WEBSTER TOWN PLANNING BOARD MINUTES

PLACE

Webster Town Board Meeting Room 1002 Ridge Road

TIME

7:00 p.m.

DATE

6 May 2025

PRESENT

ABSENT:

Anthony Casciani, Chairman

Dave Malta, Vice Chairman

Mark Giardina, Secretary

Derek Anderson

John Kosel

Peggy Maltman

Drazen Gasic

Katherine Kolich, Recording Secretary

Frank Ciardi, Attorney

Josh Artuso, Director of Community Planning & Development

Erika Corsi, Planner of Community Planning & Development

Anthony Casciani

Welcome to the May 6, 2025 Webster Planning Board meeting.

Pledge of Allegiance/Roll Call.

Anthony Casciani

If anyone is here for Providence Estate that has been tabled and the Meadows

Two is also off the agenda this evening.

Summary overview of outcome:

TABLED MATTERS

:

SCHEDULED MATTERS

:

1. PROVIDENCE SECTION 9

Applicant

H.G, BUILDERS

Status

APPLICANT REQUESTED TO BE TABLED TO JUNE 3, 2025 MTG.

2. MEADOWS TOW SECTION 2

Applicant

880 PHILLIPS ROAD LLC

Status

APPLICATION WITHDRAWN; PROJECT RECEIVED FINAL

APPROVAL FOR ENTIRE SUBDIVISION IN 2021

3. DINKS & LINKS SOCIAL

Applicant

JOE CATTALANI

Status

APPLICANT TO FEEDBACK PROVIDED:

e The applicant will work with NYS DEC to obtain a Jurisdictional

Determination in reference to wetlands on or adjacent to the property.

Pg. 78 May 6, 2025 Planning Meeting

e The applicant wil! work with Hegedorn’s and St. Ann’s to resolve

questions/concerns regarding the feeder road from Black Cherry Bivd to 104

Access Rd.

e The applicant should consider shifting the building south to allow ADA

parking spots in front of the building.

The applicant should delineate designated walk areas with a raised walkway.

4. MCALPIN INDUSTRIES

Applicant

875 PUBLISHERS PARKWAY

Status

PRELIMINARY SITE PLAN APPROVAL GRANTED.

SPECIAL MEETING SCHEDULED FOR MAY 20, 2025 TO CONSIDER FINAL

APPROVAL AND SPECIAL PERMIT

5. SIERRA FRADING POST

Applicant

KIM GEORGEN

Status

FEEDBACK PROVIDED:

e The applicant will work with Wegmans to identify snow storage locations.

The canopy will remain in the rear of the building for trash receptors and a

recessed loading dock.

6. LOCKWOOD ELECTRIC

Applicant

LON LOCKWOOD

Status

FEEDBACK PROVIDED:

e The applicant will work with Town Staff to confirm whether or not the property

is located within a Monroe County Agricultural District.

Applicant will confirm if a Jurisdictional Determination is required for this

property.

(MARK GIARDINA READ INTO THE RECORD)

1. PROVIDENCE SECTION 9: Located at Abruzzi Drive. Applicant H.G.

Builders is requesting PRELIMINARY/FINAL SUBDIVISION & SITE PLAN

APPROVAL (

PUBLIC HEARING

) associated with the creation of 10-lots and

construction of 10 single family dwellings on a 5.36-acre lot having SBL# 050.03-1

68.006 located in the R-1 Single Family Residential District under Sections 269-11 and

296-17 of the Code of the Town of Webster.

APPLICANT REQUESTED TO TABLE TO THE JUNE 3, 2025 MEETING.

(MARK GIARDINA READ INTO THE RECORD)

2. DINKS & LINKS SOCIAL: Located directly east of Lowe’s Home Improvement.

Applicant Joe Cattalani is requesting SKETCH PLAN REVIEW associated with the

development of a 39,000SF indoor/outdoor recreational facility on a 9.38-acre lot having

SBL# 079.10-1-2.3 located in the HC High Intensity Commercial District under Section 269-

5 of the Code of the Town of Webster.

Pg. 79 May 6, 2025 Planning Meeting

Appearing before the board was Joe Cattalani for Dinks & Links at least for now. (RECORDING

NOT LOUD ENOUGH AND APPLICANT IS NOT SPEAKING LOUD ENOUGH) I am not

sure. I am trying to capitalize on the fastest growing sports in America, which is pickleball

throughout the states right now so you will see these places starting up and by far the fastest

growing sport in what was once created by retirees in Florida __ _____ pickleball. We were

actually camping last week in Naples; Florida and they were 17 years old, so it’s getting younger

and younger and very active for all kinds of _ family out in Webster . I spoke with Josh

and Erika and met Tony before on a different site and there was a question with parking and I

was glad to be at that meeting because it made me realize, you know what, it’s over we are going

to jump to a different site where even though a lot of sin Webster pretty much had

a variance so we switched to a spot that it wouldn’t be needed and we switched the spot that

would give us so we are hoping to build an indoor/outdoor facility and have a

small restaurant inside and 14 pickle ball courts inside and there will be 6 to 8 outdoors along

some other activities.

Anthony Casciani

[ know the area you are talking about Dale, what is the deal with that.

Dale Vance

They did a wetland delineation and sent the JD off tothe NY State DEC

building where all the courts and stuff are, and I did not indicate that. We have a copy of that

somewhere. There ts a little bit in the front, where the swale is | imagine build a park around it

and _—_—sdmore of the water issue.

Anthony Casciani

Parking would be right across the street.

Dale Vance

Yes, just like....exactly like Lowe’s. So right across the way there would be

parking

Anthony Casciani

Actually, the design of the elevation is quite attractive.

Dale Vance

Well, we didn’t come out and give you an unreasonable _ build something

that was kind of eye catching planning on family entertainment back there and all there

canopies are lit up back there. We reached out to our neighbors and

Anthony Casciani

You are here for sketch plan so the main thing as we spoke, I wanted to have

a representative here from . One of the things from years ago, there was a curb cut with

NY State unto the 104 feeder Jane now that has been kind of gone for years and never discussed

it because there is not that many significant structures have been built.

