I just want to be sure everybody’s clear on
what that is. There's the height of the tower and the lighting rod that goes on the top and there’s
this other thing which is abbreviated ACL. It stands for antenna center line. So, some of these
antennas are about 8 feet. Okay, from the ground to about this height above my head. Some of
those antennas are about 8 feet long. The center of that antenna is about four feet down. So, in
round numbers when Verizon runs a propagation plot, you always do it to the center of the
Pg. 254 September 1, 2026 Planning Meeting
antenna. That's the height that’s important. Although you need the whole antenna to do its job, it’s
the antenna center line just to keep it simple. So, you'll see on the propagation plots antenna
center line values, but you'll see in the application different things about the height of the tower
and the lighting rod that goes on top of it. That’s 139 feet. The antenna center lines are the ones
that are on the propagation plants. So, as I said, we looked at those materials and now those
materials are provided by Verizon. So, I already know that you are very skeptical to say you know
well here's somebody saying that they have a problem that they have to solve and how do we know
it’s actually a real problem. So, we have communicated about drive testing and about, you know,
other types of ways to ascertain whether or not that information is accurate.
As I mentioned before, I’ve been through several hundred of these sites throughout New York
State. Not all of them but a handful of them at least have had what are called monitored drive tests
where I was actually on site, check the equipment for accuracy. Had the drive test run, compared
whether or not the measurement were repeatable, and then here was the real good part, I got to
compart that data to the propagation tool that was used to make the prediction in the first place.
There’s a very good correlation these days between the propagation tool results and the drive test
that one would get if you actually ran a vehicle around the road and picked up those samples of the
signals. So, that’s kind of good news, right? Is that the computer-based analysis is very accurate.
If we were having this conversation 30 years ago, | wouldn’t be saying that. There was a big
discrepancy between what the tool actually predicted and what a drive test would show. And so, at
that time a lot of comparison was done between drive tests and simulation tools. But what I can
tell you is based on my experience for these monitor drive tests. When I’ve had the opportunity to
compare a drive test to a propagation tool result, all things being equal, it’s not exact. It never is
because trucks get in between the car and the tower. There’s other type of anomalies that happen.
But to a very good approximation, the computer-based simulation predicts very well what’s going
on.
To help you with this, there’s a website that’s called opensignal.com. Other work
OPENSIGNAL.COM. You can look on opensignal.com and you load an app on your phone and
then you can actually observe what the measured test is from multiple people who are running the
same app. It’s sending and receiving data. It’s measuring signal strength. It’s the same sort of
thing as a drive test except it’s multiple people that are actually doing this. And it’s all correlated.
It’s cold together and you can view it on the app. So, as a matter of routine, Professor Chickarelli
and I look at that information when we're going into a site. Sometimes the data is there that we
can use and sometimes it isn’t there. There is data for this particular site and perhaps at another
meeting we can talk about how that correlated but the answer is, it correlates very well. What
Opensignal.com shows is pretty much what the propagation plots that Verizon has proposed for
existing coverage show. Okay, there’s weak signal in the area that they say there’s weak signal
and there’s strong signal where they say there is strong signal. So, it’s a very good comparison
and it's certainly is an independent thin. Now, there's ways to take those measurements that
we've talked about before, but I think you'd probably be satisfied looking at that information, and I
would be happy at some point to walk you through that. I don’t have the graphics for that right at
hand. But | would glad to talk with you about that. Let me stop here for a second. That was a lot
of information probably. Are there questions that I can clarify and then I'll move on.
Pg. 255 September 1, 2026 Planning Meeting
I have a question from a legal standpoint. It’s probably more for the zoning but
when the code says the maximum fee should be 100 and Verizon’s code perhaps probably what a
lot of people are disgruntled about because they’!] see it above the canopy. Did you review
whether or not a 100 foot tower that would satisfy and be accomplish the same thing as a 125 or,
I’m sorry, eliminate the gap that they say they? And could a 100 foot in other works, could a 100
foot tower eliminate this gap and zoning board to your
lawyer.
In the supplement available last week (video was skipping and greyed out) left
sites do compromise the coverage. Now having said that could multiple sites be put in to fill in and
bolster that coverage? Sure, it could be done. Okay power
keeps growing more.......... (video keeps skipping) question for me as much and would they be will
fo accept the compromised coverage. I've had that discussion with their head RF engineer, and
they are not willing to compromise that coverage and there’s no other alternatives that he’s willing
to consider that would actually address that issue at a lower tower height but beside if you get
down below the trees. Okay, now that disrupts how the signal propagates through the trees. You
can't have antennas shooting through trees because of the radio signal just gets absorbed by the
canopy. So, that’s why the drone footage that they show in the application materials. It has to be
about 10 to 15 feet above the top of the canopy so it can skim along the top and dive in when it
needs to. So, that’s maybe the long answer to your simple question, right? At the lower heights
the coverage is compromised. Was there a follow up on that or ?
Well, yeah. I mean, I just I guess ultimately the question then becomes, are you
saying that the gap in the coverage can’t be satisfied at 100 feet, it has to be a 125 feet? Or not?
We’ re not sure or does it have to be 125?
In order to get the coverage that they need. The proposed height is what
they're asking for and if you go lower than that proposed height, the tree canopy, terrain, and a
host of other obstacles between the user and the base station start to cause a problem. So that’s
our opinion is that the proposed height is at or near the minimum height that could be
accomplished unless one starts breaking the system up into multiple towers and putting and these
would not be like 20 foot towers, right? I mean, you know, you're talking 70, 80 foot towers,
multiple towers in people's backyards, right? I mean, the impact of those probably is more than
the impact of his one particular tower, which goes to the chairman’s comments before.
Yeah. Actually, years ago when we first got the first cell towers in town, we
set the height at 100 foot thinking it would reduce it and wouldn’t have such an impact on
neighborhoods and so forth. Come to find out though, you needed more of them to accomplish
the coverage, right. So, the code never got changed and, in my opinion, I think it probably
should get changed, but it is what it is today. So, therefore, an applicant is looking for variances.
And the code does actually serves a purpose because it actually causes an
applicant to come before you or before the zoning board of appeals and demonstrate need.
That’s not a bad thing, right. So having that number in there, not a bad thing. What else can I
Pg. 256 September 1, 2026 Planning Meeting
tell you about this? You know, speaking of Webster North in particular, we did look at the
alternative sites that were listed in the application. You know, and we always ask that question
of the board. If you know of other sites which might have been better sites, they should be looked
up. I think you’ve already been asked that question because, you know, at least a couple of sites
I think were proposed by the board. So, Verizon has already looked at that. We didn’t know that.
We were not involved until you know, just last couple of months. So, you’ve already done that.
One of the items that we had as a finding and this was not directly address yet by Verizon and
you may not need it to be addressed, but we put it there because you're the decision makers.
We're just the ones who try to point these things out. There’s a process they go through to
identify land control so they, you know, they do mailings to, you know, land owners of record.
Maybe they get a response back from them, maybe they don’t. They probably follow up. I’m not
100% sure what that process is that they go through, but they haven't reaily documented that for
you. So, if you’re satisfied that they have made an adequate attempt to reach land owners where
there was no response, then out finding is mood on that particular point. You might know that
they have done that. We don't. So, that's why we put it in as a finding. But in terms of all the
other findings that we had in our preliminary report from back in August, I believe that all of
those findings have been in our opinion adequately addressed to the point that the board could
look at the results and look at the answers and then be able to weigh that to third prong of
Willith, which ts the least intrusive means to actually address the significant gap that they’ve
identified. And of course, we'll stand by to try to help you with that if we can do that.
I think you’ ve done a great job with this thing quite honestly, quite a bit of it
already and your comments and your responses to the questions and so on and so forth and pretty
clear and concise. I think that’s good. I think it’s just a matter of everybody getting a chance to
review it and get up to speed with it. That’s all. I think you’ ve done a great job, Mr. Johnson.
Well, thank you kindly and I certainly credit goes to Professor Chikarelli. He
did the bulk of the research on this and putting the findings together and then he and I hammered
it out and had some fisty cuffs to get things right, so, but I appreciated his hard work. He’s
probably listening tonight from Tennessee, by the way.
Sir, ] echo Mr. Casciani’s comments. I also appreciated the fact that you put
regulatory citations in your footnotes because I think it makes it easier to understand the basis of
the regulations and how they apply to some of your findings.
Well, I’m glad you found it helpful. Thank you. Thank you for that comment.
! appreciate it. I'll yield the podium at this point unless there’s any further questions.
Josh, do you mind putting up the application from Verizon, the one that’s linked
in our agenda and like go to page 48 of the application. This is really more of a question to the
consultant. So, basic question, you know, we have two applications essentially before us,
Webster North and Lake Road. With kind of the gap analysis that was provided from Verizon
there seems to be some overlap between the two towers. The question being, you know, if
Webster North proceeds, does Holt and Lake really still need it? Or if Holt and Lake proceeds
Pg. 257 September 1, 2026 Planning Meeting
with the gap over lapped, is really Webster North still needed? And I was just wondering if that
was evaluated.
