It is 7:00 o’clock and I would like to welcome everyone to the Planning
Borad meeting of the August 5, 2025. We have 5 items on the agenda this evening.
If anyone is here for the Dinks & Links that is going on the Hegedorn’s property, that has been
tabled to September 2, 2025.
Pledge of Allegiance/Roll Call.
Summary overview of outcome:
TABLED MATTERS
:
I. SIENNA RESERVE
INSITE LAND DEVELOPMENT, INC./ORCHARD RD
Status; APPROVED WITH CONDITIONS:
No fence shall be located along the rear property line.
4x4 posts with signs shall be placed on each rear property line indicating the areas of
conservation easement.
2. COBBLESTONE PLACE PHASE 2
BRICKWOGD MANAGEMENT/1025 RAVENSIDE LANE
Status; APPROVED WITH CONDITIONS:
Pursuant to the Town of Webster Engineering Department comments and review.
SCHEDULED MATTERS
:
3. MCALPIN INDUSTRIES, INC,-PHASE 1-MODIFICATIONS
MATT MCALPIN/8665 HARD RD
APPROVED AS PRESENTED
Py. 167 August 5, 2025 Planning Meeting
4. MCALPIN INDUSTRIES, INC.-PHASE 2-FINAL SITE PLAN APPROVAL
MATT MCALPIN/8665 HARD RD
APPROVED WITH CONDITIONS:
Pursuant to the Town of Webster Engineering Department comments and review.
5. FINGER LAKES FEDERAL CREDIT UNION
JASON STANLEY/711 & 715 RIDGE RD
APPROVED AS PRESENTED
6. LOCKWOOD ELECTRIC
LON LOCK WOOD/633 BASKET RD
APPROVED AS PRESENTED
7. DINKS AND LINKS
JOE CATTALANI/FIVE MILE LINE RD
**This project will be tabled to the September 2" meeting pending additional
information requested by the Town **
(MARK GIARDINA READ EACH APPLICATION INTO THE RECORD)
(SEE ATTACHED SEQR
RESOLUTIONS
)
Located on Orchard Rd. Applicant Insite Land Development, Inc. is
requesting FINAL SITE PLAN AND SUBDIVISION APPROVAL associated with the
creation of ten (10) single- family lots on a 5.94-acre parcel having SBL# 080.05-2-2.1 located in
the R-3 Single Family Residential District under Section 269-10, 296-27, and 350-12 of the Code
of the Town of Webster.
Just a little, kind of an update, this project in July of 2021 received a sketch
plan review and October 21 of 2021, I'm sorry, October 19"? it received preliminary approval so
in the meantime there has been issues trying to get sewer to it so and so forth. So, there was some
delay. Now, just for the record, a lot of this stuff has already been beaten down pretly well. The
zoning there is R-3, so this isn’t an allowed use in that area. There are several PRC comments at
the time and those were applied to these plans, the current plans. Again, that area came in under a
cluster development. A cluster development in the Town of Webster allows lots to be a minimum
of 75 foot wide. There isn’t’ a lot in this project, that is
75. Everyone is there. | think there's
only a couple maybe that are
80. The rest are all 100 foot wide lots. So, they conform to the
average lots of people in that whole area with standard tots. Instead of parkland, it was
recommended by the homeowners in the area to go to a conservation casement and Rudy, he can
designate restrictions on no tree removals and so on and so forth by the residents. That's
something that can be putin. That was one of the request that they had. And one of the things we
talked about also was at the rear line of these parcels where the casement would be to pul posts
in. So, we've talked to Rudy about it. Posting 4 by 4 inch posts with a sign on them, conservation
easement, no removal of trees or anything within this area. So, that will be part of the resolution
Pe. 168 August 5, 2025 Planning Meeting
for approval on this project. Those are just notes Thad just to bring it back up to date. So, Pm
sorry.
Appearing before the board Mike Bogojevski with BME Associates. Rudy Neufeld from Insight
Land Development couldn't be here tonight but we also have Megan Serini from our office who
did help and was the engineer working on the plans also. Like he had mentioned, the project
received preliminary approval back in October of 2021s0 we are here secking final approval
subdivision approval tonight.
We've been working with the town on confirming some of the sewer details the town was looking
al,..some Sewer options so we have been working with the town. So, hence the kind of the longer
time frame between preliminary and coming back for final now but at this point, I think we’ ve got
all that sorted oul with town staff. We’ve met with town staff initially, so that way we can get a
lot of those detatls ironed out and now Rudy would like to look for final subdivision approval and
move forward with the subdivision.
I's been a little bit like.... mentioned, so Pll do a quick recap of the project just to kind of... don’t
know how much everybody remembers of it. Like you’d mentioned, it’s zoned R-3. Access will
be off Orchard Road. The project’s on the north side of Orchard Road. The roadway will be private
and like you mentioned, there’ll be an HOA for the subdivision as a whole to...for the ownership
of the private portions of the project and to provide maintenance of those items. Ultilities are
consistent with a subdivision like this water main will be extended from Orchard Road. Sanitary
sewer Is consistent with the preliminary approval approved plans to go to the north to Blue Creek
Drive cul de sac. There’s an existing sanitary sewer manhole there and that’s where the sewer will
connect to. Storm sewers will run along the roadway and then will extend to a proposed storm
water management area in the northwest corner of the project there. That’s basically where the
drainage flows to and then it goes to the north into existing storm sewers within the subdivision to
the north. Like you had mentioned, there are conservation easement areas that were reviewed
during the preliminary approval on basically the east and west boundaries of the project. Those
haven't changed and still consistent with the preliminary plans. One of the conditions of the
preliminary approval was for additional tree plantings to enhance the buffer to the residential
neighbors to the north so that is one of the additions that was made to the final subdivision plans
was additional tree plantings along that...basically that northern boundary of the property of the
project and then the one thing Rudy did propose was, and he’s done it, | believe, on a coupte of
his other projects where he plants trees at the end of the roadway along with some portions of
fencing, board on board, wooden fencing to try to create a little landscaped area at the end of the
road so that way, kind of creates a little buffer and designates the end of the road also which would
help to the residents of the north also. We did receive PRC comments before we submitted the
final application and then additionally since submitting, we've received town engineer comments
and town staff comments.