Dale Vance

Yes, my understanding.

Anthony Casciani

But now there is a point where we can get a good grip on this thing so that is

something I think we need to resolve.

Dale Vance

My understanding that the Hegedorns back than they were hoping to get the mall

Pg. 80 May 6, 2025 Planning Meeting

that Irondequoit had.

Anthony Casciani

No, don’t go there please. I don’t know what the hell I had for breakfast, but

I remember that.

Dale Vance

The plan was to build a mall there. The timing may have been....I think it was...

Anthony Casciani

Leonard Dobbs wanted to build on the Holt Road site and Hegedorns to build

on this site. That’s the history of it.

Dale Vance

Yeah, most people were not around here. BOTH PARTIES SPEAKING AT THE

SAME TIME.

Anthony Casciani

The curb cut was required when St. Ann’s got approved, the nursing home,

that is when that got approved and simultaneously the road was designed Black Cherry is that

called, Black Cherry was designed across from the school to be able to come across that area

into your property and exit out on to the feeder road which would eliminate school buses on Ridge

Road and eliminate a lot of the problems in that area. That was the intendent of that, and it had

nothing to do with the mall though.

Dale Vance

NOT SPEAKING LOUD ENOUGH. We don’t think that they want to extend that

to the 104 feeder road. There isn’t going to be the traffic that may have been planned before. It’s

just a smal] development of pickle ball. It doesn’t make too much sense at this point. I think we

should figure out what makes sense.

Anthony Casciani

I agree with you Dale; it is a big expense that is why we have kind of let this

thing go and go. We didn’t bother with it, with a lot of the smaller places that have done in. You

know, Popeyes and Dairy Queen, they have their own exit over there so we never brough any of

it up but now we are getting to the interior and hopefully you do sell some of these places in there.

But at what point does it have to be right now, I don’t know but I think we need to get a resolution

and when can we do this and at what point. Because if I am recalling it in the resolution of the

Town Board, any further development on that property deemed necessary to put this connection

in. We have let it go but at what point can we do it. That is the crux of this whole thing.

Dale Vance

Okay, I don’t have an answer for that.

Anthony Casciani

Ok, so I think this is a great project and everything is good going in but again,

we have to get this thing resolved. If it's not right now, what is it, next year. I think we need an

answer to that before this gets an approval . When can we come up with a timeline to complete

that roadway.

Dale Vance

Ok, I believe you received a letter from the Senior Home, and they really do not

Pg. 81 May 6, 2025 Planning Meeting

Anthony Casciant

Yeah, that isn’t their call. That road was put there with a dead end so it could

continue, It goes right down to the fence. That is why it was put there so the road could connect

onto your property. 10:03 my minutes. That was the intent of it when Betty Mullen DiProza was

the CEO of St. Ann’s at that time, she was well aware of what the timing was on that. Well now,

that was 20 some years ago. Things change but the thing still need to be done. The idea was to

eliminate traffic and that is part of the design of the overall area for the town. I know you can’t

answer now. You guys need to get together, that is what I think we need to do and get a solution

to that.

Dale Vance

J think the existing roadway between Lowe’s and BJ's has accomplished a lot of

that kept traffic off of Ridge Road.

Anthony Casciani

Yeah well, I’m the reason that road is there too. That wasn’t even going to be

in there but that’s another story.

Dale Vance

So, in that resolution from the town to Lowe’s, it said the developer maybe required

to build to connect through. So, what your saying is you guys want the road.

Anthony Casciani

To connect through, that was the intent of it. That is why we put the burden

on St. Ann’s. Like Josh was saying today, they could have ended their parking, there drive way,

that road coming in at their parking lot, but it had to be extended all the way back so people knew

this was going someplace. You know like a subdivision and people say, my kids have their

basketball! there, but that road is intended to continue through that’s why it’s there.

Dale Vance

So, | guess that it is something for the Hegedorns to further with the town.

Anthony Casciani

1 don’t know what the board feels on it, if they say wait another year or

whatever but we have to get some kind of solution to it.

Drazen Gasic

Tony can I ask, to extend it up to where. I would like clarification, like how far

was the intention to extend it om the resolution. Was it supposed to go up to that

road that connects between BJ’s and Lowe’s or you............

Dale Vance

I have a map if you want.

Anthony Casciani

Well, It comes from St. Ann’s by Lowe’s there and then it crosses going north

and meanders a little bit of an angle and then over and to the express way feeder.

Drazen Gasic

Ok, so frontage road up to frontage.

Anthony Casciani

So, you know how Barrett Drive is by the post office, basically one of those.

(APPLICANT APPROACHED THE BOARD WITH PLANS)

Pg. 82 May 6, 2025 Planning Meeting

Drazen Gasic

HAVING DISCUSSION WITH THE APPLICANT. So, is this the intention to

eventually do it this way.

Dale Vance

| think that’s what the intention was when the town did that.

Anthony Casciani

Right now, the road design isn’t too important, it’s just a timeline for that curb

cut. So, you want to see what you can do with that Dale. Come up with something and talk to the

whoever is there. Board members, any....you are actually here for a sketch review. Does anybody

have any concerns or interests.

Drazen Gasic

I just had some questions. With Lowe’s trucking access being right there budding

to your property, is that road remaining and same thing with the concrete area.

Dale Vance

That actually is an easement there that’s a truck turnaround for the entire

development not just for Lowe’s, Lowe’s kind of capitalized on it but it is actually for the entire

development for a truck turnaround.

Drazen Gasic

I know sometimes they gate it off in the back where their storage is. The sketch

plan, as least going off of it, substantial parking across the street. Is there anyway to push the

building and littke more south and do ADA parking in the front like you say if you have any

elderly or need to get closer to the building.

Dale Vance

I don’t see a problem with that. There is 20 feet right now. Certainly, we can find a

spot for them. That’s a good idea.

Drazen Gasic

Is that road there, town road between Lowe’s and Bjs. Is that owned by the town.

Josh Artuso

It’s private.