Some of what you’re saying, I'll move my mic over here perhaps. Some of
what you’re seeing is in that overlap is the capacity relief that the new site will bring. Because
you can’t draw traffic off of the existing sites unless that coverage ....unless the signal is
stronger. So, the phones which are in that particular location are actually drawn to the new
base station. So, the overlap is intentional and also when you’re moving on a road between two
base stations, there’s a process called handoff that occurs as one signal starts to fade and the
other one starts to pick up the mobile controller makes a decision to switch off to the other base
station at that point. You need to have a little bit of overlap for that sort of thing to happen. But
for capacity, you need to have a lot of overlap because you're trying to actually pull traffic to the
new site and leave the old site less burdened by the traffic that was there. So, the Holt site that is
up to the north is actually a small cell site that’s up on the top of a small pole. They put the pole
in for this, and it has an omnidirectional camera that’s up on the top of the pole and it essentially
is a fill in so that the proposed site doesn’t have to be quite as tall. That site is already actually
built, and it’s installed except they don’t have fiber run to it yet. They've been waiting for
whoever put the fiber in to bring it up to that particular site. So, they can’t actually use the site
yet until they get that fiber back haul in place. The back hole is where once the base station
receives the signal, all the data to and from that particular facility runs along the fiber back to a
central office essentially that.........
Is there fiber already established at this location or will this tower just sit and wait.
I’m guessing that it is not there yet. And it would also have to be installed,
but I defer to the applicants. I know Tim knows the answer to that, but.........
SOMEONE SPEAKING, CAN NOT SEE OR HEAR BECAUSE THEY ARE NOT AT THE
MIC.
Did he answer your question okay?
It did. The only other question I had is so initially sites H through K were rejected
outside the search areas when the applicants presented to us. You know, now with the again
looking at both applications, if Holt and Lake goes in, would the alternate search areas that were
rejected H through K be something that should be considered again as an RG analysis as in, you
know, moving the tower potentially further southeast away from residences if Holt and Lake was
to be installed.
I suspect our attorney Smith is coming to answer the question. Let me take a
quick crack at it which is we asked the RF engineers to actually...on the propagation tool turn
Holt and Lake on because we wanted to see what its performance was because that may indeed
affect you know the other site and it doesn't right all it does is fill in an area that the proposed
site would not cover and Holt and Lake will pick up the slack on that particular area. So, | don’t
Pg. 258 September 1, 2026 Planning Meeting
know if that’s what you were gonna say.
No, that was perfect. I just want to clarify though despite a similar naming
convention that 1s not the other macro tower that is before the planning board on tonight’s agenda.
That’s Lake Road. So, I do just want to clarify that the Lake and Holt is a small cell which is
essentially as Professor Johnson was saying it fills in a hole. It’s a band-aid to be able to service a
very small but highly used and intensely used area. So, if you’ll note on the map where Holt and
Lake is, that is where Webster Park 1s. So, it’s serving, you know, events such as the Turkey Trot
or the White ...the county’s White House is there. So, it’s really supposed to be a small booster
that is allowing more individuals to connect in a very small tight space. So, I did want t clarify that
the proposal before you for Webster North is really apples and oranges to the small cell at Holt and
Lake and a different application for the Lake Road which is also before the board.
That was actually in your paper work, I went through that and it was specific
those two points too.
I think my last question here primarily for Verizon. So, in the application, it said
that the antennas must clear 110 to 115 foot clutter of function. But future collocutors in the same
application indicate would be in that range of, you know, 115 to
110. So, you wouldn’t be able to
necessarily have a future co-locater on this poll. It would just service Verizon and not anybody
else.
So, I can’t speak to how a different and actually, Professor Johnson may how a
different providers network works, right? So, we can only look for our antenna center line to where
we need to shoot to for that line of sight. And that is to the Webster, the Four Mile Creek, the
Webster Park, Four Mile Creek and Webster Tower. Yes, I remembered them all. So those lines
of sight is what the antenna center lines shotting towards. You make a good observation of that
those two heights are the same, but we can’t at this time speak to what another carrier’s need
would be to fill in the network.
Yeah, I guess my concern would be another carrier coming in and saying I need a
tower here as well now because I can’t co-locate.
That is a future possibility and also might be....we will be back before the board to
increase the height. But I can’t speak to now what a future carrier would need. But to meet
Verizon’s need and again being respectful that we do want to have the tower at the lowest height
possible to meet the network needs that are before the board today. That is the 130 foot tower with
130 foot center line. To go up any higher for lower attachments would necessitate us asking for a
higher pole than we can demonstrate at this time.
I can’t recall any other than Verizon putting cell towers in the area here and one
of the stipulations is if AT& T or whoever want to come in, they co-located by code to...it’s
required that they find them a co-location on a current tower which is generally Verizon’s .
But in this case they wouldn’t be able to do it.
Pg. 259 September 1, 2026 Planning Meeting
Yeah, I don’t know.
Because they would have to co-locate it into the tree line.
If you look back at the July 24" Webster North preliminary report that
Professor Chickarelli and I issued to you, finding number 12 deals exactly with your question.
There is a provision in the current FCC regulations that says that if another service provider
wants to come in that there is a provision for increasing the height of the tower to accommodate
them without pretty much this type of process. So, that’s again that’s federal law that’s not Town
of Webster code, right? So, any concerns about that need to be addressed to the folks who
actually write those things which is the US Congress.
But the height can only be so much. I mean then you have to get away froma
monopole.
Yep. Well, the height, I forget exactly what the numbers are off the top of my
head but it's 10% or 10 feet or 20 feet above the top of the existing pole and is one bite of that
apple. So once that happens nobody else can do it again. Now, it has to go through the full
zoning review, but that’s in our findings because | wanted you to be aware that that’s a
possibility. Now, that doesn’t mean that I’m not suggesting that that’s a reason for denying this
application.
It would allow this tower at this location to fall into a neighbor’s yard based on the
because right now it’s to that land owner.
(video was skipping and greyed out) Webster North report say what are the
exceptions of ....
(video was skipping and greyed out) If consideration needs to be given to collection
capability and if the application should have accounted for that as an increase, then the location
that it’s currently cited on should be altered for that.
Derek Anderson; I don’t see that as part of this application whatsoever. We have before us is an
application for the height of a tower of a specific height.
For a single use.
If they paint it blue or if they paint in black, it’s still a tower of a specific height.
You can’t speculate on what may happen in the future. We don’t approve based on speculation.
We approve based on the application we have in front of us.
I think that’s your opinion of the board. Table this and.............
Yeah, I think there’s still a lot to discuss.
Pg. 260 September 1, 2026 Planning Meeting
Review all the paperwork. I mean again, there’s volumes of it here to go
through and Mr. Johnson actually did a real good job of explaining quite a bit of that stuff too. So,
that was good. Okay, can we ask to request to table this to the next meeting then and let you keep
moving to the zoning board approving that? That way you’re still moving along to keep this
process moving.
We certainly appreciate the town allowing this process to continue so we can go
before the zoning board.
RESOLUTION 26-062 Anthony Casciani made a motion to
TABLE APPLICATION TO 10.6.26
which was seconded by Drazen Gasic.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson ABSTAIN
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Located at Lake Road and County Line Road.
Applicant Robert Burgdorf for Bell Atlantic Mobile Systems d/b/a Verizon is requesting
PRELIMINARY SITE PLAN APPROVAL (
PUBLIC HEARING
) in association with a 125
foot telecommunications tower with a4’ lightning rod and associated ground-mounted equipment
ona 7.8-acre parcel having SBL# 037.03- 1-44 located in the LL Large-Lot Residential District
under Sections 269-5 and 350-13 of the Code of the Town of Webster
Appearing before the board was Laura Smith with Nixon Peabody representing this application. I
will try to focus on the differences between this application and Webster North but also want to
make sure we have a robust record and I’m able to address all the question that you have that are
particular to Lake Road.
As noted, this is at the corner of Lake Road and Monroe Wayne County Line road. This is a
125ft tower. So, it is a different height than the Webster North Tower. But similar to Webster
North as demonstrated in our application materials and confirmed by the town’s independent
consultant, there is a significant gap in wireless coverage in this cell as well. This area is
currently served by three distant overburden sites. It continues to be served by Four Mile Creek
and East Webster. However, this site is also served by a tower at Gennai. All three sites are
terrain and foliage challenged resulting in significant gaps in both low band and mid band
coverage Moreover, as we noted before, the actual utilization of data for the past year shows that
several key performance indicators have already exceeded 100% utilization at these other three
Pg. 261 September 1, 2026 Planning Meeting
existing towers. That mean the existing network cannot meet the current demand that is shown
in exhibit F of our application pages 7 and
9. The goals of this project are to increase network
capacity; provide reliable coverage; to the Lake Road service area in northwestern Webster, and
offload traffic from existing overloaded sites. Here, which is somewhat different than the
Webster North application, the mid band comparison is particularly significant. In addition to
the midband coverage being week, being able to put up this tower will both address the lower
mid band coverage as well as by providing significant mid or sufficient mid band coverage in
this area. It will then free up the low band congestion that’s happening at this site.
