WEBSTER TOWN PLANNING BOARD MINUTES

PLACE

Webster Town Board Meeting Room 1002 Ridge Road

TIME

7:00 p.m.

DATE

3 September 2024

PRESENT

ABSENT:

Anthony Casciani, Chairman

Dave Malta, Vice Chairman

Mark Giardina, Secretary

Derek Anderson

John Kosel

Peggy Maltman

Derek Meixell

Josh Artuso

Katherine Kolich, Recording Secretary

Kyle Taylor, Attorney

Anthony Casciani

Welcome to the September 3, 2024 Webster Planning Board meeting.

Pledge of Allegiance/Roll Call

Anthony Casciani

We have 2 tabled matters on the agenda and one of them, The Human Bean

Drive Thru Café have asked to be tabled again. So, J] don’t know if anyone is here for that, but

this will not be heard tonight. Everything is ok but 1 would actually like to make one change, if

everyone is ok with this. The first one was Lochner, but we also have number 3 on the regular

scheduled matters, Splash Car Wash.

Summary overview of outcome:

TABLED MATTERS

:

LOCHNER SUBDIVISION

Applicant

McMahon LaRue

Status

APPROVED W/CONDITIONS: SUBJECT TO PRC COMMENTS.

1-YEAR MEANINGFUL CONSTRUCTION.

ENGINEER CERTIFICATION THAT PROJECT WAS COMPLETED PER PLAN

HUMAN BEAN DRIVE THRU CAFE

Applicant

The Lambent Waft, LLC

Status

TABLED TO THE OCTOBER 1, 2024, MEETING.

SCHEDULED MATTERS

:

708 HARD ROAD-ASSEMBLY OF GOD-SIGN:

Applicant

Jamie Catalano

Pg. 125 September 3, 2024 Planning Meeting

Status

APPROVED W/CONDITION: ADD STREET ADDRESS NUMBER TO

FACE OF SIGN

943 COPPER KETTLE ROAD-ACCESSORY APARTMENT

Applicant

Thaddeus Okolowicz III

Status

APPROVED AS PRESENTED: ACCESSORY APARTMENT AGREEMENT

REQUIRED PRIOR TO ISSUANCE OF CERTIFICATE OF COMPLETION

SPLASH CAR WASH-1 YEAR EXTENSION

Applicant

Fox Five LLC

Status

1- YEAR EXTENSION APPROVED; THIS WILL BE THE LAST EXTENSION

GRANTED

WATERVIEW APARTMENTS-PHASE 3

Applicant

Legacy Development Co.

Status

FEEDBACK PROVIDED; PROJECT PROCEEDS TO ZONING BOARD OF

APPEALS ON SEPTEMBER 10, 2024 FOR CONSIDERATION OF VARIANCES

(Mark Giardina read the first application):

LOCHNER SUBDIVISION

Located just west of 1854 Lake Road. Applicant McMahon

LaRue Associates is requesting PRELIMINARY/FINAL SITE PLAN & SUBDIVISION

APPROVAL (

PUBLIC HEARING

) associated with the re subdivision of a 21.8-acre parcel

into (2) 3-acre lots (to be developed with single family residences) and (1} 15.8-acre lot (to

remain undeveloped) having SBL# 037.03-1-36 located in an LL Large Lot Single Family

Residential District under Sections 269-11 and 296-15 of the Code of the Town of Webster.

Appearing before the board was Al LaRue with McMahon LaRue Associates. We finally got the

Corp of Engineers to stipulate that the wetlands are not a jurisdictional wetland so with that we

are moving forward with the plans. We think we have addressed all the comments at the formal

meeting that we had with PRC and the formal comments that we have received and so with that,

Jeanette and Tim are here and can answer any questions that you may have from the owners so

with that I will entertain any questions that you might have.

Anthony Casciani

Why don’t you just bring us up a little bit. I think we may have one new

person here since this application was in. You have lot | which is the larger one; 3 & 4 and then

where was the entrance going to be for lot 1 that was going to the west side of the property, was

it.

Al LaRue

Yes, lot | comes directly off the private drive. We are trying to avoid any more curb

cults; counly access permits and we are trying not to overwhelm the existing private drive there

to.

Anthony Casciani

Yes, we went through all this its...the issue with this is mainly the drainage

and stuff? Wasn't that the biggest thing?

Pg. 126 Scptember 3, 2024 Planning Meeting

Al LaRue

Yes. These are alternate systems so they have to be 100 feet from the property line

and (NOT SPEAKING CLEARLY) that could cause an issue (CAN NOT UNDERSTAND

WHAT HE IS SAYING) front setback and that sort of thing so and then drainage was not much

of a problem because we had some ( NOT SPEAKING CLEARLY) so it was just the fact that

we had that they systems had to be 100 feet away from the property line.

Anthony Casciani

Anybody....I know Derek, you had a couple questions last time in regard to

it. Are you ok with this?

Derek Anderson

Yes, my questions (NOT SPEAKING LOUD ENOUGH) primarily deal with

the wetland and that has been resolved.

Anthony Casciani

Ok, this is a public hearing so if anyone wishes to speak for or against this

project. Ok, not seeing any, we will close the public hearing and bring it back to the board.

Derek Anderson:

MOTION FOR UNLISTED ACTION

Town of Webster Planning Board considered the request by Applicant, McMahon LaRue, for the

re-subdivision of a 21,8-acre parcel into (2) 3-acre lots and (1) 15.8-acre lot having SBL#

037.03-1-36 located in an LL Large Lot Single Family Residential District located west of 1854

Lake Road, and to provide access to 1854 Lake Road, and existing 4.375-acre parcel having

SBL# 37.03-01-035.

The Planning Board determined that the proposed action is an Unlisted Action under Part 617:

State Environmental Quality Review (SEQR).

The Planning Board determined that the action is subject to a single agency review pursuant to

Part 617.6(b)(1) of SEQR and that it is the most appropriate agency for making the determination

of significance. The Planning Board therefore designates itself lead agency for the proposed

action.

