WEBSTER ZONING BOARD OF APPEALS MINUTES
Webster Town Board Meeting Building 1002 Ridge Road
11 April 2023
7:00 pm
ABSENT:
Jamie Newtown, Chairman
Barry Barone, Vice Chairman
Corrine Volo, Secretary
Donald Hauza
Griff Stappenbeck
John DeMarco, Attorney
Josh Artuso, Director of Community Development
Katherine Kolich, Recording Secretary
Good evening. Welcome to the Zoning Board Appeals meeting for April 11,
2023. This evening we have 2 tabled items and | 1 scheduled matters on the agenda. We do have
proof of publication for each of these matters from the Webster Herald. We do have a full board
this evening and we do have one administrative matter.
Call Roll /Pledge of Allegiance
As I stated, we have 13 applications on the agenda this evening. This board
does have the right to stop hearing applications, which we will at 10:00 pm. I’m sorry, I am not
interested in being here until midnight tonight. So, if you are at the tail end of the agenda, it’s a
crap shoot whether we are going to get to you tonight. I am just going to be honest.
Sumuiary of Application Outcomes
TABLED MATTERS
:
613 WEBSTER ROAD/VILLAGE OF WEBSTER WASTEWATER TREATMENT
PLANT IMPROVEMENTS
Darrell Byerts, Village of Webster Mayor-Presented: Don White, Village Attorney
and Matt Higgins, Civil Engineer with LaBella.
APPROVED WITH CONDITIONS:
ALL NEW FENCING (ENTIRE PERMINTER) WITH PRIVACY FENCING; REMOVE ALL
BARBWIRE;POLE BARN WOULD BE REPLACED WITH NEW ROOF AND SIDING OR POLE BARN
WILL BE REDUCED IN SIZE AND JUST ROOF WILL BE REPLACED. GREENHOUSE TO HAVE
ALL BROKEN AND MISSING GLASS REPLACED. GENERAL LANDSCAPING SHOULD BE
SUBSTANCIAL, ARBORVITIE AND SHRUBS. SITE PLANS WILL NEED TO BE APPROVED BY
APPROPRIATE TOWN STAFF.
Pg. 57 April 11, 2023 Zoning Meeting
1650 RIDGE ROAD/AUTOMOTIVE DETAILING SHOP
Steve Schlegel
APPROVED FOR AUTOMOTIVE DETAILING WITH CONDITIONS: 2400 SF TOTAL, TWO
BAYS; CODE ENFORCEMENT WILL FOLLOW UP WITH A 6 MONTH INSPECTION TO ENSURE
PRODUCTS ARE BIODEGRADABLE. APPLICANT TO RETURN TO THE ZONING BOARD ON
10.10.23 FOR A POSSIBLE EXTENTION OF SPECIAL USE PERMIT, STAFF SHOULD CONSIST OF
OWNER AND ONE EMPLOYEE; THERE SHOULD BE NO OUTDOOR STORAGE, MUST BE KEPT
INDOORS; NO REPAIRS; SALES; OR PRODUCT TO BE SOLD. THERE SHOULD BE A MINIMAL OF
6TO 10 CARS. LANDSCAPING SHOULD BE DONE BY SIX MONTH CE REVIEW AS APPROVED
WITH ALL ORIGINAL APPROVALS.
SCHEDULED MATTERS
:
771 RIDGE ROAD/BEST BUY AUTO SALES SIGN
Vital Signs
APPROVED AS PRESENTED
943 RIDGE ROAD/MARINA DODGE JEEP EXPANSION
Al LaRue
APPROVED AS PRESENTED
520 FOREST LAWN ROAD/ACCESSORY STRUCTURE
William T. Lill
APPROVED WITH CONDITIONS: APPLICANT WILL NEED SURVEY
STAKEOUT AND AN ACCESS AGREEMENT BETWEEN APPLICANT AND
NEIGHBOR.
1197 RIDGE ROAD/WEBSTER HOME IMPROVEMENTS/STOOP & STEPS
Tom O’Brien
APPROVED AS PRESENTED
877 MAPLE DRIVE/CHICKEN COOP
Nicholas & Megan Sereni
APPROVED WITH CONDITIONS: MAXIMUM NUMBER OF HENS IS 6; A
ONE YEAR EVALUATION OF HENS ON APRIL 2024 ZB MEETING WITH A
POSSIBILITY OF ALLOWING MORE HENS. COOP IS TO BE LOCATED BEHIND
GARAGE.
231 RAPHAEL DRIVE/ACCESSORY STRUCTURE
Dave Brannigan
APPROVED AS PRESENTED. APPLICANT TO REMOVE OTHER SHED.
492 ARIA LANE/GARAGE ADDITION
Troy Bradford
APPROVED AS PRESENTED
Pe. 58 April 11, 2023 Zoning Meeting
512 COVEWOOD BLVD/CARPORT WITH ADA RAMP & COVERED PORCH
[ Applicant: Thomas Milliman Jr
APPROVED AS PRESENTED
375 WEBSTER ROAD/RED BARN FARMS
Roger Awe
TABLED TO MAY 9, 2023
1016 JOHN LEO DRIVE/GARAGE ADDITION
Maria West
APPROVED AS PRESENTED
1045 RIDGE RGAD/TAKE 5 OIL CHANGE
Quattro Development
TABLED TO MAY 9, 2023
(Corrine Volo read the first application)
VILLAGE OF WEBSTER WASTEWATER TREATMENT PLANT IMPROVEMENTS:
Located at 613 Webster Road. Applicant Mayor Darrell Byerts is requesting an extension of a
nonconforming use associated with proposed upgrades to the Village of Webster’s Wastewater
Treatment Plant on a 10.10-acre parcel having SBL #065.10-{-13. (WEB located in an R-3
f Single Family Residential District under Section 350-19 of the Code of the Town of Webster.
*Please note: the septage receiving component of the project has been eliminated. *
Before we get started, just a few comments on this application. So, the last time
that we addressed this application was February 14, 2023 unfortunately we had to cancel some
meetings in March due to some missing members. Which I will say, we have addressed, and the
town has brought on a couple of new members, alternates to support this team. During that
meeting on February 14, we closed, and I am going to repeat, WE CLOSED the public comment
portion of that meeting, and we will not re-open the public comment back up on this application
this evening, but 1 do want to acknowledge did received and has reviewed:
e aletter dated March 5, 2023 from Lori Reynolds
e a PowerPoint and letter submitted on March 6, 2023 by Brian & Margarita Dunham
® anemail sent on March 10, 20203 and we do not have a last name. The first name was
Robby.
* aletter dated Mach 10, 2023 by Michael & Polly Conn
* a website comment dated March |1, 2023 by George Baker
* anemail dated March 13, 2023 by Patrick & Kansas McDonald
e aletter dated April 6, 2023 by Elizabeth Barnard
In addition to that we did receive a village response to comments that I am assuming you will
conumunicate to us this evening from Mr. Swingley. Those comments were dated 3.24 but the
[ letter was dated 4.3.2023 and in addition to that, ] did receive late this afternoon, an email
Pg. 59 April 11, 2023 Zoning Meeting
forwarded to me that was a request by and Lam sorry I don’t have it in front of me and I believe it
was the Dunham's to table this meeting to the next meeting which would have been May 9, 2023.
The board is not going to table this application. We are going to proceed with it this evening, but
we welcome you as residents of the Town of Webster to continue to pursue whatever next steps are
in the process with this application that has been presented to us by the Village of Webster.
Ok, before we get into your presentation, the last thing that [ wanted to address is the letter
received March 23, 2023 by Mr. White and Mr. White, if you would like to summarize that for the
board and then we could address it.
Attorney for the Village of Webster. In that letter | quoted Section 359-91 in the
Webster Town Code which deals with preexisting nonconforming uses and that section provides
that a nonconforming use shall not be extended or increased except with the Zoning Board of
Appeals.
So, when the villager initially submitted its application, it was our feeling that the increase in a
nonconforming use was related to the seplage receiving station as this board knows that has been
removed from the project and the village will not do any septage treatment at its wastewater
treatment plant. So, that raised a question with me anyhow, what is the extension or increase to the
non-conforming use at this point. The capacity of the plant is not being increased. In fact, the
actual square footage of the buildings is going to be decreased because of the two new trickling are
smaller than the existing trickling filters. So, | would since it’s the province of this board to
interpret the zoning code in the Town of Webster. I] would like to know what this board’s
interpretation is at this point of what the extension or increase in the nonconforming use of the
village wastewater treatment plant. That was the purpose of the letter.
Perfect! Thank you for summarizing. So, I spent some time since this letter was
distributed to myself and the board and | came down to a couple of key things. One, there is
history with this site and if you look at the _ of this board with respect to a
nonconforming use such issues in that history that have been noted are pretty much everything that
has been documented in 350-91so0 from that perspective } certainly feel that this should evaluate
this application but probably more importantly to me, the new chemical bulk storage that has been
proposed, I understand that you removed the septage receiving certainly from that perspective this
is anew construction and that is new building and that is being added to the project. Everything
else ] can make the argument that it is pretty much a replacement in kind or better than what exists
today. So, that ts my two cents, but I will let the rest of the board reflect on that.
I agree with you.
I would agree with you. It is pretty much replacement in kind and the septage will
be removed as the applicant indicated. If anything, it will help the pure waters,
Any other comments?
Pg, 60 April | 1, 2023 Zoning Meeting
I agree with the remainder of the board’s opinion in addition of the chemical storage
building does fead it to be an extension of nonconforming use. Everything else is currently at the
site that would be an improvement of the situation.
| would agree also. I...you mentioned the building for chemical storage, but [I think
that building has safeguards in it for chemical spillage and so on. Which they may not have now, |
don’t know. So, it would be an improvement.
So, Don, | received this letter awhile back and I apologize that I was not able to get
back to you personally on it. | think it kind of raises a mixed issue of law and fact. One of the
things that the court of appeals indicated is that when you have preexisting nonconforming uses,
the goal ultimately is to stop them to basically having them expire and runout, so they no longer
meet nonconforming. In that vein when you look at this the statue 350-91, it’s not worded, in my
opinion, very well or is it worded with any clarity. When it says a nonconforming use sha!! not be
extended or increased, it’s in my opinion that it’s ambiguous as to is it talking about duration or is
it talking about utility. There is not any case law that ] have found that talks about it in the context
of duration that is to say by fixing the buildings and making them better that there is going to be a
longevity increase to it and therefore what you are doing is in affect you extend the nonconforming
use in time, in duration. Which would be against what I have read and how the court appeals have
interpret what the ultimate goal is on nonconforming use. The idea is to let the landowner use their
property but once it becomes nonconforming that it is not in perpetuity that there is a duration and
an end. Then as you take actions to extend it in time you are really going against the intent of the
zoning code of the State of New York. However, if you look at it in terms of building usage and
look at it literally are you expanding the facility by making it larger, which I think was the context
of your letter. Really what is done here is it is making the footprints of the building smaller so that
you are interpreting 91 as it being size and not in terms of duration. I can’t say that in reading this
statue that Iam able to say that the forefathers who drafted this language and put it in their
INAUDIBLE intentions. I suppose it is up to the board to interpret that language as part of the
parcel of their obligation as the Zoning Board. It sounds as though that each individual board
member that spoke is interpreting il in terms of physical size not in duration. So, if that is the way
that they choose (o interrupt it, ] cannot sit here and say that that is against the intention of the
statute or against how it is specially written. IT really can’t tell but the case law, my belief is that
this area is generally expansions of the building and the context of a larger operation and not in
terms of extending INAUDIBLE. ] don’t know if that explanation is helping or not, but I think that
is the struggle for INAUDIBLE.
Well, I just think this board will go down a slippery slope if you interpret an extension
as extending in time because you can have any property owner that has a preexisting
nonconforming use simply because they maintained the property or they want to improve it, They
pul a new roof on their house, and they are in an industrial zone , you know, they are a preexisting
nonconforming use. Yes, they are extending the duration of their house, they don’t have to come to
this board for approval for that. So, I think your duration argument is not the greatest one.
Pg. 61 April 11, 2023 Zoning Meeting
I am not saying that itis, Lam saying that the statute has chosen the words
“extended” or “increased” in the context of that the use shall not be extended. Had they thought it
was exclusively in size they may have said enlarged; scope increased things like that and they
chose not to.
Don White. T understand that. | understand that they chose not to, and it is rather ambiguous, and
the point is simply that to me it would be hard to defend it if you are using duration as a tigger
pomt because you know, the village could have done nothing but simply spruced up the site and
we wouldn’t have come here but would that be in violation of the statute? [don’t know but, in any
event, if the chairman can clarify, you said based on the history of the property, what does that
mean? There is nothing in the statue thal says simply because of history of the property that you
have to come in front of the Zoning Board of Appeals.