Drazen Gasic

Maybe something to consider somehow to slow down a little bit of traffic there if

you are going to have contractors coming through there if you have kids or others crossing the

road to get into the building. Is there going to be a speed bump or something to slow it down a

little bit or does it need a crossing as part of the concept.

Dale Vance

A speed bump is not a bad idea. They put they put that little turn in the road there

right after Lowe’s just to do that.

Anthony Casciani

That is not even in the plan . All we are interested in is the building and a time

line for the curb cul.

Drazen Gasic

So, right now they are showing . Tony, they are showing a building across the

street there they are showing parking, it’s just a way for either ADA parking in front of the

building or a designated walk area to go from the parking lot to the building.

Pg. 83 May 6, 2025 Planning Meeting

Derek Anderson

Lowe’s has a ratsed.........

Drazen Gasic

Like a speedbump or designated speedy bump just to a designated wall area that

is raised and clearly defined so that it forces somebody to slow down when they are going by

there.

Anthony Casciani

So, for sketch plan, the design of the building ok. What is it, 39,000 sq ft.

Dale Vance

Yes

Anthony Casciani

Alright I like the idea for what you are showing for the base around it, 4 ft up.

That adds to it a whole lot. Alright, anyone have any questions or concerns. It’s just sketch plan,

so you have to deal with DEC and all that now. Ok, you are on the road with it so if you can come

up with making a decision for a time line that we can agree to, I think that is going to be key. Ok,

thanks for coming in.

© The applicant will work with NYS DEC to obtain a Jurisdictional

Determination in reference to wetlands on or adjacent to the property.

e The applicant will work with Hegedorn’s and St. Ann’s to resolve

questions/concerns regarding the feeder road from Black Cherry Blvd to 104

Access Rd.

e The applicant should consider shifting the building south to allow ADA

parking spots in front of the building.

e The applicant should delineate designated walk areas with a raised walkway

(MARK GIARDINA READ INTO THE RECORD)

3. MCALPIN INDUSTRIES: Located at 875 Publishers Parkway. Applicant McAlIpin

Industries is requesting PRELIMINARY SITE PLAN APPROVAL (PUBLIC

HEARING) associated with the construction of phase I (100,000 SF of a total 300,000SF)

of a light manufacturing warehouse on a 25.65-acre lot having SBL# 079.06-1-32.123

located in the HC High Intensity Commercial District under Section 269- 11 of the Code

of the Town of Webster.

Appearing before the board was Mike Ritchie with Costich Engineering and Matt McAlpin with

McAlpin Industries. Thank you for allowing us to come in front of the board. We were last in

front of you a few months ago, when we presented the project where Matt presented the overview

of his company and what they do. Since then, I think the biggest issues were the coordinated

review for SEQR and the wetland review. We did receive some additional PRC comments from

town staff, and we subsequently revised the plans and resubmitted to address those comments.

We did receive the no impact letter from the DEC relative to the wetland, so we received that last

week and we were, happy to pass that along to Josh. We did also hear from the previous time

Mr. Casciani that we were in front of you. They are looking for some kind or some more

Pg. 84 May 6, 2025 Planning Meeting

architectural detail on that building. We did submit some additional architectural renderings.

Anthony Casciani

Is this what you changed it to. The one you just gave me.

Mike Ritchie

[am not sure what you are talking about.

Matt McAlpin

Most of those are in the submission. There are a couple additional ones in there

to reemphasize.

Anthony Casciani

Are you sure this is the same building.

Mike Ritchie

A lot more updates to it and again, it’s a phase project. Phase one and I think I

heard a 100,000 but was...applied for 120,000 square foot for the first phase. 300,000 square foot

overall. So, the first phase being on the south side of the project and subsequent additions would

be to the north. We also made some revisions to the utilities. We did add a second storm water

management pond on the north side of the site to get some additional earth also to prevent kind

of some low spots on that north area and hopefully allow any future development on that very

north end on publishers to be able to utilize that for storm water management as well. So, we’ ve

addressed all the comments from PRC, from the agency’s water authority health department and

the like and with this boards approval we would like to move forward wit site work on this in

probably the next month or two. So, there team is ready to go, and we would be happy to answer

any questions that this board may have.

Anthony Casciani

Ok, you submitted I think it was April 15th, I think it was April 15'". You

had some comments, and you address ail the comments then you had the latest edition of it.

Mike Ritchie

We revised and resubmitted those back as well. They were technical in nature, no

major showstoppers or anything. Again, if there’s any connections this board has or any other

comments going forward would you.

Anthony Casciani

This is all primarily 99% all engineering detail.

Mike Ritchie

And I think more of the Engineering has been sorted out at this point.

Anthony Casciani

[ don’t want to get into all that part of it but The concern we have is the

building. What's it going to look like, traffic and things of that nature. You did a traffic study

and completed that. I think that was probably one of the main things, wasn’t it.

Dave Malta

That and the widening the entrance so the tractor trailers could turn in.

Mike Ritchie

We proposed a slight widening of the entrance there and we did also propose a

dedicated lefthand turn into the site which will be part of the first phase.

Anthony Casciani

Ok, we can open it up, it’s a public hearing. Is there anyone who wishes to

Pg. 85 May 6, 2025 Planning Meeting

speak in regard to this project.

Diana Davis at 942 Gaywood Lane: | might be behind the curve on this one, but it looks like you

guys are calling it high-density commercial as the zoning. SPEAKING TO THE APPLICANT.

Yes, that is what is on your plan. So, I am just wondering if you’ ve and again, | might be behind

the curve, so I don’t...again, my fault if I haven’t been the story.

Anthony Casciani

What is it , you’re specifically asking.

Diana Davis

Yeah, no, my question is given that it’s office park and this is a warehouse facility,

it would be one of the uses that the Town Board would basically have to do a special use permit

for, so ] am just wondering where we are in that process.

Mike Ritchie

That was taken care of initially with the town.

Diana Davis

Got it, okay.

Mike Ritchie

That was the first step of the project.

Diana Davis

But it is office park still, right.

