Planning Board Meeting
Planning Attachment 2024.11.12

Site Plan and Survey

November 12, 2024 · 1 min read · extracted text · View original

09/19/24

LEGAL DESCRIPTION

NOT PROVIDED

C-2

INFINIGY

C-3

500 W OFFICE CENTER DR, SUITE 150 FORT WASHINGTON, PA 19034

NEW SWITCHBOARD

FL2 WEBSTER

NEW UTILITY TRANSFORMER BY UTILITY COMPANY EV CHARGING ONLY

1058 RIDGE ROAD WEBSTER, NY 14580 MONROE COUNTY

EV CHARGING ONLY

NEW CHARGEPOINT POWER BLOCK (TYP. OF 2) EXISTING TREE TO REMAIN

EV CHARGING ONLY

NEW CHARGEPOINT DISPENSER (TYP. OF 4)

EV CHARGING ONLY

TRAFFIC STOP SIGN (REMOVE + REINSTALL)

EXISTING BURIED HV ACCESS POINT

DRAWINGS ISSUED FOR

REV.

DATE

DRAWN

DESCRIPTION

QA/QC

A

06/10/24

RR

PRELIMINARY REVIEW

BB

B

09/10/24

RR

REVISED PRELIM. REVIEW

BB

0

09/10/24

BB

FOR CONSTRUCTION

EP

1

09/19/24

BB

FOR CONSTRUCTION

EP

09/19/24

SHEET TITLE:

OVERALL SITE PLAN SHEET NUMBER:

1 OVERALL SITE PLAN

C-1

22"x34" SCALE: 1" = 10'-0" 11"x17" SCALE: 1" = 20'-0"

10'

5'

0'

10'

THIS DOCUMENT AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF INFINIGY ENGINEERING, PLLC AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR OTHER PROJECTS WITHOUT THE WRITTEN AUTHORIZATION OF INFINIGY ENGINEERING, PLLC. IT IS UNLAWFUL FOR ANY PERSON TO AMEND ANY ASPECT OF THESE DRAWINGS WITHOUT THE WRITTEN APPROVAL OF THE PROFESSIONAL OF RECORD.

REVISION:

1

End of document