It certainly states some of the issues that we would look at in terms of an
extension and in my case, I had never indicated that the extension was in time, I specifically stated
if you recollect, that it was the building in my opinion that triggered with respect to the history
comment, there is certainly a history with this site with respect to traffic, noise, all of the things
that are in here , odors, that this board would like to look at. In my opinion, as part of this
extension in terms of the building footprint. Which is the chemical bulk storage building. Had you
not proposed the chemical bulk storage building, in my opinion, I would suggest that everything
else is replacement in kind or as I stated before, you are improving what is existing.
Ok, I just wanted you to clarify. Thank you. So, unless you want any further
discussion about that March 23" letter, we can move on.
No, | think the direction of the board is that we would still hear this application
this evening.
That is fine. I just wanted it on the record, just in case.
Understood and appreciate it, Thank you for raising the question.
So, it was under Mr. Swingley’s....this is Jake Swingley, and he is the Superintendent
of Public Works for the Village of Webster. Jake was not with us. This is Matt Higgins from
LaBella. The villages Engineer. Jake was not with us before, but Jake is here now in case there
ure any questions about existing uses for any parts of the wastewater treatment plant. Specifically,
the green house and the pole barn in the back if you have any questions about that. In the April 3
letter, Matt addressed the comments that came out of the town’s project review committee, and |
don’t know if you want to go through all these or what.
| think there are only a couple key ones. You are talking about the PRC
comments?
Pg. 62 April 11, 2023 Zoning Meeting
Yes, that was the first part of it. The second part addressed Mr. Dunham's PowerPoint
presentation and I don’t know if you got him a copy of our response, but he is certainly...it’s a
public record, he can have it,
So, I believe Mr. Artuso, the PRC comments from March 14" correct, it was
included this evening? 613 Webster Road, Community Development.
e Application was tabled by ZBA in February pending additional detail on proposed
chemical storage building.
e Number 2 received many complaints from nearby residents about historical operations
and proposed upgrades. Esthetic improvements and existing components of the plant are
a priority for the neighbors.
e Number 3, as of the time of this meeting revised plans have not been submitted to the
town, Therefore, we will not be able to review this item any further.
e And lastly and most importantly in my opinion is the sewer department comment that the
proposed chemical bulk storage building size of which we had a question previously and
I think the board had beat that up a little bit. Is most likely appropriate for an operation of
this size in nature that is being conducted.
Were there any others that ] missed?
There was a subsequent PRC review that was done as a result of this being delayed to
April 11'" so there were a couple of extra comments that they did address regarding the proposed
material of the chemical storage building giving that it was metal we were inquiring as to if there
would be a protective coating applied so that the building doesn’t prematurely corrode from
exposure to the chemicals and they provided a response indicating that it will be a metal building
but it will also be coated with corrosion resistant coating to prevent premature corrosion and then
there was also concern about the mix of chemicals being stored and it is common to have different
types of chemicals stored in the same facility as long as there is proper containment and that is up
to the Engineer to make sure they are meeting those standards.
Anything that you would like to add or address with respect to PRC?
If you would like, | would be happy to walk the board through the renderings that
we created to kind of refresh memory of and maybe provide a further description of that building.
Sure.
SHOWING THE BOARD AND AUDIENCE RENDERINGS AND SPEAKING
ON THEM) This is from the southeast showing the exterior and the proposed interior of this
building. The colors are generally what the village anticipates selecting during construction and
the variety of uses are shown in this image where we have the bulk storage tanks or one for ferric
chloride and one for sodium hypochlorite. The ferric chloride tank with the capacity of 6,000
gallons and the sodium hypochlorite with the capacity of 3,000 gallons. Each of those are vented
Pg. 63 April L1, 2023 Zoning Meeting
through the roof not within the building. Each one has separate secondary containment that
provides 110% capacity of storage so 6600 gallons for ferric and 3300 for sodium hypo. They are
fully separate so if both tanks were to spill at the same time it would remain in separate concrete
closures. You see in there that there are several trucks, the size of the building has to do with a few
ancillary uses the village intends to use this building for. Parking of a dump truck; parking of a
pick-up truck; parking of a lawnmower-seasonally; electrical power distribution panels to serve the
facility as well as a clothes washer/dryer for operator clothing so they don’t have to wear dirty
clothes home. The flip side of this just shows a view from the other direction from the northwest.
Again, a large garage door on one end; windows to provide some ambient light inside. Does
anyone have any questions about that?
Is the unloading going to take piace inside?
Is what?
All the untoading to fill the tanks
No, so the unloading will take place ...so this building is proposed to be located
right here (SHOWING ON THE RENDERINGS) and the unloading of trucks will pull up in the
driveway outside and run their hose through a man door on this corner to a panel that will provide
the correct hook ups and signage to make sure they are discharging it into the right tank and
minimizing any spilling that would occur. So, that panel will have it’s secondary containment zone
within there and the secondary containment via a small curbed area in the driveways so if there is
any leak or spill at the truck that that is contained within that curbed area in the driveway is
collected with a drain that sends it to the pump station at the bottom of the plant and recirculates to
the head of the plant so there will be no release to the environment from the truck nor from within
the building.
And that is all designed with the chemical bulk storage, NY States Chemical
Bulk Storage regulations in mind and I am assuming the facility will have a spill prevention report,
SPR.
Correct. So, they currently have a chemical bulk storage permit for their existing
facilities, and they anticipate modifying that to receive official ongoing approval to store the
chemicals as shown here.
The fast thing that | was interested in hearing more about this evening ts the
comments that were made and perhaps you could provide some clarity of what 1 will call the
aesthetic issues that were previously identified from the fencing, and I know you have documented
some of this, but I would just like to get it on record. The fencing what you are proposing; the pole
barn; ] guess for a lack of better words, along the creck; and the greenhouse.
| will have Jake address that.
Pg. 64 April 11, 2023 Zoning Meeting
The greenhouse, the glass is going to be replaced in the greenhouse and just as
history, obviously this decision took the village board quite awhile to make and we were nol
interested in vesting into something that we could potentially take down but once the decision was
made to make the improvements to the plant and obviously it is not an unreasonable request
giving the greenhouse replacement windows there; the pole barn we have contacted a few
contractors to look at it. One of them I talked to him on the 20" of March and again on the 30" of
March and he ts dealing with a family issue and visiting a relative in Florida, 1 was hoping to have
an email from him today but J just got back from Golf Port Mississippi this afternoon and I have
not received anything, but I was checking it while ] was down there.
The fence, we talked about replacing the chain-link around the perimeter of the facility and putting
in privacy slats and there is a section near the road. There is a little return where the driveway
comes in and the original plan was to clean it up so we can put more landscaping out there and
make that look nicer but if the consensus is that that should stay to provide a little more of a
barrier, we can provide additional privacy slats in that as well.
(SPEAKING TO Jake Swingley) Can you explain what the plan is for the pole barn.
The pole barn ! guess either way, it’s getting better. We are replacing the roof, or
we have also contemplated reducing the size of the pole barn. That is what we are waiting to hear
back from the contractor as to the better way to go about that. Obviously with the roof panels they
are missing and there are a couple of trusses that need to be addressed so we thought that if we are
pulling it alt off, it’s larger than what we need now so we may just take a portion of it down. We
can use it for storage. There are manhole covers; grates and things like that; piping; flowerpots go
in there in the wintertime. So, it is larger than what we need right now so if it’s better, like I said,
either way we are going to replace the siding and the roof or reduce the size and put a new roof
and siding on it.
There was previous concern maybe Josh your raised, maybe work with in the
floodplain if they were to remove a portion of that building. Obviously, there is much of a concern
having it in the flood plain.
Yes, so any development or activity of any kind within the flood ptain typically
requires a flood plain development permit that would be issued by the town. Yes, any reduction
because a good portion of this building is within the flood plain and so any reduction in size with
theoretically benefits the flood plain, but it would require an additional permit that we would issuc.
And the village is aware of that. Obviously, we applied for both a building permit and
the food plain permit before the work on the barn.
And could we just state one last time, the next steps in this process are the village
must vole on the approval of the funding for the plant upgrades?
The village has already approved the funding. TPhey took a binding resolution awhile
Pg.65 April 11, 2023 Zoning Meeting
ago and they presenily...... and they received an interest free loan from the State of NY which
they are already drawing on, so the funding is all in place. They don’t need any approvals for that.
Perhaps Matt can address the SPEDYS permit, where that is.
Maybe I will just clarify that the funding is in place for the wastewater treatment
plant improvements project, the scope of that project. Has the board passed any sort of resolution
relating to funding relating to the aesthetic improvements? (SPEAKING TO DON WHITE) and is
that what you are asking?
Not yet because we don’t have the estimates for what the cost are yet but village, I
have talked to the mayor and the trustees, there are funds available through the ARPA funds that
the village and the town received also and could be used for this kind of a project.
Certainly, from my perspective, and open it up to the rest of the board, I would
wanl some assurances that these improvements were going to be made before any action was taken
by this board.
INAUDIBLE directed me to get these things done and we realize like I said, the
greenhouse, they said get that scheduled and get the glass in there it’s April 11" and we weren’t
quite sure if it was going to be done snowing yet and I have contacted them about the barn at the
direction of the board and we have contacted the fence company. The fence company has a
proposal to us already and they are aware of what those funds are committed to doing that and they
[ have not passed a resolution yet because we are going to do it all at once.
Discussion amongst the board members
We would have the ability to include the improvements as part of the building permit
for the new structure so essentially if the improvements to the existing structures were not made,
we would not issue a certificate of compliance.
Let’s address SEQR
RESOLUTION 23-0106 Jamie Newtown made a motion for an UNLISTED
Donald Hauza.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
SPEAKING OUT
f Jamie Newtown: No, the public comment portion is closed,
Pg. 66 April 11, 2023 Zoning Mceting
SPEAKING OUT
The public comment is closed. Any further comments or questions?
(NOT SPEAKING LOUD ENOUGH) I just like to be sure it is done in a timely
fashion, and lam not sure. | am talking about the improvements to the site, and | am not sure
how to guarantee that to these people.
Another option would be to ask for a letter of credit which INAUDBLE (NOT
clear) toa C of O.
That would be another option.
Maybe that would light a little fire to get the project going and faster if that is
your concern.
The improvements to the plant itself , the tricklers and so on, they don’t require a
C of O, do they?
A certificate of compliance probably.
I thought all the was basically be replaced in kind so you wouldn’t need a certificate
of compliance for the actual improvements to the wastewater treatment process stuff.
So, let’s make the trigger bulk storage.
Well, that is what I was indicating.
I wouldn’t have a problem with what Mr. Artuso suggested is make it a condition of
the building permit to the chemical bulk storage building that the improvements are done to the
barn; the greenhouse; and the fencing. So, if those are not done by the time the chemical storage
building is built , then you don’t get a certificate of compliance or completion for that building
and now the whole thing is now in violation.
Can you get the SPDYS permit without the chemical storage facility?
No the village has absolutcly no incentive to delay any of this really and it is just a
matter of getling a contractor on board for the INAUDIBLE and Mr. Barone probably can
appreciate this, these days, it took awhile to find a contractor who is even interested in the
project in the first place and then with supply issues, who knows how long it is actually going to
lake . It is going to get done but we couldn’! tell you when because we don’t even have...we
haven't decided because we don’t know the cost if it is relatively the same cost to put a new roof
and side the existing building or have to shrink it about a 1/3"), will shrink it. As Jake said, the
Pg. 67 April 11, 2023 Zoning Meeting
village doesn’t need the space anymore and itis better for the floodplains to have less than a
building there.
Discussion amongst board members. (John DeMarco and Jamie Newtown) Jamie Newtown: We
are chatting whether it makes sense to segregate this application into two pieces and that would
be purely administrative meaning that the upgrades to the treatment facility, once again back to
our discussion earlier, around 350-91, those are not, I believe, not subject to the extension of
nonconforming uses as they are upgrades replacement in kind on existing equipment vs. the
chemical butk storage facility that we could INAUDIBLE or should INAUDIBLE the assurances
that we are requesting for the rest of the site through the issuance of the building permit and
certificate of compliance.
Discussion amongst board members.(John DeMarco, Jamie Newtown)
I can’t get the permit without both pieces? The SPDYS permit and I thought there
was some incentive on the villages part that they have to get the SPDYS permit in order to...So,
if the upgrades are conditioned as part of the building permit and certificate of compliance
process, I don’t see how they can not do it.
I was just throwing something out there.
Is DEC going to issue the permit prior to the start of construction or do they want
to see the actual finished product before they issue the permit?
I don’t know what the exact affective date of the permit will be, but we will see a
draft copy at some point before construction completion certainly . I would expect it during this
calendar year. It is very unclear based on correspondence with DEC and we anticipated seeing it
last year and haven’t seen it yet and there is hopes on the part of DEC that local approvals and
any intermunicipal agreement would be in place prior to their release of the permit but I think at
some point they are just going to release a draft copy for public comment and then proceed with
releasing the permit but it is all very unclear at the moment. The exact timing, I should say. F
So, if we were to condition this, if it were to be approved, the condition would
indicate what? What are the required upgrades? The fence, what specifically about the fence. I
think we need to be specific about it. So, we have four items, three ilems. The fence, we have
what we will call the pote barn and we have what is called the green house.