Part of the final application included the responses to those inittal PRC comments and then we did
just submit written responses to the latest round of town engineer and town staff comments. A lot
of that stuff we've met with town staff on just to review. We're confident, Rudy’s confident that
Pg. 169 August 5, 2025 Planning Mceting
alot of that stuff can be addressed. We don’t see anything in there that hasnt been addressed or
hasn't been talked about al this point so we're pretty confident that stuff can be basically just
finalized on any revised plans to be submitted to town staff and then reviewed from there. A lot of
technical changes if that needs to happen. But that’s very much the recap and summary of what's
happened from preliminary to final, but the plans themselves are very much consistent with the
approved preliminary plans, So, with that 'd be happy to answer any questions from the board.
Ok, I guess...we received...[ read it quickly but received a letter today, last
minute here from Dan Dmachich at 789 Blue Creek Drive and he had some comments here. I
think what we'll do is we'll add this into the record, and these are very similar to the comments .
[ am assuming some of you people are neighbors there. I received a letter from this gentleman
today in regard to the project and some or people from your group had submitted a letter previous
with a bunch of signatures. You're al! familiar with that, I] guess, Well, [have to compliment you
on it. You did a nice job with that, whoever did it. They were legitimate requests. I agree with
many of the things on there. | think you did a very fine job with that whoever did it. Just for
correcting on some of them, within the 65 foot buffer. ’m just going to read a couple of these just
to try and shorten this thing up so we can get all on the same page here with the board. (READING
FROM THE LETTER-PLEASE SEE ATTACHED LETTER ALONG WITH ALL
SIGNATURES)
Within the 65° of buffer which is 15" beyond the 50° setback and constitutes the “limit of
disturbance” in lots 6-10. We propose that the removal of existing vegetation be specifically
prohibited and included in the definition constitutive of disturbance within this area, in addition
to any excavation of soil and grading.
J agree with that 100%. We can put that ina resolution. We can put that in that, that does not get
cut and does not get disturbed. Okay, that’s one of the main things you had, So, you want to keep
that buffer. So, that’s ...it’s a request and personally, f agree. I’m hoping the board will go also.
There is a comment in there about existing trees to be saved over 8 inches and so on. That is in
the approval. We already did that. It says we didn’t do it. Yes, we did. It’s right in the minutes
of the preliminary approval. That was accomplished.
Trees that are mature, trees need to be preserved.
Now, obviously, we all know that you can’t preserve a tee where there's a house going to go, or
a driveway, the road, and so on and so forth. Tree’s on the property then can be saved, and those
we can put in that those be saved. Any trees over 8 inches, not ina right of way or anything, can
be saved. Fm going through these because I’m trying to address your letter without making a
whole evening of it here, so bear with me.
Within all areas outside of the “limits of disturbance” we would propose that rather that this area
being constitulive of a conservation easement belonging to the HOA of the new residents, who may
vote atany time to encroach, alier er remove it, greater protection should be afforded to this
wooded area by either of the following options.
Pg. 170 August 5, 2025 Planning Meeting
r 8/5/25 Webster Planning Board Presentation:
1. Intro: Dan Drmacich, 789 Blue Creek Drive, Webster
2. As a resident who lives adjacent to the Sienna Project, | have, as
all of my neighbors do, strong concerns about the impact this
housing development will have on us, specifically from the
removal of vegetation which has provided us over the past 30
years:
A. Protection from the noise pollution from Rt. 104,
B. Natural reduction of the temperature, and
C. A safety corridor for deer, fox and coyotes, as they travel to
and from the Webster Bird Sanctuary
3. However, we do realize that the land in question has been sold
to Mr. Neufeld & approval has been granted by this Planning
Board for development.
|
4. Despite our disappointment that the Town of Webster did not
purchase this land and use it as an extension of the Bird
Sanctuary for the recreational benefit of Webster citizens, our
neighborhood and the animals, whose protection is now
diminished, and will undoubtedly force more of them onto the
surrounding roads where more of their deaths will occur,
accompanied by more car accidents, our neighborhood citizens
are hopeful that the Planning Board directions to Mr. Neufeld
will result in some action that will partially meet our
environmental concerns that include:
A. Protecting the current vegetation in the corridor between the
Sienna development and the Blue Creek neighborhood,
June 28, 2025 Obi asee—
/
Town of Webster Planning Board Members Leh Livres
Dan Drmacich & Barbara Kruze, 789 Blue Creek Drive
Gregor Schuler, 793 Blue Creek Drive
Request for Planning Board Conditions for Approval of Proposed Sienna Project on
Orchard Road (Planning Board Meeting July 1*, 2025, 7pm)
In 2027, Mr. Rudy Neufield, owner of Cross Roads Inc., purchased the land,
located between Orchard Road and Blue Creek Drive for the purpose of building several
homes, for approximately $120,000. While our entire neighborhood opposes this
development, we understand that in an absence of the ability to purchase the land
ourselves, the only recourse we have is to appeal to you, the Planning Board, to ensure
that the developer adheres to certain conditions which ensure that the development is
minimaily invasive. !t appears that the current final site plan makes substantial provision
for the preservation of existing trees and habitat, and we are therefore urging the Planning
Board to ensure that these provisions are upheld and implemented through conditions
you, the Planning Board, are able to attach to Site Plan Approval.
