242 West Main Street, Suite 100 Rochester, NY 14614 585.325.1000 | passero.com

June 13, 2024 Attn:

Mr. Joshua Hough, P.E. // Director, Group Lead Engineer - Civil

Re:

fairlife Dairy Plant (Project Izzo) Development Basket Road, Webster, NY Evaluation of Potential Traffic Impacts from Site Plan Modification Passero Project No: 20233605.0002

Haskell Architects and Engineers, P.A.

Dear Mr. Hough

The following letter provides an update to the August 2023 Traffic Impact Report (TIR) in response to Town of Webster concerns related to the recent Site Plan modification which provides an on-site wastewater pretreatment area. This letter addresses any potential traffic impacts that may result from the Site Plan modification.

1. SITE PLAN CHANGES The Site Plan modification includes an on-site wastewater pretreatment facility located at the southwestern corner of the site. The wastewater pretreatment area will operate 24 hours per day, seven days per week. Access to the wastewater pretreatment area will be provided via the fairlife facility truck driveway on Tebor Rd as shown below. The modified Site Plan is attached.

Wastewater pretreatment area

The site will continue to provide space to queue 15 trucks without spilling back into Tebor Road.

fairlife Dairy Plant (Project Izzo) Development, Webster, NY Evaluation of Potential Traffic Impacts from Site Plan Modification Project No: 20233605.0002 June 13, 2024

2. TRIP GENERATION The August 2023 Traffic Impact Report (TIR) analyzed trips generated by the fairlife facility including employee and truck trips. The on-site wastewater pretreatment area will result in additional truck trip generation. It is anticipated that 40 trucks per day will be required to remove sludge from the wastewater pretreatment area. The arrival and departure times of the trucks is based upon process flows from the facility. If the truck trips are evenly distributed over a 24 hour period, the increase in peak hour truck trips is approximately 2 trucks entering and 2 trucks exiting the facility.

3. EVALUATION OF ADDITIONAL TRUCK TRIPS The August 2023 TIR analyzed the traffic impacts of the proposed fairlife facility with truck trip generation of 200 trucks per day entering and exiting the facility. The Site Plan modification results in additional truck trip generation of 40 trucks per day operating 24 hours per day. The small increase in truck traffic associated with the wastewater pretreatment facility of 2 entering and 2 exiting trucks during the peak hours is not expected to have a significant adverse impact on traffic operations at the study area intersections. Even if the trucks are more concentrated such that the peak hour truck trips increase by 5 entering and 5 exiting trucks, no significant adverse traffic impacts are anticipated. The conclusions and recommendations contained in the August 2023 TIR remain valid. Please feel free to contact me directly with any questions. Sincerely, Passero Associates Amy C. Dake, P.E., PTOE Senior Managing Traffic Engineer adake@passero.com • 585-314-5078 Attachments

Page 2 of 2

A

B

C

BASKET ROAD (COUNTY ROAD 4)

(A 66.00' WIDE PUBLIC R/W)

BOULTER INDUSTRIAL PARK

(A 66.00' WIDE PUBLIC R/W)

PROPERTY LINE

50' BUFFER

9'X20' PARKING STALL - AUTO 8'X20' HANDICAP STALL (250 SPACES)

STORMWATER MANAGEMENT FACILITY #2 (74,161 SF)

X

X X X

2

X

50' BUFFER

X

DECORATIVE FENCE W/ CURVED TOP

NY York Super Tanker

QQ

NY York

er Tanker Super Tan ker

X

NY Yor k Super Tanker

Super Tan ker r Tanker

X

r Tanke

OU

STA

C (TAX AC

X

NY York Super Tanker

NY York Super Tanker NY York Super Tanker

X

X

UTE O R E T

104

AILR R L A R

X

OAD

X

20' UTILITY EASEMENT (ELEC. & GAS)

0 NT NO.

X

NY York Super Tanker

NY York Super Tanker

TRUCK GUARDHOUSE

NY York Super Tanker

NY York Super Tanker

584.33'

FER

E N T 88) C K R -0 YO 66.03-01

r Tanker

NY York Supe

NY York Supe

100' BUFFER

QQ

12'X60' TRAILER PARKING (48 SPACES)

PROPOSED BUILDING (50' MAX HEIGHT) FFE = 414.25

EMPLOYEE PAVILION

PROPOSED ASRS BUILDING (120' MAX HEIGHT) FFE = 414.25'

48" DOCKS (20 SPACES)

PROPERTY LINE

25' BUF

R NEW

X

NY York

k Supe r Tanke r

NY Yor

100' BUFFER

FUTURE BUILDING

211.98'

3

FUTURE 20' EASEMENT FOR MONROE COUNTY ROUTE 104 TRAIL EXTENSION

PROPERTY LINE

QQ

DECORATIVE FENCE W/ CURVED TOP

50' BUFFER

20' PUBLIC SEWER EASEMENT DEDICATED TO THE TOWN OF WEBSTER

EXISTING SWALE

100' BUFFER

PROPERTY LINE

DRY SWALE (TYP)

LANDSCAPE BERM (6-8 FEET HIGH) W/ DECIDOUS AND EVERGREEN TREES

100' BUFFER

FUTURE BUILDING

PROPERTY LINE 48" DOCKS (8 SPACES)

12'X60' TRAILER PARKING (103 SPACES)

100' BUFFER

4

0

150

300

FOR WASTEWATER PRETREATMENT AREA (DESIGN DETAILS), REFER TO PROJECT WEBSTER WASTEWATER (HASKELL PROJ. NUMBER 6710057201).