What about landscaping?
Yes, so general landscaping.
As far as landscaping, it should be substantial in size. | mean, there is a row of
spruce trees that were planted behind the initial row, and they are maybe like 2 feet high, that
you can sce from Webster Road. It should be substantial in height if there are going to be shrubs
Pg. 68 April 11, 2023 Zoning Meeting
and arborvitae or any type of bushes. They just can’t just plant little whips and that should be
reviewed by the Public Works Department.
This is the first time that we heard about a landscaping requirement.
Well, you had indicated that you were thinking about landscaping at the entrance.
Yes, pulling in decorative flowers and bushes, not screening.
Well, thats...there again, we need to define your definition of landscaping and
my perception of landscaping.
And screening of the site, I believe as Mr. Swingley explained it, the perimeter of
the fence will be replaced and now the privacy panels, will they the entire perimeter of the fence
or just...
Yes
So that should screen me from when all those spruce trees have gotten too large
and then I am seeing through them.
Wait, can we clarify the existing fencing which is the chain-link fence. The
chain-link fence is coming down.
Yes, the chain-link and I] believe it was detailed.
All of it, I just want to be clear.
They are going to use as many of the existing posts as they can so it’s not going to
be any higher, but the chain-link will be all replaced. So, the brand new chain-link and then
within the chain-link, you kind of weave these privacy slats through the chain-link and that is
what the proposal is.
And you are removing the barbwire?
The barbwire is going to, yes. So, the question was, at the entrance there are those
returns and there is some of the fencing that doesn’t have to be there around the perimeter so.
(NOT USING THE MIC) holding up a picture and said, this is what we are talking
about. (PASSES THE PICTURES OUT TO THE BOARD)
So now I think we have a good handle on the fencing. The pole barn, there have
been 2 approaches that have been stated, right. Approach number I, is to remove a portion of
the building or the 2 option, is to replace and repair the roof section.
Pg. 69 April 11, 2023 Zoning Mecting
Correct and we don’t know what the cost difference is. To repair the entire roof
guess some or one of the roof trusses needs to be replaced to so if you have to replace that, that is
what triggered maybe just making the building smaller and don’t replace that truss and just make
the building smaller. So frankly, the preferred route is to make it smaller but without any
estimates to cost, | am hesitant to commit the village one way or the other. Mr. Swingley is
trying to get estimates by now, but he has been unable to do so but, in any event, no matter
which option it is, there will be a new roof and brand-new siding on cither on the existing barn
or on the smaller barn. If it gets smaller, the north side of the barn doesn’t have to have a garage
door on it anymore and it would just be a man door because you just have the larger doors at the
other end.
Ok, so just so lam clear on this, the pole barn, one or two options, you are
either going to repair as is with a replacement of a new roof and replacement of new siding.
Correct.
Option two, depending on pricing, is to reduce the size replace, put a new roof
on and new siding.
Correct.
Either way, it will be newly sided and new roofing.
Correct.
The greenhouse is going to stay, and all of the glass will be repaired?
Yes. Any missing glass will be replaced with new glass.
And what will that be used for in the future?
It is currently a drying bed but occasionally on the digester you have to pour off
the drying bed and that’s where it would continue to have the same use. It is used very
minimally now because we have a centrifuge but occasionally it does have to be utilized.
And then the general landscaping and we understand now that the entirety of
the fencing will be replaced and that is on all perimeters, correct?
Yes
Or on the entire perimeter ] should say and then the landscaping you are
proposing some ornamental plantings around the entry way?
Yes
Pg. 70 April 1{, 2023 Zoning Meeting
(NOT USING THE MIC)Yes, with the direction of the returns and the returns
come down. Either way we can do some landscaping, additional landscaping there but obviously
without the returns we have more room for more landscaping.
Can we clarify the returns. Do you have anything that you can show on here?
| only have that one picture that I fust passed around showing the X. Those two
sections with the X’s are what is being referred to as the returns. That is, it. Just those two
sections.
So, we can either leave them and they have new chain-link with the privacy slats OR
remove it and replace it with landscaping. Whichever this board desires.
| suggest we remove it.
SPEAKING OUTLOAD.
Sir, ] have made it very clear, we have had hours of conversation; we have
hours of documents that have been submitted to us. I would just like to state for the record, this
board is here basically in a voluntary role, trying to do our best and we are going to be here for 3
4 hours and we have heard about 3 hours already of public comment. We have to move on.
SPEAKING OUTLOAD.,
Alright, thank you.
What is the purpose of those return sections?
It is just the entrance.
APPROACHES THE BOARD. (NOT USING THE MIC) narrow down the
entrance but with the privacy slats, it will secure the entrance.
Ok, but it is not like they close and lock.
(NOT USING THE MIC) No, they are fixed. It is about a 30-foot alley down
there and INAUDIBLE ten on one side and six on the other.
Can we just get clarification on the slats. Are they PVC slots and what is their
litetime expectancy? Will they crack and dry out and require frequent replacement? Is there
better fence option?
We have those at the gate inside now and they have been in for about, | believe
about 5 years, and | haven't noticed any deterioration with them. Everything has a life cycle, and
Pg. 71 April 11, 2023 Zoning Meeting
Pam sure it would require a replacement over time, but 1am not certain what that is. Is been 5
years and they stil] look good.
So back on the general landscaping, the request would be to keep the return
sections with the privacy slots in them, the red X’s and leave as is and in addition to a few
ornamental plantings you said you would contribute to pretty up the entry way. Ok, do we have
any further questions/comments/concerns around the slots? What other options did you consider
from a fencing standpoint?
| wish John was still here, he had to go pick up his son. He got the quotes and
was doing an investigation on the fence. I know he was talking about a wooden fence but
obviously that is a lot of maintenance on it, and it can start looking bad pretty quick. I know we
just talked about a chain-link fence but with the chain-link fence, | am sorry, I just drove for 20
hours. The chain-link fence would look good but that is just a matter of time as well so with
addition of chain-link and the privacy slat that kind of gives the best of both worlds and it gives
you a better fook for the chain-link itself and then provides the screening and the desire has been
expressed for that.
Any questions/comments on the site so that I can reiterate? So, just to reiterate
from a, what I will cail, an overall facility aesthetic enhancement point of view. The fence: It
would be completely replaced and obviously you stated some of the post will stay unless they
need to be repaired. New fencing and chain-link around the entire perimeter without the
barbwire and the support system for the barbwire that would reside on the poles will be removed
and the entire pertmeter fencing will have privacy slats put in it, That is the fence.
Option one 1s to leave as is and repair the roof which would be all new and put all
new siding on the building OR if money allows, they will reduce the size and put a new roof on
and new siding to match and I am assuming that the chemical bulk storage colors.
Yes, that would be our preference. The roof would be different because the pole
barn building does not have electricity, and we have to have panels in there where it allows light
in there.
Understood. The greenhouse will remain all, and all missing glass will be
replaced, and any other necessary repairs will be made and then general landscaping, we are
going (o throw in the return fence section under general landscaping will remain improved and
privacy slots left in place or in place. In addition, there will be some ornamental plantings that
will be placed at the entry way.
Said plans would need to be approved by appropriate town staff and when | say
approved, | mean signed off by.
With respect to the septage which is no longer going to be accepted, which
buildings were used for the septage and are they going to be demolished or no longer used?
Pg. 72 April | 1, 2023 Zoning Meeting
There was no building.
None of the facilities were used at all or for that?
Correct. There was no separate septage receiving building originally.
It was proposed.
H was just a pipe coming out of the ground basically. So, one, with these conditions
the only thing what they ask ts if they can be done concurrently with the overall upgrade of the
plant. We would want to have to wait to, you know, until these are completed before.
No, | think we had said that we would hinge it on the issuance of the building
permit.
I don’t have a problem with that. It was unclear as to where you were headed.
1 think that is the appropriate path. I was spit balling and the board told me that
I was foolish.
Ok, that’s fine.
One more question on that seplage issue, when was the date, the approximately
when that was discontinued.
December 22, 2018 | believe or 2017. 1 believe it was 2017. (DON WHITE
HAVING DISCUSSIONS WITH JAKE SWINGLEY)
It was sometime in 2018.
Does anyone have any further comments or questions? Ok, does anyone have
anything else that they would like to add? Last call. Barry, it sounds like you want to add
something.
| am reading the actual application. JUST NOW READING IT) Is this an
extension of the use variance then?
No, itis an extension of preexisting nonconforming usc. (EVER YONE
SPEAKING AT ONE TIME)
| am just trying to think how we would word the motion, that’s all.
We would make a motion to grant the extension of a preexisting
nonconforming use.
Pg. 73 April 11, 2023 Zoning Meeting
And then we would reference the plan number and then reference all the
conditions that we would put on it.
Correct. Ok, I don’t believe we have any further comments, I feel like this
board was thrown a political football to be quite honest. It does not please me that this landed on
our lap; it does not please me that the town and the village can not come together and make a one
Webster community when the Town of Webster has two, I will repeat, wo wastewater treatment
plants and the rest of Monroe County is services off of Van Lare. I believe this is an issue that
could have been resolved elsewhere. However, I do feel, and I respect all of the input and the
community and comments from the residents in the area. [think this board struggled to find a
balance between beautifying. Some of the issues that have been raised around the site, I feel like
these conditions placed on it will address a lot of those issues. I truly belicve that if we don’t act
on this and this is my opinion and my opinion only, that it is not for the benefit of the betterment
of the community that this will continue to fall in disrepair, and I feel like we have the
opportunity now to place restrictions and handcuff this project to these conditions. That will
better that facility in the jong run. That is my soapbox. I will get down off of it and move to the
board to see if anyone would care to make a motion,
RESOLUTION 23-011 Jamie Newtown made a motion to APPROVE AND
GRANT THE EXTENTION OF A PREEXISTING
NONCONFORMING USE FOR THE WEBSTER
VILLAGE WASTEWATER TREATMENT PLANT
IMPROVEMENTS Located at 613 Webster Road.
Applicant Mayor Darre!| Byerts is requesting an extension
of anonconforming use associated with proposed upgrades
to the Village of Webster’s Wastewater Treatment Plant on
a 10.10-acre parcel having SBL #065.10-1-13. AWWEB
located in an R-3 Single Family Residential District under
Section 350-19 of the Code of the Town of Webster which
was seconded by: Corrine Volo
VOTE:
Mr. Newlown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
CONDITIONS:
e ALL NEW FENCING (ENTIRE PERMINTER) WITH PRIVACY FENCING: REMOVE ALL
BARBWIRE;POLE BARN WOULD BE REPLACED WITH NEW ROOF AND SIDING OR POLE
BARN WILL BE REDUCED IN SIZE AND JUST ROOF WILL BE REPLACED. GREENHOUSE
TO HAVE ALL MISSING/BROKEN GLASS REPLACED. GENERAL LANDSCAPING SHOULD
BE SUBSTANCIAL, ARBORVITIE AND SHRUBS. SITE PLANS WILL NEED TO BE
APPROVED BY APPROPRIATE TOWN STAFF,
Pg. 74 April 11, 2023 Zoning Meeting
Watt a minute, what do you mean site plan approval?
[ Josh Artuso: We would need the Planning Board Chairman to sign off on the mylar.
Oh, ok.
e All NY State DEC permits and we will say that it is a condition that you receive the
necessary approvals from the state inclusive of chemical bulk storage permits or
modifications to the existing permits. I will say, all the general conditions, fence;
pole barn; greenhouse; general landscaping will be a condition of the issuance of the
building permit for the project. To close out the building permit, those will have to
be completed for the certificate of compliance.
* The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire April 11, 2024.
Can ] ask you a question, you mentioned something about one year from today?
Can you restate that and clarify?
Construction is set to expire on April 11,2024. You have to start meaningful
construction. You have one year to commence. That could be footers...
[ Brian Dunham approaches the board.
(Carrine Volo read the second application)
1650 RIDGE ROAD AUTOMOTIVE DETAILING SHOP: Located at 1650 Ridge Road.
Applicant Steve Schlegel of Tesley LLC is requesting a special use permit to allow an auto
detailing business within a portion of an existing tractor equipment storage building on a 1.12-
acre parcel having SBL# 081.01-1-62 located in an LC-II Low Intensity Commercial District
under Sections 350-17 and 350-103 of the Code of the Town of Webster.
Appearing before the board was Steve Schicgel. I am the owner of Tesley LLC Steve’s
Lawncare who is currently renting the majority of space. For the sake of time, ] would like to be
thorough but yet pretty brief. If you may recall, | was back here in February, and it was the
suggestion of the board to withdraw the use variance application and submit a request for a
special use permil for this. So, we are looking to use just a couple of bays, a small percentage of
the building for a small automotive detailing business to rent out to.