The Planning Board has given consideration (o the criteria for determining significance as set

forth in Section 617.7(c)(1) of SEQR, and has

1. considered the information contained in the Short Environmental Assessment Form Part

I dated October 17, 2023,

2. considered public comments directed to the Planning Board during the Public Hearings

on November 7, 2023 and September 3, 2024, and

3. completed Parts 2 and 3 of the Environmental Assessment Form.

NOW, THEREFORE, BE IT RESOLVED that the TOWN OF WEBSTER PLANNING

BOARD hereby determines that the proposed action will not have a significant adverse effect on

Pg. 127 September 3, 2024 Planning Mecting

the environment for the reasons set forth in the attached Notice of Determination of Non

Significance; be it further,

RESOLVED that the TOWN OF WEBSTER PLANNING BOARD is authorized to take all

actions reasonable and necessary to file the Negative Declaration and discharge the TOWN OF

WEBSTER PLANNING BOARD’S responsibility as lead agency for this action, be it further,

RESOLVED that the TOWNOF WEBSTER PLANNING BOARD, based on the information

and analysis above, the referenced supporting documentation, and discussions of the action by

the TOWN OF WEBSTER PLANNING BOARD as documented by the Minutes for this

meeting, that the proposed acion WILL NOT result in any significant environmental impacts, be

it further,

RESOLVED that the TOWN OF WEBSTER PLANNING BOARD, therefore makes a

DETERMINATION OF NON-SIGNIFICANCE, be it further,

RESOLVED, that the TOWN OF WEBSTER PLANNING BOARD, based on the above reasons

issues a NEGATIVE DECLARATION as evidence of its determination.

LOCHNER SUBDIVISON

NOTICE OF DETERMINATION OF NON-SIGNIFICANCE

The Planning Board has reasonably concluded the following results from the proposed action,

when compared against the cnteria in Section 617.7(c):

1. The proposed action will not have a substantial adverse change in air quality since it does

not include a regulated emission source.

2. The proposed actionwill not have a substanuial adverse change in ground or surface

water quality or quantity since the proposed action includes septic systems designed to

current Department of Health Standards.

3. Water will be supplied by the Monroe County Water Authority which has adequate

capacity to support the action.

Wastewater will be treated by individual on-site septic systems.

The proposed action will not have a substantial adverse change in potential for erosion,

flooding, leaching ordrainage problems. Development of individual parcels will

conform to NYSDEC for storm water management and control.

6. The proposed action will not have a substantial adverse change in existing solid waste

production since the action is for the subdivision of residential properties that will

produce solid wastes in quantities typical of single-family residences.

7. The proposed action will not have a substantial adverse change in existing noise, odor or

light since the action ts being developed in accordance with Town of Webster standards.

A temporary increase in noise levels consistent with normal construction activities is

anticipated when during construction on the subdivided lots.

Sloe

Pg. 128 September 3, 2024 Planning Meeting

8. The proposed action will not have a substantial adverse change, or cumulative change

since the proposed action creates five new residential parcels from an existing residential

parcel. Traffic generated is anticipated to be minimal.

9. The proposed action will not have a substantial adverse impact on the criteria listed under

Section 617(c)(1)(ti) of SEQR because no habitats or threatened or endanger species were

identified on or contiguous to the proposed site.

10. The proposed action is not located in an area designated as a Critical Environmental Arca

by the Town of Webster or New York State pursuant to subdivision 617.14(g) of SEQR.

1f. The proposed action is not in material conflict with the Town of Webster 2008

Comprehensive Plan.

12. The proposed action will not create an impairment of the criteria listed under Section

617(c)(1)(v) of SEQR since the action is not located in or adjacent to the listed resources

and ts in character with the surrounding community.

13. The action will not result in a major change in the type or use of energy since the action

is for the subdivision of three parcels into five parcels and the construction of nine, single

family residences. Single family residents would not require an upgrade to existing

power distribution system infrastructure.

14. The action will not create a hazard to human health since it does not contain nor is it

located adjacent to an existing sources of hazardous substances or contaminants. The

project does not contemplate the use of hazardous substances or contaminants.

15. The action will not create a substantial change in use of the land since the action is

consistent with zoning for the land, the existing community character, and the Town of

Webster 2008 Comprehensive Plan.

16. The action will not attract a large number of people for more than a few days when

compared to taking no action since the action involves the creation of nine new parcels

and does not create areas that will attract a large number of people.

17, The action wilk not create a cumulative impact on the environment as listed under

61 7(c)(1}(x), (xi), and (xii) of SEQR.

RESOLUTION 24-0037 Derek Anderson made a motion for an

UNLISTED ACTION which was seconded by

Derek Meixell.

VOTE:

Mr. Anderson AYE

Mr. Kosel AYE

Mr. Malta AYE

Mr. Mcixell AYE

Mr. Casciani AYE

Mr. Giardina AYE

Mrs. Mattman AYE

Pg. 129 September 3, 2024 Planning Meeting

[

RESOLUTION 24-0038 Dave Malta made a motion to PRELIMINARY

SITE PLAN & SUBDISIVION APPROVAL

Located just west of 1854 Lake Road. Applicant

McMahon LaRue Associates is requesting

PRELIMINARY/FINAL SITE PLAN &

SUBDIVISION APPROVAL (PUBLIC

HEARING) associated with the re subdivision of a

21.8-acre parcel into (2) 3-acre lots {to be

developed with single family residences) and (1)

15.8-acre lot (to remain undeveloped) having SBL#

037.03-1-36 located in an LL Large Lot Single

Family Residential District under Sections 269-11

and 296-15 of the Code of the Town of Webster

which was seconded by John Kosel.

RELIMINARY APPROVAL

OMA s wo Mo

a

Subject to PRC comments

Subject to Conservation Board comments.

. All the improvements shall be constructed according to the specification of the

Town of Webster.

All roadway construction to be in accordance with the specification and

regulations set forth by the Town of Webster.

All sitework is to be in compliance with the standards of the Town of Webster.

Comply with all requirements of any State, County, or Town agency.

Address drainage, lighting, signage, landscaping, buffering, berming, and snow

storage

Approvals are subject to Drawing No: cad file 1451-00

Proceed to Final approval.