We are therefore proposing the following:
A)Within the 65' of buffer which is 15’ beyond the 50' setback and constitutes the ‘limit of
disturbance’ in lots 6-10, we propose that ‘removal of existing vegetation’ be specifically
addition to any excavation of soil and grading.
| 50 Laie prohibited and included in the definition constitutive of ‘disturbance’ within this area, in
AM
2. Within the +/- 3.8 acres outside of the ‘limits of disturbance’ beyond lots 1 and 2, we
propose a similar prohibition be set upon the removal of existing vegetation. If existing
vegetation is to be removed here, as indicated by the engineer's note that ‘existing trees
to be selectively cleared’ (p.5), we would expect an inventory of ‘The location of all
existing stands of trees on the site, with particular notation of all existing trees with a
diameter of eight inches or more,’ as should have been required by the Planning Board o
the site in its entirety, prior to Preliminary Site Plan Approval, according to Cn. 215
Section A, tem T9 6
8. As we understand thafTaiiure to have included this in this
first instance would potentially invalidate subsequent site plan approval, we would be
willing to accept the specific prohibition of removat of all trees in this area—or a selective
inventory of precisely which trees are identified to be removed-- as a condition of site
plan approval, in lieu of the complete inventory
3. Within all areas outside of the ‘limits of disturbance,’ we would propose that rather than
this area being constitutive of a conservation easement belonging to the HOA of the new
should be afforded to this wooded area by either of the following options:
a The Town should control this easement, or
0
Myr residents, who may vote at any time to encroach, alter or remove it, greater protection
Dead
por
which prohibit the removal of existing mature vegetation outside of the
Ea (5 The developer should be required to place restrictions upon the deeds of all lots
disturbance area, as well as being required to provide notice to the purchasers
“a
Ml
a 1472 Blve Creek Dive
" ese C, Treardona. Wwebsier “fly O-Jnen.don.
174 Yoe Greek’ Daye
* Veaceurt Tuncay webster , ¢ ie
3
144 Donald RPyYAaAw 77% BlYue CRERk OR Vesratt Kam
SV ia uy) WS Dluelrw “Bhan | Loo
"Cli LE View 18 Blue CreeK (bY Be
7 NE Cal PID BE Bw bb yo [Ving dr
ll AEaLimany eS Blue Ae :
* LP na \) ) Latte: aw KG + el eat LA Medios e
2 David SA LETES Tat Flue Crek wy. 7a
*Soym stow son FAL Blt deo > Lge fn
“ Jerri Sresahard (632 oe Lanes Trad Oe) roochard
23 David Creschard 632 Fire bales Toul OZ. (
24
Theresa Knapp SOD Pive Croek Wu sa Z Hua(g
” ul Bec KIAEP So db leak ya
© Myle B. Dayoan 292 BlsoCceek - HEB
Man Kath aes Lye 742 Bly (wen - eo
7]
I. The town take control of the easement, 03
That is an absolute. Once an HOA is formed, the homeowners there then...the 10 homeowners
that are ultimately be in there, they can’t vote to say well you know what, we’re going to change
it. No, that land stays forever wild. That is part of a residential area. That's the way an HOA
works so there is nobody going to be able to go in and change anything afterwards, okay. And let's
sec,
2. The developer should be required to place restrictions upon the deeds of all lot which
prohibit the removal of existing mature vegetation outside of the disturbance area, as
well as being required to provide notice to the purchasers of such restrictions. This
condition would be a function of the Planning Board's creation of the subdivision which
is effected through final ste plan approval.
That could go right in the deed when they buy the house. That would be in their deed that they
can not disturb that land, okay. | am trying to address some of the things that your letters. ..pretty
much all of them, And I think that was pretty much it. So, with that, we did close the public hearing,
but I know this is four years ago, but it’s been awhile. If there is anybody who wants to speak in
regard to this, just keep it short for a few minutes. Anything new or different, and you’re more
than welcome to come up. Yes sir. Give us your name and address.
Gregory Schider at 793 Bluecreek Drive: Lam right against the land because it’s a pie shape. The
only real concern T have at this point is the fence and trees. The fence will stunt the growth of the
trees, and | looked at his other properties where he's done it and tings are falling over, 1 mean, it
looks terrible. Ht should just be a double row of trees. Make it look pretty and more protection
because a fence doesn’t grow high, trees do. And then TF just want to make sure there's no
additional assessment on my property because last time on the map that I got, Lwas giving all nv
land to the town because no one proof the blueprint. So, 1 just want to make sure no additional
assessment is put on my property where the sewer line is going. So, P don’t know where | can see
that.
I'm losing you there. Is the sewer crossing your property?
No, t’s next to mine, but it’s really tight. And I didn't give them permission to
use my land, but on the last survey map or whatever, vou know, layout, they had my land being
given to vou guys and I want to make sure no assessment is put on my land. Okay, can we do back
on one of the maps so we can see. There looks like there’s an assessment for that. (VIEWING
THE SURVEYS ON THE TV)
(SHOWING MR. SCHULER WHERE THE LINES ARE ON THE SURVEY)
That's the property line and this is the sewer line.
So, that would be in the middle of the casement that’s been given...
As long as the property line...because | don't want any of his...
Pg. 171 August 5.2025 Planning Mecting
Now Punderstand what you're saying, So, you just don ( want anything going
over onto yours. I got you. Okay. Thank you. Anybody else wish to speak.
I’m kind of following up on what the gentleman said. If you look at the plan that
shows where the trees are being removed, these plans show trees being removed from this
gentleman's property.
From his property?