We tried renting out to other businesses and currently the towns code is not necessarily...we
don’t have many video tape stores or watch repair shops anymore which is what LC-2 is zoned
for. So, we found a use for automotive, and | found a potential tenant who is very great, and I
have a bunch of reviews for him if you guys are interested in seeing the reviews. We are just
[ Pg. 75 Apri! 1f, 2023 Zoning Meeting
looking for a short-term special use permit to allow him to conduct his work there. Are there any
questions I can answer?
Donald Hauza; What is the time span?
It was a five-year request for a special use permit,
What date did we have for special use permits (Not clear) approved?
The only one that | am aware of , since I began was in regard to the potbellied pigs.
There was one previously, but I can’t tell you the year that there is a landscaping
company of Gravel Road that it was granted for the landscaping company, and I think it was
revisited after one year and then extended to five.
| am not familiar with that particular application.
Originally, he was looking for a use variance.
Right.
We thought that was too much INAUDIBLE to show financial hardship, so this is
an option, but it gives us a little bit more control as well because the use permit expires and has
to be renewed INAUDIBLE so... because one of the comments was well, you are going to use
one bay now for this well, what if he turns the whole building and that is not necessarily what we
have in mind so I think the use permit was an option we could live with as opposed to a use
variance because we have the history.
Can we limit that or restrict that to less than five years or is that up to the
discretion of the board?
| think that is what we did with the pig.
We asked her to come back after a year.
Yes, ] think six months,
Six months and then we would provide an extension up to five years
Up to five years based on that report.
The statute says, the permit may include reasonable conditions which is only
what the ZBA determines necessary to ensure the standards of safeguard are set fourth in the
section and can be met and will be met.
Pg. 76 April 11, 2023 Zoning Meeting
It motivates the applicant to be a good neighbor.
It is one to five years.
Could you just restate the intentions for the number of vehicles; frequency of
vehicles; turn over.
Sure. As a small operation it would be the owner and one employee, and they
just do a handful of cars a day. So, they are usually higher end detailing jobs. They don’t have
any outside storage. So, if they want to leave a customer’s car there overnight it would have to be
parked in the building. They are not to leave anything outside. No outside storage there and then
customers would just come and drop off their car and pick it up.
No auto sales
Correct. No automotive sales and it is strictly automotive detailing.
What is the square footage again?
I think it is around 22-2400 square feet.
Which is it?
Steve Schlegel; They are 30 x 40 so it ‘is 2400 square feet.
So, do you anticipate two bays or one for that only?
Correct. The whole rest of the building is still designed for landscaping
equipment.
So, if we said there would be a six-month review with up to one year or two-
year extension after that, | would prefer not to go to five years. It sounds like we have the
authority to limit it to [| to 5 years,
Would it be possible, if the board would like to do a lesser time, would it be
possible to do a two year with a possible extension? | started this process...
Let’s stop right there. No matter what and this is me speaking, I am not going
to approve this unless we have a six-month check-in to begin with. That is absolute. It is nol
happening, in my opinion, without a six-month check-in. OK.
Which has been typical with other special permits in the past,
So now, at the six-month extension | guess we have the ability to extend it for
up to five years. So, we can issue now for six-months and
Pg. 77 April 11, 2023 Zoning Meeting
L
Condition it on an appearance and then al that time will make a determination as
to the permanent period of time.
Does that require a new application in six months or just a revisit?
No
It will appear on the calendar. I don’t know Josh if he gets notified that it is back
on.
Yes, we would certainly make you aware.
October 10" we would have you revisit the Zoning Board.
Ok, thank you.
So just to recap this application, as was stated before, this applicant came in for
a use variance for automotive use. Auto detailing only is not allowed in this district. The board
was not in favor of that approach but was willing to take a take a look at a revised application
submittal to the Zoning Board to access whether it made sense or not to move forward witha
special use permit. That gives this board the opportunity to evaluate this use after a period of
time, You heard us talking, six months would be a review period and coming back in on October
10" to address any public comment concern; any observations that were made by the town etc.
and probably inspect the site as well. I will open this up to public comment.
Sarah Castanova at 1629 Ridge Road and we also have a property at 1645 Ridge which is across
the street from this facility. A little bit of an issue going forward because a precedent would be
set for all storage facilities in Webster to be able to rent out each of their units. Since this waws
an original storage facility approved by the Planning Board it will not be a good precedent to set
for all of the storage units that are now in Webster. Number six on the 350-103 talked about
required landscaping, the Planning Board did require landscaping on Ridge Road that has not
been installed yet. Automotive is not enumerated in the LC-2. It is in CO and IN and so for
number |2 it does not comply with the code. These septic chemicals, the Planning Board was
worried about being number 10 and [1] that would not include being an adequate facility for
disposing of the chemicals used and several vehicles a day, Vic’s was just approved for a home
occupation, and he is limited to 3 a day and this would be a larger one | guess but putting a limit
on it would be a good idea. Also, there is no fertilizer storage there which was not in the original
approvals so more ground water concerns and original approval like I said, was for seasonal
traffic storage facility and this is definitely beyond that.
There has also been automotive/mechanical body work done there and not just dollops at this
point. So, | guess that is it.
I just want to clarify one point, this Zoning Board approved a setback back to
[04, is that an accurate statement?
Pg. 78 Aprif 11, 2023 Zoning Meeting
Yes
And at the time, the facility was presented to us as an indoor...he was basically
storing his tractors for snow blowing business, correct?
Correct
And doing repair and maintenance on those tractors so when you say a storage
facility to the Planning Board, I guess I an tracking what you are saying.
This application had been put in front of the Planning Board
Prior to original approval?
As a use variance
To make it a little clearer, the project originally appeared before the Planning Board
for site plan review before it’s original construction. Then it also returned six months again to the
Planning Board under the provision that allows them to deem them a use that is similar to other
uses, They did not agree with that. They didn’t think it was a fit for that code. So, they referred
to it to this board for a use variance.
I see.
So, Josh, the public comment speaker seem to confirm that there are violations
there present or there are not?
Well, I can confirm yes, that the landscaping from the original approval has yet to
be installed...
I didn’t see a storm water facility either.
I don’t recall one.
] thought there was one planned on the northwest corner. Towards the
expressway by the parking lot.
There is a swale coming down the hill in the front which goes around the
building on the side and then there is another low-lying retention arca off to the west side. It
really doesn’t collect or hold or hold any water because it is really sandy there it just drains.
Obviously, it is a matter of policy and general course, we shouldn't be approving
any applications where there are outstanding violations, and I don’t know whether or not that is
in fact the case or lack of compliance.
Pg. 79 April 11, 2023 Zoning Meeting
There is no per say open code violations if that is what you are reterring to. We are
aware of the landscaping requirement and the applicant has indicated that when the weather
turns, he will be installing that. | can not corroborate what was stated in regard to the automotive
repair or collusion work that is nothing that the town staff have witnessed but we would certainly
keep a close eye and have our code enforcement ensure that they are complaining with any
conditions if the board approves
1. John DeMarco: The facility is set up though to address any chemicals that are being washed off?
This property is on septic. Do you have any information as to (SPEAKING TO
THE APPLICANT) the products that are used or how they react with...
The only thing that we are washing off there is salt for the winter. We do have a
fertilization truck that we park inside there but we are not washing off the machine or anything
else like that. {t is just stored inside.
What about the doll up operation, do they use any chemicals?
Al! their stuff is biodegradable soap that they are using for that.
What is the fertilizer truck?
Jt is for our landscaping business for lawn fertilization.
It sounds like if we do issue a special use permit, we need to ensure that these
previous conditions and or uses that were specified for this facility are met. Because I recall,
specifically talking about having tractors with snowblowers only in this facility,
It thought this was lawncare as well because it is a dual season business. It is
lawncare in the summer and snow removal in the winter.
So the code allows for reputation on a special use permit so to the applicant, you
need to be aware of that, number 2 and number | and 2 is, if there are any requirements that you
are not needed as it relates to the initial approval or of this approval are you in agreement that it
would come under the requirement of the special use permit? So, you would be subject to that
reputation .
Yes absolutely. We want to be in compliance with whatever we need to do.
Not just with respect to the auto detailing but the greater use of the building.
Correct
That is agreeable with you? 1:35:31
Pg. 80 April 11, 2023 Zoning Meeting
The great use, could you just clarify that.
Sure, 1 don’t know but there seems to be, the public comment scemis to suggest
and now I am hearing that it is on septic, and I don’t know about the fertilizer truck and whether
there is anything being cleaned, hosed off, or whether these products for the auto detailing shop
are biodegradable or not but at Jeast there is potential for runoff into the ground. Alj lam saying
is | want to sec If you are consenting to any violations of the greater building would be included
in those purposes for the special use permit meaning auto detailing so that you understand the
violations on the on the greater operation if you will... would subject you to losing your special
use permit for auto detailing.
Yes, that is fine.
Is that agreeable with you?
Yes, absolutely.
Any other public comment? Ok, we will turn the discussion back to the board.
RESOLUTION 23-012 Jamie Newtown made a motion for an UNLISTED
Donald Hauza.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
So, it appears that, the current approach would be to potentially approve a
special use permit for a six-month period with an extension possibly up to a period of 5 years
depending on a revisit to this board on October 10, 2023 and inspection(s) by the Town of
Webster for these operations. The operation that I heard, what I believe would be, the owner and
one employee and no outside storage of vehicles outside the building. Ail to be left inside unless
being delivered or picked up. There will be no automotive repair, maintenance, or product sales.
The operation would be limited to 2400 square foot which is equivalent of two-1200 square foot
bays.
The applicant must comply with all original approval conditions inclusive of landscaping of what
is allowed to be stored within the facility. Josh, where are they documented...where are those
conditions documented currently?
We have them up at town hall and I can certainly provide you with a copy via
email.
Pg. 81 April 1!, 2023 Zoning Meeting
Ok. So, the applicant would comply with all original approval conditions, and I
would suggest that we provide of maybe a maximum.,..... It’s getting to be spring, two months,
to address these issues. Landscaping is one of them. Is that fair, two months? Three months?
Should we say site plan compliant. Landscaping would be part of that. Because |
recall] a detention pond on the northwest corner of this facility, and I didn’t see one.
| missed the first part of what you said.
Make it site plan compliant. Including landscaping and stormwater. Our concern
is stormwater run off because of chemicals so there should be some retention on that. 1 don’t
think there was a road on the north side going and there is a driveway there. There again, lam
thinking out loud.
Right, but how long are we going to give them to address these issues is the
question.
| would give them the whole six months upon revisiting it.
[ understand now. Oh, in terms of the number of cars, you said a handful if we
were to restrict to two employees, five cars per day?
Is that five cars per employee or for the facility in total?
In total. If you have two bays and a car tn each bay possibly.
I don’t think that number is fall off, but I think each employee can do more than
2 Ya cars a day.
My concern is, no cars to be stored outside at night. ] mean employees have to
park their vehicles, He has a land scaping company, and he is going to have trucks. I mean,
during the course of a business day it is going to be busy but absolutely everything should be
clean.
Jamie Newtown; How about, we restrict it, just for now, for the sixth month period, to 7-10 and
no more than that ] would think. I mean, you can’t even store inside overnight in 2400 square
fect so.
Right, so that would Jimit the lack of being stored outside but 1 would say no more
than
10. Steve Schlegel: And that is just for the automotive detailing shop because during a snowstorm,
we have twenly operators showing up.
Hopefully, we don’t have a snowstorm between now and October.
Pg. 82 April 11, 2023 Zoning Meeting
Remember it snowed on Mother's Day...
Ok, so we will limit it to ten cars, Once again, this is all subject to inspections
and revisit to the board.
Do we want to require SDS sheets on the products used on the detail shop?
Do they need biodegradable compliance? Because it is going to septic, we are eventually getting
runoff and that is going to get full quick.
What did we require for Vic’s because this is the same type of business and same
type of chemicals.
I don’t think we addressed that. So, biodegradable products only. You stated
that is what they are using, correct?
Correct.
Does anyone have any further questions or comments? Do you feel we have
appropriately captured this providing this applicant an opportunity to comply with the existing
conditions and get some additional revenue at least for a six-month period while we evaluate it?
Are you clear on the expectations?
Yes
We will have them all documented, and you can pick those up along with the
previous conditions from Mr. Artuso.
We do have letters from surrounding neighbors that we should include.
There were four letters of support from surrounding neighbors including the
application.
RESOLUTION 23-013 Corrine Volo made a motion to APPROVE THE
AREA VARIANCE Located at 1650 Ridge Road.
Applicant Steve Schlegel of Tesley LLC is
requesting a special use permit to allow an auto
detailing business within a portion of an existing
tractor equipment storage building on a |. 12-acre
parcel having SBL# 081,01-1-62 located in an LC-II
Low Intensity Commercial District under Sections
350-17 and 350-103 of the Code of the Town of
Donald Hauza.