These items are demonstrated on page 18 of exhibit F is the existing mid back coverage which
shows there is little to no reliable mid band coverage in this area. Page 14 show that Lake Road
cell has existing low band coverage that’s akin to rural or suburban and incur applications. And
then page 15 and 19 of exhibit F show how those two coverage gaps would be solved with the
project as proposed. Just like in our Webster North, the proposed height is the minimum
necessary to provide the effective coverage in this area. As shown in exhibit R and B of our
application and was also confirmed by the town’s independent consult, the supplemental
propagation plots compare coverage at the proposed 100 ft antenna center line. So again, we
discussed the 125 ft tower has 120 center line against a reduced height of 95 feet, which would
be akin or close to the 100 foot tower permitted under the code. As confirmed by the town’s
consultant, a 95 foot tower is too low to overcome the area terrain and the foliage and does not
allow for the necessary coverage improvements, capacity overloads and the network
densification needed in this area.
Also, like Webster North, we have conducted an exhaustive alternative site analysis and no
viable alternatives exists. The record clearly demonstrates there are no viable alternatives sites
that would offer an improved visual impact while still meeting Verizon’s RF needs. 1f you recall
from our prior meetings, I believe back in March that Verizon undertook the comprehensive site
selection analysis in it’s initial application evaluating a total of seven candidate parcels within
and immediately outside the search area. As shown on page 9 of exhibit G and as appropriately
noticed by the Planning Board at the March meeting, the majority of the properties located
within the search area are owned by our currently proposed Jandlord Windmill Farms.
As discussed with the Planning Board in March and documents in our March 31, 2026
supplemental application, we did engage in extensive negotiations with the landlord for
permission to be on any other location of the landlord’s property both in addition to the property
the location on the property requested by the planning board as well as just blanket can we be
anywhere else. For those reasons though, as we were included on our March 31* supplemental
application, if you recall, it was a letter from the landlord. It was exhibit T of the application.
The landlord could not permit Verizon to be located anywhere else on the property due to
conservation easements and then the working operations of the farm. Verizon also reviewed two
additional candidates identified by the board. If you recall on our prior exhibits, we were calling
them H and IJ but those two locations which were outside search ring failed from an RF
perspective. We also asked our site selection analysis and RG to re-evaluate the search area,
which candidly is an unusual step for Verizon to take, but certainly want to be responsive to the
Pg. 262 September 1, 2026 Planning Meeting
planning boards requests. However, after researching and redetermining the search area, again,
that materials presented to you as exhibit U, it was determined the search area really had to be in
the location and that it was presented in the original search.
The remaining property owners within the search area, so those other six of the original
candidates, declined to participate in lease negotiations. In these decision, we’ll want to note,
and I know this is certainly top of the mind for the board, but we can’t force people to lease to
us. So, to the extent that there are other locations, we are happy to look at the other locations.
We did so during Lake Road, but the decision to enter into a lease is purely the landowner’s
discretion. We cannot command a landowner to enter into a lease with us. That leaves only the
selected site at the corner of Lake Road and County Line Road is the only candidate that’s both
technically viable and available for lease. Much like the Webster North Project, this project will
also not have an environmental or community impact.
As we also noted on the Webster North project, and we did hear similar concerns tonight, you’ll
hear similar concerns in October. And not to...these are deeply held feelings by the individuals,
and we respect those deeply held feelings. But the law is very clear here. Science is clear. There
is no harmful effects of RF radiation. In the law as it stands and right, wrong or indifferent as
one might feel about the law, the law expressly preempts boards from denying or conditioning
approval of a wireless facility based on health effects. This field is entirely preempted as long as
we do our due diligence and demonstrate to the board that we meet the FCC requirements and
the regulations which have been presented to the board of exhibit P. Again, this is not to speak
to people’s deeply held beliefs in and understanding of what they feel is the RF effects, but I
want to be very clear that the law is strong on it and science in my opinion is very strong on it.
The FCC believes that the science is very strong on it as is the FDA and the WHO. That there
are no negative health effects of RF emissions and cannot be considered as part of this
application.
Much like Webster North, this project will not pollute, will not create noise, will not increase
traffic or create a demand on governmental services. It is an inert facility that is located on the
corner of or near other public utility infrastructures located on the corner as well. There’s
electrical wires and telecommunications wires transversing the parcel. I’ll also note like Webster
North, this application meets the requirements of state and federal law. I was struck as we are
hearing the public comments from before and likely we’!l hear from this group that there is a
reason these are protect as public utilities or the reason New York State has recognized them as
public utilities. There’s a reason there’s a telecommunications act of 1996. Popular things do not
need federal law protecting it. This is a difficult decision. The federal government recognizes
this is a difficult decision, That is why it has put protections in place and protections in place
and preemptions in place to ensure that there can still be a rapid deployment of wireless
telecommunications facility across the country while still being mindful of the areas and
concerns raised by local boards. That’s the same reason we have a shot clock. If this was an
easy decision, the federal government would not have to put in restrictions on how quickly a
board has to act in making a decision. I think although we can discuss the policies and should
one reach out to Congress to go through a change of the law, the law is what it stand, and the law
Pg. 263 September 1, 2026 Planning Meeting
is there because this is a hard choice and is meant to protect the type of public infrastructure that
is needed to ensure people to have an ability to communicate.
I can pause there or I can also go through the legal standards for that public utility standard and
the telecommunications act, or I can pause and let Mr. Johnson come and give his report.
So, I think my comments regarding this site are almost going to be duplicates
of what we talked about previously, right? We have looked at the various heights. The proposed
height is what's needed because the coverage footprint draws back when we go to a lower height
terrain and foliage and other obstacles in the area. I didn’t comment about the human exposure
issue on Webster North, but we'll take a moment to do that here. In both applications there is an
exhibit produced in one case by (Sear set?) in Webster North site and that showed less
than 1% of the FCC threshold. The FCC established a 100% threshold for general population.
That site is below 1% of that threshold. So, it’s almost imperceptible in terms of it’s intensity.
Aerosmith produced the report for the present site for Lake Road, and the maximum theoretical
exposure would be 3.27% of the FCC’s threshold. So again, very, very low emissions and
toward that end what I would caution people is that the cell phone is actually going to produce
more electro magnetic energy when you hold this to the side of your head and make a phone call
or even if you're not making a phone call that the phone is occasionally talking to the base
Stations to report it’s location. This is where the exposure is coming from. So, if people are
concerned about exposure at the levels that the base stations have been analyzed, that’s nothing
compared to what you're getting from the actual cell phone. There’s also radio and TV signals
that are in the air and I don’t have specific numbers for those for this area, but generaily much
stronger than what you'd be getting from base station.
Having said that, the same issue regarding the alternate sites. You know, we don’t have
documentation about what attempts were made to contact unresponsive land owners if any of
those sites were viable, but it sounds like most of the alternative sites are owned by the same
landowner and you know, he’s already precluded the use of other locations on his property. So, I
think unless there were further questions specific to Lake Road, I'd be finished with what I had to
say.
I think one of your comments was on regards to the Lake Road project was
for the applicant, you know, dates and persons they contacted in that area, and I would testify
that I spend some time with Mr. Burgdoff myself and trying to contact people in that area to see
if there was another place for it. And all due respect to them, there was nothing. So, right back
to the original spot. And on that spot as well all know, we tried to relocate the tower further back
in and for reasons of the land owners, they couldn’t do that and we understand that. So, again, I
think you did a pretty thorough job with this too here.
Thank you.
| had just a quick question. In your review is the location of this tower just
capacity driven ?
Pg. 264 September 1, 2026 Planning Meeting
Yes, Lake Road is. There’s already low band coverage. So, we look at three
different bands. We look at the ow band which is about 700 megahertz that is already there but
there’s very limited capacity. When these sites were first put in back in the 1980 and 1990's
there weren't a lot of people using cell phones so that bandwidth was quite sufficient but now we
heard some figures from attorney Smith about how wireless devices have proliferated and ow
more bandwidth is needed to service that many users simultaneously to these sites. So, low band
is covered. The low band signals from the mobile phones are trying to reach out to the adjacent
neighbor sites, and there’s not enough capacity there to accomplish that. So, putting another site
in the general area where the search ring is located would draw traffic away from those sites,
service if at the new base station, and the new base station would have much more band with at
the mid band and then at C band. Okay, we consider that all kind of one band, but there’s hugs
amounts of bandwidth that are available with that new spectrum. And I say that now 20 years,
30 years from now, someone will be quoting me and saying, “well, that wasn’t huge. This is
hug” Right? So, the demand continues to grow, and this site would actually supplement what's
happening in the existing coverage right now. So, thank you for your question.
But it is primarily capacity driven?
It’s primarily capacity because the low band is already in service. There is
no mid band or any usable midband at this location. So, there will be new capacity but there’ il
also be new spectrum at midband which opens up more bandwidth for folks that are connecting
to this particular base station.