Yes.
Yes, there are a couple of mature trees that......
Those trees are already taken down.
They're going to be taken down you say.
Those trees are already taken down. Why didn't you update the map? They were
down 3 years ago.
Because he’s concerned about work being done on his property and this showed
work, but if it’s done already, then it's not a concern.
Thank you.
Diana Davis at 942 Gaywood Lane: Hi, 1 just want to say, actually 1 realty like this development.
So, fd think it’s great that you guys work with a developer and there's preservation of you know,
existing vegetation. The conservation easement thing is awesome. This is the kind of thing that,
vou know, our group, The Webster Open Space Committee, we really sort of want to see happening
more often in Webster. £ think i is the perfect example of how when vou have a development, it
doesn’t have to be completely awful and destroy everything. Tt can be actually really nice, and
vou can get the best of both worlds. And [think it’s also.a great example of how residents. 1 don’t
know who Dan ix, but To think it’s a great example of how they can...you know, if they're
understanding the code and they can intelligently as for things that make sense that are within
your power to do, this is how it’s all suppose to werk. So yeah, T just want to say this ts exactly
what f like to see and yay! Also, 1 just wanted to clarify the elements of their letter that you were,
sort of agreeing to and saving, vou know, this is good sniff. You're going to read those into the
resolution, Obviously, not the thing about the homeowners association because, as you explained,
that doesn't need to be.
What I have done, ve taken notes on it so if we make a motion, whoever
makes a motion, we can, In my opinion, | would like to enter these into the resolution.
Because T know that’s important. Alright, thanks.
Pe. 172 August 5, 2025 Planning Meeting
Again, Dan, TP dont Know how to pronounce his name, Drmachich, T guess. He
did submit a letter and this came late today. | mean, this ts like 4 years late, bul you know, we're
okay with W. And pretty much everything he’s got in here is what I just expressed because tt
sounds like he read your letter and put a Jot of it in here. So, what I'll do is [ will give it to Katherine,
and we'll enter this into the record also. Okay. All right, now board, some were not here when this
was approved back then, They did receive a preliminary approval and since then it has received
all governmental approval. It's done through PRC; it’s been updated with comments from PRC
commitice and so on and so forth. So, if anybody has anything that they'd like to add into it, please
help out.
All is at it was.
Now I guess as far as engineering, Josh and Keith, you guys, you've received
all the necessary paperwork for it. So, you fellas are all set with it. Ok, engineering is good. That
was a concern we had back then and here we are tonight. So, we did SEQR on this back then right.
Ok, that was done at preliminary. Alright this may take a little bit because | don’t have anybody
preparing a motion for me.
RESOLUTION 25-0056 Anthony Casciani made a motion for FINAL
SITE PLAN APPROVAL Located on
Orchard Rd. Applicant Insite Land
Development, Inc. is requesting FINAL
SITE PLAN APPROVAL associated with
the creation of ten (10) single- family lots on
a5.94-acre parcel having SBL# 080.05-2-2. 1
located in the R-3 Single Family Residential
District under Section 269-10, 296-27, and
350-12 of the Code of the Town of Webster.
Which was seconded by Mark Giardina.
FINAL APPROVAL CHECKLIST
1. Subject to PRC comments.
Subject to Parks and Recreation fees Gf applicable)
Subject to Preliminary Approval Conditions.
Subject to all applicable governmental fees,
Subject to Department of Public Works approval
6. Significant construction shall occur within one year, as deemed by the Planning Board, to expire
on $.5.26
7. The conditions of Preliminary and Final approval are depicted on the cover page of the final
designed plans.
$8. The Engineer for the proposed project shall provide a Letter of Certification that all proposed
work was completed, as per Planning Beard resolution of final approval before a Certificate of
Occupancy will be issued,
9. A Letter of Credit to the Town for the project shall include the fee for the Engineer's final
ceruification inspection of the site.
10. All storm water facilities are to be constructed first
Py. 173 August 5, 2025 Planning Meeting
wae iw MN
11. Subject to resolution of the Final approved minutes.
12. Approvals are subject to Drawing Na: 2723-16
13, NO FENCING along property linc, just trees.
14. (PER MR. CASCIANI) SEE ATTACHED NOTES AND COMMENT LETTER FROM
NEIGHBOR.
Now, if you guys want to help me out. | want to add a couple of the things that we just discussed. I'm
going to pul those in there too. One is and I will put this whole sentence in.
Within the 65° of buffer which is 13° beyond the 30° setback and constitutes the “limit of
disturbance” in lots 6-10. We propose that the removal of existing vegetation be specifically
prohibited and included in the definition constitutive of disturbance within this area, in addition
toany excavation of soil and grading.
Mr. Chairman, I think that would be consistent with the comment to provide
the conservation easement signage along that limit of the conservation easement which is beyond
the setback.
That’s another part of it down there.
I’m thinking that might cover......
I will put it in just so we reiterate.
I'm thinking that ] might cover it.
Anthony Casciani; Ok, the trees, we had that in the preliminary. So, you're going to have to
before final and before you get a permit and everything, you're going to have to just locate the
trees that youre saving on the site there 8 inches. So, saving the trees, that’s afready been in
there. So, we'll follow up with that one.
Deed restrictions??? 1} CAN NOT HEAR.
That would be in the homeowners restriction. That's the idea, Let's back it
up a little bit. Will put it in but part of the approval for the HOA is the deed restriction is that
none of thal and can be touched and that’s controlled because it is an HOA. So, the HOA
controls that.
Mr. Chairman, it would also be included in the casement language for those
(wo proposed conservation easements then gets included in the HOA.
| believe. And I think we discussed the rear property lines at the 65 foot
buffer coming back that of the buffer area that 4 x 4 inch signed, this is a conservation be placed
In the rear lines of those lots,
Pg. 174 August 5, 2025 Planning Meeting
Alright.