Pg. 83 April 11, 2023 Zoning Meeting
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mts. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
CONDITIONS:
e APPROVED FOR AUTOMOTIVE DETAILING WITH CONDITIONS: 2400 SF TOTAL, TWO
BAYS; CODE ENFORCEMENT WILL FOLLOW UP WITH A 6 MONTH INSPECTION TO
ENSURE PRODUCTS ARE BIODEGRADABLE. APPLICANT TO RETURN TO THE ZONING
BOARD ON 16.10.23 FOR A POSSIBLE EXTENTION OF SPECIAL USE PERMIT, STAFF
SHOULD CONSIST OF OWNER AND ONE EMPLOYEE; THERE SHOULD BE NO OUTDOOR
STORAGE, MUST BE KEPT INDOORS; NO REPAIRS; SALES; OR PRODUCT TO BE SOLD.
THERE SHOULD BE A MINIMAL OF 6 TO 10 CARS. LANDSCAPING SHOULD BE DONE BY
SIX MONTH CE INSPECTIGN/APPROVAL AS APPROVED WITH ALL ORIGINAL
APPROVALS.
* The applicant must obtain all necessary governmental! permits, including a Town
Building Permit.
e That one-year significant construction shall occur to expire April 11, 2024.
Just a couple of things, the letters of support for application as Mrs. Volo
pointed out , 1650 Ridge Road -Mark McCauley; 1645 Ridge Road-Steven D. Gossamer, 1656
Ridge Road-Tony Domacello; 1644 Ridge Road- Jared Cote and those were the letters of
support for this application. Ok, I think just based on the approval from the board the conditions
are going to built into your special use permit which will be issued by the town, and we will see
you back here on October
10. Steve Schlegel: Ok and thank you very much.
(Corrine Volo read the fourth application)
BEST BUY AUTO SALES SIGN; Located at 771 Ridge Road. Applicant Vital Signs is
requesting an area variance to allow a second building mounted facade sign where only one is
permitted, associated with a used car dealership on a 1.73-acre parcel having SBL# 079,17-1-
21.11 located in an MC Medium Intensity Commercial District under Section 265-7 of the
Code of the Town of Webster.
Appearing before the board was Steve Stanley from Vital Signs. We have Best Buy Auto Sales
at 771 Ridge Road. We are proposing an area variance to have a second sign mounted to the east
side of the building. Each of these signs will be 46" X 46” which gives us total square footage of
14.69 percent. The signs are both non-ifluminated; flat panel with digital print and as |
mentioned, we are requesting an areca variance to be allowed to hang a second sign. There are,
with the document that ] handed out just a moment ago, you can see that the other businesses
right on Ridge Road that are also auto dealerships are aloud multiple lit signs. So, as I said
before, we are requesting you to put a second sign on the building that will be non-illuminated.
Pe. 84 April 11, 2023 Zoning Meeting
Is there a need for that second sign that the customer feels they need badly?
It is the overall symmetry of the building with if you want to call them two bump
outs with the recessed area in the middle. Having two signs on the peak of the roof might give
an overall better aesthetic to the building with displaying the business name.
And both of the signs will be the same?
Correct.
One says Auto and the other says Sales.
| am sorry, that is correct. Auto and Sales.
Ok, any further questions or comments from the board? It seems pretty straight
forward and that whole section up and down Ridge Road have multiple signs. I think the most
closely related obviously is the Chevy Subaru and Ford dealers that are across the street. 1
believe Hyundai next door and the Nissan Dealer. You didn’t give us a picture of those, but I
know they have multiple signs too. This seems pretty straight forward. This mecting is open to
anyone wishing to speak for or against this application. Seeing no one, we will return the
discussion back to the board.
RESOLUTION 23-014 Jamie Newtown made a motion for TYPE IT SEQR
which was seconded by: Barry Barone.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
(Barry Barone)
1. This request is not out of character in the neighborhood: All the auto dealerships up and
down the street has multiple signs.
2. There will not be a detriment created to nearby properties: None
3. The benefit is not achievable by any other method: They are looking for some symmetry
and J] can sce where the building is perfectly symmetrical, and they just want to balance it
and J think it has a nice look to tt.
4. This request is not substantial: Not compared to some of the other size of signs up and
down the street.
5. There are no adverse physical or environmental impacts to the site or neighborhood: None
6. The difficulty is not self-created: They are just looking to make the building as attractive
and easy lo see al possible,
This is not an undesirable change: None
~~
Pg. 85 April 11, 2023 Zoning Meeting
8. This request is not significant: The signs are not overly large in sive and actually the other
dealers in other buildings have much larger signs.
And just to reiterate what the applicant said, these are non-back fit signs.
What is the square footage for these?
Of each individual sign?
Yes
14.69 each so with two of them, we are at 29.38.
Which probably complies with one sign and probably complies with the size
requirements.
Correct.
RESOLUTION 23-015 Barry Barone made a motion to APPROVE
THE AREA VARIANCE ; Located at 77!
Ridge Road. Applicant Vital Signs is requesting
an area variance to allow a second building
mounted facade sign where only one is
permitted, associated with a used car dealership
ona 1.73-acre parcel having SBL# 079.17-1-
21.11 located in an MC Medium Intensity
Commercial District under Section 265-7 of the
Code of the Town of Webster which was
seconded by: Corrine Volo.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
CONDITIONS:
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire April 11, 2024.
(Corrine Volo read the fourth application)
Located at 943 Ridge Road. Applicant Alfred
LaRue is requesting an extension of a non-conforming use to accommodate a 3,379 SF addition
to a pre- existing non-conforming car dealership on a 4.82-acre parcel having SBL# 079. 15-1-
Pg. 86 April 11, 2023 Zoning Mceting
22.104 located in an MC Medium Intensity Commercial District under Section 350-91 of the
Code of the Town of Webster.
Appearing before the board was Al LaRue with McMahon LaRue Associates. John Gabrielle
one of the principles of Marina Dodge, is here to answer any questions you might have regarding
the operation and what he is planning to do, This is a non-conforming use. We are adding a
3379 square foot addition over an area that is now presently black top and that is to contain the
Jeep Dealership. It results in an addition of existing building of 17.9 percent. The whole
building, right now, is 18846 square fect so the new building , the total, is 10.59 percent of the
total.
It's going to be very unique building because of the grades. (SHOWING ON THE PLANS) what
is also happening with the building is there is a new entrance to the service which is coming in
from the north now and straight in, two lanes and then going in to service and that is in the lower
floor there will be a wall on the east side of that entrance. The area, the three parking spaces in
front of the new Jeep dealership, is going to be concrete and there is going to be molded in
boulders in that concrete for display of jeeps. It’s a pretty steep area but that is perfect for what
the product is and so there will be an easy way to go straight into the show room. There is a
sidewalk that is going to get extended. We have moved handicapped spaces that used to be in
the front before and there is still one there but two at the southwest corner and two at the
northeast corner and then across from the main building, there 1s another handicapped space
where the chagrining stations are. So, that is it in a nutshell. Do you have any questions that you
would like answered?
Just note that we did receive from the Webster Planning Board, and I will read it
quickly. At the April 4, 2023 meeting the Planning Board of the Town of Webster heard the
following application:
Located at 943 Ridge Road, Applicant Al Larue of
McMahon-Larue Associates is requestitg SKETCH PLAN REVIEW associated with the
construction of a 3,379 SF addition to an existing auto dealership on a 4.82-acre parcel having
SBL # 079.15-1-22.104 located in an MC Medium Intensity Commercial District under Section
269-5 of the Code of the Town of Webster.
The Planning Board ts comfortable with the use variance and based on the Planning Boards
review of this project, the board is contfortable with the requested use variance. I guess they
wanted us to know it was comfortable. Any conunents or questions on this?
The front setback is identical to the front setback of the existing?
It is. There is going to be a straight wall right across. Itis going to be very similar to
what ts there now.
Plenty of side setback at 40 feet so.
Pg. 87 April 11, 2023 Zoning Meeting
We maintain the 25-foot drive isles everywhere with the parking. Handicapped is
handled through the building on the lower floor, both sides to an elevator.
I think it is a natural extension to the building.
This was initiated because of the requirements of Jeep?
Al LaRue; Yes
They can’t maintain the license?
I will let John talk to that.
President of the Mariana Auto Group. So, to answer that question, it is not
necessarily a requirement. They are looking for their dealerships because of some of the new
products we have they want to upgrade the facilities and so this is something we have been
contemplating for quite some time and decided to go forward with it. If you have been out to
Victor, there is a brand-new facility that was erected from ground up that has the new look that
Chrysler is looking for. It is already going to enhance what J think is already the nicest facility in
Webster and it will give it a modern take on what they are looking for so. It addresses some of
the things that we feel are lacking in the facilities. Specifically, a two-lane service drive and
entrance as you come right off the road into the service lane and with some of the new products
that we have, as A! has mentioned, Jeep is a unique product, so we want to make sure that it has
that aesthetics for the customers as they come in to look at them.
The only reason that I ask the question is because the area variance statement of
difficulty indicated that the Jeep franchise required the showroom addition in order to maintain
the franchise. That may be a little aggressive,
Yes, maybe. It’s something, as I said, that they are asking the dealers to do, and
they are not forcing anyone at this point, but we are just trying to be ahead of the curve.
You had mentioned charging stations? Are they proposed charging stations?
Existing?
We are the first to my recollection or to my knowledge, we are the first
dealership in the county to have level 3 charging stations and they are right here in the Town of
Webster in front of our building. There are two different units with two heads each so you could
have 4 vehicles parked there at any given time. They are for fully clectric vehicles which at
present, we don’t have any, but they are coming and it’s where the market is, but they are
functioning. So, if you have a fully electric vehicle, you can come in and charge it. There is an
app, Or you can use a credit card.
Pe. 88 April 11, 2023 Zoning Meeting
Thank you. Are there going to be some fagade modifications of the on the
existing entrance as well?
Presently the building ts eifs dryvit and that will go to an alucobond and will
have a more metallic finish to the Chrysler Dodge Ram butiding and the Jeep building, I don’t
know if you have any of the renderings there but if you don’t, we will make sure to get them
over to you.
My point was it was all going to blend in together. This mecting is open to
anyone wishing to speak for or against this application. Secing none we will turn the discussion
back to the board.
RESOLUTION 23-016 Jamie Newtown made a motion for an UNLISTED
Griff
Stappenbeck.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
Does anyone have any further comments or questions? [ think Mr. Barone
pointed it out, problem the best in terms of the impacts of the setbacks, it blends right into the
existing front showroom entrance. It is an extension of that facade line and I see some positive
impacts with the traffic flow. [have pulled into the dealership a few times and it’s a bit tight in
there and this seems to maybe improve that flow for the facility. Any other comments or
questions?
It ts just an expansion of the existing use and basically cosmetic.
All of the automotive manufactures maybe not require bul strongly suggest new
cohesive look to their different dealerships. Look at all the Chevy's, Fords, they are al] starting
to look very similar. Chrysler docs the same thing. [tis the nature of industry.
Does anyone care to make a motion?
RESOLUTION 23-017 Burry Barone made a motion to APPROVE THE
AREA VARIANCE Located at 943 Ridge Road.
Applicant Alfred LaRue is requesting an
extension of a non-conforming use to
accommodate a 3,379 SF addition to a pre-
existing non-conforming car dealership on a 4.82-
Pg. 89 April [1, 2023 Zoning Meeting
acre parcel having SBL# 079.15-1-22.104 located
inan MC Medium Intensity Commercial District
under Section 350-91 of the Code of the Town of
Griff
Stappenbeck,
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
CONDITIONS:
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
® That one-year significant construction shall expire April 11, 2024,
Do you still need to go back to the Planning Board, correct for a final?
Yes, he does.
(Corrine Volo read the fifth application)
520 FOREST LAWN ROAD ACCESSORY STRUCTURE: Located at 520 Forest Lawn
Road. Applicant William T, Lill is requesting area variances to allow:
a. The placement of accessory structure nearer to the front property line than the rear
line of the main building
b. 0° setbacks to all property lines surrounding proposed structure
associated with the construction of a below grade 1,000 SF accessory structure on a 0.35
acre parcel having SBL# 048.19-1-5 located in an R-1] Single Family Residential District
under Sections 350-12 & 350-36 of the Code of the Town of Webster.
Appearing before the board was Cindy and Bill Lill. We bought the house in 2018 and it was a
mess when we bought it. We rehabbed il and now we would like to put a garage on the lot, on
the parcel. It is a four-lot parcel, it’s an 1890 cottage lots, they are small but still there are four
and the house sits on one. It is important | think to bring up that we do have written support
from our neighbors, and we were hoping that because it is subterranean that the setbacks would
not be or could be waived. This current proposal is a result of many shots to the DEC, and this
does satisfy the concerns with the DEC and their INAUDIBLE for potential hazard erosion area.
If we are able to put the garage in that configuration it would allow us to service and access the
western properties and be able to repair the slope, the yard and the break wall for our cars and
our neighbor’s property.