VOTE:

Mr. Anderson AYE

Mr. Kosel AYE

Mr. Malta AYE

Mr. Meixell AYE

Mr. Casciani AYE

Mr, Giardina AYE

Mrs. Maltman AYE

Pg. 130 September 3, 2024 Planning Meeting

[

RESOLUTION 24-0039 Dave Malta made a motion to FINAL SITE

PLAN & SUBDISIVION APPROVAL Located

just west of 1854 Lake Road. Applicant McMahon

LaRue Associates is requesting

PRELIMINARY/FINAL SITE PLAN &

SUBDIVISION APPROVAL (PUBLIC

HEARING) associated with the re subdivision of a

21.8-acre parcel into (2) 3-acre lots (to be

developed with single family residences) and (1)

15.8-acre lot (to remain undeveloped) having SBL#

037.03-1-36 located in an LL Large Lot Single

Family Residential District under Sections 269-1 1

and 296-15 of the Code of the Town of Webster

which was seconded by Derek Meixell.

FINAL APPROVAL

AWA wWNo

7

Subject to ProjectReview Committee comments

Subject to Parks.and Recreation fees.

Subject to Prelimmary Approval conditions.

Subject to all applicable governmental! fees.

Subject to Department of Public Works approvals.

Significant constmction shall occur within one year, as deemed by the

Planning Board, to expire on 9.3.25

The conditions ofPreliminary and Final approval are depicted on the cover

page of the final

designed plans.

The Engineer forthe proposed project shall provide a Letter of Certification

that all proposed work was completed, as per Planning Board resolution of

final approval before a Certificate of Occupancy will be issued.

VOTE:

Mr. Anderson AYE

Mr. Kosel AYE

Mr. Malta AYE

Mr. Meixell AYE

Mr. Casciani AYE

Mr. Giardina AYE

Mrs. Maltman AYE

(Mark Giardina read the second application):

HUMAN BEAN DRIVE THRU CAFE

Located at 2195 Empire Blvd. Applicant The

Lambent Watt, LLC (Torance Washington) is requesting SKETCH PLAN REVIEW

associated the construction ofa proposed 600 SF drive through coffee shop and walk-up cafe on

a |.10-acre parcel having SBL# 078.20-1-75 located in an MC Medium Intensity Commercial

Pg. 131 September 3, 2024 Planning Mecting

District under Section 269-11 and 350-18 of the Code of the Town of Webster.

APPLICANT REQUESTED TO TABLE.

(Mark Giardina read the third application):

WEBSTER ASSEMBLY OF GOD SIGN

Located at 708 Hard Road. Applicant Jamie

Catalano of Vital Signs is requesting SIGN APPROVAL associated with the construction of an

approximately 30 SF monument sign on a 2.20-acre parcel having SBL# 064.15-2-19 located in

an R-3 Single Family Residential District under Section 265-7 of the Code of the Town of

Webster. ‘

Appearing before the board was Josh Palmer with Vital Signs representing Webster Assembly

of God. It’s 708 Hard Road. It’s pretty cut and dry. We are just proposing a 6 foot tall

structure aluminum sign pushed through acrylic; internally lit letters; so, the face of the sign is

aluminum on both sides and would be opac and basically only the letters light and would kind

of be an edge lit affect with'the translucent film on the face of it.

Anthony Casciant

Is that pretty much the color you are using on that right there?

Josh Palmer

It’s pretty much what you see right there.

John Kosel

Is there going tobe a street address on there? I think we should.

Anthony Casciani

That’s a good point.

Josh Palmer

I can put one, a vertical one maybe on the butt end, facing the road and running

down ward. We can do some dimensional letters on that.

John Kose]: On both sides?

Josh Palmer

This would be facing the road.

Anthony Casciant

I think that 1s ok.

Josh Palmer

Ht sits back that] think you should be able to see it.

Anthony Casciani

Ok, that’s good.

Pg. 132 September 3, 2024 Planning Meeting

Derek Anderson:

RESOLUTION

The Town of Webster Planning Board considered the request by Applicant, Jamie Catalano of

Vital Signs to construct an approximately 30 SF monument sign on a 2.20-acre parcel having

SBL# 064.15-2- 19 located 708 Hard Road.

The Planning Board classifies the proposed action to be a Type II Action under Section

617.5(c}(2) of the State Environmental Review (SEQR) Regulations and therefore is not subject

to further review.

RESOLUTION 24-0041 Derek Anderson made a motion for TYPE II

SEQR which was seconded by John Kosel.

VOTE:

Mr. Anderson AYE

Mr. Kosel AYE

Mr. Malta AYE

Mr. Metxell AYE

Mr. Casciani AYE

Mr. Giardina AYE

Mrs, Maltman AYE

E RESOLUTION 24-0042 John Kosel made a motion Located at 708 Hard

Road. Applicant Jamie Catalano of Vital Signs is

requesting SIGN APPROVAL associated with the

construction of an approximately 30 SF monument

sign on a 2.20-acre parcel having SBL# 064. 15-2-

19 located in an R-3 Single Family Residenttat

District under Section 265-7 of the Code of the

Town of Webster which was seconded by Mark

Giardina.

CONDITION:

Add street number to sign.

VOTE:

Mr. Anderson AYE

Mr. Kosel AYE

Mr. Malta AYE

Mr. Meixell AYE

Mr. Casciani AYE

Mr. Giardina AYE

Mrs. Maltman AYE

[ Pg. 133 September 3, 2024 Planning Meeting

(Mark Giardina read the fourth application):

ACCESSORY APARTMENT WAIVER

Located at 943 Copper Kettle Road. Applicant

Thaddeus Okolowicz III is requesting an ACCESSORY APARTMENT WAIVER

APPROVAL (

PUBLIC HEARING

) associated with construction of a 420 SF addition, and

use of 574 SF of space from existing residence to create a 994 SF accessory apartment on a

0,35-acre parcel having SBL# 064.19-t-29 located in an R-3 Single Family Residential District

under Sections 350-12 and 350-50 of the Code of the Town of Webster.