If you folks would like to help, feel free. This is all part of your
neighborhood. | think these are everything that you requested.
Trees??? [CAN NOT HEAR
Instead of a fence.
Can I address that. So, the fence is not proposed along the rear property linc.
It's only proposed just at the end of the road.
A fence doesn't grow............ ICAN NOT HEAR
Let’s just put the trees.
So, beyond the fence, we have...we show basically the line of proposed
evergreens and then beyond that ts the amount of buffer existing trees that we could keep to limit
the grading so but at least the fence isn’t along the property line. It’s just a small section at the
end of the road. The real buffer is the continuous row of tree plantings. The landscape plan
shows it really.
Is that what I'm looking at right at the end there, Josh where you got
your...... what's that.
Proposed new trees
You can show the old....there’s one with the fence right at the end of this
drive road, right: there.
There's the design.
That is only for the width of the road right at the end of it where the pavement
stops,
You can move and get a road built right up to your
house, only in Webster. 2.0.0.2... 1 CAN NOT HEAR.
So, what you are saying is you prefer just to see the trees in there.
I would preter............. 2 to 3 foot a year... LCAN
NOT HEAR.
Pg. 175 August 5, 2025 Planning Mecting
Anthony Caseiint Ok, tets do that, So. we"H eliminate the fencing and propose the trees to
match to what they re puting in.
I CAN NOT HEAR.
Ok, so lets put it this way. No fencing along the rear property line and it
should be just a line of evergreen trees. And again, what you just said, it’s under the HOA so that
makes the restriction so nobody can do anything as far as cutting trees in there. Ok, I think that
covers it pretty much. I think we have addressed the comments of the neighbors. [think we’ ve
worked as best we can with it because, you know, we all know that there's houses going up and
the land is approved for it and all we can do is the best we can do with it. You know,
VOTE;
Mr. Casciani
Mr. Malta
Mr. Giardina
Mr. Anderson
Mr. Kosel
Mrs. Maltman
Mr. Gasic
RESOLUTION 25-0057
VOTE:
Mr. Casctani
Mr. Malta
Mr. Grardina
Mr, Anderson
Mr. Kosel
Mrs. Maltman
Mr. Gasic
AYE
ABSENT
AYE
AYE
AYE
AYE
ABSENT
Anthony Casciani made a motion for
SUBDIVISION APPROVAL Located on
Orchard Rd. Applicant Insite Land
Development, Inc. Is requesting
SUBDIVISION APPROVAL associated
with the creation of ten (10) single- family
lots on a 5.94-acre parcel having SBL#
080.05-2-2.1 located inthe R-3 Single Family
Residential District under Section 269-10,
296-27, and 350-12 of the Code of the Town
of Webster. Which was seconded by Mark
Giardina.
AYE
ABSENT
AYE
AYE
AYE
AYE
ABSENT
Pg. 176 August 5, 2025 Planning Meeting
COBBLESTONE PLACE PITASE 2: Located at 1025 Ravenside Line. Applicant Brickwood
Management is requesting FINAL APPROVAL (
PUBLIC HEARING
) in association with the
construction of a 3-story building containing 47 market rate apartment units on a 5.0-acre lot
having SBL# 079. 15-1-8.003/SEN2 located in the MHR Medium High Residential District under
Sections 269-1] and 350-14 of the Code of the Town of Webster.
Appearing before the board was Jake Calabrese (NEVER SIGNED IN) and | am with Marathon
Engineering here to present the Cobblestone Phase 2 project. Also here is Luke Vanupps with
Brookwood Management as well as Matt Tomlinson with Marathon Enginecring.
We are seeking preliminary and final approval for the 3-story; 47 unit market rate apartment
facility. Just to kind of follow-up on some board comments from the July meeting. We finalized
the snow storage locations as well as, we confirmed with our landscape architect that the plantings
on the south side. They're along the 3 on | slope will grow just fine. He’s very confident in that.
Between that last meeting and tonight, we have updated the SWPPP, resubmitted it and received
comments back from the town on 7/23 and we were able to sit down with Keith, Mark, Erika with
the town to just review the comments and just conform that they were more maintenance related
than engineering related. After that meeting, we updated our plan just to include a pond plan as
well as some minor updates within the body of the SWPPP and then resubmitted that the first of
August to the town. They are currently, | think, just reviewing that now. Other than that, there
really hasn’t been too many changes plan wise. So, with that, 1 will hear any comments or
concerns from the board.
Ok, anybody have any concerns with this. We pretty much went through it.
Peggy, you had comments about the trash and recycle stuff.
Yes, we will have recycling with the facility.
| remember Drazen made about comment about the snow storage and we made
comments on that.
Yes, we finalized those. Resolved all that.
Everything else was engineering detail and that that was the SWPPS and so
on and so forth. With that, Keith and Josh, you guys are alright with all that.
Yes, we received their response to our comments. We've not reviewed them
yel.
Okay. So, let's see, they did come in for preliminary. We did close the public
hearing. Now, if there is anybody for that project. We did close it, but we could...Okay, that’s
fine, we'll leave tt closed. Anybody, any comments for this for preliminary.
Py. 177 August 5, 2025 Planning Meeting
RESOLUTION 25-0058 Anthony Casctani made oa motion for
PRELIMINARY SITE PLAN APPROVAL
Located at 1025 Ravenside Lane. Applicant
Brick wood Management Is requesting
PRELIMINARY SITE PLAN APPROVAL
(
PUBLIC HEARING
) in association with the
construction of a 3-story building containing 47
markct rate apartment units on a 5.0-acre lot having
SBL# 079,15-1-8.003/SEN2 located in the MHR
Medium High Residential District under Sections
269-11 and 350-14 of the Code of the Town of
Webster, Which was seconded by Mark Giardina.