Mike Ritchie

It is zoned still yet but that was a required Town Board.

Diana Davis

Okay then. Again, | am just behind the curve but that’s all. I just was wondering

and I just wanted to make sure that if it is office park that you guys are still adhering to the lot

coverage maximums.

Mike Ritchie

We are.

Diane Davis

All right. Thank you.

Anthony Casciani

Okay, anyone else wish to speak. Nobody. All right, board. Any comments.

I have looked at this thing a few times.

Drazen Gasic

Josh, if you can zoom into the entrance way area, the vehicle turnaround is showing

a fire truck, but you are saying you have WBSO trucks there. Are you able to provide vehicle

(urnarounds there for a WB50 in that entrance way.

Mike Ritchie

I believe we ran a WB62 on that as well. I don’t know if the detail shows a 50. 1

don’t know, Matt, did you confirm WB?

Drazen Gasic

It is just showing a fire truck. It doesn’t show a standard operation vehicle coming

in and out. My concern is just on Hard Road north south coming into it. Does that other side

have to get widened too. Coming southbound going into the facility.

Pg. 86 May 6, 2025 Planning Meeting

Mike Ritchie

I don’t believe any proposed trucks are proposed to come from the north side. AH

the truck traffic would come from

104. Drazen Gasic: So, you seem to stop pavement just short of the existing facility there. Any

intention potentially to mill and pave ail the way to Hard Road after construction?

Mike Ritchie

That wasn’t part of our, but I can talk with Matt. You know, it shouldn’t be a major

change to the scope to mill and just make that a nice uniform pavement. Have an issue with that.

We already have to pave that portion by the end.

Drazen Gasic

It’s just after construction. You're going to be doing earth work and there is going

to be in and out traffic. You know, if it gets degraded, it'll look nicer if it’s just a continuous...

Mike Ritchie

A nice, finished product and then, you know, we could put topping on everything

and redo the striping and make it all uniform.

Drazen Gasic

J am not sure if it would be part of your, but I guess this question is related to Josh.

You know, should there be a stop sign on that intersection there onto Hard Road, especially now

with truck traffic being proposed. Should a stop sign, and striped stop be on that intersection.

Josh Artuso

Sure. Yeah, that would be...that’s a private road so it would not be the town’s

responsibility to do that.

Mike Ritchie

We have no issue with that,

Drazen Gasic

Josh, if you can go to the utility plan and go to the front of the building. So, if you

zoom in to where the water line goes into the building. | just to get a clarification here. You have

a combined system going in and then a combined system leaving. The building, is it going to be

just hydrant dedication going out or is thal going to be...

Mike Ritchie

Yes, it will be split in the building for domestic fire sprinkler and then back out to

the......

Drazen Gasic

That has to be a correction that has to be made on the drawings.

Mike Ritchie

Yeah, we’re coordinating with MEP just trying to get everything sorted out where

all the connections lie but yeah, that ts that intent.

Drazen Gasic

Are you able to provide a mechanical room drawing of just showing how that

transition.

Mike Ritchie

] think that'll be part of the building permit process but that will be done. Again,

you know, meter backflow in an enclosure out by the road where it separates the public water.

Pg. 87 May 6, 2025 Planning Meeting

Drazen Gasic

IT was just surprised not to see profile views of the sanitary or storm lines. Is that

something that you guys can add?

Mike Ritchie

Absolutely. I think that’s, you know, something for construction. Again, there’s

nothing really out there in terms of conflicts with other utilities but with other utilities but

certainly can provide profile view for those.

Drazen Gasic

And then I think my fast question here with that pond going in now in the back,

do you have access going up to it for maintenance.

Mike Ritchie

That was not a comment that was generated, but we certainly have no issue

providing an access easement to the Town of Webster for both ponds. Knowing that they are

going to be private, but in the event that the town ever needed to get to them, we have no issue

granting easements for those.

Drazen Gasic

I guess would it be an easement or would it be also like a stone gravel road in order

to go back there and do the maintenance.

Mike Ritchie

I think the intent is that the parking lot adjacent to it would be built and that would

allow it to provide access, but we can certainly look into that to make sure that if town staff needs

to get back there, you know, put a gravel access road to the berm to the outlet structure but we

can add that in to the final plan.

Drazen Gasic

So, Josh, does the Town of Webster maintain the pond.

Josh Artuso

No, we would require a stormwater maintenance agreement, and it would be the

responsibility of the owner.

Mike Ritchie

It would still be a good idea to add something there in case they need to hire a

contractor to hog out the pond, so it doesn’t, you know, destroy landscaping. So, we can put that

in the plans for.

Drazen Gasic

I recommend putting in an access road to it for maintenance and then the volume

of that pond, I just want make sure that your not at a US Army Corps dam level.

Mike Ritchie

We are not.

Drazen Gasic

You're below it.

Mike Ritchie

We’re below the height for a dam.

Drazen Gasic

Alright and then the spillway that you have there, there discharge to it, you have

indicating where it’s going, and I just want to make sure that that is not impacting the neighboring.

Pg. 88 May 6, 2025 Planning Meeting

Mike Ritchie

We did have to Jook at that because everything drains up north through Publishers.

So, we have a spillway and then a swale and then a dedicated secondary storm line to get that all

to the north, so it doesn’t pond back in there.

Drazen Gasic

That’s all the questions [ had. There are some engineering things in there that we

could build in for .

Anthony Casciani

Yeah, a lot of this stull actually that’s all engineering detail that's why. We

have town engineers to look at that also. They have reviewed a lot of this already. So, like

drainage and a lot of hours went into that already. Anybody have any questions . Does anyone

one have any questions or concerns. BOARD: No. Ok, then we will close the hearing and bring

it back in. Alright at the last meeting we actually...we made a motion, I believe, that we would

take lead agency if nobody was interested. It went out for 30 days and nobody took it, nobody

wanted it that’s for sure. So, it came back. 30 days are up. So, we need to make a motion to take

lead agency for the SEQR process. You can combine...can we combine that, Derek.

Derek Anderson

We’ ve lypically done in the past. Is there any other comments.

