OAD

HATCH ROAD

NSET ROYAL SU DRIVE

SITE

FIVE MILE LINE ROAD

RIDGE R

MCMAHON LARUE ENGINEERS AND SURVEYORS 822 HOLT RD. WEBSTER, NEW YORK 14580 INFO@MCMAHON-LARUE.COM (585) 436 - 1080

TOWN 440

Gravel Parking Lot

LOCATION SKETCH N.T.S

P

OH

Asphalt Driveway

PLANS UNDER REVIEW NOT FOR CONSTRUCTION

Asphalt Driveway 438

Catch Basin RIM:434.36 E INV:432.96

INSTALL CONCRETE WASHOUT PER DETAIL

O 43 5

436

HP

Power Pole

OHP

OHP

5.00 Feet Wide Easement to RGE and RTC L:5240 P:119

OHP

8" Tree

Power Pole

OHP

OHP

Guy Wire

36" Tree

Water Valve

Fire Hydrant

Power Pole

W

N:0.25 W:0.21 Capped Rebar Found

Vegetated Area

RIDGE ROAD

Guy Wire

Concrete Sidewalk

Vegetated Area

OHP

437

7 43

439

8" Tree

HP O 436

20' Side Setback

43.4'

Bollards

7 43

Metal Sign

Concrete Porch

436

Concrete Sidewalk 21.9'

5

Vegetated Area 24.5'

43

Asphalt Parking Lot

15.1'

1 Story Frame Building FF:438.49'

24.4'

28.2'

28.2'

TO BE DEMOLISHED

Frame Shed FF:436.18'

CURRENT EXTENT OF ASPHALT

13.4'

14.2'

14.2'

50.5'

Sign

No Standing

434

W

437

Light Pole

S

STATE ROUTE 404

433

6

435

43

432

434

438

20' Side Setback

OHP

Power Poles

10" Tree

Concrete Wall

P OH

433

430

INV:4" PVC Z:430.68

431

436

40.4'

435

Concrete Barriers

W

Storm Water Retention Area

6" Tree

2

INV:6" PVC Z:430.44

Split Rail Fence

429

Edge of Pavement

431

43

433

434

433

2

43

OHP

SILT FENCE (TYP.)

Street Line

20.00 Feet Wide Easement to Lot 2 for Utilities, Sewer, and Water Per Ref. 6

3 43

Asphalt Driveway

432

COPYRIGHT c by McMahon LaRue Associates: 2025

xxxxxx xxxxxx xxxxxx xxxxxx

TOTAL SITE AREA =

ZONING DISTRICT =

UTILITIES:

75,450.0 SQ.FT. 1.732 ACRES MC MEDIUM-INTENSITY COMMERCIAL DISTRICT

DIMENSIONAL CONSTRAINT

FRONT SETBACK SIDE SETBACK REAR SETBACK FRONT BUFFER SIDE BUFFER REAR BUFFER MIN. LOT SIZE MIN. LOT WIDTH MAX. LOT COVERAGE MAX. BLDG. HEIGHT

REQUIRED

50.00 20.00 75.00 50.00 20.00 TOTAL 75.00 45,000 SQ FT 150.00 20% 35.00

PROPOSED

50.00 31.7 239.9 50.00 20.27 76.70 75,450 SQ FT 149.96 7.4% <35.00

CURRENT:

UTILITIES SHOWN HEREON WERE PLOTTED FROM A COMBINATION OF FIELD LOCATIONS AND RECORD MAPS. SUB-GRADE UTILITY LOCATIONS WERE NOT VERIFIED NOR CERTIFIED TO SUCH. SUB-SURFACE UTILITIES ARE DEPICTED AT QUALITY LEVEL "C" AS DEFINED IN ASCE STANDARD 38-02.

3.2%

MOTOR VEHICLE SERVICE STATIONS OR PUBLIC GARAGES. THERE SHALL BE THREE PARKING SPACES FOR EACH SERVICE BAY. UNITS OF MEASUREMENT. (1) SIZE OF PARKING SPACE. THE SIZE OF A PARKING SPACE SHALL NOT BE LESS THAN 20 FEET LONG AND NINE FEET WIDE, EXCLUSIVE OF ACCESS OR MANEUVERING AREA. (2) TRAFFIC LANES WITHIN PARKING AREAS SHALL BE AT LEAST 25 FEET IN WIDTH.

K:\2025 PROJECTS\25-0166 771 RIDGE RD\03 CAD\01 CONTRACT PLANS\01-EX COND DEMO.DWG

60

W

S.B.L. LOT NO.

ADDRESS: LANDOWNER: TITLE RECORD:

THIS MAP WAS PREPARED WITHOUT THE BENEFIT OF AN ABSTRACT OF TITLE AND IS SUBJECT TO ANY EASEMENTS OR ENCUMBRANCES THAT AN UPDATED ABSTRACT OF TITLE MAY SHOW.