PRELIMINARY APPROVAL CHECKLIST
oe
10. Il.
12.
13. I4.
15.
16
Subject to PRC Comments
Subject to a Letter of Credit posted with the Town of Webster.
Subject to Conservation Board comments
Subject to Monroe County Water Authority comments
Subject to the determination of the ZBA for requested variances.
Address any land to be conveyed to the Town.
Address any recent subdivision approvals of adjacent lands.
All the improvements shall be constructed according to the specification of the Town of
Webster.
All roadway construction to be in accordance with the specification and regulations set forth
by the Town of Webster
All sitework is to be in compliance with the standards of the Town of Webster.
Preserve all mature trees on sile, where possible, and mark said trees by the developer's
engineer prior to the commencing of any site work.
Comply with all requirements of any Federal, State, County, or Town agency,
Address drainage, lighting, signage, and landscaping, buffering, berming and snow storage.
The landscape, hardscape, site accessories, and associated finished grading design for the
development must be prepared by a NYS licensed Landscape Architect. The final landscape
plans shall bear the seal and signature of the Landscape Architect,
Approvals are subject to Drawing No: 1764-25
Proceed to Final Approval
VOTE:
Mr. Casciani AYE
Mr. Malta ABSEN]
Mr. Giardina AYE
Mr. Anderson AYE
Mr. Kosel AYE
Mrs. Maltman AYE
Mr. Gasic ABSENT
Pg. 178 August 5, 2025 Planning Meeting
SUBDIVISION APPROVAL Located at
1025 Ravenside Lane. Applicant Brickwood
Management is requesting FINAL
SUBDIVISION APPROVAL (PUBLIC
HEARING) in) association with — the
construction of a 3-story building containing
47 market rate apartment units on a 5.0-acre
lot having SBL# 079.15-1-8.003/SEN2
located in’ the MHR Medium High
Residential District under Sections 269-1]
and 350-14 of the Code of the Town of
Webster. Which was seconded by Pegg
Maltman.
[ RESOLUTION 25-0059 Anthony Casciani made a motion for FINAL
FINAL APPROVAL CHECKLIST
Subject to PRC comments.
Subject to Parks and Recreation fees (if applicable)
Subject to Pretiminary Approval Conditions.
Subject to all applicable governmental fees.
Subject to Department of Public Works approval
Significant construction shall occur within one year, as deemed by the Planning Board, to expire
on 8.5.26
7. The conditions of Preliminary and Final approval are depicted on the cover page of the final
designed plans.
8. The Engineer for the proposed project shall provide a Letter of Certification that all proposed
work was completed, as per Planning Board resolution of final approval before a Certificate of
Occupancy will be issued.
9. A Letter of Credit to the Town for the project shall include the fee fer the Engineer's final
certification inspection of the site.
10. Alb storm water facilities are to be constructed first
11. Subject to resolution of the final approved minutes.
12. Approvals are subject to Drawing No: 1764-25
ea SS oe
VOTE:
Mr. Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mr. Koscl AYE
Mrs. Maltman AYE
Mr. Gasic ABSENT
L Pe. 179 August 5, 2025 Planning Meeting
MCALPIN INDUSTRIES PHASE Eo Located at 865 Hard Road. Applicant McAlpin ladustries is
requesting FINAL SITE PLAN MODIFICATIONS including minor revisions to the previously
approved phase | plans associated with the construction of a 120,000 SF hght manufacturing warehouse
on a 25.65-acre lot having SBL #079.06- [-32.123 located in the OP Core-Area-North Office Park
District under Section 269-10 of the Code of the Town of Webster
Appearing before the board was Mike Ritchie frem Costich Engineering and with me is Matt McAlpin and
some other McAlpin team members here and we were last before you t believe it was May 20"
where this board granted final site plan approva! for phase one as well as special use permit approval.
Since then, Matt and his team have been getting pricing and crunching some numbers and come to the decision
that phase 2 needs to happen sooner than later. Which is what's resulting in this modification of phase | and
they are very minor modifications, and all are a result of building out phase 2 nmmediately. Those minor
changes are the shifting of the loading docks from being built in the phase | portion to just inmediately north.
No change to the number of docks or anything like that just shifted as well as the entrance that was proposed
for the phase one is just getting minimized a little bit because the grand phase 2 entrance will be built
immediately.
Everything else that this board reviewed that engineering reviewed previously in terms of storm water and
traffic and layout are all as they were approved then and was approved per the preliminary plan. So, we did
receive some comments from town staff when we submitted, I guess primarily the first was, can we combine
our phase one, phase tow into one set instead of having two separate standalone, that would be confusing. So,
we did do that, resubmitted that. And then I believe, was it last week or Monday, we received a few minor
sewer department comments and we sent revisions back to the town addressing those today.
So, again, the phase 1 modifications are as a result of moving forward with phase 2, So. happy to answer any
questions this board may have.
[ think for phase | here Mike, I think what you've got with the modification, I don’t see
any issues with that. [think we're domg that as separate, obviously right. We are doing that as a separate
resolution. We gave final approval to section one a while ago there and with the section with the new section
that they are proposing to do, they had to modify what we already approved. So, basically all we are going here
is just making a modification to what was already approved . Does someone want to make a motion to that, If
you are all ok with that. 1 think it’s just a matter of simple resolution that we are approving the modifications.