Appearing before the board was Terry Okolowicz III at 943 Copper Kettle Road.

Anthony Casciani

So, you are putting this in-law apartment in for one of your parents I’m

assuming.

Terry Okolowicz

Yes, there is a 600 sq ft, approximately already there that was an addition and

then we are going to add to that another 400 sq ft. approximately to get that

994. Anthony Casciani: I was looking at it the other day and I am sure it’s ok, where is the entrance

for this? Is that the....coming off of the porch?

Terry Okolowicz

Yes

Anthony Casciani

So that ts the entrance going into the apartment section?

Terry Okolowicz

Correct.

Anthony Casciani

Ok, I see it now and the new section would be just crawl space underneath?

Terry Okolowicz

Yes

Anthony Casciani

And I think in your paperwork there is nothing at the front, no front doors or

anything like that going out to address this particular unit.

Terry Okolowicz

No and from the front you probably won’t be able to notice anything. It is

just going to be in the back of the residence, and it is basically going to go straight out for the

added square footage.

Derek Anderson

There is an interior door between (NOT SPEAKING LOUD ENOUGH) the

spaces correct, the existing and the apartment?

Anthony Casciani

Yes, that would be his cut through there which meets code.

Terry Okolowicz

Yes

Pg. 134 September 3, 2024 Planning Meeting

Derek Anderson

So, you have access to the port and the building itself (NOT SPEAKING

LOUD ENOUGH)

Anthony Casciani

| see no issues with it.

John Kosel

Is this here because it is larger than 750 sq ft.

Anthony Casciani

Yes, it’s an addition to the addition that was already existing so. It’s for one

of your parents, | am assuming.

Terry Okolowicz

Yes, this is my mother.

Derek Anderson:

RESOLUTION

The Town of Webster Planning Board considered the request by Applicant, Thaddeus Okolowicz

III to construct a 420 SF addition and use of 574 SF of space in an existing residence to create a

994 SF accessory apartment on a 0.35-acre parcel having SBL# 064.19- 1-29 located 943 Copper

Kettle Road in an R-3 Single Family Residential District.

The Planning Board classifies the proposed action to be a Type Il Action under Section

617.5(c)(9) of the State Environmental Review (SEQR) Regulations and therefore is not subject

to further review.

RESOLUTION 24-0043 Derek Anderson made a motion for TYPE II

SEQR which was seconded by Mark Giardina.

VOTE:

Mr. Anderson AYE

Mr. Kosel AYE

Mr. Malta AYE

Mr. Meixell AYE

Mr. Casciani AYE

Mr. Giardina AYE

Mrs. Maltman AYE

Anthony Casciani

Josh, you are ok with this.

Josh Artuso

Yes, the only thing that will be required 1s an accessory apartment agreement. Once

it’s built, we will need the applicants to sign off on an accessory apartment agreement.

Pg. 135 September 3, 2024 Planning Meeting

Anthony Casciani

For the county

Josh Artuso

Correct.

Anthony Casciani

It is to conform to chapter 225 code for an accessory apartment. Accessory

apartment should be limited to a maximum of 35% of ....lam not going to read all that it is not

necessary. Why don’t we say that we accept it and that it meets...the application is meeting the

requirements of 225-49-1| of the code of Town of Webster.

Josh Artuso

Tony, just to let you know, the ordinance number changed. It is section 350-50.

Anthony Casciani

And significant construction should be done within a year

RESOLUTION 24-0044 Anthony Casciani made a motion to Located at

943 Copper Kettle Road. Applicant Thaddeus

Okolowicz III is requesting an ACCESSORY

APARTMENT WAIVER APPROVAL

(

PUBLIC HEARING

) associated with

construction of a 420 SF addition, and use of 574

SF of space from existing residence to create a 994

SF accessory apartment on a 0.35-acre parcel

having SBL# 064.19-1-29 located in an R-3 Single

Family Residential District under Sections 350-12

and 350-50 of the Code of the Town of Webster

which was seconded by Mark Giardina.

VOTE:

Mr. Anderson AYE

Mr. Kosel AYE

Mr. Malta AYE

Mr. Meixell AYE

Mr. Casciant AYE

Mr. Giardina AYE

Mrs. Maltman AYE

(Mark Giardina read the fifth application):

SPLASH CAR WASH 1-YEAR EXTENSION; Located at 1013 Ridge Road. Applicant Fox Five LLC)

is requesting a 1l-YEAR EXTENSION OF FINALSITE PLAN APPROVAL (

PUBLIC HEARING

)

associated with the construction of a 7,000 SF car wash on a 2.16-acre parcel having SBL# 079.15-1-

16.003 located in an MC Medium Intensity Commercial District under Sections 269-17 and 350-18 of the

Code of the Town of Webster.

Appearing before the board was Anne Riley and I am here representing the owner of the

property. You might remember, we came here last year for an extension as well. We are still in

Pg. 136 September 3, 2024 Planning Meeting

litigation. | thought we were getting close and then the attorney for Splash left and a new

attorney came and trying to gel up to speed. So, we need to get another extension because we

don’t want to lose our approvals, We are probably going to be marketing the property again

once we resolve this litigation.

Anthony Casciani

You are aware....actually why this is put in the code years ago because of

things changing. Since this was in, we have had a couple new ones in the general area of car

washes. I am ok with giving it another year extension, but I think this should be the last one

after this because there has been significant changes in regard to car washes so, if everyone is in

agreement with that, we can give them another year extension. Ok, that will work. You can tell

them, it’s only fair. That was the reason for that part of the code so. If they come in again, that

would be 3 extensions. That is a little extensive.

RESOLUTION 24-0045 Anthony Casciani made a motion for 1-YEAR

EXTENSION OF FINALSITE PLAN APPROVAL

Located at 1013 Ridge Road. Applicant Fox Five

LLC) is requesting a 1-YEAR EXTENSION OF

FINAL SITE PLAN APPROVAL (PUBLIC

HEARING) associated with the construction of a

7,000 SF car wash on a 2.16-acre parcel having

SBL# 079.15-1-16.003 located in an MC Medium

Intensity Commercial District under Sections 269-

17 and 350-18 of the Code of the Town of Webster

(this will be the last extension )which was seconded

by Derek Meixell.