Anthony Casciani

No, I closed it, we are good.

Derek Anderson

(PLEASE SEE ATTACHED) So previously we determined this is a type one

action, So, there’s a motion for TYPE 1 ACTION.

RESOLUTION 25-0027 Derek Anderson made a motion for TYPE 1

ACTION/LEAD AGENCY which was

seconded by Mark Giardina.

VOTE:

Mr, Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mr. Kosel AYE

Mrs. Maltman AYE

Mr. Gasic AYE

Anthony Casciani

Ok, we can move to give preliminary approval on it. I like the way you

changed the building. That was probably my biggest hangup from day one was, you know, the

appearance of it. We should, we got to do, we should do though, is to actually have this

incorporated into a final drawing sheet all at one. I’m ok with moving forward with preliminary.

I think we still need to just fine-tune some of the miscellaneous things. Enginecring is ok with

your answers sort of speak and if it’s ok with the board, | don’t want to drag it out for another

month. If you can get the stuff in soon enough and it meets the requirements for Josh, I'd be

willing to say, and | think the board would agree to have another meeting in a couple weeks with

the final drawings in front of us with everything on il.

Pg. 89 May 6, 2025 Planning Meeting

TOWN OF WEBSTER PLANNING BOARD RESOLUTION

875 PUBLISHERS PARKWAY - TYPE I ACTION

THE PLANNING BOARD OF THE TOWN OF WEBSTER

1002 Ridge Road, VanIngen Court Building

SEQR TYPE I ACTION

MAY 6, 2025

MOTION FOR TYPE I ACTION

Town of Webster Planning Board considered the request by Applicant, McAlpin Industries to construct

a 300,000 square foot light manufacturing warehouse on a 25.65-acre lot having SBL# 079.06-1-32.123

located at 875 Publishers Parkway.

The Planning Board determined that the proposed action is an Type I Action under Part 617: State

Environmental Quality Review (SEQR).

The Planning Board determined that the action is subject to a single agency review pursuant to Part

617.6(b)(1) of SEQR and that it is the most appropriate agency for making the determination of

significance. The Planning Board therefore designates itself lead agency for the proposed action.

The Planning Board has given consideration to the criteria for determining significance as set forth in

Section 617.7(c)(1) of SEQR, and has

1. considered the information contained in the Environmental Assessment Form Part | dated

January 29, 2025,

2. considered public comments directed to the Planning Board during the Public Hearing on May 6,

2025, and

3. completed Parts 2 and 3 of the Environmental Assessment Form.

NOW, THEREFORE, BE IT RESOLVED that the TOWN OF WEBSTER PLANNING BOARD

hereby determines that the proposed action will not have a significant adverse effect on the environment

for the reasons set forth in the attached Notice of Determination of Non-Significance; be it further,

RESOLVED that the TOWN OF WEBSTER PLANNING BOARD is authorized to take all actions

reasonable and necessary to file the Negative Declaration and discharge the TOWN OF WEBSTER

PLANNING BOARD'S responsibility as lead agency for this action, be it further,

RESOLVED that the TOWN OF WEBSTER PLANNING BOARD, based on the information and

analysis above, the referenced supporting documentation, and discussions of the action by the TOWN

OF WEBSTER PLANNING BOARD as documented by the Minutes for this meeting, that the proposed

action WILL NOT result in any significant environmental impacts, be it further,

RESOLVED that the TOWN OF WEBSTER PLANNING BOARD, therefore makes a

DETERMINATION OF NON-SIGNIFICANCE, be it further,

RESOLVED, that the TOWN OF WEBSTER PLANNING BOARD, based on the above reasons issues

a NEGATIVE DECLARATION as evidence of its determination.

TOWN OF WEBSTER PLANNING BOARD RESOLUTION

875 PUBLISHERS PARKWAY - TYPE I ACTION

THE PLANNING BOARD OF THE TOWN OF WEBSTER

1002 Ridge Road, VanIngen Court Building

SEQR TYPE | ACTION

MAY 6, 2025

LOCHNER SUBDIVISON

NOTICE OF DETERMINATION OF NON-SIGNIFICANCE

The Planning Board has reasonably concluded the following results from the proposed action, when

compared against the criteria in Section 617.7(c):

2.

3.

an

10.

11.

12.

13,

The proposed action will not have a substantial adverse change in air quality since it does not

include a regulated emission source.

The proposed action will not have a substantial adverse change in ground or surface water

quality or quantity since the proposed action connects to the public sewer system.

Water will be supplied by the Monroe County Water Authority which has adequate capacity to

support the action.

Wastewater will be treated by the Town of Webster.

. The proposed action will not have a substantial adverse change in potential for erosion, flooding,

leaching or drainage problems. Development of individual parcels will conform to NYSDEC for

stormwater management and control.

The proposed action will not have a substantial adverse change in existing solid waste production

since the action is for the multiunit residential buildings that will produce solid wastes in

quantities typical of multi-family residences.

The proposed action will not have a substantial adverse change in existing noise, odor or light

since the action is being developed in accordance with Town of Webster standards. A temporary

increase in noise levels consistent with normal construction activities is anticipated when during

construction on the subdivided lots.

The proposed action will not have a substantial adverse change, or cumulative change since the

proposed action creates new residential parcels from an existing residential parcel. Traffic

generated is anticipated to be minimal.

The proposed action will not have a substantial adverse impact on the criteria listed under

Section 617(c)(1)(ii) of SEQR because no habitats or threatened or endanger species were

identified on or contiguous to the proposed site.

The proposed action is not located in an area designated as a Critical Environmental Area by the

Town of Webster or New York State pursuant to subdivision 617.14(g) of SEQR.

The proposed action is not in material conflict with the Town of Webster 2008 Comprehensive

Plan.

The proposed action wil! not create an impairment of the criteria listed under Section

617(c)(1)(v) of SEQR since the action is not located in or adjacent to the listed resources and is

in character with the surrounding community.

The action will not result in a major change in the type or use of energy since the action is for the

construction of multi-family residences that do not require an upgrade to existing power

distribution system infrastructure.

