Town Board Workshop
Town Board Attachment 2026.06.04

Rng Workshop Draft June 2026 Ver 3

June 4, 2026 · 6 min read · extracted text · View original

Webster WPCF Biogas to RNG Workshop Rick Kenealy – Webster DPW Paul Adams – Webster Finance Director Bob Wimmer and Roberto Dabbas -- Navitas June 4, 2026

$$!

Digester Gas • Where does it come from

Digester Gas is an Asset

• Produced in Anaerobic Digesters • Conversion of solid material to gas • Primary sludge and waste activated sludge • High Strength Organic Waste – byproducts of food production, commercial kitchens

• What is in it • Energy – 60 to 70% methane (natural gas) • Water vapor • Carbon dioxide - 30 to 40% carbon dioxide

Digester Gas • Where does it go • Combusted in digester boilers (47% of average production)

Digester Gas Use

• Provides heat to digester building • Provides heat to the anaerobic digester tank • Reduces natural gas purchase

• Any excess is combusted in flare (53% of average production) • Required for safety and permit compliance • No financial benefit

•Natural Gas – Distributed by RG&E Renewable Natural Gas (RNG)

• 100% Methane • Fossil Fuel – Underground deposit

•Digester Gas can be upgraded to Renewable Natural Gas

RNG Conversion Remove CO2

Raw Biogas

Remove Water Remove Contaminants Test RNG Quality Add fuel (if needed) ready for use

RNG Equipment

Value of the gas

Carbon Intensity Score

CI Score

•Carbon Intensity Score

Value of environmental attribute

• Webster – negative 22 • Typical Landfill – positive 30 • Dairy Digester – negative 150 to negative 250

• Voluntary Carbon Reduction Market • Environmental Attributes • Tied to the CI score • More negative the better

Value of the environmental attribute

• Annual Production of RNG – 29,000 MMBTU per year • Equivalent to the annual natural gas use of 300 homes in Webster (1.5% of the households) • Value of environmental attributes $10 to $17 per MMBTU • $290,000 to $493,000 in annual revenue

• Pathway from production to consumption

Injection of RNG

• Option 1 – Connect to RG&E Gas Main on plant access road • Lowest Operating Cost • Cap-ex estimate of $1.2M • Interconnection Facilities Constructed by RG&E • Interconnection Facilities Operated by RG&E • Gas must meet RG&E Quality Specifications • Requires TAP Agreement (Interconnect Agreement)

• Pathway from production to consumption • Option 2 – Construct Tube Truck Filling Station

Injection of RNG

• RNG would be compressed and loaded onto tube trucks • Higher operating costs due to gas compression and transportation • Would require capital investment, less than $1.2M estimated for RG&E interconnect • RNG must meet final user quality specifications • Options for buyer/user of gas (does not need to be RG&E) • Currently under evaluation

• Pathway from production to consumption

Injection of RNG

• Option 3 – Third Party Gas Management • Third Party would take possession of gas after treatment • All contracts, management, investment, liabilities and handling of the gas by third party • Would require an expansion of the gas production capability (minimum volume to be determined) • Would negate the tax credit/federal grant • Currently under evaluation

•Annual Operating Costs

Operating Costs

• Maintenance - $86,000 • Media Replacement - $26,000 • Power - $50,300 • Supplemental Propane $22,00 (Not anticipated) • Total - $184,300 • Net Revenue - $105,700 to $308,700

Capital Costs Budget

•Tax Consulting - $161,500 •Design - $348,000 •RG&E Interconnection $1,200,000 •Equipment and Installation $6,790,000 •Total - $8,499,500

• Inflation Reduction Act • Clean Energy Tax Credit (Section 48)

Tax Credit

Federal Grant

• Investment in equipment that produces energy from alternative sources • Biogas projects specifically included in program

• Section 6417 • Allows applicable entities to receive direct payment from Treasury instead of claiming tax credit in form of tax benefit

• One Big Beautiful Bill • Preserves Tax Credits • Extends Production Tax Credit until 2029

• Withum and MSC Consulting • Completed Tax Credit Eligibility Evaluations

Tax Credit

Federal Grant

• Project Qualifies for the Credit/Grant • Webster may file for credit upon injection of RNG

• Credit/Grant Eligibility • Includes portions of current project costs • Capital cost of the RNG project • Projected credit of $6.8 to $8.0M

TOWN OF WEBSTER RNG PROJECT PAYBACK ANALYSIS Tax Credit $6,800,000

Tax Credit $8,000,000

Scenario 1 $105,700 Net Revenue

Scenario 2 $308,700 Net Revenue

Scenario 3 $105,700 Net Revenue

Scenario 4 $308,700 Net Revenue

Project Cost

8,500,000

8,500,000

8,500,000

8,500,000

RNG Tax Credit Revenue

(6,800,000)

(6,800,000)

(8,000,000)

(8,000,000)

1,700,000

1,700,000

500,000

500,000

Annual Debt Service Cost

102,000

102,000

30,000

30,000

Net

Revenue Sale Natural Gas

(105,700)

(308,700)

(105,700)

(308,700)

(3,700)

(206,700)

(75,700)

(278,700)

Total Debt Service Cost Over 30 Years Net - Revenue Sale Natural Gas

3,060,000 (105,700)

3,060,000 (308,700)

900,000 (105,700)

900,000 (308,700)

Payback Period

Years

28.9

9.9

8.5

2.9

Net Project Cost

Annual Cost (Revenue) After Debt Service

Note

The preliminary eligible ITC basis is approximately $26,700,000 and the project is favorable under both the lowerbound and upper-bound approaches regarding the IRS 80/20 Rule.

Current Activities

• Developing the final project pricing for equipment and installation • Evaluating options instead of RG&E Interconnection • Requesting environmental attribute pricing proposals (revenue) • Developing Project Guarantee Agreement • Completing Project Scope and Amendments

Next Steps

• Finalize SEQR • Determine RNG Injection Approach • Determine Final Project Price • Conduct Bond Resolution Amendment • Negotiate Final Contract

Key Dates and Critical Decisions

• Finalize SEQR – Must be completed prior to Bond Resolution • Bond Resolution – Must be completed prior to contract approval • RNG Injection Approach – Needed for final site layout and project economics • Ordering equipment – RNG Upgrading Equipment has 56 week lead time from PO

Potential Path Forward

• 7/2/26 - Delivery of Project Price and Agreement • 7/16/26 - Town Board Resolution to Approve Amended Bond Resolution. This will increase the maximum cost of the project but not the amount expected to be borrowed. • 7/16/26 - Town Board Resolution to Authorize the Town Supervisor to Sign the Amended Navitas Contract. • 7/22/26 - Project Start Date • 11/30/27 - Project End Date • 11/15/27 - Flow of Pipeline Quality Natural Gas Begins • 12/15/27 - Town Files for RNG IRS Credit • 4/15/28 - Town Receives Funds from RNG IRS Credit

WPCF RNG

Questions?