So, I have a question for Linda. Did you or did anybody from the Verizon reach
out to anyone in Ontario? The town of Ontario to see if they have land available anywhere in
this area or is it all residential owned or owned by the windmill or it is ....
We did. We looked that the zoning map for the Town of Ontario. It is all
residential in that area as well.
I have a question that’s more for the expert. So, again, going back to the code
since I’m the attorney for the board relative to our requirements that it’ll be as less...I see this
project as different than the north project and then visually it’s not in the tree line. It’s not
covered. You can see it on Lake Road un; and the code again specifically indicates that we have
the right to have some type of camouflage or have an aesthetically landscaping and you have
those covered and specifically written in the code. How have other towns in your experience
dealt with that? And have other towns required like stealth designs, designs that don’t make the
tower look well, sometimes they look like a tree. 1 saw on the throughway on the way here, I
think. Saw one that looked like a tree. And I guess in your opinion, how because I see this is
different. This is not in a tree line. This is right smack on Lake Road. How would this board
consider something like that?
Well, thanks. That's a good question. So, I’m a radio frequency engineer,
not a landscape architect. But 1 have been enough of these hearings to hear some of the things
that landscape architects and others have suggested. So, I'm glad to share what I’ve heard and
Pg. 265 September 1, 2026 Planning Meeting
what I’ve seen. So, tree canopies in this area are around 65 to 75 feet tall and kind of the shorter
end of things. Here you’ve got some much taller trees. And, you know, here’s a problem that I
experienced on my property, which is somebody prior to my buying my property had actually
cabled a big maple tree. It was a beautiful tree, but it had these huge limbs that kind of went out
and what I learned from an arborist is when you cable those things, the tree will grow now, you
know, 10 to 20 % tall than it actually should be and now it’s really unstable in it’s roots. So,
sometimes you get really tall trees like that that have you know been cabled or you know for
some reason are up on a null or something and they grow taller. But typically, you know 65-70-
80 feet kind of is where the canopy stops in this particular area. Getting up above that is going
to be necessary, but now trying to disguise something that’s up at 125 feet. So, you know, that’s
going to be a clear 20 to 30 feet above existing canopy, even if there were trees around, And
there have...there are some humorous photographs, and actually I’ve seen some of these. A
friend of mine who travels the country sends me photographs of these when they run across
them. But you know, making a tree look like or a cell tower look like a huge cactus or making it
look like a huge tree in the middle of you know, a desert you know there’s questions in my mind
as to whether or not that actually is a successful stealth approach. The Town of Pittsford
recently stealthed a site that was... want to say it’s 110 feet and it looks like a pine tree.
Depending upon which direction you approach it, it blends in and some other directions it’s
clearly something that head and shoulders above the rest of the canopy, but you know, perhaps
that’s not as big a deal. You know, I think when people are driving down Lake Road, they’re
probably not going to be taking your eyes off the road too long, you know, too look and see what
the stealth tree looks like or what the tower looks like. But that’s always the problem trying to
stealth something that is higher than the canopy. Often times draws more attention than it
Should. It can be done though. It certainly can be done. Now when you stealth a tree or stealth
a cell tower it limits | what you can do in terms of collocation on that sire, The branches
themselves that are artificial tree now produce wind load and torque. So, when the wind blows
off the lake, whatever we’re going to call it, then it will force the torque at the bast of the pole to
be greater than it would be without those particular branches on there. So it limits how many
antennas you can put on because a lot of the wind load has already been taken up by the stealth
branches and if you bury antennas inside of the stealth branches at 700 megahertz, that's not so
much of a problem. But as I was explaining earlier, when you go to mid band those are higher
frequencies, the higher frequencies are very much disrupted by the extra obstacles that are right
in front of the antenna, It changes how the antenna patter works. It’s less efficient and
ultimately the propagation from that stealth site may be substantially less than what it would be
otherwise. But it’s a trade- off, right? If you're trying to balance aesthetics against technical
performance, stealth approaches are used, you know, fairly regularly at sites. Usually though,
they're not applied at things that are 125 feet. or, you know, in that range. That doesn’t say it
couldn't be done.
Okay, I guess that covers..... I should have said at the first application.
Again, this is also a public hearing and I don’t....if we table this also I think we should keep the
public hearing open for preliminary. We’ve not closed the public hearing. So, if there’s any new
information, you all can come back and still speak again. We won’t stop that.
Pg. 266 September 1, 2026 Planning Meeting
Tony, I just had one more question. I’m sorry. I just wanted to ask just because
earlier we said capacity was a driving force. Is coverage gap also a factor. I know you said
midband would be on flight. The reason I’m asking is, you know, is a 125 ft macro tower the
appropriate solution rather than like smaller cell towers that Verizon has used on Gravel Road or
Holt and Lake and other areas.
There are other approaches that could be used and I would have to defer to
Verizon as to why they chose this particular approach because whatever approach they choose
needs to meet the third prompt. Identify a gap; does the proposed site fill and mitigate the gap?
And third, is it the least intrusion on the community? So, their burden is to show you that what
they have proposed of all the possible technical solutions that are out there and wherever they
can get land control that this ts the least intrusive way to actually address their coverage gap,
and could I just add, you know since we’re talking about low band is already covered in this
particular area. So, there is no radio frequency signal coverage gap but there is a gap at mid-
band frequencies. So there no service that's useful at those frequencies and when capacity of
sites is reached that’s as good as not having enough signal because you still can’t make a phone
call and you can’t transmit the data right so I started using the term somewhere along the line
instead of just saying gap I talk about a service gap and a service gap could be caused by no
radio frequency signa at all or it could be caused by having radio signal but not enough
capacity. Both of those accomplish exactly the same thing, which is you don’t get your call, and
you don’t get your data to go through.
Yeah, I guess I’m not attorney. I’m sorry to put you on the spot again, but maybe
it’s another question for another time. Is you know, if capacity is a driving factor here, what is
the definition of need under you know, the federal effective prohibition standards that cover
this? And the shock clock and everything else. Like if capacity is the driving force and it’s not
really a low band cellular need, out of those three, which is the one that’s actually providing this
need on the federal jurisdictional level?
I can give you a reference that actually would maybe help answer that
question. Let me just look at it real quick here. I just need to go back to our original
preliminary report that was August 3” ..
The real reason I’m asking that is like you said, you know, there are other
technologies potentially that could address not necessarily 125 ft tower. That capacity factor
could be something smaller if the intent is to address capacity or midlevel.
Right. I don’t have....1 thought I had the citation in the report and I don’t.
The Federal Communications Commission actually...oh you know, I'll bet you it’s on the RG
Justification of the application but in Verizon's materials but the Federal Communications
Commission did make a regulation so there’s laws that Congress passes and then the FCC
develops regulations to implement those laws. So that’s not really law but it’s something that
until it’s challenged it stands. The FCC said that a service provider can densify their network,
which is what we're talking about. We're adding capacity. They can densify the network
Pg. 267 September 1, 2026 Planning Meeting
using...and the reason for doing that could be any one of a number of things. It could be no
radio signal. It could be base stations that can’t handle the traffic, or it could be the
implementation of new services and new spectrum. So as far as the FCC is concerned and I will
defer to that because that’s not the law that’s a regulation the FCC has promulgated that they
‘ve said that you can justify a gap in service right by any one of those or more of those particular
aspects. I can get you that that citation if ....
Yes, I would appreciate that.
Do you have my contact information?
Yes.
Okay, anybody else from the board? NO. Okay, if anyone here from that
neighborhood wishes to
Justin Jenner at 1512 Providence Drive: Again, I understand the fact that the health issues are
not something that we can stand on from a legal perspective but a couple things that I just want
to make sure I clarify specifically on the scientific research. The first thing ts there’s many
schools of thoughts on this, right? Firstly, low radiation levels sporadically are not going to be
harmful. However, what has not been studied is consistent low radiation levels that could be
harmful. And the jury’s still out on that. Yes?
you can’t prove somethings safe. You only
prove.
Justin Jenner at 1512 Providence Drive: So, my point is we can’t continue to sit here and say
the science is behind us because this is not.
Alright, that’s something we’re not even going to be discussing. That’s
something that was already brought up and it does not become an issue for this board to have to
deal with.
Justin Jenner at 1512 Providence Drive: So...
I understand what you’re saying but nothing we can do about that particular
incident.
Justin Jenner at 1512 Providence Drive: So here’s the other piece of this, right. So, | agree with
the fact that yes, we could lobby our congressmen. Verizon donates $30 million a year to
lobbying, right? To the FCC, to the government. There’s nothing that I’m going to be able to do
that’s going to be say, “Hey, Congressmen, XYZ, go change this cuz I can’t do it.” That’s why
Pg. 268 September 1, 2026 Planning Meeting
I’m coming here to the town, maybe not to you guys, but maybe to the board to say, “Hey, at
some point someone's got to make a stand. | can’t do it myself. I got a job. I got kids I got to
feed. I'm looking to you guys to help that.”
