Planning Board Meeting
Planning Attachment 2024.10.01

2024 10 01 Tow Planning Board Meeting Site Plan Revisions

October 1, 2024 · 5 min read · extracted text · View original

Site Plan Revisions Presentation to the Planning Board 10/1/2024 Classified - Confidential

With you today… Project Team Contents • Project Refresh • Progress Update

Darren Ward

Ed Burger

TBD

Sr. Director, Engineering

Sr. Director, Project Management

Public Affairs

Josh Hough

Marie Stalewski

Director, Lead Civil Engineer

Director Of Project Development

• Review of Specific Site Revisions • Questions

2

Classified

Confidential

Project Refresh The production facility will be ~785K sq. ft., which includes production, warehousing, and office space and will sit on a 110-acre property The facility will employ approximately 250 positions inclusive of management, engineering, technicians, operators, and admin roles (HR, Training and Safety, Continuous Improvement and Finance) 5M+ lbs. of dairy per day will be sourced from local milk co-operatives (typically sourced within a ~100-mile radius of the plant)

3

Classified

Confidential

Project Update (Looking West)

4

Classified

Confidential

Project Update (Looking East)

5

Classified

Confidential

Review of Specific Site Revisions • Item #1 – Removed the Scale Building and Added Direct Tanker Exit

ITEM #5

• Item #2 – Moved the Truck Guardhouse ITEM #3

• Item #3 – Reconfigured Trailer Spaces and Removed Curve Truck Drive • Item #4 – Wastewater Pre-Treatment Design Development

ITEM #6

• Item #5 – Landscape Berm Increased In Width • Item #6 – Improved Exterior Courtyard Design

ITEM #1 ITEM #2

• Item #7 – Perimeter Drainage ITEM #4

6

Classified

Confidential

Item #1 – Removed the Scale Building and Added Direct Tanker Exit Revisions / Improvements

SCALE BUILDING

•

Reduced tanker stops and starts at scale building

•

Reduced the truck drivetime on the site (Reduction of 3,915 LF of truck movements)

•

Reduced the building SF of the Site (Reduction of 5,742 SF)

•

Milk Tankers do not have to travel back to the Guardhouse to exit the site

•

Improves safety by reducing milk tanker and finished goods trucks interaction

Original Layout

Revised Layout

7

Classified

Confidential

Item #2 – Moved the Truck Guardhouse Revisions / Improvements:

TRUCK GUARDHOUSE

Original Layout

•

Truck Guardhouse remains the same

•

No truck staging on Tebor Road or in the snow plow turn around

•

Reduced concrete pavement from the south side of the site

•

Reduced the truck drivetime on the site

•

Reduced the lanes at the Guardhouse from 2 lanes to 1 lane to improve safety

•

Diversity of tankers revised from 100% super tankers to 50% super tankers / 50% regular tankers

•

16 tanker staging positions before the Guardhouse and 1 at the Guardhouse. Total of 17 positions which matches the approved site plan

TRUCK GUARDHOUSE

Revised Layout

8

Classified

Confidential

Item #3 – Reconfigured Trailer Spaces and Removed Curved Truck Drive Revisions / Improvements:

Original Layout

•

Reduced concrete pavement from the northeast side of the site.

•

The landscape berm and sound wall to the west remains the same size

•

The docks shift to the west 110’

•

No wetland impact determined by the NYSDEC and USACE

•

Reconfigured trailer parking spaces and docks west, while maintaining the same number of trailer parking spaces.

Revised Layout

9

Classified

Confidential

Item #4 – Wastewater Pre-Treatment Design Development Revisions / Improvements: •

General site location remains the same in the southwest corner

•

Discharge rates and flow characteristics remain the same

•

The Wastewater PreTreatment Building and Tank design has been further developed

•

Reduced the SF for the PreTreatment Building (Reduction of 8,874 SF)

Original Layout

Revised Layout

10

Classified

Confidential

Item #5 – Landscape Berms Increased In Width Revisions / Improvements: •

Trees added to the northwest corner to improve screening

•

Height of berm remains the same or increases in height

•

Improved visual experience for employees and guest entering the site from the western berm with a more natural shape (non-geometric)

BERM (6’ HEIGHT)

BERM (6’ HEIGHT)

BERM (9’ HEIGHT)

BERM (9’ HEIGHT) BERM (8’ HEIGHT)

BERM (8’ HEIGHT)

BERM (7’ HEIGHT)

BERM (8’- 9’ HEIGHT)

Original Layout

Revised Layout 11

Classified

Confidential

Item #6 – Improved Exterior Courtyard Design Revisions / Improvements: •

Added concrete sidewalks from the Main Office break area to the ASRS break area.

•

Improved landscaping in the employee courtyard for improved experience

•

Improved grading to create elevation differences to mimic natural topography

•

Reduced the building SF for the Employee Pavilion (Reduction of 1,543 SF)

Original Layout

Revised Layout 12

Classified

Confidential

Item #7 – Perimeter Drainage AREA DRAINS TO EXISTING DISCHARGE POINTS (MATCHES EXISTING)

AREA DRAINS TO EXISTING WETLAND (MATCHES EXISTING) AREA DRAINS TO EXISTING LOW AREA (MATCHES EXISTING)

MAIN PROPERTY DISCHARGE POINTS PERIMETER DRAINAGE TO STORM POND (REDUCES PERIMETER DISCHARGE)

AREA DRAINS TO EXISTING SWALE (MATCHES EXISTING)

AREA DRAINS TO PROPOSED POND (MATCHES EXISTING FLOWPATH)

AREA DRAINS TO EXISTING SWALE (MATCHES EXISTING)

AREA DRAINS TO INTERNAL DRAINAGE SYSTEM

AREA DRAINS TO EXISTING RR SWALE (MATCHES EXISTING) Classified - Confidential

13

End of document