VOTE:

Mr. Anderson AYE

Mr. Kosel AYE

Mr. Malta AYE

Mr. Meixell AYE

Mr. Casciani AYE

Mr. Giardina AYE

Mrs. Maltman AYE

(Mark Giardina read the sixth application):

WATERVIEW APARTMENTS PHASE 3: Located at the northwest corner of Willow Point

Way and Nautical Mile Drive. Applicant Legacy Development Co., Inc. is requesting SKETCH

PLAN REVIEW associated with the proposed construction of (2) 3 story, 45-unit apartment

buildings on a 13.52-acre parcel having SBL# 093.06-3-64.11 located in an MHR Medium-

High Residential District under Section 350-14 of the Code of the Town of Webster.

Appearing before the board was Chris Nadler and 1am general counse] for Mark Four

Enterprises, and ] am here tonight with Chris Demarso, President and owner of Mark Four and

Pg. 137 September 3, 2024 Planning Mecting

David Cox from Passcro, our design engineer.

As many of you may have remembered this project was approved in the 1980's for an 8 story,

150 unit midrise apartment building. We have come back multiple times since then and most

recently in 2017 for a scaled down 5 story apartment building. At that time, we submitted a

traffic study that showed that the proposed development would not have a noticeable impact at

McEwen and Bay and would not have noticeable impact at Willowpoint and Bay. We have

submitted a line of site study in 2017 showing that no views would be impacted with a 5 story

building as well as many other environmental reports and I am sure the town has them on file

and will be updating as needed.

We have met with the town supervisor and the town planner and are here today to present a

much a significantly reduced project, 2-3 story buildings with 90 apartment units and we are

proposing to create a thirteen acre parcel on which the 2 -45 units would be located. It’s 6.8

units per acre which is allowed by the MHR zoning code. A primary access will be onto

McEwen Drive. David Cox from Passero is here to present the technical details and then we

can both answer questions and get the boards feedback and any suggestions.

David Cox with Passero Associates

So, as Chris mentioned, that original plan was for a bunch

of town houses in the front of the property and then that large 8 story building or 7 story

building in the back here so that was always part of the overall planned development for this

project so, it was to be broken up in phases. This last piece in the back was phase 4 and that

was the last phase and that is why we are here for is to complete that last phases.

From the beginning it was always contemplated to have a larger building back here and this

plan actually has a 158 units in this big building in the back here. On the aerial photo, you can

see all the town houses have already been developed and that last piece is what it’s still vacant

and that is where....you know, instead of having one large building 150 units, now it’s just two

buildings with 45 units each for a total of 90 units and a definite decrease and also just 3 stories

so bringing it down from 7-8 stories, down to 3 stories and a 158 units down to 90 units and

also there are other projects in Webster that I have personally designed over my years and I just

wanted to take a look at those and see and they are actually somewhat similar. So, thts is Picture

Parkway (HE IS SHOWING PLANS FOR PAST PROJECTS HE HAS DONE) This is off of

Hard Road here where there is a bunch of 4-plex’s and surrounded by a large building and it is

72 units so a very similar project where we have smaller buildings and a larger building up

front. We have Winding Creek Woods, very similar where we have a bunch of town homes

down here and then we have a grouping of larger buildings. So, these are 5 buildings and there

is a 130 units in this area and a pretty dense, pretty small area and we have a 130 units grouped

there, so similar and then we have Webster Green behind Brusters and once again, we have

town homes and then two larger buildings in the back here and each of these were approved for

60 units so a $20 units right here in this tight little area and this actually got approved at 12

units per acre. So, that is almost double at what we have at 6.8 units per acre, So, just on these

projects, ] personally designed a very similar style of nothing smaller, townhomes or buildings

like that, 1-2 or 5(1 CAN NOT REALLY HEAR HIM. NOT USING THE MIC) larger more

Pg. 138 September 3, 2024 Planning Mecting

dense units. So, a little blow up area here. We have McEwen Drive to the north here so there is

already an existing access point off of McEwen which we will be utilizing for our access that

comes into the property and we have Maritime Drive that is the one that ties into McEwen, so

we are going to tie into that for the first building. We have parking on two sides. These

buildings to have garages and we have (10) garages, so they have (5) on each side so there is

some garage space for these units which is a very nice amenity, These are higher end market

rale apartments and then the other building, lower building will come off of Willow Point Way

and have an access there and providing parking on two sides again. Same thing with those

garages.

So, we are at about !.6 parking spaces per unit, and [ will point out that the original design up

here has planned for 1.5 spaces per unit so that is very much in keeping with what we have

proposed here and then as far as, just kind of an elevation view, here is a rendering of what the,

you know, conceptually of what the buildings will look like so a nice modern style looking

building and we do have a flat roof so that will be a very similar height to a 2 story single

family house with a pitched roof or a 2-story town home with a pitched roof so really similar

height in keeping with surrounding buildings in the neighborhood as well as fits in with code.

So, code is a max of (3) stories so we are within code of that so no issues there and really

tonight we are at the conceptual sketch plan, so we really wanted to get feedback from the town

and that is why we are here to see if we needed to make any modifications, changes and really

looking for the boards input on this, but this is a great project and there is definilely a need for

diversity of housing stock. [know Webster a growing area and a great place to live. 1 moved

here in 2015 because it is just a “really where life is worth living” and a great town. A lot of

trees, the bay, the lake. Webster has a lot to offer, and I think people Know that and like to

move here so with that, we can take any questions that you may have.

John Kosel

How many bedrooms are these units going to have?

David Cox

How many variances?

John Kosel

Bedrooms.

Chris Nadler

It will be a mix of 1,2 and possibly a few 3 bedroom units.

John Kosel

Because with | point whatever car spaces per unit and if you have a 3 bedroom one

and you have a couple living with two of their kids, there could be 4 cars there, possibly 4 cars.

Chris Nadler

That is possible, and we actually regulate that through the terms of our lease

where we are not going to allow a couple to Iet there adult children with vehicles

without....they would have to get a separate unit. We regulate that through our lease.