We were scheduled for last month and because the mecting didn’t occur, we sent in some
paperwork, and I think you people all have. Maps and a set of notes that | had planned on
reading last month but we just sent them in because you were not here. So, you can sce from the
Pg.90 April 11, 2023 Zoning Meeting
map that is in color that Forest Lawn being an old neighborhood established in 1880, the lots are
small, The buildings are right on the boundaries, all of them, so we are not doing anything that ts
different. Our garage if it goes there, would not affect anyone's view and it would not affect any
access from any of the neighbors. The black and white map shows the dimension of the
properties and Forest Lawn so you can see across the lake the 45 feet wide and if you put a house
on any one of them, there is no room left for setbacks.
Is Gene Jenson, is that a female?
Male
Could you tell him I would like to shake his hand someday?
He was here.
He said, Hello Josh and thanks for all you and your team does on a daily
basis!! | don’t think that has ever occurred in the fifteen years that I have sat in this boardroom.
Gene is a good guy and good neighbor. So, he did send it in, and I think it was via
email, and there should be another one. We only have two neighbors back there.
We have them I just thought I would read that. Any questions or comments on
this?
Yes, there was a comment from PRC. Where DEC did not approve the location
based on the code. Can I have an explanation on that one, Josh?
That was sent in just as an example.
They didn’t approve of any of the locations that you have tried. | think that...
We were too close to that line that was established back in the 80’s so this is away
from that. We didn’t have to go to them for this. We have to come to you guys.
I think he was referring to an internal PRC comment. A project review of internal
comments.
'm sorry.
So, you are referring to the one that indicates that they have applied to DEC and
denied.
That is correct.
Pg.91 Apmril [1, 2023 Zoning Meeting
I believe they included a copy of the fetter that deemed their application not
approvable.
Incomplete
That is normal for DEC.
Notice of incomplete application.
That is correct.
Yes, il is my understanding that they have tried several times to locate it in a place
that would be compliant with the towns code however, itis forward of the natural feature area,
and I am assuming that they were not going to allow you to construct there.
That is correct. When we bought the property, we had no idea that we were going to
have an ordeal to pul a garage on the property and lot 18 was the obvious place for it and the
DEC was against that. Lots 20 and 21 the line runs more south than north on those properties so
there was no room there to put a garage there. So, our neighbor Mr. Jenson and his wife Jody
were kind enough to sell us that piece of property that would allow us to put the garage on their
ground, well, out ground now.
So, did that meet the satisfaction of the town?
So,
This is what we are trying to do with the town. It does meet the DEC unless you have
something that I haven't seen.
So, f do believe that Gene was actually was the one that initially reached out to me,
the town, indicating that he wanted to sell some land to his neighbor and then I believe we have
had some correspondences after that, and this didn’t go through the traditional resub division
process where the town actually reviews a mylar map. This was a split by deed between two
private parties so had it gone through the traditional process, we would have most likely
suggested that purchasing more land than what was ultimately purchased, I believe they
purchased the exact amount of land to construct the garage so unfortunately this was not caught
in that resub division process. It was kind of handled as a private matter.
Gotcha. So, that is the zcro-foot side setback.
Correct.
That is fine as long as you have a good neighbor. Somebody else buys the
property and T understand that you are ina jam ...
Pe. 92 April 11, 2023 Zoning Meeting
Well, originally, they had proposed to construct in on Gene's property but then that
obliviously complicates matters for a variety of reasons. So, we suggested that they purchase
some additional tand and combine il but unfortunately it is the exact size of the proposed
structure, but it will be primarily below grade.
The only wall will be the north wall of the garage which is the southern part of our
property.
It’s all below grade. The entrance door, the door is all you will sec.
The roof of the garage will be dirt.
It is not ideal but it suites their needs right now.
[tis a very unique situation down there.
So, what are you thinking with this?
They need to get some sort of easement or maintenance agreement between the
property owners going forward.
For a foundation wall?
It is all buried.
There would have to be something that acknowledges on the part of Mr. Jenson that
they will most likely encroach onto his land in order to build this thing. So, yes, the town would
request some sort of formula documentation. | have spoken to Gene, and ] know he is very
supportive of this, but we would just want something for our records.
That we would rebuild or bring the property back to original or ?
For the construction of the building, if approved, you would most likely have to
excavate past what you own so we would want something indicating from Mr. Jenson that you
have his permission to do that and then in terms of any perpetual maintenance in the future,
which might be something that would need to be spelled out.
Ok.
We haven't addressed the first one you requested,
There is also a comment from the sewer department. To ensure that there 1s no
conflict, the sanitary sewer, or any piping im the area .
Pe.93 April 11, 2023 Zoning Meeting
Yes, that particular easement 1s for access only. We have confirmed that there is no
pipe in that location but yes, we want to be sure that the building remains to the west of that
sanitary casement linc.
I think it is laid out now, isn’t it.
Yes
So, | think we are just down to an easement agreement, access agreement
between the two parties?
Discussion amongst board members.
I would like to have this staked out prior to any type of excavation just to ensure
it is the exact location because the nature of the location so there should be a survey stake out.
Which they would have to do anyway.
Well, one would hope.
Ok, so are you willing to accept a couple of conditions? One being an access
agreement be filed/developed between you and the Jenson’s and then the second one would have
your surveyor pul surveyor stakes in prior to excavation. We understand you are going to over
excavate but you ensure that the building corners are truly at the zero-foot setback mark. They
don’t extend beyond that, ok.
Can we get some help from somebody with the agreement like an outline or something?
Do you have a personal attorney that you could call?
Yes
Check with him. The attorney and surveyor will have to work together, that’s all.
It is called an access agreement.
You can explain it to your attorney, he will understand that you are just seeking
permission to access your neighbors property to do the construction and to maintain it if need be.
So, it is just during construction?
(TOO FAR AWAY FROM MIC) No, it will be a permanent agreement that
allows you to repair foundations to go in there and fix it.
Pg. 94 Aprit f1, 2023 Zoning Mecting
This application is open to anyone wishing to speak for or against this
application. Sccing none, we will return the discussion back to the board,
RESOLUTION 23-018 Jamie Newtown made a motion for TYPE IT SEQR
which was seconded by: Donald Hauza.
VOTE:
Mr. Newlown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
Does anyone have any further questions or comments?
{Barry Barone)
This is an extremely unusual variance, but the gentleman needs a garage. You need a garage in
the climate, especially near the lake. He was industrious enough to go to a neighbor and work out
an agreement. It doesn’t meet any of the town codes but it’s the only place to pul a garage there
thanks to the DEC’s restrictions. So, | will say that that particular neighborhood is very tight. It
is a cottage lype in the neighborhood so nothing there meets the standard setbacks.
This request is not out of character in the neighborhood : Not really out of character with
the neighborhood.
2. There will not be a detriment created to nearby properties: The neighbor has already sold
you the property so there really is no detriment because they already agreed to il.
3. The benefit is not achievable by any other method: As I said, there is no place else on the
property to put a garage. I tried to figure something out, but it just doesn’t work.
4. This request is not substantial: It is somewhat substantial because there are still setbacks
but unusual situation.
5. There are no adverse physical or environmental impacts to the site or neighborhood: None
6. The difficulty is not self-created: Like you said, when you bought the house, you figured
you have four lots there you can put a garage anywhere. DEC squashed that idea, so.
7. This is not an undesirable change: The garage will not even be visible to the neighbors
because the are going to look right over the roof of it. Not blocking any views or anything.
8. This request is not significant:
RESOLUTION 23-019 Barry Barone made a motion to APPROVE THE
AREA VARIANCE Located at 520 Forest Lawn
Road. Applicant William T. Lill is requesting area
variances lo allow:
1. The placement of accessory structure nearer
to the front property line than the rear line of
the main building
Pg.95 April [1, 2023 Zoning Meeting
2. 0° setbacks to all property lines surrounding
proposed structure
associated with the construction of a below grade
1,000 SF accessory structure on a 0.35-acre parcel
having SBL# 048.19-1-5 located in an R-1 Single
Family Residential District under Sections 350-12
& 350-36 of the Code of the Town of Webster.
which was seconded by: Corrine Volo.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
CONDITIONS:
e Applicant to obtain an access easement agreement with neighbor to the south for
construction and maintenance of structure and provide copy to the Town prior to
building permit issuance.
e Survey Stakeout of pole barn location by professional land surveyor with inspection
by Town prior to construction to ensure that building is placed in the correct
location.
« The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire April 11, 2024.
Who is your attorney?
Mark Gunther
If Mark has any questions, tell him to call me.
And to Mr, Hauza’s point, provide a copy to the town, to Josh.
Ok.
You should have the garage staked by a licensed surveyor before you gel started
on il. So, that’s definitely on your property, right?
This fecls like this is becoming the world’s most expensive garage.
It’s been a while. Its been since
18. Pg. 96 April 11, 2023 Zoning Meeting
Alright, it is now 9:20-9:22 we are at application number 3 for this evening.
We have 4-11 to go. As [stated on the onset of the meeting, we are not going to hear
applications passed 10: 00 this evening. We may give consideration, I can talk to Mr. Artuso
about a special meeting between now and the next scheduled meeting if needed and we can have
discussion after tonight, but | would suggest, we are probably going to gel through 4 through 6
and 7 through |] we are probably not going to get to this evening, so lam giving you fair
warning. Seven is Aria Lane; 8 is Covewood; 9 is Red Barn Farm; 10 is John Leo and 11 is Take
5. You are welcome to say bul | am pretty sure we are going to get through six.
(Corrine Volo read the sixth application)
WEBSTER HOME IMPROVEMENTS FRONT STOOP & STEPS: Located at 1197 Ridge
Road. Applicant Tom O’Brien is requesting an area variance to allow an alteration to a pre-
existing non-conforming building associated with the construction of a front stoop with steps on
a 0.69-acre parcel having SBL# 080.13-2-9 located in an MC Medium Intensity Commercial
District under Section 350-18 of the Code of the Town of Webster.
Appearing before the board was Tom O’Brien, owner of Webster Home Improvement. Our
business is 1197 Ridge Road. I am just trying to modify some front steps.
Can you go into a littke more detail as to why you would like to do the
modification for the record.
[am looking to do a railing on the front, and I have some old stairs from an
existing structure that are deteriorating to the point where I can’t modify them anymore.
Ok, thank you. That is what we needed.
The steps actually look like they are off center with the actual door right now.
A little bil, yes.
Yes, these steps, they would be code compliant. So definitely necd new steps,
especially a commercial building when you have public coming in and out of the building.
It is a home improvement business so that reflects. That is the first thing that you
Sec.
This meeting is open to anyone wishing to speak for or against this application.
Secing none, we will return the discussion back to the board.
RESOLUTION 23-020 Jamic Newtown made a motion for TYPE ITSEQR
which was seconded by: Barry Barone.
Pe. 97 April 11,2023 Zoning Meeting
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
So right now, the building is what...... the step is probably. ...the new step is
going to be what, a couple feet longer or closer to the street than the original.
Probably maybe 2 feet, maybe.
Just two feet.
Yes
So, it would still be a 36-foot setback.
There is no other place to put the stoop except where the current one exists at the
front door. The stairs are not code compliant and not terribly user friendly. Just based on things
have changed since that building was originally built.
Not only that, is ita commercial building that the door swings out. You actually
have to back off those steps to open the door. It needs a little bit of a platform there.
And this is what you are going to replace it with?
Yes
It will have railings which will make it more compliant to accessibility for people
and with a landing so that when the door opens you don’t have to go back down the stairs to
open it. Any other questions?
Fairly simple. It will certainly look nicer than the existing one.
Yes, and improvement to the entry way to the business.
RESOLUTION 23-021 Corrine Volo made a motion to APPROVE THE
AREA VARIANCE Located at 1197 Ridge Road.
Applicant Tom O’Brien is requesting an area
variance Lo allow an alteration to a pre-exisuing non-
conforming building associated with the
construction of a front stoop with steps on a 0.69-
acre parce] having SBL# 080. 13-2-9 located in an
Pg. 98 April 11, 2023 Zoning Meeting
MC Medium Intensity Commercial District under
Section 350-18 of the Code of the Town of Webster
which was seconded by: Barry Barone.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mes. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
CONDITIONS:
® The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire April 11, 2024.
(Corrine Volo read the seventh application)
877 MAPLE DRIVE CHICKEN COOP : Located at 877 Maple Drive. Applicants Nicholas
and Megan Sereni are requesting a special permit to allow the construction of a chicken coop and
raising of (6) hens, which is not permitted, on a 1.90-acre parcel having SBL# 078.1 1-1-28
located in an R-3 Single Family Residential District under Section 350-103 of the Code of the
Town of Webster.
Appearing before the board was Megan and Nicholas Sereni. You basically described our entire
application. We are proposing a chicken coop to be right behind our garage, so it is away from
public view. We have talked to our neighbors about raising chickens and they are very
supportive of i. [believe you guys have a couple copies for our immediate neighbors. | am
aware that one of our board members had to recuse himself for this and I didn’t know he was a
neighbor.
Well, maybe you should introduce yourself to him.