RESOLUTION 25-0060 Peggy Maltman made a motion for FINAL
SITE PLAN MODIFICATIONS Located
al 865 Hard Road. Applicant McAlpin
Industries is requesting FINAL SITE PLAN
MODIFICATIONS including minor
revisions lo the previously approved phase |
plans associated with the construction of a
120,000 SF light manufacturing warchouse
on a 25.65-acre lot having SBL #079.06-1-
32.123 located in the OP Core-Area-North
Office Park District under Section 269-10 of
the Code of the Town of Webster. Which was
Pg. 180 August 5, 2025 Planning Meeting
seconded by Anthony Cascran
VOTE:
Mr. Casciant AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mr. Kosel AYE
Mrs. Maltman AYE
Mr. Gasic ABSENT
Located at 865 Hard Road. Applicant McAltpin Industries is
Requesting PHASE II FINAL SITE PLAN APPROVALS including minor revisions to the previously
approved phase | plans associated with the construction of a 120,000 SF light manufacturing warehouse
on a 25.65-acre lot having SBL #079.06-1-32.123 located in the OP Core-Area-North Office Park
District under Section 269-10 of the Code of the Town of Webster.
Appearing before the board was Mike Ritchie with Costich Engineering. Section 2 is the 120,000 sq feet
immediately north of phase |. Again, all the stormwater management; traffic, everything was design for full
buildout so no real engineering change just building some additional bio retention facilities and building the
additional parking and one thing did come up, prior to this mention to phase 2, the fire marshal had comments
that a fire access road would be needed to be built whenever phase 2 would be proposed so as you can see
that’s shown on the plans along that west property line and an emergency access road just for emergency access
vehicle only tying into Publishers Parkway. So, everything else per this plan is the same as it was on the
preluninary plan but just building more of it in one step now.
The emergency exist gores out on onto to Publishers Parkway. Now, I don’t know what
the stories there's some issues with that yet Josh. There's some engineering stuff that needs to be resolved.
Well, we appreciate that we just did get a revision, I believe, earlier today or yesterday.
Unfortunately, all staff have not had the opportunity to review in depth and detail the phase 2 plans.
Okay, Well, we probably should table this then.
T mean the phase 2 plans are as they were for, you know, preliminary and storm water traffic.
But again, if town staff is not comfortable with it, | guess we can come back ata later date. But again, there
really there are no changes to this plan that what was approved, And we are happy to work with staff on any
conditions they may have.
That's engineering, | don’t know what needs to be resolved with that.
Right and again, all we got today were a few minor sewer comments, labeling things, adding
cleanouls. You know, ] know that this is a big project, and they want to make sure it’s all set and we're more
than happy to add a condition that, you know, no plan sign off can be sent in until we've addressed all.
| will leave that up to engineering. Whatever they choose to do, we'll...
Yes, [am good with that.
Pg. [81 August 5, 2025 Planning Mectiny
OK, so we can move forward with itand then we lh just putin part af the resolution that
final details will be resolved through engineering.
E would like to clarify similar to others, your pre-mylar review will be an extended review.
We understand and we're more than willing to work with town staff to address any and all
comments they have.
Tony, before you do that, quick question....With this emergency access road going up to
Publishers Parkway is that a gate that is at the beginning of that.
Yes. It will be knox box for fire department access.
I'm looking more for just a reminder than anything else. The address of the property.
We worked with town staff, and it is a Hard Road address, and I think it’s 865 Haard Road. So.
that was revised in the plan
RESOLUTION 25-0061 Anthony Cascitanit made a motion for
PHASE II FINAL SITE PLAN
APPROVAL Located at 633 Basket Road.
Applicant Lon Lockwood is requesting
PHASE IE FINAL SITE PLAN
APPROVAL (
PUBLIC HEARING
)
associated with the construction of un
8,822SF multi-tenant post-frame — style
building on a 1.48-acre lot having SBL#
066.03-1-9.11 located in the IN Industrial
District under Section 269-11 and 350-22 of
the Code of the Town of Webster. Which
was seconded by Mark Giardina.
CONDITIONS
1. Final details should be submitted to Engineering,
VOTE:
Mr. Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mr. Kose] AYE
Mrs. Maltman AYE
Mr. Gasic ABSENT
Pg. 182 August 5, 2025 Planning Meeting
Located at 711 and 715 Ridge Road
Applicant Jason Stanley 1s requesting PRELIMINARY SITE PLAN AND SUBDIVISION
APPROVAL (
PUBLIC HEARING
) in association with the demolition of the existing structures
(two-story residential dwelling, barn and garage) and the construction of a new 2,600SF banking
facility with internal site parking on a proposed 2.26-acre lot having SBL#s 079.17-1-78.111 and
079.17-1-79 located in the MC Medium Intensity Commercial District under Section 269-5 and
350-18 of the Code of the Town of Webster.
Appearing before the board was Evan Gelell (DID NOT SIGN IN) with Costich Engineering and
Bob McFadden with Fingertakes Federat Credit Union. So, last meeting we received preliminary
approval, and we also received town engineering comments, and we addressed all the comments;
provided a new SWPPP; provided the updated plans for final approval. Not much has changed
since preliminary. We worked through the landscape and some of the comments with the storm
water Management facilities.
Everything you had the last time was good. There was just the SWPPPS and
miscellaneous drainage, this and that, It would be nice to have you guys out of here, wouldn’t it.
Okay, does anyone have any concerns with this? We covered everything and all we had was the
drainage issues and things of that nature and that’s all been resolved apparently so.
RESOLUTION 25-0062
for
PRELIMINARY APPROVAL Located at
711 and 715 Ridge Road. Applicant Jason
Stanley is requesting PRELIMINARY
APPROVAL (
PUBLIC HEARING
) in
association with the demolition of the
existing structures (two-story residential
dwelling, barn and garage) and the
construction of a new 2,600SF banking
facility with internal site parking on a
proposed 2.26-acre fot having SBL#s
079.17-1-78.1 bE and 079.17-1-79 located in
the MC Medium Intensity Commercial
District under Section 269-5 and 350-18 of
the Code of the Town of Webster. Which
was seconded by John Kosel.