Interestingly we did a parking analysis of our properties and there is 2000 units throughout the

county and what we need for our tenants and guests and service providers are 1.2 spaces per

unit and this project we are supplying 1.5, oops... 1.6.

Pg. 139 September 3, 2024 Planning Meeting

David Cox

It is a high ratio of (1) bedroom apartments.

Mark Giardina

The colored sketch of the apartments that you are planning, those are the colors

that you are going to use. The black and orange, excuse me, yellow/orange referring to this.

(HOLDS UP THE PICTURE OF THE APARTMENTS)

Chris Nadler

I] think some of that ts wood, wood feature not orange.

Anthony Casciani

I think by the time this project gets there it will look a little different than

this. So, lets leave it with that. To me, the biggest issue with this is going to be the variances

that you are going to need. You will need variances on this. That one part, what was that about

8 foot or something or 16 foot from the property line, that Is going to be an issue. We met last

week when and we did discuss and there was a little controversy going on about the number of

units per acre. You are combing the two parcels of land, and I know that I wasn’t positive on

how that worked in a situation like this. I did do a little research on it and actually you are

correct, in saying that, yup, because looking up the Town Engineer in the past has looked at

Sites like this in similar situations and has agreed that you use the entire parcel, even though it is

not usable, it’s wetlands; epode; this that and the other .... DEREK ANDERSON SPEAKING

OVER. Is there a written policy on that?

Anthony Casciani

I don’t know if there is a policy on that but that ts what the town accepted on

other projects.

Derek Anderson

| realize that is what they accepted in the past.

Anthony Casciani

The Town Board never changed it.

Derek Anderson

| know the actual wording literally says, maximum 5 units per acre. It doesn’t

say average. It says maximum.

Anthony Casciant

Per acre.

Derek Anderson

They are saying that they have 8 units per acre. So, that is greater than

5. Anthony Casciani: What do you have, 13.5 acres,

Chris Nadler

We have 13.1 acres.

Derek Anderson

But the code specially says maximum of 5 untts per acre.

David Cox

It is 8 units per acre.

Pg. 140 September 3, 2024 Planning Meeting

Derek Anderson

Which is what you have which is greater than

5. The code says 5 units per

acre.

Chris Nadler

No, it says 8,

Josh Artuso

Yes, [am pretty sure it says

8. Chris Nadler: Either way, one of the nice things about this, is that the development is focused

up at the top of the hill, completely away from the environmentally sensitive areas.

DAVID COX APPROACHED THE BOARD TO SHOW WHAT THE CODE SPECIFICES.

Derek Anderson

So, that is different than what is on line.

David Cox

| printed this from home.

Derek Anderson

If that is how it is now, when I looked at it earlier, the version that I saw

online literally said 5. 1 don’t know why because we don’t have a printed book anymore, we

only have what is available on line. But, if you specially add 8, that exact number .

Chris Nadler

We are at 6.8 and we are allowed

8. Derek Anderson: Right but what you are doing is averaging it over the entire parcel. So, my

question is, this thing says 8 per acre, the way | read that when il says 8 per acre is that’s it and

you said you have 13.1 acres, but you are doing an average of 13.1. You have a parcel, but it

says maximum per acre, 8 per acre TWO PARTIES SPEAKING AT THE SAME TIME

It is not 13 acres. You can’t, you are....it’s the way that it’s written, it says 8 per acre itis not an

average of 8 per acre it says a maximum of 8 per acre. What you are doing is an average of 8

per acre. You are taking the entire 13 acres, and you are saying 18 and therefore I get 90 units

or whatever, I can put in there and 1 am only putting in half of that. That is actually an average

of the entire acreage that is covered. The way the code is written it says

8. So, what Tam

asking, is even though the town has done this before is there been any kind of written policy

that says we have administratively determined that when if says maximum that we actually

mean average. I have not seen anything that supports that.

Chris Nadler

1 will tell you it’s NY State case law that defines tt per parcel essentially, ] guess

what you are defining it as, as an average but I think...I am sure Mr. Taylor and Mr. Genesse

can work that out.

Derek Anderson

We would need something that supports that because I understand that it has

been allowed in the past and had higher densities on other areas but with the way the wording

actually is it says a specific number per acre. What you are giving us is an average for this

entire development. Then the other question I have in relation to that is that the back portion of

this parcel, when this original development has come in and by the way, | have never seen it,

Pg. 141 September 3, 2024 Planning Mecting

any previous approval drawings even though I requested them, I have never seen any of the

previous approval drawings phase for this project. This project is from 1988, things have

changed significantly environmental wise. You have an environmental protection overlay

districts that cover the CAN NOT UNDERSTAND WHAT IS BEING SAID this entire parcel.

You have a forested protection area that also covers most of this parcel. You are also still in,

you are now in the waterfront, the LWRP which is also new from when this thing was done in

1988, so you have a whole new set of environmental regulations that have to be complied with,

with this development. So, the other discussion is, is that all this area in the back that they are

claiming is that you can do an average of development on it’s really not developable. So, does

that really count for the total......

Anthony Casciani

The Town Engineer said that the issue was discussed at a conceptual stage,

the town has to look at the entire site in the MHR zoning district. It is not like eliminating

wetlands; steep slopes; as far as establishing density.

Derek Anderson

I don’t know what that is in regard to.

Anthony Casciani

What’s that.

Derek Anderson

What is that in regard to.

Anthony Casciani

It was some minutes from another meeting.

Derek Anderson

Ok, I don’t know the context of that.

Anthony Casciani

This is what it is saying...

Derek Anderson

This board right now, for the application as it is in front of us, it seems to me

that we have to take into consideration if there is a huge portion of the parcel, you really only

have about 3 acres of this thing that is not in this area that is now protected by the various

overlay districts and so forth within the land and the town has given me copies of those overlay

districts.

Anthony Casciani

You know what, this............ BOTH PARTIES SPEAKING AT THE

SAME TIME

Derck Anderson

Can those overlay districts really be counted towards... ..1t’s not developable

land

Anthony Casciani

This is a question.,..actually, you brought this up and | am just looking at it

here. Mr. Anderson raised a question about the density of the development.........