. The action will not create a hazard to human health since it does not contain nor is it located

adjacent to an existing sources of hazardous substances or contaminants. The project does not

contemplate the use of hazardous substances or contaminants.

TOWN OF WEBSTER PLANNING BOARD RESOLUTION

875 PUBLISHERS PARKWAY - TYPE | ACTION

THE PLANNING BOARD OF THE TOWN OF WEBSTER

1002 Ridge Road, VanIngen Court Building

SEQR TYPE I ACTION

MAY 6, 2025

15. The action will not create a substantial change in use of the land since the action is consistent

with zoning for the land, the existing community character, and the Town of Webster 2008

Comprehensive Plan.

16. The action will not attract a large number of people for more than a few days when compared to

taking no action since the action involves the creation of nine new parcels and does not create

areas that will attract a large number of people.

17. The action will not create a cumulative impact on the environment as listed under 617(c)(1)(x),

(xi), and (xii) of SEQR.

Mike Ritchie

Yes, we can do that. We did submit the updated elevations as part of the most

recent package.

Anthony Casciani

That way these are not just a sheet. They’ re incorporated right.

Mike Ritchie

We can certainly make that. I guess two weeks , I don’t think It will kill us. I think

we already submitted most of those renderings when we submitted the revised plans.

Anthony Casciani

But in lieu of a separate rendering if you can just put it all in, right in one of

those sheets. Right in your drawings like you know. I think that would work ok.

Mike Ritchie

Yes, we certainly make those incorporated into the final approval plan set if that is

what you're looking for prior to this board being able to issue final approval or if you wanted to

condition it, we could make it so that those are part of the record submitted in the final plans.

Matt McAlpin

A lot of what you have in front of you right now is part of the submission. We

just had a couple of updates that I wanted to make sure you saw.

Drazen Gasic

Tony there’s just some good amount of engineering items that would be nice to be

incorporated as a final set so when the board votes on it as a final we’ re good to go.

Anthony Casciani

Ok, lets do that. Let’s do a preliminary if that’s okay and then in two weeks

we can have the final and you got everything incorporated into it.

Mike Ritchie

Yes, we can turn everything around.

Anthony Casciani

You wanted a stop sign.

Drazen Gasic

A truck being used for the access movement just to make sure that intersection

works with an 18-wheeler, a stop sign there just for safety to stop onto Hard Road and then the

road going up to the pond.

Derek Anderson

You also noted profiles from the sewers.

Drazen Gasic

Yes, but that should be engineering’s calls

RESOLUTION 25-0037 Dave Malta made a motion for PRELIMINARY

APPROVAL (

PUBLIC HEARING

)Located at

Located at 875 Publishers Parkway. Applicant

McAlpin Industries is requesting PRELIMINARY

SITE PLAN APPROVAL (

PUBLIC HEARING

)

associated with the construction of phase I (100,000

SF of a total 300,000SF) of a light manufacturing

warehouse on a 25.65-acre lot having SBL# 079.06-

1-32.123 located in the HC High Intensity

Pg. 90 May 6, 2025 Planning Meeting

Commercial District under Section 269- 11 of the

Code of the Town of Webster which was seconded

by Mark Giardina.

PRELIMINARY APPROVAL CHECKLIST

= pO be

a

= ooo

Subject to PRC Comments

Subject to a Letter of Credit posted with the Town of Webster.

Subject to Monroe County Water Authority comments

Subject to the determination of the ZBA for requested variances.

Ajl the improvements shall be constructed according to the specification of the Town of

Webster.

All roadway construction to be in accordance with the specification and regulations set forth

by the Town of Webster.

All sitework is to be in compliance with the standards of the Town of Webster.

Comply with all requirements of any Federal, State, County, or Town agency.

Address drainage, lighting, signage, and landscaping, buffering, berming and snow storage.

. The landscape, hardscape, site accessories, and associated finished grading design for the

development must be prepared by a NYS licensed Landscape Architect. The final landscape

plans shall bear the seal and signature of the Landscape Architect.

11. Approvals are subject to Drawing No: 9649 Dated:

VOTE:

Mr. Casciani AYE

Mr. Malta AYE

Mr. Giardina AYE

Mr. Anderson AYE

Mr. Kosel AYE

Mrs. Maltman AYE

Mr. Gasic AYE

(MARK GIARDINA READ INTO THE RECORD)

4. 1048 SHOECRAFT ROAD APARTMENTS: SIERRA TRADING POST: Located at

900 Holt Road. Applicant Kim Goergen, of Wegmans Food Market Inc. is requesting

SKETCH PLAN REVIEW associated with enclosing a portion of the existing former

Chase-Pitkin outdoor space, to create a new tenant space on a 28.7-acre lot having SBL#

079.12-01-06.211 located in the HC High Intensity Commercial District under Section

269-5 of the Code of the Town of Webster.

Appearing before the board was Evan Goldfeld (DID NOT SIGN IN) from Costich Engineering

and I have Kim Jurgen from Wegman’s . So, for sketch plan review, the proposed project is

enclosing that existing ouldoor display area that was once part of Chase Pickins. The project, the

building, would enclose 19,000 square feet of that for retail for Sierra Trading Post. The rest of

the canopy would remain in the rear of the property. We would be incorporating a trash compactor

and a recess loading dock and the utilities. We are utilizing the Hobby Lobby wall currently and

the southern wall for the outdoor display area, so it fits within that footprint of the outdoor display

Pg. 91 May 6, 2025 Planning Meeting

area. The utilitics are private and most of them have been stubbed during the development of the

plaza. I know PRC had comments about the truck access that we had coming off of Rachel. We

are in the works of coming down from either the north end and through the Wegmans property.

Right behind the plaza, making a turn within the back of the building and there is also an option

of locking to come off of 104 to Ridge Road and circulate down through Rachel just to relieve

that turn radius at that point.

The building elevations were submitted as part of this package, and I think it’s a nice looking

modern fagade with their branding.

Anthony Casciani

What will they have to do with the interior. Will the have to tear that floor

out.