We are actually about 800 feet, Never Say Never Stables which is like a petting
zoo/farm so we kind of fit in with the general esthetics. ] just wanted to make sure that the board
knew we are not planning on having any roosters and the only reason that we are proposing to
get six hens is that it is a requirement, We can not get any less because the state is afraid that...
people buy them and flush them down the toilet after Easter as like a gift, we are not sure but that
is basically out application ina nutshell. We are here for any questions.
Thank you. I think in your application you had pointed this out or maybe it was
somebody on the comments that pointed this out and 1am sure this is being taken into
consideration but | said this before, we are starting to see more and more of this, homesteading
type of and I will say mentality and don’t take that the wrong way but that is what is happening
in the country, i's a movement and not just here in Webster. Josh, we talked about modifying
the code and this is one area of focus for the future. This is not the first time we have dealt with
chickens, Is at least the fourth time and then we obviously dealt with some pigs so. The major
Pg. 99 April 11, 2023 Zoning Meeting
concern is always clean up; where are they going to be; are there any roosters vs hens; and the
assurances that you are not going to have roosters that are waking people up al 4:30 in the
morning and certainly would be a condition of this that you would not have any roosters.
That's fair.
Do we have to cap it at 51x in the condition or no?
We can,
That was preemptive concession in the future if we could get more, than that would
be something.
| would say we cap that.
Start with the six and then
It is a minimum sale of six.
Right.
Maybe |2
This mecting is open to anyone wishing to speak for or against this application.
Secing none we will return the discussion back to the board.
RESOLUTION 23-022 Jamie Newtown made a motion for an UNLISTED
Griff
Stappenbeck.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza RECUSE
Mr. Stappenbeck AYE
Ok, any further comments or questions?
We got another letter on this today.
Yes, | think we did.
We had two from neighbors and then another one that was also in favor.
They just wanted to support?
Pe. 100 April 11, 2023 Zoning Meeting
Yes, more support.
Here we go, chicken coop at 877 Maple Drive. (GEE ATTACHED LETTER)
From 871 Maple Drive. I will make a motion to grant a special permit...
So, you have the ability to reinspect or bring it back for review,
How long does it take before the hens...
Full grown? We would not get them until the end of May and so from there it
would be four to six months before they are larger.
A year from now because then they will be adults.
That seems reasonable.
We will do a one-year evaluation which would put us out. We don’t even have
the 2024 calendar yet so April of 2024. So, this will be one year with an opportunity for an
extension after reevaluation.
And with the cap of ten.
Correct
When we reevaluate, do they get a chance to ask for an increase in chickens?
Possibly.
And maybe by then we will have a chicken code.
RESOLUTION 23-023 Corrine Volo made a motion to GRANT A
SPECIAL PERMIT Located at 877 Maple Drive.
Applicants Nicholas and Megan Sereni are
requesting a special permit to allow the construction
of a chicken coop and raising of (6) hens, which is
not permitted, on a |.90-acre parcel having SBL#
078.11-1-28 located in an R-3 Single Family
Residential District under Section 350-103 of the
Code of the Town of Webster which was seconded
by: Jamie Newtown.
VOTE:
Mr. Newlown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza RECUSE
Mr. Stappenbeck AYE
Pg. LOL April 11, 2023 Zoning Mceting
Karen Buck <kbuck@ci.webster.ny.us>
To Josh Artuso <jartuso@ci webster ny.us>;Katherine Kolich <kkolich@ci. webster ny.us>
Name:
Address:
Contact Information:
Agenda Item or Topic you
are commenting on:
Please type your comments
in the box below:
Karen Buck
Town of Wester
Linda Stango
545 Spring Meadow Lane
lmstango@yahoo.com
877 Maple Avenue
We are in support of the application for the Sereni's to build a
chicken coop and raise hens. The Town should consider
changing the zoning ordinance to permit the raising of hens as
of right.
Thank you for your consideration.
Director of Community Programming
(525) @72-6247
ch. Webster jy. tts
March 7, 2024
Zoning Board of Appeals
Town of Webster
1000 Ridge Road
Webster, NY 14580
Chicken Coop at 877 Maple Drive
Neighbor Letter
Dear Board Members,
We, as the neighbor to Nicholas and Megan Sereni at 877 Maple Drive, are supportive of their decision to
raise chickens. We believe they are capable and conumitted to raising healthy chickens, and as neighbors,
lave no issues wilh chickens being raised on their property.
PL L— Lek $7/ ee Va Ss 7/83
Signature Addfess Date
;
CONDITIONS:
e Maximum of 6 hens
e Requires a one-year evaluation in April 2024 ZBA meeting with possibility of
extending special permit and allowing more hens.
e Coop to be located behind the garage
* The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire April El, 2024,
(Corrine Volo read the eighth application)
231 RAPHAEL DRIVE ACCESSORY STRUCTURE: Located at 231 Raphael Drive.
Applicant Dave Brannigan is requesting an area variance to allow a 20° rear setback where
50° is required associated with the construction of a 33° x 15’ (495 SF) accessory structure on
a 0.40-acre parcel having SBL# 063.18-2-2 located in an R-3 Single Family Residential
District under Section 350-12 of the Code of the Town of Webster.
Appearing before the board was David Brannigan at 231 Raphael Drive here in Webster. 1 want
to build an accessory shed/structure for the various yard items. I have yard furniture; four
wheelers; pig roaster; rototiller, lawnmower, all stuff jike that. | have a small 8 X 8 a metal one
that is falling apart and is obviously not big enough, so I measured it out and the size that 1
needed in my application. The only place for something that big in my yard is where I propose it
to be because of the septic tank.
Now, will the other shed come down once this one gets erected?
Yes. It might be down before we get done tonight. It came with the house.
How is your hand?
Two years and five surgerics, that’s all Lhave. (APPLICANT SHOWING
HIS HAND)
Your wife explained that to me,
Oh, that was you. I just missed you. I was around the corner, but you had left
already. I can not get anyone to straighten it out for me. | have to wear mittens again.
There is no sewers on that street, just...is everybody on septic systems?
Yes. | remember 10-15 years ago there was a big thing about pulling pump
stations in for a regular sewer line but that was....
Well, the leech lines kind of dictate. They take up the whole back yard.
Pg. 102 April 11,2023 Zoning Meeting
It will leave enough room for me to hang out. I cleaned it up. There is a
icture I think, iUs going to kind of look like that Amish shed.
ie gong
Just note, there are five letters of support that were in your application.
(PLEASE SEE LETTERS ATTACHED) This meeting is open to anyone wishing to speak for
or against this application. Secing none, we will return the discussion back to the board.
RESOLUTION 23-024 Jamie Newtown made a motion for TYPE Il
Barry Barone
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
This is obviously larger than a shed or what would be considered a shed.
Maybe not in terms of height but in terms of square footage based on what you provided as a
Photo in the application. A shed would be up to 200, is it 200 or 220?
200
200 and 10 X
20. Twenty is the maximum length now. What you are
proposing is 495 which is just under requiring Planning Board approval right, for 500 square
feet for an accessory building. Does anyone have any further questions or comments?
(Jamie Newtown)
1. This request is not out of character in the neighborhood: Not out of character. Letters of
support from the neighbors (that I just went through)
There will not be a detriment created to nearby properties:
The benefit is not achievable by any other method:
This request is not substantial:
There are no adverse physical or environmental impacts to the site or neighborhood: None
6. The difficulty is not self-created: It is self-created. Fifty-foot shed is only 5-foot rear and
side setback that was changed from previously 15 but when you get to an accessory
structure it requires a 50-foot rear setback, but you are al 20 fect which is the best you can
do because some of constraints that you indicated in your back yard.
7. This is not an undesirable change: No undesirable change.
8. This request is not significant:
lead
RESOLUTION 23-025 Jamie Newtown made a motion to APPROVE
THE AREA VARIANCE Located at 231
Raphael Drive. Applicant Dave Brannigan is
requesting an area variance to allow a 20° rear
setback where 50° is required associated with the
Pg. 103 April (1, 2023 Zoning Meeting
construction of a 33° x 15° (495 SF) accessory
structure on a 0.40-acre parcel having SBL#
063.18-2-2 located in an R-3 Single Family
Residential District under Section 350-12 of the
Code of the Town of Webster which was
seconded by: Griff Stappenbeck.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
With that being said, what you are proposing the allowable height of the
structure would be... I don’t have that. I just want to make sure that we...
Max height of 20 feet but I think...
It looks more about 12 feet
| just want to make sure that...this is going to be a preconstructed unit, right?
Yes
So, lets just make it consistent with the dimensions that were just stated that
you provided in the application.
CONDITIONS:
e Applicant to remove existing metal shed.
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit,
e That one-year significant construction shall expire April 11, 2024,
Just so you hear il again, | appreciate cverything you guys do especially Josh
and Katherine. Thank you for your time.
(Corrine Volo read the ninth application)
492 ARIA LANE GARAGE ADDITION: Located at 492 Aria Lane. Applicant Troy Bradford
is requesting an area variance to allow a9’ side setback where 15° 1s required associated with the
construction of a 12° x 20° (240 SF) garage addition on a 0.44-acre parcel having SBL# 078.07-
3-13 located in an R-3 Single Family Residential District under Section 350-12 of the Code of the
Town of Webster.
Pg. 104 April 11, 2023 Zoning Meeting
Appearing before the board was Troy Bradford at 492 Aria Lane. Basically, | have an existing
bump out it’s approximately 4 ft by 12 ft and T basically just want to eliminate that all together
and create a 12 x
20. You can see from my survey that my property kind of angles so the front
of the new garage additions is going to be around 11-12 foot and then the back corner will end
up being somewhere around 9-10 feet.
| think you certainly demonstrated that itis not out of character of the
neighborhood,
I took some pictures. | did my homework. | did not supply any letters of support.
I mean | basically pretty close to all my neighbors. The neighbor to the north who recently
moved in James Egan, I had some pretty in-depth conversations with him as close as yesterday
evening, he has absolutely no issues with it. He has given me his verbal OK . Everything has
been fine on that level.
How about the neighbor to the south? Because that is who it is going to affect the
most.
Oh, [ ain sorry, south, my apologies.
Is it the lawyer James Egan?
Yes, it ts.
And that 1s the neighbor at 496?
Correct.
Tell him you heard his name was the Doctor.
] am assuming you know Frank too then?
Certainly, what you are proposing is the most logical Jocation for a third bay.
The size, itis definitely not an oversized garage. You left a note here, 12 foot by 20 foot,
correct?
Correct.
Which is a typical one car garage and in terms of depth, 22-24 is more common
today. So, 12 by 20, 240 square foot is not excessive. Once again, that is the logical location on
the driveway side attached to the existing garage. | think itis pretty reasonable, 9-foot side
setback to 11 feet on the front and 9 foot in the back and 11 fect in the front. Itis going to blend
in with the existing garage and tic in. 1 don’t have any other comments.
Pg. 105 April 11, 2023 Zoning Meeting
This mecting is open to anyone wishing to speak for or against this application. Seeing none, we
will bring it back to the board.
RESOLUTION 23-026 Jamie Newtown made a motion for TYPE II
Barry Barone
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
(Jamie Newtown)
1. This request is not out of character in the neighborhood: Not out of character with the
neighborhood. You provided several examples.
2. There will not be a detriment created to nearby properties:
3. The benefit is not achievable by any other method:
4. This request is not substantial:
5. There are no adverse physical or environmental impacts to the site or neighborhood: No
adverse impacts.
6. The difficulty is not self-created: I think you minimized that. This is not an excessive size
garage and the most logical location for it to be placed. No issues with the black top
driveway and you will meet the 5-foot side setback for the asphalt
7. This is not an undesirable change: No undesirable change.
8. This request is not significant:
RESOLUTION 23-027 Jamie Newtown made a motion to APPROVE
THE AREA VARIANCE Located at 231
Raphael! Drive. Applicant Dave Brannigan is
requesting an area variance to allow a 20’ rear
setback where 50° is required associated with the
construction of a 33’ x 15’ (495 SF) accessory
structure on a 0.40-acre parce] having SBL#
063. 18-2-2 located in an R-3 Single Family
Residential District under Section 350-12. of the
Code of the Town of Webster which was
seconded by: Griff Stappenbeck.
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
Pe. 106 April 11, 2023 Zoning Meeting
CONDITIONS:
¢ The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire April 11, 2024.
So, Red Barn Farms left so that would have put 1016 John Leo Drive in the
whole if we would have cut them off. Are you here? We will get through it. I don’t want you to
leave, you are the last two here.