Derek Anderson

| have always questioned it, and [never really got an answer mainly because

we were never given the final approval plan for phase |, 2, and

3. We have never seen any of

Pg. $42 September 3, 2024 Planning Mecting

those things even though they have been requested but as a board we have not received any of

those things. So, we don’t have anything to go on.

Chris Nadler; Derek, you are looking at me like I failed to give you

Derek Anderson

No, I am just letting you know because you are the applicant.

Chris Nadler

I don’t have stuff from 1985.

Derek Anderson

You have that one plan which is very interesting because we have never seen

that before. The other thing [ do notice, because I have driven in the area and took a look at it is

that it looks very much like you have this parking lot for eastern unit right in the middle of the

storm water detention pond for the rest of the facility. There is an outlet structure there is

cattails and that doesn’t show up on your plans. That is another change that has happened since

1988 is all the stormwater protection requirements. If your remember back then, that stuff was

not really in place.

Anthony Casciani

Ok, why don’t we do this, you have some good points, and I think maybe

the thing to do 1s maybe why don’t you outline them, take them into consideration at this point

and then we can address these things because there are some unknowns here that we are just

bewildered with.

Derek Anderson

I think as a board we have to have an understanding and discussion amongst

ourselves to about we have these areas that have been identified as places that should be

protected. How as a board are we going to have interpretation to work towards this.

Anthony Casciani

Well, the areas to be protected that certainly are...this here, the upper flat

plateau of the overall parce! which goes all the way down to Irondequoit Bay. That is an epode,

wetland and everything else. That is all protected area. So, there is nothing going in that area.

Derek Anderson

Right, but what they are doing is they are claiming acreage lo apply towards

the total development. So, the ultimate question is, is that legitimate? You can’t develop it so

why would it count. BOTH PARTIES SPEAKING AT THE SAME TIME. ..clarification of

Anthony Casciani

Based on past in an MHR, we have accepted it so that is where Iam going

with this. Is it right, 1 don’t know.

Derek Anderson

But we have never had this type of environmental overlay.

Anthony Casciani

Correct, so that is why I am saying......

Derek Anderson

This is unique, so this is something...

Pg, 143 September 3, 2024 Planning Meeting

Anthony Casciani

Why don’t we let them check into that and come up with a solution to that.

Would that be the answer.

Kyle Taylor

Derek, your point is noted and certainly the applicant and council and [ can take

up that conversation and get a resolution.

Anthony Casctani

Good. Alright, | know there are some neighbors here | am assuming. This

is not a public hearing............

Derek Anderson

Well, there is one another point though, in the presentation you referenced the

traffic study that was done on the previous 2017 plan, that traffic study showed that this

intersection fails and at that time the argument was made that it failed so therefore we can put

whatever we want because it’s fatled anyway. That is not a legitimate argument.

Chris Nadler

The traffic study and what we said about it, what the traffic study says is that, in

2017 and I am assuming it has been corrected but ] may be wrong, the east bound lane failed

not the intersection.

Derek Anderson

The intersection coming out of Willow Point failed going into Parkside.

Chris Nadler

It did not say that.

Derek Anderson

That was definitely a take away from that traffic study and anyone who

travels up and down Bay Road and tries to get in and out of Parkside and tries to get in and out

of Willow Point, they know it has failed because you can sit there for 5-10 minutes trying to

make a left and turn out of there before you get a chance to get out of there. So, that intersection

has failed. BOTH PARTIES SPEAKING AT THE SAME TIME

Chris Nadler

We will take a look at that. BOTH PARTIES SPEAKING AT THE SAME

TIME.

Derek Anderson

The recommendation 1s not simply it failed so there for we can make it fail

worst.

Anthony Casciani

I think ultimately there is going to need to be a traffic study done.

David Cox

Yes, we are going to.

Anthony Casciani

That many units and that much traffic. I] think we are all in agreement to

that. That would be down the road. Good points that were brought up. You know what, this is

not a public hearing for the record so it’s not open for public speaking, however, 1 know there

are some people here and are interested in the site...if a few on you want to come up, 2-3

people and I just don’t want to gel repetition going. Come up and just give us your name and

address and maybe you can help us out to.

Pg. 144 September 3, 2024 Planning Meeting

Dave Grier at 400 McEwen Lane: | am a direct neighbor to the property. Lam very concerned

at exactly what Mr. Anderson talking about with grouping, grouping for convenience sake with

all the acreage together but then not being able to utilize the acreage and actually that property

with all the overlay zones. There is a beaver pond at the bottom and a run off that is going to

come off of that and Lam very concerned about shoe herning the property of the building inte a

much smaller area. [know the Planning Board is really concerned about the esthetics of the

project and Lam concerned that it will not reflect well on what we are trying to do in Webster

because we are jamming inas many units ay possible. The last attempt that Legacy put in,

submitted was for 98 units, this attempt is for 90 units and a lot of concern about parking. The

town code as you know, is two units plus no over flow parking so 225 units of parking and they

are looking at a 144 units for parking and I am not sure where those other 81 people go but I

am concerned it will be by Mr. Johnson's and my home, so 1 am concerned about the esthetics

and of course how many tnits they are trying to jam in this area. If we went with how big this

area is 3.76 acres, we really should be looking at putting something like 30 units in that area

and that should be the maximum.

Anthony Casciani

Ok, thank you.

Charlie Johnson at 440 McEwen Lane: Which is directly behind the property. Acttatlly, it is the

last property right before the pumping station. (VIEWING PLANS ON THE SCREEN) So,

obvisioyly we are looking directly out at the back of this structure. Again, | am not expert at

reading these but in terns of the tree line itself and in terms of what they were taking down and

what they were going to keep, that existing tree line stops, | think, at the measurement they have

for the property next door to mine and maybe you would have te zoom in there. So obviously

what | am talking about is what we are actually looking at. We also have children, two

children that have to walk up Mc Quen Drive to Bay Road to take the bus everyday just like Mr.