FINAL APPROVAL CHECKLIST
I. Subject to PRC comments.
Subject to Parks and Recreation tees (if applicable)
Subject to Preliminary Approval Conditions,
Subject to all applicable governmental fees.
Subject to Department of Public Works approval
wn fe db
Pg. 183 August 5.2025 Planning Meeting
6. Significant constuction shall occur within one year, as deemed by the Planning Board. to expire
on 8.5.26
The conditions of Preliminary and Final approval are depicted on the cover page of the final
designed plans.
8. The Engineer for the proposed project shall provide a Letter of Certification that all proposed
work was completed, as per Planning Board resolution of final approval before a Certificate of
Occupancy will be issued.
9. A Letter of Credit to the Town for the project shall elude the fee for the Engineer's final
certification inspection of the site.
10. Approvals are subject to Drawing No: 9444 Dated: 5.12.25
VOTE:
Mr, Casciani AYE
Mr. Malta ABSENT
Mr, Giardina AYE
Mr. Anderson AYE
Mr. Kosel AYE
Mrs. Maltman AYE
Mr. Gasic ABSENT
Located at 633 Basket Road. Applicant Lon Lockwood is
requesting FINAL SITE PLAN APPROVAL associated with the construction of an 8,822 SF
multi-tenant post-frame style building ona |.48-acre lot having SBL# 066.03-1-9.11 located in the
IN Industrial District under Section 269-10 and 350-22 of the Code of the Town of Webster.
Appearing before the board was Greg McMahon with McMahon LaRue and Lon Lockwood, the
applicant and owner of the property.
We appeared last month and received preliminary approval. Two of the comments; the larger
comments that we heard last month were that the dumpster enclosure was to be of concrete block
type and that change has been made to the plans and also you wanted to sce some type of
renderings or colors for the building and elevations, colored elevations were provided. I believe
we did receive town engineer comments, and they were addressed on the plans, and we are here
tonight seeking final approval.
Looks nice, nice looking building, Outdoor lights on the building. Any lighting
on the site or whatever. We may have talked about it, but } don’t remember though.
There ts a lighting plan with
1 think we did discuss it. The lights you did mention it, None casting oul
Pg. 184 August 5, 2025 Planning Mectine
toward the road
They're ali dark sky compliant and all the light spill is contained on the
property.
Okay. Are you going to put a sign in there because more than one business.
You don't have it here now but would you.
I hadn't even thought about a sign.
It’s not a problem. But when you do, my suggestion because you have your
Business and then you have the dog business and so on. Make it into one sign though instead of
separate signs, ok. Anything clse. I think we've looked at this. There were just some issues
that were there . Derek, you had concern about it being in an agricultural district or something
and thal was resolve though.
RESOLUTION 25-0063 Mark Giardina made a motion for FINAL
SITE PLAN APPROVAL Located at 633
Basket Road. Applicant Lon Lockwood is
requesting FINAL SITE PLAN
APPROVAL (
PUBLIC HEARING
)
associated with the construction of an
8,822SF multi-tenant = post-frame — style
building on a 1.48-acre lot having SBL#
066.03-1-9.11 located in the IN Industrial
District under Section 269-11 and 350-22 of
the Code of the Town of Webster. Which
was seconded by John Kosel.
FINAL APPROVAL CHECKLIST
Oe
Subject to PRC comments,
Subject to Parks and Recreation fees (if applicable)
Subject to Preliminary Approval Conditions.
Subject to all applicable governmental fees.
Subject to Department of Public Works approval
Significant construction shall occur within one year, as deemed by the Planning Board. to expire
on 8.5.26
The conditions of Preliminary and Final approval are depicted on the cover page of the final
designed plans.
The Engineer for the proposed project shal! provide a Letter of Certification that all proposed
work was completed, as per Planning Board resolution of final approval before a Certificate of
Occupancy will be issued.
A Letter of Credit to the Town fer the project shall include the fee for the Engineer's final
certification inspection of the site.
Pg. 185 August 5, 2025 Planning Meeting
10. All storm water facilities are to be constructed first
11. Subject to resolution of the final approved minutes.
12. Approvals are subject to Drawing No: 24129
13. Applicant to return for any future signs,
VOTE:
Mr. Casciant AYE
Mr. Matta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mr. Kosel AYE
Mrs. Maltman AYE
Mr. Gasic ABSENT
DINKS & LINKS: Located next to 900 Five Mile Line Road. Applicant Joe Catalani is requesting
PRELIMINARY SITE PLAN APPROVAL (
PUBLIC HEARING
) associated with the
construction of a 41,000 SF indoor/outdoor recreational facility on a 9.38-acre lot having SB#
079.10-1-2.3 located in the HC High Intensity Commercial District under Section 269-10, 269-11
and, 350-19 of the Code of the Town of Webster.
*#This project will be tabled to the September 2™ mecting pending additional information
requested by the Town **
ADMINISTRATIVE ITEM:
* Planning Board meeting minutes for June 3, 2025 (CASCIANI/KOSEL) and July 1, 2025
(CASCIANI/KOSEL) were approved.
With no other applications before the Board this evening Anthony Casciani concluded tonight's
meeting at 8:00 PM.
Respectfully Submitted,
Signed
Mlle Pie é~ vaca 2128
Mark Giardina, Secretary
Katherine Kolich, Recording Secretary
C ADeeer Wan
Pg. 186 August 5, 2025 Planning Mecting