We’re all in the same boat. So, you... where do we got to? I mean, somebody
has to go up above us. We’re in the same boat.
Right, so who do we go to. That’s the question.
Talk to the state. Who’s going to do it? I mean, I don’t think this board is
capable of going.
Hopefully somebody else at
Well, somebody’s got that kind of free time. They can do it.
Weill, I sure.... ll make time, but I need someone at the municipality level to help
to go through that with us is my point. The third and final thing that I want to say is that there’s
other institutions like International Firefighters Association who banned cell phone towers being
put on their buildings because of everything we’re talking about here. Right. So, I respect it. I
understand the law. I appreciate the time and you letting me talk about this, but at some point in
time, there's only so much that we can do as citizens, and we need support of our elected
officials to help us with that.
We’re in agreement with you it’s just that our hands are tied, too.
How do we untie them?
Tim Lochner at 1854 Lake Road: I'm across the road from the proposed tower site. | would
just like to comment really quickly about it’s a horrible spot to put that. I mean, just absolutely
horrible. The financial impact for us across the road is going to be just unbelievable. And I can
tell you really quickly, I have a couple building sites over there and I had a purchase offer last
week and as of yesterday it was cancelled. So, there is a financial impact. I’ve got a couple
million dollars in this property across the road and I live there as well. I love the area, but I
think that it’s going to be a big problem financially for everybody, not just me, all my neighbors.
And my neighbors are very important to us as well. I just feel as if......... I’m not opposed to a
tower by any means. It’s just the wrong spot for it. There’s got to be a corner somewhere that
that can go. Thank you, have a good night.
David Rasmusen and I’m an attorney. I’m representing Daniel and Kelly Rasmussen under
1890 Lake Road directly across from the proposed facility. The piece that I'd like to comment on
is the site selection issue. There was a letter submitted by Windmill Farms back in with the
March 31° submission and in that letter you know Windmill Farms as attorney Smith has aptly
noted controls most of the land within the search area and they want it on that site because that’s
Pg. 269 September 1, 2026 Planning Meeting
a piece of land they don’t otherwise have any use for and they can make money on it and I get
that but their commentary of why they can’t site it in other location within the search area I think
is disingenuous. They recite the USDA conservation stewardship program as being prohibitive of
the use. That’s not really the case. They haven’t that....the conservation stewardship plan is a
five-year commitment. We don’t know how far into the commitment they are. They could be four
and half years for all we know. And they could remove a piece from the conservation stewardess
program. It’s right in the website for the program. So, I think...I don’t think they’ve really given
us the whole story on that. Then they talk about a contract they have with Kurig, Dr. Pepper.
They don’t tell us what's prohibited. They don't tell us the duration. They don’t tell us the
consideration. They don’t tell us there’s a penalty if they remove it from the site. They’ve really
given us no information about that at all to why that’s prohibitive in some respect.
Same thing, they talk about a contract with KDP which hasn’t even started yet. Their own letter
says it starts sometime in 2026. They don’t tell us when, they don’t tell us the duration. They
don’t tell us what's prohibited. So, they've really given us nothing other that a representation
that it would...that they don’t think they can do it. But they need to prove it. We need to....1
would urge you to dig deeper into that letter and the representations They're making.
Now, there’s also been a request to expand the search area. I don't know if Mr. Johnson’s
analysis has covered that issue, whether an expansion of the search area would meet the criteria
and solve Verizon's purposes. I don’t know how deeply he’s gone into that. If he hasn’t, I would
ask if he do that as well. Thank you very much.
Okay, thank you. Yeah, you...I remember when we first talked about that,
we tried to get that to move back by the woods, you know, move it back in, and there was issues
with underground tile and the conservation easement they had with whoever. Well, I don’t know
if oe...
SOMEONE FROM AUDIENCE SPEAKING OUT...that’s my point. They’ ve made those
representations, but I think they got to go a little deeper.
Yeah, that I don’t know if we can even do that. I don’t think that’s in our
ability to do that. Okay, appreciate it. Thank you though.
Hi Folks, quick question, So it’s very short. If Lake Road is primarily a
capacity densification project rather than a basic coverage project, has Verizon demonstrated
that 125 foot macro tower is the least intrusive means reasonably capable of solving that
capacity problem, which I think is a question you guys brought up understandably. Okay,
thanks.
Okay, thanks Kevin.
Ellen Lindall at 1886 Lake Road: I wasn’t going to get up here, but I just had to. I wanted to
eche a little bit of what of what Mr. Rasmusen just said and I! would agree that, you know, I think
the Windmill Farms letter very eloquent, articulate, and lengthy, had ail these justifications. But
Pg. 270 September 1, 2026 Planning Meeting
I agree that it probably was somewhat disingenuous but does that even matter? Because as the
Verizon rep said, you can’t force people, private land owners, to agree to this and I get that, but
I guess the question, one question I would have was or is, you know, can Verizon sweeten the
deal? And I don’t know how that works. I know ballpark what these lease arrangement are and
what private land owners can make off of them, but can Verizon go back to them and say, you
know, instead of $1,500 a month we're going to pay you $4,000 a month and maybe then a
corner of the property would open up because when you go, you know, they've. They own like
130 acres on one side and 136 acres on the other side and there's a lot of corners. I drive up and
down that road everyday and I’m always looking because of this very issue. There’s a lot of
other places that this could go. They may choose not to and that’s up to them, but this is
certainly the path of least resistance and least difficulty for Verizon because it’s right there at the
corner and they don’t have to have...create a new road or egress or you know route in to get toa
place that’s a couple hundred yards away. But I just go back to the meeting in March and you,
you know, the chair said this, you know, we don’t want, we don’t want it right there at the corner
of Lake Road. That’s our scenic Seaway Trail and it can’t be there. Look what they did at Pellet
Road and they pushed it back. There’s one also at Lake and Slocum Road that is pushed back at
bit, And I think that the...some of the commentating was, you know, the different towers that
we're tapping into. One was at Ganae but the one at Slocum Road is quite a bit closer than
Ganae so I don't know if there’s consideration that’s been given to that. And the final point I
just want to make is and this was asked by the consultant in terms of the due diligence that
Verizon really did with this. You know the....] think it was site G,E, Dand C. We don’t know
what that due diligence was. They said they reached out to these folks and just didn’t get a
response. But I think it’s important that we know, you know when was that outreach? How
frequently was that outreach? Was it written? Was it phone? And what were the details of that
because I think they owe it to us and when I look at the map too again being intimately familiar
with this neighborhood to the east of site D there’s a big piece of this circle that isn’t even
labeled as an option and I would think that there’s you know somebody owns that property and
that is north of Lake Road and it’s a pretty big hunk of that circle if you pull it up where would
be a potential spot. Who owns that? That’s not...1 don’t believe that’s D, you know, east of D
and C I, you know, there’s nothing there. There’s a lot of woods. Perhaps there's wetlands, but I
just think that they need to demonstrate due diligence that they really have done adequate
outreach to the other options before it gets plunked in this horrific spot.
Okay, thanks. See, those areas are residential and the...if you consider the
height of the tower and the fall line, those would not even be sized enough to do it.
I live on County Line Road, and I live right across the street down my driveway
jrom where this ugly tower is going to be. I’ve said this before to the board. Given what's going
on in real estate and what we know has already happened, I ant looking at a $50 to $150,000 hit
when we tried to sell our house. This house....this tower will be 300 to 350 feet from my house.
And I know someone said, “would you want this in your backyard?” I doubt it. I think someone
said, maybe Mr. Casciani that someone had spoken to the attorney about relocating this tower
even on that 7.4 acre site and there not willing to do that. I mean, it’s come down to the point
that the farm’s dictating the future for all of us, and it seems absolutely unwilling to understand
Pg. 271 September 1, 2026 Planning Meeting
what their neighbors are going through. And that’s unfortunate at best. Not good neighbors.
We put up with all the spraying all summer because we have to now we're going to have a tower
to look at that's going to kill us financially. The issue of the health effects I understand you can’t
deal with. Please know that there was a feral court case in 2023and the courts ordered the FCC
to re-evaluate the information available. They have failed to do anything. It’s under an
administration that’s not willing to change anything that would not benefit the public. I think
maybe in a couple of years we might see a difference, and I think that’s something you need to
consider. This tower is going to go up with the understanding that it fills a gap. Right now,
they’re filling a gap by putting satellites up. And they're putting up a thousand more satellites
every year. These tower are not going to be needed. And that’s probably a lot sooner than
you're thinking. Probably within five years. It’s my understanding from Mr. Johnson's report
that Verizon has to provide you with an information of new towers that might be needed in the
next two years. I haven’t had a chance to read the supplement. I’ve read his report and that
what I can glean ts in that report there are significant deficiencies in the information that may be
all addressed in the supplement which I haven’t had a chance to look at yet. As for the issue of
settled science, it’s not settled. It’s settle but it’s not settled the way they want you to believe.
And in 2023, that’s why the court decided, send it back for review. We want a new evaluation.