Grier indicated, just from a pure volume standpoint, even now trying to make a left turn onto

Bay Road going to work every day and every morning ts a challenge. | don’t know what is

going to happen with Willow Point but if the are saying that McQuen is the primary road that

they want to use, that has avery high impact on quality of life. The last part is, and lam not

sure how this works but access to the interior parts of the building. If there ts an isstte in-

between those buildings, | don't know how emergency equipment gets in there.

Anthony Casciani

That is resolved with the Fire Marshal.

Charlie Johnson at 440 McEwen Lane: With that structure, do that go through that little peak

there or do they come back to McQuen...how would they access that?

Anthony Casctani

That would have to be controfled by the Fire Department. They would have

to review that part.

Charlie Johnson at 440 McEwen Lane: And then niy last question, it’s more of a zoning or

VETTANCE ISSUE.

Pg. 145 September 3, 2024 Planning Meeting

We don’t have a measurement to our property to the back of the dwelling, so I don’t know if

that is a 100 feet or if it's the property line or if it is the actual dwelling itself that is a 100 feet

from the next district.

Anthony Casciani

Ok, thank you. [think the best way to handle this is to review some of these

questions that were brought up and address. We have done this in the past I don’t know if we

were wrong in doing it, | don’t know by including those parcels into the overall equation and

then using part of it. [know that in a cluster development you don’t add that land in but my

understanding in an MHR you do add it in. I don’t know if lam right or wrong. That is my

understanding of what we have done.

Chris Nadler

I will tell you as we have reviewed the code entirely, after our meeting because it

came as a surprise to me, it is in compliance with code to use the entire 13.1 acres. It is what

your code says so you can’t read anything else, developable acres, you can’t read in the stuff we

want to develop or not want to develop, it’s just what the code says and they way you have been

doing it apparently is the right way and it is what your code says and that is all you are allowed

to follow. No matter what you want.

David Cox

And I can say, from the 3 projects that I have previously did, none of the wetland

areas, all 3 of them had wetland areas, the wetland areas were not taken out of that calculation.

Anthony Casciani

In this type of case like the MHR ?

David Cox

Correct and all 3 were in the MHR.

Anthony Casciani

Well again, | am reading, and this was one of the comments from the Town

Engineer at the time stating that and that is what we based our information on but lets get it

clarified 100 % and you can talk to our town attorney and see if you can get some

documentation on this. Another thing I would like to before I forget, is coming off of Willow

Point Way and I know there was an issue with people in there something a law suit or

something whether you could use it or not. 1 know it can’t be blocked but that was the last that

I understood.

Chris Nadler

The town ordered that it not be blocked. We have access to a public road that is

sufficient, and we will show that with an updated traffic report.

Anthony Casciani

Ok, f think those are the fittle things that we need.

Derek Anderson

So that would give them permission to build across private property?

Chris Nadler

Excuse me?

Derek Anderson

| am thinking back to the conmment, the biggest argument that the people at

Willow Point have was that this is our private property and that you are proposing a

Pg. 146 September 3, 2024 Planning Meeting

development that goes through our land and again, the last time I was here it was never totally

resolved so I’m curious, by some kind of agreement, lawsuit, court order, given permission to

go through Willow Point?

Chris Nadler

What I said was, we have access to a public road, McEwen that ts sufficient to

handle all of the traffic from this.

Derek Anderson

Right, what about limiting access to going through Willow Point?

Chris Nadler

That ts not our intent,

Derek Meixell

Your second building exclusively goes on Willow Point Way from what I can

see.

Chris Nadler

We own Willow Point Way at that point .

Anthony Casciani

So that parcel back in the 80’s when this was originally approved, the

entrances were off of Willow Point. They have had to been. Also, McEwen but....right?

Chris Nadler

That is exactly correct.

Anthony Casciant

Alright, if you can just get some documentation showing that.

Chris Nadler

Sure, we can absolutely do that.

Anthony Casciani

| see what you have their Dave, but I think you should do something in the

letter form, a checklist of different items.

Chris Nadler

Ok, we can do that. Well, thank you very much.

MRB

Tony, ] just want to confirm that you are looking for...Planning Board members and the

other staff from the town to provide any follow up comments/concerns so that the applicant can

address them?

Anthony Casciani

Yes

MRB

I just wanted to be sure we were clear on that as well.

Anthony Casciani

lam sure that Engineering is going to have some....Is there a PRC meeting

this week so more than likely this would be part of it.

Josh Artuso

Yes

Pg. 147 September 3, 2024 Planning Mecting

MRB

So, there would be further comments coming to you. More than what was already

discussed. So, I just wanted to make sure that we identified that those comments would

becoming to you so you could address them and either on the drawing and as well, written

form.

Chris Nadler

Great, thank you very much. We appreciate it.

Anthony Casciant

Ok what else, are you scheduled for the Zoning Board?

Chris Nadler

Scheduled for the Zoning Board next weck.

Anthony Casciani

Well, I guess that is all we can really do tonight. I think we have a start in a

direction. I think we just have to verify it that’s all.

Chris Nadler

I think there is a lot of information that a full set of site plans would tell this

board that will elevate a lot of concern. An updated traffic report I think that will elevate a lot of

concerns and we will go from there.

Anthony Casciani

Thank you for coming. Now the way this process will go is when they come

in again, I don’t know, the next stage maybe just another review like this. Ultimately than there

is a preliminary hearing and if and when it gets to that stage, that is the public hearing and that

is when you can get up and speak and so on but then we will all know a little bit more of what is

going on.

Audience member speaking out loud, NOT AT THE MIC regarding lots.

ADMINISTRATIVE ITEM

No Minutes were approved.

With no other applications before the Board this evening Anthony Casciani concluded tonight’s

meeting al 8:30 PM.

Respectfully Submitted,

sina M4, / Smet _ _ Dated A/oV (2, 2O2€

Mark Giardina, Secretary

Katherine Kolich, Recording Secretary

NOV 14°24 PH?! 40

FILED WEBSTER TWN CLK

Drone (V WWladL

Pg. 148 September 3, 2024 Planning Mceting