WASTEWATER PRETREATMENT SITE

VARIANCE THREE (3): PLACEMENT OF THE 8' HORIZONTAL WOOD SLAT FENCE WITH DECORATIVE ALUMINUM POSTS WITHIN THE BUFFER AREA ON THE WEST SIDE OF THE PARCEL.

VARIANCE TWO (2): INCREASE THE BUILDING HEIGHT FOR THE ASRS SECTION FROM 50' MAXIMUM TO 120' MAXIMUM. INCREASE THE SILOS FROM 50' TO 102' FOR 13 SILOS AND 50' TO 113' FOR 36 SILOS.

VARIANCE ONE (1): PLACEMENT OF THE 14' DECORATIVE PRE-CAST CONCRETE SOUND WALL WITHIN THE BUFFER AREA ON THE EAST SIDE OF THE PROPERTY.

THE FOLLOWING VARIANCES WERE APPROVED BY THE ZONING BOARD OF APPEALS AT THE SEPTEMBER 12, 2023.

VARIANCE APPROVAL

PARKING CALCULATIONS

±785,000 SF 18.02 AC. (16.32% COVERAGE)

0.00 SF 00.00 AC. (00% COVERAGE) ±785,000 SF 18.02 AC. (16.32% COVERAGE)

4,8090,167.98 SF 110.40 AC.

© 2023 Microsoft Corporation © 2023 TomTom

151 SPACES

248 SPACES 10 SPACES 258 SPACES

250 SPACES 7 SPACES

50 SPACES

(125 EMPLOYEES + 75 EMPLOYEES) = 200 SPACES

FRONT YARD = VARIES; 250 FT. AND GREATER SIDE YARD = VARIES; 400 FT. AND GREATER BACK YARD = VARIES; 200 FT. AND GREATER

WETLANDS

C-121.1

C-121

PRE-CAST CONCRETE FENCE

DECORATIVE FENCE

FARM FENCE

PROPOSED BUILDING

5

C-125

C-126

C-127

C-124

C-123

C-122

KEYMAP

PROPOSED POND

HEAVY-DUTY ASPHALT PAVEMENT

X

HEAVY-DUTY CONCRETE PAVEMENT

MEDIUM-DUTY ASPHALT PAVEMENT

DECORATIVE FENCE W/ CURVED TOP

HORIZONTAL WOOD SLAT FENCE

EXISTING BUILDING

BERMS

MEDIUM-DUTY CONCRETE PAVEMENT

LIGHT-DUTY ASPHALT PAVEMENT

GRAVEL

LIGHT-DUTY CONCRETE PAVEMENT

FRONT YARD = 50 FT. SIDE YARD = 25 FT. BACK YARD = 100 FT.

PROPOSED BUFFER

SITE LEGEND

100 FT.

50 FT. 20 FT. 25 FT.

80 FT. 40 FT. 80 FT.

PROPOSED BUILDING SETBACKS:

066.03-1-18.11, 066.03-1-27.214, 066.03-1-28.111, 066.03-1-28.113

MULTIPLE

PANEL 36055C0232G DATED 8/28/2008 ZONE X, ZONE AE

INDUSTRIAL (IN)

1886 TEBOR ROAD WEBSTER, NEW YORK

SITE INFORMATION

=

125 EMPLOYEES 75 EMPLOYEES 50 EMPLOYEES

EXISTING PAVEMENT

ADJACENT TO RESIDENTIAL =

DISTRICT BUFFER AREA:

FRONT YARD = SIDE YARD = BACK YARD =

MINIMUM BUFFER:

FRONT YARD = SIDE YARD = BACK YARD =

MINIMUM BUILDING SETBACKS:

PARCEL ID:

LAND OWNER:

FLOOD ZONE:

ZONING:

SITE ADDRESS:

TRAILER PARKING =

PROVIDED AUTO PARKING = PROVIDED ADA PARKING = TOTAL =

PARKING:

REQUIRED AUTO PARKING = REQUIRED ADA PARKING =

VISITORS

TWO LARGEST SHIFTS

1ST SHIFT 2ND SHIFT 3RD SHIFT

PARKING REQUIREMENTS

TOWN OF WEBSTER ARTICLE VIII SUPPLEMENTARY REGULATIONS FOR ALL DISTRICTS, 350-74 OFF-STREET PARKING, (E) (4) MANUFACTURING, STORAGE, OR OTHER INDUSTRIAL FLOOR AREA. PARKING SHALL BE PROVIDED IN SUCH AMOUNT THAT NO EMPLOYEE OR VISITOR NEED PARK ON A PUBLIC STREET.