Evan Goldfeld

So, the concept now, because it is all concrete currently, they are going to level

it and obvisioyly there were floor drains, and you can probably see them in there. (LOOKING

AT THE PLANS ON THE SCREEN) so it was all pitched to the center so the high points are on

the perimeter and it’s going to be leveled for that portion and then we will be rerouting the storm,

the trench drain to the rear. There is a storm drain back there. We’ve already looked at the

drainage patterns from when this was developed and the volumes. The only utility running

through there would be sanitary out of the front We would have to cut through the floor.

Anthony Casciani

He is showing me a picture of another Sierra. Kind of looks a little different.

APPLICANT IS SPEAKING TO CHAIRMAN AND NOT INTO THE MIC. Right now, they

switched to more of the white and cream color.

Anthony Casciani

It’s got an orange sign on it and has stone going up the sides. What’s the plaza

there? All Wegmans, it’s all brick anyways. So, this you’ve the lower part . What is the white

part on this.

Evan Goldfeld

Yeah, I don’t have the details from the architect since we’re at conceptual level

of what it is, but they’ve been using, 1 mean with construction these days you know, kind of a

fascia board or board or something of that nature.

Anthony Casciani

I think it’s fine but if there is a way to just dressing that up. There is a lot of

white there that I am looking at you know, whereas the plaza itself is pretty broken up and

designed nice and features and so on. If you can do something just to dress that up a little bit by

the entrance area.

APPLICANT IS SPEAKING TO CHAIRMAN AND NOT INTO THE MIC. OK, will bring that

back to the architect.

Anthony Casciani

I think that will be good. Anything else anybody.

Pg. 92 May 6, 2025 Planning Meeting

Mark Giardina

What is the color of the sign again.

Anthony Casciani

Well, it’s like an orangish color they have.

Mark Giardina

Oh, okay.

Derek Anderson

Seems tike a good fit for the location.

Drazen Gasic

If I could ask, in the back so you know, the Sierra portion looks like it going to be

redone but there is a portion still in the back that is the former Chase Pikkin what’s that...what’s

going to happen with that portion of the building.

Evan Goldfeld

That portion of the building is going to remain. The canopy is structural for that

roof, the back wall and there’s some egress doors for the Hobby Lobby to that area.

Drazen Gasic

Okay.

Anthony Casciani

There is actually only a couple of comments, general comments. Tractor

trailers are required to stay in the appropriate lanes when making the turn from Rachel Drive into

the plaza. You were aware of that anyways. The others, all the utilities are going to be private,

which is on your private property. So, correct. Only concerns. I have no issues, anybody.

Drazen Gasic

Just lo put some consideration for snow storage. It’s a very tight area and that’s a

berm there. So, [’m not sure where your going to store the snow over lime.

Evan Goldfeld

Yes, with Wegman’s Plazas you know, they hire a contractor, and you see the

big mountains out front. So, it will be removed out of there and put out to where no one utilizes

the parking.

Anthony Casciani

I guess with that, you’re all set. See you next time you’re in.

e The applicant will work with Wegmans to identify snow storage locations.

The canopy will remain in the rear of the building for trash receptors and a

recessed loading dock.

(MARK GIARDINA READ INTO THE RECORD)

5. LOCKWOOD ELECTRIC: Located at 633 Basket Road. Applicant Lon Lockwood is

requesting SKETCH PLAN REVIEW associated with the construction of an 8,822SF

multi-tenant post-frame style building on a 1.48-acre lot having SBL# 066.03-1-9.11

located in the IN Industrial District under Section 269-5 of the Code of the Town of

Webster.

Appearing before the board was [an Kuchman with McMahon Larue and | am here with Lon

Lockwood owner of Lockwood Industries Electric. We are here for sketch plan application for

Pg. 93 May 6, 2025 Planning Meeting

the new office location and operations facility for Lockwood Electric in addition to leasable space

for a tenant to be determined, garage space and then a dog daycare as well. The site is a former

homestead, farming, agricultural residential site. It’s now zoned industrial. We were before the

Town Board last week for application of industrial use permit and referral to the Planning Board

here tonight.

Lon Lockwood is proposing to build a post frame style kind of pole barn style structure for their

operations which I believe we've submitted the architectures as part of our application by GLA

Architects, The site has been mostly demolished from its original homestead application. What

remains is a couple of accessory structures. One of which is going to be incorporated as part of

this buildout for the dog daycare and the substantial post frame pole barn in addition is going to

be mostly for Lockwood Electric and the parking space is substantially increased for Lockwood

Electric fleet of vans and work vehicles in addition to employee parking.

Lockwood Electric is currently operating out of 520 Salt Road. So, a long time Webster resident

and looking to stay in the community. The application process is long for us. Like I said, we were

before the Town Board last week and we're before the Planning Board today for Sketch Plan

application. We’re next to the Zoning Board of Appeals for a variance to the buffer requirements

and then we will be here a couple more times for preliminary and final application and then finally

back home to the Town Board for the issuance of industrial permit along with the special permit

application for the dog daycare.

With that said, the goal is to minimize total disturbance on the site to under an acre. So, it’s a

small scale construction operation that will yield substantial dividends to the community and the

success of the business. I wanted to see what comments the board had. I think we’ve jumped the

gun a little bit. We've prepared and submitted pretty substantial site plans with a substantial

amount of design incorporated. A lot more than what you would typically see on a sketch plan

application, but we do want to take the boards’ considerations as we move over to the Zoning

Board and the remainder of the Planning Board application process.

So, al this moment I will open it up for any questions.

Anthony Casciani

Are there no variances required.

lan Kuchman: There is a variance required.

Anthony Casctani

Have you got it yet or you have to not yet.

lan Kuchman: That'll be the next process for us.

Anthony Casciani

And what would that be for, I’m sorry.

lan Kuchman: So, for Industrial Zone the parcels have an industrial setback requirement and a

buffer requirement which is a little bit more than what we are asking for and it includes not only

Pg. 94 May 6, 2025 Planning Meeting

the building but also the parking area, So, the edge of pavement is slightly infringed on that buffer

requirement. So, we will be seeking a modest amount of relief from that. I think the intent of that

requirement is most industrial sites in Webster are large parks, you know, like Xeroz Park where

you re looking for a little bug buffer between those larger parcels. This is a much smaller parcel.