40

N:1.95 W:0.71 #6 Rebar Found Base Bent East

OHP

SITE DATA:

20

1,358.12 Along R.O.W. Line to the west R.O.W. of Five Mile Line Road

0

Fire Hydrant

GEOGRAPHIC SCALE

1 INCH = 20 FEET

ABSTRACT OF TITLE:

( 66.00' R.O.W. )

Wooden Deck

Steps

P OH

W

15.1'

13.7'

LOT 2

Light Pole

15.0'

Existing Sanitary Easement to the Town of Webster Per Ref. 5

22.5'

22.3'

Concrete Porch

435

W

437

438

OHP

HP

75' Rear Setback

Vegetated Area

O

438

" IT IS A VIOLATION OF THIS LAW FOR ANY PERSON UNLESS HE IS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF A LICENSED ENGINEER OR LAND SURVEYOR IS ALTERED, THE ALTERING ENGINEER OR LAND SURVEYOR SHALL AFFIX TO THE ITEM HIS SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION ".

Asphalt Driveway

6

to ent m e s 5 er Ea Sew Per Ref. tified) m r o t r e e S t d I n te bs xima n of We ded Use o r p Ap ow ten the T ing or In d r Reco LOT 1 (No Area to R.O.W. 75,450.0 Sq. Ft. 1.732 Acres

43

Gravel Parking Lot

50' Front Setback 150.02' Wide

Asphalt Parking Lot

LIMIT OF DISTURBANCE 30,790 SQ. FT/0.71 AC.

DRAWING ALTERATION THE FOLLOWING IS AN EXCERPT FROM THE NEW YORK STATE EDUCATION LAW, ARTICLE 145, SECTION 7209 AND APPLIES TO THIS DRAWING

Water Valve

PROJECT:

771 RIDGE ROAD PART OF TOWN LOT 59 TOWNSHIP 13 - RANGE 4 PHELPS AND GORHAM PURCHASE TOWN OF WEBSTER, MONROE COUNTY STATE OF NEW YORK PROJ. NO: 25-0166 CLIENT:

ALLAN MALLETTE 771 RIDGE ROAD WEBSTER, NY 14580 DATE

REVISIONS

BY:

P OH

REFERENCES

MAPS: 1. LIBER 243 OF MAPS, PAGE 10 2. LIBER 294 OF MAPS, PAGE 80 3. LIBER 323 OF MAPS, PAGE 77 4. LIBER 352 OF MAPS, PAGE 55 5. EXISTING CONDITIONS MAP BY DSB (JULY 2006) DEEDS: 6. LIBER 10136 OF DEEDS, PAGE 345 7. LIBER 5240 OF DEEDS, PAGE 119

WETLANDS

NO PORTION OF THIS PARCEL IS SHOWN TO FALL WITHIN A REGULATED WETLAND HABITAT. THIS DESIGNATION WAS PROVIDED FROM INVENTORY MAPPING PROVIDED BY THE U.S. FISH AND WILDLIFE SERVICE AND THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION. IF AN OFFICIAL DETERMINATION IS REQUIRED, CONSULT WITH A QUALIFIED WETLAND BIOLOGIST TO FIELD-VERIFY EXISTENCE OF POTENTIAL WETLAND AREAS.

Power Poles

DRAWN BY:

CHECKED BY:

ISSUED:

SCALE:

JANUARY 13, 2026

1" = 20'

PROJECT STATUS

CERTIFICATION

I HEREBY CERTIFY TO THE PARTIES LISTED HERE UNDER THAT THIS MAP WAS MADE USING THE REFERENCE MATERIAL LISTED HEREON AND THE NOTES OF AN INSTRUMENT SURVEY PERFORMED IN ACCORDANCE WITH THE CURRENT STANDARDS OF THE NEW YORK STATE ASSOCIATION OF PROFESSIONAL LAND SURVEYORS COMPLETED ON OCTOBER 2, 2025.

PRELIMINARY / FINAL DRAWING TITLE

- ALLAN MALLETTE

EXISTING CONDITIONS/ DEMOLITION PLAN

Alfred I. LaRue, N.Y.S.P.L.S # 046558

SHEET NUMBER

DRAWING NUMBER

1 of 4

C-100

OAD

HATCH ROAD

NSET ROYAL SU DRIVE

SITE

FIVE MILE LINE ROAD

RIDGE R

MCMAHON LARUE ENGINEERS AND SURVEYORS 822 HOLT RD. WEBSTER, NEW YORK 14580 INFO@MCMAHON-LARUE.COM (585) 436 - 1080

TOWN LOCATION SKETCH N.T.S

HP

O

9'W x 20'L PARKING SPACE

OHP

5.00 Feet Wide Easement to RGE and RTC L:5240 P:119

OHP

OHP

OHP W

0.1

HP O

41

RIDGE ROAD

OHP

PLANS UNDER REVIEW NOT FOR CONSTRUCTION

OHP

Catch Basin RIM:434.36 E INV:432.96

P OH

20' Side Setback

LIMITS OF PROPOSED STANDARD DUTY ASPHALT

50' Front Setback 150.02' Wide

0.1

1.0 25' MIN.