(Corrine Volo read the tenth application)
512 COVEWOOD BOULEVARD CARPORT WITH ADA RAMP & COVERED
Located at 512 Covewood Blvd. Applicant Thomas Milliman Jr is requesting an area
variance to allow an alteration to a non-conforming building (40° front setback where 50’ is
required and 10° side setback where 15’ is required) associated with the construction of a
covered car port and porch on a 0.59-acre parcel having SBL# 063.07-2-57 located in an R-3
Single Family Residential District under Sections 350-12 & 350-94 of the Code of the Town of
Webster,
Appearing before the board was Thomas Milliman at 512 Covewood Blvd. My wife and I are
jooking to put this addition on in front of our home for our child with cerebral palsy. You may
have seen her; she was here earlier. As she is moving into her teenager years, we are trying to
make the house more accessible for her. We have modified our first floor to have a bedroom and
a handicapped accessible bathroom. Our previous addition on the back of the house had a ramp
that was covered for backyard access, and we are looking to be able for her to get on and off the
bus and have a ramp. Ail the drawings provided were done to ADA compliance and that is why
we are asking for the covered portion to be as long as il is so that the full compliant ADA ramp is
covered, and we are trying to keep the same feeling and look as the original house of the 1950's .
The original house is 49 feet away from the road and it was built prior to the standard so the
current front porch is a concrete stoop with metal railings. It is cracked and is in dire need of
repair and so that would also fall under this because it is closer to the road than the 50-foot
setback. | provided pictures and I know many of you drove by and saw it. No additional run off
because currently there now 1s an asphalt driveway so it would be covering the existing
driveway.
And the gutters will just Ge into the current down spouts?
Yes, and we have no plans to ever enclose it because the intention is you will
be able to get out of the car, come up the ramp and be able to sce the school bus from the
breezeway of the house. The original breezeway that is between the garage and at some point,
prior to us in 2001, the previous owners enclosed the portion of the breezeway so that this is
wailing in this area is for wailing for the school bus and you will be able to see where you are
going and so forth. That is our reasoning behind what we are doing.
Pg. 107 April {1, 2023 Zoning Meeting
It is logical.
It makes perfect sense. The ramp is underneath the covered roof .
This meeting is open to anyone wishing to speak for or against this application.
Secing none, we will return the discussion back to the board.
RESOLUTION 23-028 Jamie Newtown made a molion for TYPE I
Donald Hauza
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
Most of the houses in that neighborhood are closer to the front line and the
sideline because that whole neighborhood is kind of tight and the lots are a little bit narrower.
This addition that the gentleman is proposing is perfectly practical for what he needs so that is
why the Zoning Board exists. We have given a Jot of variances in that neighborhood to people
with front porches; in front of the garage. Not out of character with the neighborhood.
As | drove through, I was pointing out, this one and this one...
(Barry Barone)
1. This request is not out of character in the neighborhood: We have granted several variances
in that neighborhood and most of those homes are 40 feet from the front rather than
50. Just the way they built in those days.
2. There will not be a detriment created to nearby properties: None
3. The benefit is not achievable by any other method: The benefit is actually helping a family
member with the ramp and now it is a covered area. You can pull the car up there and get
her out.
4. This request is not substantial: None
5. There are no adverse physical or environmental impacts to the site or neighborhood: None
6. The difficulty ts not self-created: The house is situated on the lot and that is the only place
lo pul thal carport ramp,
7. This ts not an undesirable change: Not and it is actually very attractive and adding to the
covered porch also. So, I don’t sce any negative issues whatsoever,
8. This request is not significant:
RESOLUTION 23-029 Griff Stappenbeck made a motion to APPROVE
THE AREA VARIANCE Located at 512
Covewood Blvd. Applicant Thomas Milliman Jr is
requesting an area variance to allow an alteration to
Pg. 108 April 11, 2023 Zoning Mecting
a non-conforming building (40° front setback where
50° is required and 10° side setback where [5° is
required) associated with the construction of a
covered car port and porch on a 0.59-acre parcel
having SBL# 063.07-2-57 located in an R-3 Single
Family Residential District under Sections 350-12
& 350-94 of the Code of the Town of Webster
which was seconded by: Corrine Volo,
VOTE:
Mr. Newtown AYE
Mr. Barone AYE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
CONDITIONS:
e The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire April 11, 2024.
Jamie Newtown”: Once again, Red Barn Farm he left when we gave him the offer and
Take 5 Oil Change is not here which leaves 1016 John Leo Drive. It’s 10:01 so we are
sorry...(LAUGHTER) 3:07:10
(Corrine Volo read the eleventh application)
Located at 375 Webster Road. Applicant Roger Awe is requesting a
special permit to allow the seasonal use of an existing barn as a special events space on a 3.85-
acre parcel having SBL# 050.03-1-34.2 located in an R-1 Single Family Residential District
under Section 350-103 of the Code of the Town of Webster.
THIS APPLICATIONS TABLED TO MAY 9!" 2023 MEETING,
(Corrine Volo read the twelfth application)
1016 JOHN LEO DRIVE GARAGE ADDITION; Located at 1016 John Leo Drive. Applicant
Maric West is requesting an area variance to allow a 10” side setback where 15’ is required
associated with the construction of a 12” x 21° (252 SF) garage addition on a 0.43-acre parcel
having SBL# 079.13-3-42 located in an R-3 Single Family Residential District under Section
350-12 of the Code of the Town of Webster.
Appearing before the board was Maric West at 1016 John Leo Drive. We want to put an
addition on the back of our house which obviously just needs a permit, but it comes out a little
bit past the side of the garage and part of the project that we want to do is another one car garage.
We have actually worked with an architect and talked with our neighbors. We talked with the
architect, and they are concerned about the roof line, so we met and obviously Barry is the
contractor, and he has been to the meeting with the architect, so we know that the roof line
Pg. 109 April LL, 2023 Zoning Mecting
matches up. Itis not a standard throw on addition. It will match the roof lines of the house; it
matches the look and feel of the neighborhood and the gentleman to the north of me, to the left of
me, he has a third car garage which would be similar, and he has no issues with what I do/what
we do with out house.
Once again, as you pointed out, the addition on the rear portion doesn’t require
anything, it is the garage addition thal you are proposing and it kind of completes the picture and
the look and provides you with a third car garage.
And it makes the house more aesthetically flow,
So, you have got a 10-foot side setback where 15 is required for thal garage
addition. Once again, we just heard about one of these applications and that is the logical
location for this addition, and I certainly wouldn’t go anywhere else with it. That is 12-foot X 21
which is almost identical to the 12 foot by 20 that was proposed by the previous applicant.
Which on his lot put him at 9 foot and 11 foot and you at 10 so.
Well, this house is unfortunately biased to that part of the lot so with that 41 feet
on the other side but unfortunately that garage would not make sense being on that side of the
house, so we don’t have a lot of setback to work with.
This meeting is open to anyone wishing to speak for or against this application.
Damon Tyler at 916 Lothario Circle: Fant here to express nry objection to an area variance as
requested by the property owners of 1016 John Leo Drive. Tam the owner of 916 Lothario
Circle, and my property is generally to the northeast to the subject property and abuts the
property in question sharing about 15 feet or rear property line. The variance would allow the
primary structure at 1016 John Leo Drive to expand northwards to a point of about 25 feet of the
primary structure onto the lot of the north.
The proposed construction would be out of character for the neighborhood by creating the
narrowest gap between primary structures in the area with the exception of corner lots. Gaps
range between 40-60 feet. Even the corner lots maintain gaps that meet or exceed 30 feet.
If this variance is granted and construction proceeds, pry vista to the tree line and horizon
benveen 1016 and 1018 Jolin Leo Drive would be reduced by 40%. Essentially, 1 would only
have construction in homes in the backyard. The variance request is rooted as desired from an
additional garage stall as stated and the existing structure has a two-car garage with an
additional 100 square foot in-garage storage area on the north side. Based on the drawing
provided the storage area ts not being reclaimed by the project and as proposed, would result in
essentially three and half earage stalls on this property. If this five-foot-wide storage area was
sacrificed the landowner would have any ample room for an additional stall on the 12 foot of
buildable property without intrusion into the standard setback.
Pg. 110 April (1, 2023 Zoning Meeting
f know that this would be the second area variance granted to this homeowner within the past
four years. Presently and additionally to the primary structure the subjects property suffers
coverage from a 300 square foat elevated deck; 2100 square foot patio; 870 square foot
inground pool and two additional outbuildings. [tis my opinion that the landowners, hence
1016 John Leo Drive, have outgrown their property. This additional need for should not
be allowed to create an uncharacteristic condition in the neighborhood and an imposition on the
neighborhood. Thank you.
Sorry, where are you again? What address are on you?
916 Lothario.
Could you restate your objection again.
My objection is the narrowing of gaps between the homes creating an
uncharacteristic condition in the neighborhood.
On the garage or are you talking about the addition?
The gap between the proposed addition on 1016 and [018.
Is there any objection from 1018?
Not at all. He actually signed the letter and said that he approved it.
So, you are concerned about your view back through your back yard and
through those two residents?
Yes, if creates an uncharacteristic spacing of homes in the neighborhood and it
also moves the primary structure of the applicant closer to my home.
She could proceed with the rear addition without any variances, you realize
that.
Yes, INAUDIBLE (bath parties speaking at the same time)
INAUDIBLE closer to your home.
The garage does as well. Not ina perpendicular fashion but diagonally.
Ok, thank you. Anyone clse who would like to speak for or against this
application. Seeing none, we will return the discussion back to the board.
Pg. $11 April 11, 2023 Zoning Meeting
RESOLUTION 23-031 Jamie Newtown made a motion for TYPE II
Donald Hauza.
VOTE:
Mr. Newtown AYE
Mr. Barone RECUSE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
Jamie Newtown; Ok, does anyone have any other comments or questions? So, we have one
neighbor in favor at 1018 which is the immediate neighbor to the south.
| have spoken with all my neighbors that actually live on my street and they were
actually more concerned when they saw your sign go up in my yard that I was selling my
property. They were all in favor of me doing home improvements for the neighborhood, making
the neighborhood better, you know, bringing more value to the homes in the neighborhood.
It certainly is not out of character of what this board has granted in terms of
third car garages. Third car garages are pretty common these days. Pretty much most houses are
now going with a third car garage. The proposed size at 12-foot x 2! foot is not out of character
of what a third car garage bay would be . Ten feet is certainly not unrealistic. Any thoughts or
comments? Mr. Hauza?
If (hat house was centered on that lot, there wouldn’t be an issue. Unfortunately,
it is not centered. I agree with you as far as the 10-foot side setback. There again if it were a
cluster development they would be more in compliance. There are a lot of three car garages in
that area. The rear addition, I believe you are looking to put a laundry room in there.
Yes, and a powder room.
[ really don’t have any issue with it.
The sheds allowed; the deck size is allowed; the pool is in compliance .
Everything 1s in compliance. Was there a variance granted for the other accessory building?
The poo! house on the right side. It was in 2020, three years ago. We built a poo]
house on the other side of the house so we could actually have shade. When you are out there
watching kids in the pool.
Mr. Stappenbeck?
No comments. It is not out of character of what we have granted in the past .
Mrs. Volo?
Pg. 112 April !1, 2023 Zoning Mecting
A shed of the same size would be permitted within 5 feet of the lot line. Where
this is attached to the house so from that point of view, it’s...... adding it to the house is less
intrusive and if it were a separate building
Did I do SEQR? Yes, public comment is closed. Does anyone care to state any
additional findings?
I believe the exterior is going to match the rest of the house?
It is sir.
So, it is going to look like it was part of the original house?
Yes, and we have met with the architect, and they are going to match and work with
the roof line to make sure it looks like part of the house.
I think Mrs, Volo makes a good point that this applicant could bring that shed
up and make it 10 x 20 and stick it 5 foot from the lot line and accomplish the same thing. In a
worst position.
And it would look worse.
RESOLUTION 23-032 Donald Hauza made a motion to APPROVE THE
AREA VARIANCE Located at 1016 John Leo
Drive. Applicant Marie West is requesting an area
variance to allow a [0° side setback where 15’ is
required associated with the construction of a 12” x
21° (252 SF) garage addition on a 0.43-acre parcel
having SBL# 079. 13-3-42 located in an R-3 Single
Family Residential District under Section 350-12 of
the Code of the Town of Webster which was
seconded by: Jamie Newtown.
VOTE:
Mr, Newtown AYE
Mr. Barone RECUSE
Mrs. Volo AYE
Mr. Hauza AYE
Mr. Stappenbeck AYE
CONDITIONS:
© The applicant must obtain all necessary governmental permits, including a Town
Building Permit.
e That one-year significant construction shall expire April 11, 2024.
Pg. 113 Aprif [1, 2023 Zoning Meeting
TAKE 5 OIL CHANGE: Located at 1045 Ridge Road. Applicant Quattro Development is
requesting a use variance to allow the construction of a 1,610 SF oil change facility on a 1.25-
acre parcel having SBL# 079.15-1-8.009 located in an MC Medium Intensity Commercial
District under Section 350-18 of the Code of the Town of Webster.
TABLED APPLICATION TO MAY 9, 2023.
Since there is no further application before the Board Jamic Newtown adjourned tonight’s
mecting at 10:30 p.m.
Minutes were approved for February 14, 2023,
Corrine Volo, Secretary
Katherine Kolich, Recording Secretary
HAY = PMDIE
FILE D WES TER THN OLX
i
Sug, M.- Mogan
Pg. 114 April 11, 2023 Zoning Meeting