This a much smaller parcel this is less that an acre and a half. So, I think it would be realistic to

ask for that relief from the board.

Anthony Casciani

Now your drainage it looks like a pond back there.

Ian Kuchman

Yes so, the challenge with this site is that we're tying into an existing structure.

So, our finished floor elevation is pretty well established. It’s a relatively flat site as it is so, we

don’t have a lot of options storm water-wise so we’re trying to sheet flow everything into that

relatively flat swale that’s going to have a perforated under drain. It’s going to drain into the

storm sewer out on Basket Road.

Anthony Casciani

Okay. You have a dumpster enclosure going....that’Il be near the front.

Ian Kuchman

Yes, we choose the front within that dog fenced in area to avoid the westerly winds

blowing odor into the operations of Blackwood Electric.

Anthony Casciani

A little premature but just when you get to that point, don’t just throw cement

block up, make it look decent you know.

Lon Lockwood

| live directly across the street, and I am going to make sure it is a nice place.

Anthony Casctani

Alright, any questions or concerns.

Derek Anderson

So, you mentioned it used to be agricultural use, and I noticed this is near Bolter

Industrial. One thing to double check and I didn’t see it on the SEQR form but just double check

in general, is that...there are county agriculture districts in this area that haven't been used for a

long time, but the agriculture districts have never been resolved. So, just verify that the parcel

itself is not subject to agriculture district reporting.

Lon Lockwood

I will double check. Thank you.

Derek Anderson

There are even acouple industrial parks that we have that are right in the middle

of an agriculture district that had never been dissolved.

Jan Kuchman

Yes, with that said, we’re on the industrial side of Basket Road so everything

around us, we got Waste Management right next door to us. Right across the street, we do have

residents, so we are substantiating a buffer.

Derek Anderson

But that why I mentioned it because it’s deceptive. The agriculture district was

put in place 30 years ago and then as development came in certain areas and it hadn’t been used

Pg.95 May 6, 2025 Pianning Meeting

for agriculture for years and years. but the district still exists. So, you are subject to those

requirements.

lan Kuchman: Josh are you aware of....

Josh Artuso

I don't believe this property is within an agricultural district, but we can help double

check that and with this property being on Basket Road, we were required to refer in to Monroe

County and I know that that’s also something that they take a look at as well. So, once we....we

can confirm that for you.

Anthony Casciani

All right. That’s something we can check out anyways, right. So, when you

come back to preliminary you can have an answer to it.

Ian Kuchman

First things first, get our variances first.

Drazen Gasic

I just have one more thing, you indicated a fence in the RGE RTC easement, utility

easement, | just want to make sure that it is allowed within that easement, the fence that you guys

are proposing.

lan Kuchman: Okay.

Drazen Gasic

And then out of curiosity, interior architectural plan showed storage. I’m assuming

we're not dealing with like transformers; storage; any kind of chemicals inside because it’s right

next to a budding to the dog area. Does it need to have a fireproof wall between the two

components of use, ] guess.

Lon Lockwood

So, I’m sorry, I’ve got hearing aids. I have a bit of a hard time hearing you. But

you are concerned about the storage.

Drazen Gasic

Yes, | am assuming you are not storing transformers any kind of chemicals inside

because it’s right next to a budding to the dog use and then your storage use.

Lon Lockwood

Correct. The storage use is going to be used for the H & L Incorporated that’s

owning this place to store the stuff to maintain the property.

Drazen Gasic

Okay.

Lon Lockwood

And that kind of stuff, nothing industrial or anything like that. Nothing more

than you would find in your garage.

Anthony Casciant

The overall site once you’re completed, there’s outdoor storage, right.

Lon Lockwood

No. Everything should be inside. The only thing outside would be a parking

lot.

Pg. 96 May 6, 2025 Planning Meeting

Anthony Casciant

That sounds good.

Derek Anderson

So, the draft SEQR, it does indicate on here that there are wetlands or other

regulated water bodies on the parcel. So, you’re aware you have to start that whole process with

the new wetlands regulations as soon as possible.

Anthony Casciani

Derek, you're saying there are wetlands on there.

Derek Anderson

Yes. According to the SEQR form, it identifies that there’s wetlands or other

regulated areas and you know, because of that, ] would say that they got to start down that path

of the jurisdictional determination under the NY State Wetland Regulations. Start that now so

you don’t get hung up on it.

Anthony Casciani

Ok check in to that. Sounds good and good luck. You know what, before you

go, Josh, if the are going to the Zoning Board do you feel that there are any issues with it.

Josh Artuso

No, I think that the variances that are being requested are not really substantially

and are not of concern.

Anthony Cascaini

f was thinking, if it was questionable, you know...

Josh Artuso

I mean, the board could provide a letter of support if they’re favorable to the design.

Anthony Casciani

It’s up to you, fellas; do you want to send them a letter. THE BOARD

AGREED. We can send them to the Zoning Board that might expedite it a little bit.

e The applicant will work with Town Staff to confirm whether or not the property

is located within a Monroe County Agricultural District.

Applicant will confirm if a Jurisdictional Determination is required for this

property.

ADMINISTRATIVE ITEM:

© Approval of Meeting Minutes for March 4, 2025 (GIARDINA/MALTA) THESE MINUTES

WERE A DUPLICATE AND NOT NEEDED. April 1, 2025 (GIARDINA/KOSEL) GASIC

-ABSTAIN.

Pg. 97 May 6, 2025 Planning Meeting

With no other applications before the Board this evening Anthony Casciani concluded tonight's

meeting at 8:00 PM.

Respectfully Submitted,

Signed

Mark Giardina, Secretary

Katherine Kolich, Recording Secretary

JUN 4°25 axSia7?

FILED WEBSTER THN CLK

Crone tllann

Pg. 98 May 6, 2025 Planning Meeting