We're going to get that eventually, and by that time, this will be too late. My wife and I both
have leukemia and this tower will be 24/7 RG communication radiation to our house. That's
what I don’t kneed and neither do the children that live across the street at the Rasmussen’s and
if the people can buy this property now that’s for sale on Lake Road, that seems unlikely given
what we're going to hear with the scare with that. It sounds to me like they’ve backed everybody
into a corner. Verizon doesn't give a dame about us. They are going to put this tower up.
You're going to end up having to approve it because there really doesn’t seem to be any
alternative and no one’s willing to budge on the other side. But as residents and we have to live
with it. We’re going to tale the hit. Not Verizon, not the farm. They’re going to just go merrily
along, take their money every year with inflation adding to it every year while we suffer and
while the town suffers because if my value goes down, you take a tax hit. You’re going to take a
tax hit on 26 properties within 500 feet. Keep in mind that the quote all the time about the
Telecommunications Act of 1996, the recommendation at that time was a 1600 foot differential
between the tower and residences. We’re nowhere near that. They're not even trying to live
with that. That hurt us and ultimately it’s going to hurt the town because people are not going to
buy homes near these towers. You’re going to end up with neighborhoods that get deserted.
Okay, thanks a lot. All I can at this point say about this whole thing is I think
this board has gone above and beyond as best we could on this site. I mean, you all know that we
tried to get it located back in the woods. Josh, we met with them supervisor at a meeting and we
tried to relocate the thing somewhere where it wouldn’t be so obvious and we got nowhere with
it. That was the bottom line with Verizon. They literally made the circle, and we talked about
other areas across the road and every which way, and I understand what you’re saying, and I
can’t fault you for feeling that way but tell me what we can do.
HARD TO HEAR. SOMETHING ABOUT
PUSHING IT BACK AS FAR AS POSSIBLE ???
Pg. 272 September 1, 2026 Planning Meeting
No, that’s up to them. We’ll have to ask them that, but that’s up to them to
do it. All right, anybody any further questions? I mean, I don’t know what more we can do with
this until we review this. That may be something that could be done again is to try and recontact
them and see if there’s some possible way to renegotiate that site. I don’t know. I'll make that as
a Suggestion to the town, and we’ll do our best to try. That’s all I can do.
HARD TO HEAR: SOMETHING ABOUT
A ROAD???
That was one of the things we talked about and apparently they’ ve got
underground piping.
HARD TO HEAR
Okay. If you’re willing to negotiate again with them, we...I’d be more than
be willing to sit with them again. (oTdBS GET SEIS BING GRA BTEC OMB
The question was raised whether Verizon had contacted the Town of Ontario. I’ve
spoken to the supervisor, and they've never gotten a word. I know they talked to Alec, the
supervisor it was necessary though (video was skipping and greyed out) town inside that did not
contact the town.
We asked a question at one of the earlier meetings.
Yes, some of those properties are located across the county line in Ontario. And I
want to be clear, I hope I was not representing, we did contact the town, and we did confirm on
the zoning map that those are residential properties as well, so they’re not ideally situated for a
higher intensity use.
Tony, I just have one more question. Just because of the openness of the location,
these cell towers usually have generators with fuel tanks. What is typically like the testing
schedule on those and then expected runtime and noise like is there any concern of noise from
those generators going through the neighbors just because it’s open in that corner?
Typically, they are tested I believe once a week for about a % hour time period. It
is a slight hum, but it is no more than a dryer or a typical hum of testing the generator. But yes,
generators are tested about once a week for a half an hour period.
Do you know how many gallons of fuel they usually have, or I know it’s a diesel
generator.
It is a diesel generator. It’s not listed on the site plan. So, I will confirm the
volume of the tank.
Pg. 273 September 1, 2026 Planning Mecting
RESOLUTION 26-063 Anthony Casciani made a motion to TABLE
APPLICATION TO 10.6.26 which was
seconded by Dave Malta.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson RECUSE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Alright, and we won’t close the public hearing. We’ll leave it open so that
any new information or whatever, it’s still open for discussion with the town. Okay.
One thing I think that we haven't considered from a town perspective is
Actually, fighting this in court and there's a court case Omni point Communications
Incorporated versus City of White Plains that the Court of Appeals upheld, and it seems to
indicated that we could possibly fight Verizon Wireless in court and possibly have the denial by
the planning board upheld in court. Something to consider. I encourage you guys to look into
that as a possibility.
Yeah, what I’m thinking of that is spending dollars in court and end up losing
a case. I don’t see how they don’t know. But anyways, we’ll see what happens with this for
moving along.
Located at 607 Phillips Road. Applicant Michael
Cunningham of Vital Signs is requesting SIGN APPROVAL in association with the installation
of one (1) 14.89SF non-illuminated sign on a 1.68-acre parcel having SBL# 065.01-1-28.1
located in the I-N Industrial District under Section 265-7 of the Code of the Town of Webster.
Appearing before the board was Steve Stanely on behalf of Mike from our shop for the EMS
building. It’s rather straight forward as was just described. We have a flat panel ACM placard
with a digital print. On front if it will be mechanically fastened to the building as mentioned the
total square footage for the project is 14.89 square feet. This sign will be none lit as well.
So just a simple shield sign going up in the front of the building?
Yes sir.
Derek Anderson:
Pg. 274 September 1, 2026 Planning Meeting
PENFIELD-WEBSTER EMS SIGN
The Town of Webster Planning Board considered the request by applicant Michael Cunningham
of Vital Signs to install one (1) 14.89 square foot sign for Penfield-Webster EMS located at 607
Phillips Road on a |.68-acre parcel having SBL# 065.01-1-28.1.
The Planning Board classifies the proposed action to be a Type II Action under Section
617.5(c)(2) of the State Environmental Review (SEQR) Regulations and therefore is not subject
to further review.
RESOLUTION 26-064 Derek Anderson made a motion for TYPE II
SEQR which was seconded by Drazen Gasic.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
RESOLUTION 26-065 Anthony Casciani made a motion for
SIGN APPROVAL Located at 607
Phillips Road. Applicant Michael
Cunningham of Vital Signs is
requesting SIGN APPROVAL in
association with the installation of one
(1) 14.89SF non-illuminated sign on a
1.68-acre parce] having SBL# 065.01
1-28.1 located in the I-N Industrial
District under Section 265-7 of the
Code of the Town of Webster which
was seconded by Dave Malta.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Pg. 275 September 1, 2026 Planning Meeting
Mr. Gasic AYE
Mr. Vetter AYE
Located at 900 Holt Road. Applicant Peter Derse of ID Signsystem is
requesting SIGN APPROVAL in association with the installation of one (1) 28SF internally
illuminated sign on a 28.47-acre parcel having SBL# 079.12-1-6.211 located in the HC High-
Intensity Commercial District under Section 265-7 of the Code of the Town of Webster.
Appearing before the board was Josh Palmer with ID Signs/Vital Signs. Requesting
permission for this face lit with channel letters on a raceway at Holt Road Wegmans Plaza. I
think we just removed the previous, whatever the previous hair cut place was and similar in
size going back up. Just standard channel letters with white acrylic face.
Derek Anderson:
SUPERCUTS SIGNS
The Town of Webster Planning Board considered the request by applicant Peter Derse of ID
Signsystem to instal! one (1) 28 square foot sign for Supercuts located at 900 Holt Road on a
28.47-acre parcel having SBL# 079.12-1-6.211.
The Planning Board classifies the proposed action to be a Type II Action under Section
617.5(c)(2) of the State Environmental Review (SEQR) Regulations and therefore is not subject
to further review.
RESOLUTION 26-066 Derek Anderson made a motion for TYPE II
SEQR which was seconded by Drazen Gasic.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
RESOLUTION 26-067 Sven Vetter made a motion for SIGN
APPROVAL Located at 900 Holt
Road. Applicant Peter Derse of ID
Signsystem is requesting SIGN
APPROVAL in association with the
installation of one (1) 28SF internally
illuminated sign on a 28.47-acre parcel
Pg. 276 September 1, 2026 Planning Meeting
having SBL# 079.12-1-6.211 located in the
HC High-Intensity Commercial District
under Section 265-7 of the Code of the
Town of Webster which was seconded by
Drazen Gasic.
VOTE:
Mr. Casciant AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Located at 593 Basket Road. Applicant
Tony Snow of Gupp Signs is requesting SIGN APPROVAL in association with the installation
of one (1) 18SF non-illuminated sign on a 42.7-acre parcel having SBL# 066.01-2-6.1 located in
the I-N Industrial District under Section 265-7 of the Code of the Town of Webster.
Appearing before the board was Tony Snow with Gupp Signs and we are proposing to erect a
free standing road side sign, double sided so it’s visible from both north and south traffic just to
identify our location and address number and water authority logo. Not lit, just fabricated.