TOTAL =

BUILDING COVERAGE

(30% MAX.) EXISTING = PROPOSED =

AREA:

SITE COVERAGE CALCULATIONS

PROJECT LOCATION

VICINITY MAP (SCALE: 1" = 5,000')

D SE N E C LI

E PRO FESS I ONA L 02/28/24

RCPI II

TOW - PB SPS

C

05/08/23

05/15/23

05/23/23

06/09/23

07/11/23

08/16/23

09/06/23

09/15/23

09/15/23

10/03/23

11/03/23

JRH

CHECKED BY:

SHEET NUMBER

C-003

OVERALL SITE PLAN

3450044

AE JOB NUMBER

RAE

DRAWN BY:

We hereby expressly reserve the property rights to this drawing and it is not to be reproduced, copied in any format or manner whatsoever without first obtaining our express written permission and consent.

TOW - TB SPS

TOW - ZB VAR

D

B

CPP

F

CPI-FILL

L

CPI-PB

RCPI-PB

K

G

MCWA M

RCPI-PB

RCPI-PB

N

I

RCPI-PB

O

RCPI-PB

09/29/23

FINAL-CPI TW

T

J

09/29/23

REVISED GMP

W

11/17/23

REVISED GMP W

11/17/23

05/02/24

DATE

RCPI-TW

DESCRIPTION

QQ

No

UG

RK H E X C E L S IO R

5

O

HU

4

STOP

E FORM

NY York Sup

FARM FENCE (TYP)

X

20' PUBLIC SEWER EASEMENT DEDICATED TO THE TOWN OF WEBSTER

PROPERTY LINE

SNOW PLOW TURN AROUND

TRUCK ENTRANCE

"SNOW PLOW TURN-AROUND AHEAD" SIGN

(A 60.00' WIDE PUBLIC R/W EASEMENT)

TEBOR ROAD

FUTURE MILK RECEIVING (4 BAYS) FIRE PUMPHOUSE AND TANK FFE = 413.00 50' BUFFER

MILK RECEIVING BAY (9 BAYS)

PHASE 2 BUILDING EXPANSION

DECORATIVE FENCE (TYP)

PHASE 2 BUILDING EXPANSION SILOS (113' MAX HEIGHT)

50' BUFFER

EXISTING EXISTING DRIVEWAY DRIVEWAY

9'X20' PARKING STALL - AUTO 9'X20' HANDCAP STALL (2 SPACES)

AUTO GUARDHOUSE FFE = 404.80'

X

1

EXISTING DRIVEWAY

(A 60.00' WIDE PRIVATE EASEMENT)

PRIVATE ROAD

AUTO ENTRANCE

50' BUFFER

50' BUFFER

○ ○ ○

○ ○ ○

○ ○ ○

○ ○ ○

100' BUFFER

STORMWATER MANAGEMENT FACILITY #1 (82,360 SF)

X

P:\345_Bev\3450044 Project Webster\21DesignWorking\CIVL\03 AutoCAD\03 Revised\Sheets\3450044201C-003.dwg Layout Name: C-003 May 03, 2024 - 11:55am PLOTTED BY: raelrod

3

COUNTY LINE ROAD

JOSHUA R. HOUGH, P.E.

HASKELL ARCHITECTS AND ENGINEERS , P.A. P.C.

CIVIL ENGINEER EW Y E OF N AT A R . H O

FAIRLIFE, LLC (SUBSIDIARY OF THE COCA-COLA COMPANY)

100' BUFFER

ker Super Tan

D

NY York

WETLANDS

NY York Super Tanker

X

BASKET ROAD (COUNTY ROAD 4)

NY York Super Tanker

NY York Super Tanker

PROPERTY LINE

X

○ NY York Super Tanker NY York Super Tanker

LANDSCAPE BERM (6-8 FEET HIGH)

20' PUBLIC SEWER EASEMENT DEDICATED TO THE TOWN OF WEBSTER

○ NY York Super Tanker NY York Super Tanker

2

50' BUFFER

○ NY York Super Tanker

STOP

NY York Super Tanker

1

NY York Super Tanker

○

50' BUFFER ○

STOP

k Supe NY Yor

20' PUBLIC SEWER EASEMENT DEDICATED TO THE TOWN OF WEBSTER

PROJECT IZZO

S

JOS T

NEW YORK

Engineering # 080447

NEER l l l Riverside Avenue Jacksonville, Florida 32202 Phone # (904) 791-4500

98322 REG. NO.

WEBSTER. NEW YORK

NG I

431.39' STOP

r

A

B

C

D

End of document