Pretty basic. You know, if anybody thinks and this is interesting, I think I
mentioned this at one of the other meetings recently. It’s like what are we doing this for, like a
simple thing. If we didn’t have this, at least everyone that applies for a sign, they pretty much
are aware of what our code calls for and the fall into queue with it. If you don’t have a plan of a
sign, the height, size, and lighting, we would have lit up signs all over town. Flashing lights and
everything else and all different locations and I wouldn’t be surprised if you seen some across
Ridge Road ultimately. So, that’s why. It’s a simple thing but at least we have it under control
where people queue up and we get a good product out of them. These are all nice looking signs.
Derek Anderson:
MONROE COUNTY WATER AUTHORITY SIGN
The Town of Webster Planning Board considered the request by applicant Tony Snow of Gupp
Signs to install one (1) 18 square foot non-illuminated sign for Monroe County Water Authority
located at 593 Basket Road on a 42.7-acre parcel having SBL # 066.01-2-6.1.
The Planning Board classifies the proposed action to be a Type II Action under Section
617.5(c)(9) of the State Environmental Review (SEQR) Regulations and therefore is not subject
to further review.
Pg. 277 September 1, 2026 Planning Meeting
RESOLUTION 26-068
Derek Anderson made a motion for TYPE II
SEQR which was seconded by Dave Malta.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
RESOLUTION 26-069 Sven Vetter made a motion for SIGN
Located at 593 Basket Road.
Applicant Tony Snow of Gupp Signs is
requesting SIGN APPROVAL in association
with the installation of one (1) I8SF non-
illuminated sign on a 42.7-acre parcel having
SBL# 066.01-2-6.1 located in the I-N Industrial
District under Section 265-7 of the Code of the
Town of Webster which was seconded by
Dave Malta.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Located at 865 Hard Road. Applicant Steve Stanley of Vital
Signs is requesting SIGN APPROVAL in association with the installation of three (3) internally
illuminated wall-mounted signs, two (2) wayfinding signs and one (1) monument sign totaling
366.13SF on a 25.65-acre parcel having SBL# 079.06-1-32.123 located in the OP Core Area
Office Park District under Section 265-7 of the Code of the Town of Webster.
Appearing before the board was Steve Stanley with Vital Signs along with Matt McAlpin from
McAlpin Industries. As described, we are proposing 3 building mounted channel letters; two way
finding directional signage and one free standing internally lit monument at the roadside. The
channel letters are basic with aluminum construction and internally lit and they also will be face
lit as well both on the east side of the building and then the south side and the north side. Also,
Pg. 278 September 1, 2026 Planning Meeting
with that, we will have stud mounted aluminum letters that will be non-illumined on the east side
of the building as well and for the house number 865 for Hard Road. The total square footage was
declared earlier of 366.13 and that does include all of the signs that we are proposing tonight.
There is a few questions that we have for the board in regard to the placement of the monument
sign. I know there has been some back and forth with the U of R and we would like to see if we
can get some of that hashed out today.
I think us going over it with Josh last week and your sign and the U or R sign
are separated. If would have been nice if they could have been combined or side by side or one
over the other or something. Because, where the sign is going to be...you know how you have
that box, what ever that electrical, hot box right out there in front, that is actually blocking one of
the signs.
Correct. There was numerous attempts back and forth with the U of R to propose
a stacked version of that sign and I believe those conversations were over time.
Yes, the latest is to proceed with our own monument sign on our property and they
were going to make other arrangements on their property. We did have a number of conversations
about putting the monument sign together with them and they are not interested in doing that.
Okay, nothing you can do about that, I guess. It would have been nice. Neater
and cleaner.
We went through 9 revisions.
If I am not mistaken, their sign is the one that is going to be hidden by that
hotbox.
I’m still hoping to work with them on it. It’s been six to seven months now, so.
Well, good Juck with it. Anybody? These signs are pretty standard on the
building, and I don’t have any issues. The only one J had concern with was that monument sign
and you explained it.
Derek Anderson:
MCALPIN INDUSTRIES SIGN
Pg. 279 September 1, 2026 Planning Meeting
The Town of Webster Planning Board considered the request by applicant Steve Stanley of Vital
Signs to install three (3) internally illuminated wall mounted signs, two (2) wayfinding signs and
one (1) monument sign totaling 366.13 square feet for McAlpin Industries located at 865 Hard
Road on a 25.65 acre parcel having SBL # 079.06-1-32.123.
The Planning Board classifies the proposed action to be a Type IT Action under Section
617.5(c)(9) of the State Environmental Review (SEQR) Regulations and therefore is not subject
to further review.
RESOLUTION 26-070
VOTE:
RESOLUTION 26-071
VOTE:
Derek Anderson made a motion for TYPE I
SEQR which was seconded by Drazen Gasic.
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Sven Vetter made a motion for SIGN
Located at 865 Hard Road.
Applicant Steve Stanley of Vital Signs is
requesting SIGN APPROVAL in
association with the installation of three (3)
internally illuminated wall-mounted signs,
two (2) wayfinding signs and one (1)
monument sign totaling 366.13SF ona
25.65-acre parcel having SBL# 079.06-1-
32.123 located in the OP Core Area North —
Office Park District under Section 265-7 of
the Code of the Town of Webster which
was seconded by Dave Malta.
Mr, Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mes. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Pg. 280 September 1, 2026 Planning Meeting
We would like to have one clarification. The access road is going to be widen by
8.5 feet and the distance from the property line to the access road is going to be 16.5 feet. I
know for residential typically you have to have your structure 6 foot from the property line and
the distance from the property line...I’m sorry, the access road to the property line is going to be
16.5 feet and we would like to make sure that we put that in the proper space the first time so
splitting that difference is that option? Do you guys have any preference on where that gets
dropped?
I think the question is, when I was reviewing the code, I couldn’t find anything
that said what distance from your property line that a monument sign can even be. It will be 25
feet from the road, I saw that but the distance from your property line, I need some guidance on
that.
Josh, do you know what that is?
I don’t believe there is a setback in our code.
From the lot line?
Correct.
Personally, I don’t have an issue with it. I don’t know if legally you can.
We will put it somewhere between. It won’t be on the line and make sure that it
appropriate.
I will check the code and give you an answer.
Thank you, I appreciate that.
Why don’t we do this, we will approve it and then he (Frank Ciardi) can get
to you if it has to be here or there. Obviously, you are not going to put it up tonight . Okay?
Thank you, sir.
BLOOM & BLEND LIGHTS: Located at 790 Ridge Road. Applicant Alyssa Connors is
requesting FINAL SITE PLAN APPROVAL in association with the installation of 36 feet of
decorative exterior lighting on a 7.2-acre parcel having SBL# 079.17-1-15.1 located in the CO
Commercial Outdoor Storage District under Section 269-10 of the Code of the Town of Webster.
Appearing before the board was Alyssa Connors and I am one of the owners of Bloom & Blend.
We are just looking to see if we can get approval to put up lights on northeast facing side of our
building just to try and get customers attention.
Pg. 281 September 1, 2026 Planning Meeting
What kind of lighting is it? Are thy like Christmas tree lights or...
They are considered permanent lighting. However, when I talked to the
company, the way that they showed it to me, it kind of looks like an extension of a gutter, but it
can be taken down. We mad sure of that because if we don’t stay with out current landlord and
stay at this property, we want to be able to move it with us because we’re putting money into it.
So, they are probably LED lights.
Yes, I believe so.
They’re not shing out anywhere. I know the building is in the back, but are
you shining like to the east?
Correct. They’re shining down. Downwards.
Anybody any concerns with that? I mean our code is, you know, if you look at
the planning guidelines, one of the things that is very strict on there when this was done was the
kind of lighting and so on and so forth. There’s certain situations through, in my opinion, you’ re
sitting in the back of the building over there. You are not out on the highway with bright lights or
anything.
Yeah. It shouldn’t have any effect on cars driving by or neighboring businesses.
I did make sure of that with the company that we are going to be using. And it is something that
we can control through an app on our phone as well so we can change the colors of it depending
on the season, holiday, things like that, but it won’t be flashing lights; it won’t be moving lights.
That is what I was going to ask. So, they’re not flashing on and off. Alight.
This is actually the first application that we’ ve had for lights.
I know it. Well, we actually....this is the second thing we’ve done with this.
The first one was at Seven Brew. We approved the lights on that. You know, because that’s their
style and so on. And we did ask them to have a dimmer because if they’re bright or gets too much
noise or so on so forth that we have the ability to control that.
You want to just make sure that they’re not doing the LED that....
No, that’s it. They’re not flashing or anything she said so yeah.
Pg. 282 September 1, 2026 Planning Meeting
Or switching colors.
Well, when you switch colors, they all switch?
It would be like a stagnant light. Like, if I wanted every other one to be red and
green for Christmas, it would just stay as red and green. It wouldn’t be like red, green, red, green.
It wouldn’t look like a carnival.
A special light for Saturday OR Sunday...LAUGHTER.. .just kidding.
I do have a question though. About 45 minutes before this meeting started, I got
an email from Mark Giardina.
Okay, he’s a person that is not here this evening.
It was about the cost related to...if you guys were to approved this tonight it is
saying that it would be an invoice totaling 4,950.00 dollars.
What’s this again.
I’m not ...yeah, [’m not sure why we would need to pay that when the lights are
less than a grand for us to install.
Yeah, | think that might be a fishing scam that we’ve seen some of our applicants
receive emails that are posed from the Town of Webster.
SOMEONE FROM THE AUDIENCE SPEAKING OUT
I guess the only other comment that I would make is that since this is first really
formal one on lighting, we do have chapter 222 of the outdoor lighting code and based on the
description that is in here about pointing the lights down and keeping it away from nuisances to
the neighboring properties, it to me at least it does appear to conform with that section of the code.
Yeah, and I think you did say they are down lit.
Pg. 283 September |, 2026 Planning Meeting
Yes
And you don’t have no neighbor to the east of you right at that point. They’re
in front like more.
It would technically be West Herr I believe but they’re quite a distance away.
So, it doesn’t really impact any neighbor.
Nope, I don’t believe so.
Derek Anderson:
The Town of Webster Planning Board considered the request by applicant Alyssa Connors to
install 36-feet of decorative exterior lighting for Bloom and Blend located at 790 Ridge Road on
a 7.2-acre parcel having SBL # 079.17-1-15.1.
The Planning Board classifies the proposed action to be a Type II Action under Section
617.5(c)(9) of the State Environmental Review (SEQR) Regulations and therefore is not subject
to further review.
RESOLUTION 26-072 Derek Anderason made a motion for TYPE
IIT SEQR which was seconded by Drazen Gasic.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
RESOLUTION 26-073 Sven Vetter made a motion for SIGN
Located at 790 Ridge Road.
Applicant Alyssa Connors is requesting
FINAL SITE PLAN APPROVAL in
association with the installation of 36 feet of
decorative exterior lighting on a 7.2-acre
parcel having SBL# 079.17-1-15.1 located
Pg. 284 September 1, 2026 Planning Meeting
in the CO Commercial Outdoor Storage
District under Section 269-10 of the Code of
the Town of Webster which was seconded
by Drazen Gasic.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Okay, next up is Vital Sign Building Addition.
Well, how do you want to do it? You want ....I wanted to do the signs, but
this isn’t for a sign. This is for a building. Then we should go right back up to the top again.
Located at 764 Ridge Road. Representing Agent,
Thomas Fitzgerald, is requesting PRELIMINARY SITE PLAN APPROVAL (PUBLIC
HEARING) associated with the construction of a 15,000 SF one-story addition to an existing
11,000 SF building on a 4.21-acre parcel having SBL #079. 17-1-8.1 located in the CO
Commercial Outdoor Storage District under Sections 269-5 and 350-20 of the Code of the
Town of Webster.
Appearing before the board was Thomas Fitzgerald with MRB Group and I am here on behalf of
representing our clients Glenn Development and Vital Signs. We are here for the preliminary plan
review and hopefully get approval tonight. From the comment letters we’ve gotten as of dated
from August 28". We’ve addressed most all the comments. We did get a response back from the
town engineer earlier today with regards about doing a SWPPP. After some back and forth, we
did agree we would do the SWPPP in regard to the drainage situation they had with locating on
the pond on the north side of the site. We’re willing to prepare a SWPPP report for drainage
calculations for them to explain how the drainage for the in pervious area will not impact the pond
itself. I know the grade will have to get adjusted during final approval. It’s slowly going into the
pond, but we will adjust as it is needed. Aside from that, that kind of where we are right now so
if there’s any further questions for the preliminary process, we’re more than welcome to...
Well, I think you had some correspondence with the town engineer. He’s
fiving us a notice here. There’s several things. He wants you to go through the process, you
know, with.....he’s got a whole bunch of plans....not demonstrate ADA compliance sidewalks so
Pg. 285 September 1, 2026 Planning Meeting
forth. Plans must clearly identify all points of ingress and egress. A fire sprinkler system will be
required. Remove all references. Did you get this?
Yes, we got that and we addressed all those comments. The latest one’s from
August 28" is the one we sent last week.
And the drainage became an issue to I guess with the back. Offsite
drain.....onsite drainage going to the north. Now, where does it go from there. I mean, I remember
years ago those were...it was like a stretch like a swale of water through there for all those
properties that are there.
Glenn Development speaker (?) never stated name: So, based on what our review was originally
it’s all impervious surface that we’re touching sort of speak so there’s no additional impervious
surface being created. Therefore, the sheet drainage to the north has always existed, When we
began out review. So, to hear that some things changing was part of the comments from the town
engineer which were agreeing to dig deeper via a SWPPP report and essentially recalculate what
the requirements are and make any adjustments as necessary, which has been the latest point of
conversation with them. So, we are in agreement with the town engineer.
Well, he had concerns about the SWPPPS reports and so on too.
Glenn Development speaker (7?) never stated name: Yeah, so we’re saying that we’re agreeing that
we will do SWPPPS as requested by the town engineer.
Well, the recommendation is actually to table this thing at this point until you
guys get together, resolve all the issues and I know you want t get going with it. If you can get
this done with engineering, I mean, that’s the holdup for us. We’re okay with the building and so
on and so forth. If you can get this project under your belt with the town engineer and you come
in next meeting for your preliminary and you could get your final at the same time. Wouldn’t be
holding you up or anything. You'd still........ one more meeting.
We can roll both the meetings in order. (not at the mic, hard to hear)
I mean it’d be possible to do. I think I’m right. Am I right, Josh?
Yes, as long as all the concerns have been addressed.
You got a whole month to get all this stuff in order with them. Get it all
straightened out and then you can get preliminary and final the same evening.
Pg. 286 September 1, 2026 Planning Meeting
So, we have no issue with that. The initial comment letter that we
received after the first meeting or prior to the first meeting did not address some of these things.
So, there was a feeling that there were additional comments made after sketch plan approval which
didn’t allow us proper time to address these prior to this meeting. So, respectfully, there are some
frustrations on our end. So, if you as a planning board are willing to work with us, we’re in
agreement that we will handle these with the town engineer and hopefully we can address them
and receive final site plan approval next meeting. Is that fair to say?
The latest comments I see here are from I think August 20" | I believe.
That’s correct. Can I request one item? Next meeting, we’re ahead
of the cell towers. LAUGHTER
Actually, the cell towers were actually first thing on the agenda so, but we
wanted to get the signs out of the way. Probably could have done yours too but that might not
have made everybody happy. So, is that working okay with you fellas? Request to table it?
We’re in agreement with that. We’re happy to meet the
requirements of the town engineer and if you’re saying that we can get final next meeting
then.... BOTH PARTIES SPEAKING AT THE SAME TIME.
That’s a very possible thing to do. Provided everything, your clear with him
and that should be...because it’s all engineering detail.
I know that we did give you the conservation board site review that we just did a
couple weeks ago because that’s when we first got notification that we should take a look at that.
I think that you’re saying that all of the items that are being addressed to satisfy the town engineer
are the same items that we mentioned in the conservation board.
Well, your comments are addressed to the planning board. Then we deal with
those.
Okay, so that’s the question. Sounds like we’re going forward with a motion and
an agreement. When then do we get to make sure that or we discuss with you whether or not these
have been the same?
The thing we would put in preliminary meeting you know and those would
come up. The reason ]’m not bringing them up, I know we’ ve got them. You did give them to us
and like I said, you guys did a great job with them, too. But that’s all stuff that we’re not going to
Pg. 287 September 1, 2026 Planning Meeting
deal with tonight anyway. We just got the paperwork and that thing is 8 pages of work you guys
got there to deal with. We could spend a whole night just dealing with that.
Okay, so I'll just talk offline with you on that. Okay.
So, will address that at the meeting.
Okay, the next one? That’s good as long as we
That’s the way we would do it.
RESOLUTION 26-074 Anthony Casciani made a motion to TABLE
APPLICATION TO 10.6.26 which was
seconded by Drazen Gasic.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina ABSENT
Mr. Anderson RECUSE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
ADMINISTRATIVE MATTER:
e Approval of minutes for: August 4th, 2026. Motion: (CASCIAN/MALTMAN)
VOTE:
Mr. Casciani AYE
Mr. Malta ABSTAIN
Mr. Giardina ABSENT
Mr. Anderson ABSTAIN
Mrs. Maltman AYE
Mr. Gasic ABSTAIN
Mr. Vetter AYE
Pg. 288 September 1, 2026 Planning Meeting
e Amendment of October 5, 2021. Motion: (CASCIANI/MALTA) cut and paste error on a
resolution was duplicated.
VOTE:
Mr. Casciani AYE
Mr. Malta AYE
Mr, Giardina ABSENT
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
With no other applications before the Board this evening Anthony Casciani concluded tonight’s
meeting at 9:35 PM.
Respectfully Submitted,
Signed Xe 14 Me Udrrexc, Dated | O -G ~2O026
Maerk-GtardinasSecretary
Katherine Kolich, Recording secret GIF Mae Liman
OCT 7°25 awS:4S
TLED WEBSTER THN CLK
aN Nega
Pg. 289 September 1, 2026 Planning Meeting