ENLARGED ASPHALT PARKING LOT

" IT IS A VIOLATION OF THIS LAW FOR ANY PERSON UNLESS HE IS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF A LICENSED ENGINEER OR LAND SURVEYOR IS ALTERED, THE ALTERING ENGINEER OR LAND SURVEYOR SHALL AFFIX TO THE ITEM HIS SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION ".

W

HP

OHP

5.0

0.1

O

SEMI-TRUCK CAR HAULER VEHICLE TRACKING PATH

10' POLE WITH DOUBLE LITHONIA LIGHTING D-SERIES SIZE 2 WITH BLC4 DISTRIBUTION, OR EQUAL, (SEE DETAIL)

DRAWING ALTERATION THE FOLLOWING IS AN EXCERPT FROM THE NEW YORK STATE EDUCATION LAW, ARTICLE 145, SECTION 7209 AND APPLIES TO THIS DRAWING

43.4'

1.0

15.0'

5.0

0.1

15.1'

21.9'

FLOOR DRAIN DISHARGE

SHOP SINK DISCHARGE

50.5'

STATE ROUTE 404

1.0

W

83.75'

17

S

239.9' 0.1

OHP

24.5'

DUMPSTER ENCLOSURE

PROPOSED MOTOR VEHICLE SERVICE STATION

24.4'

1.0

33.75'

33.75'

OPERATIONS MANAGER TO RELOCATE PARKED CARS AS NEED TO CLER WAY FOR CAR HAULER TURNAROUND

15.1'

P OH

20' Side Setback MOUNT LITHONIA LIGHTING D-SERIES SIZE 0 TLC4 DISTIRUBTION OR EQUAL (SEE DETAIL) ON EXISTING POLE

0.1 31.7'

INV:6" PVC Z:430.44

OHP

INV:4" PVC Z:430.68

20.00 Feet Wide Easement to Lot 2 for Utilities, Sewer, and Water Per Ref. 6

( 66.00' R.O.W. )

MOUNT LITHONIA LIGHTING D-SERIES SIZE 0 TLC4 DISTIRUBTION OR EQUAL (SEE DETAIL) ON EXISTING POLE

83.75' 5.0

P OH

W

13.7'

24

5.0

13.4'

75' Rear Setback

OIL/WATER SEPARATOR (SEE DETAIL) 10' WALLPACK WITH LITHONIA LIGHTING WDGE3 LED OR EQUAL, (SEE DETAIL)

Existing Sanitary Easement to the Town of Webster Per Ref. 5

22.5'

22.3'

1.0

PROJECT:

771 RIDGE ROAD

W

PART OF TOWN LOT 59 TOWNSHIP 13 - RANGE 4 PHELPS AND GORHAM PURCHASE TOWN OF WEBSTER, MONROE COUNTY STATE OF NEW YORK PROJ. NO: 25-0166 CLIENT:

0

PLANNING BOARD CHAIRPERSON

DATE

TOWN ENGINEER

DATE

20

40

W

OHP

APPROVAL SIGNATURES :

ALLAN MALLETTE 771 RIDGE ROAD WEBSTER, NY 14580 DATE

REVISIONS

BY:

60

P OH

SITE DATA:

COPYRIGHT c by McMahon LaRue Associates: 2025

S.B.L. LOT NO.

ADDRESS: LANDOWNER: TITLE RECORD:

079-17-1-21.11 771 RIDGE ROAD NOR-WEB INC 10136 / 345

TOTAL SITE AREA =

75,450.0 SQ.FT. 1.732 ACRES

ZONING DISTRICT =

MC MEDIUM-INTENSITY COMMERCIAL DISTRICT

TRAILER

TOWN ASSESSOR

DATE

TIRE DIAMETER

3.0'

DIMENSIONAL CONSTRAINT

FRONT SETBACK SIDE SETBACK REAR SETBACK FRONT BUFFER SIDE BUFFER REAR BUFFER MIN. LOT SIZE MIN. LOT WIDTH MAX. LOT COVERAGE MAX. BLDG. HEIGHT

REQUIRED

50.00 20.00 75.00 50.00 20.00 TOTAL 75.00 45,000 SQ FT 150.00 20% 35.00

PROPOSED

50.00 31.7 239.9 50.00 20.27 76.70 75,450 SQ FT 149.96 7.4% <35.00

CURRENT:

DIRECTOR OF COMMUNITY DEVELOPMENT

DATE

FIRE MARSHAL

DATE

DRAWN BY:

CHECKED BY:

JYT

IFK

ISSUED:

SCALE:

JANUARY 13, 2026

1" = 20'

PROJECT STATUS

PRELIMINARY / FINAL DRAWING TITLE

WEBSTER SEWER DEPARTMENT

DATE

3.2%

MOTOR VEHICLE SERVICE STATIONS OR PUBLIC GARAGES. THERE SHALL BE THREE PARKING SPACES FOR EACH SERVICE BAY. UNITS OF MEASUREMENT. (1) SIZE OF PARKING SPACE. THE SIZE OF A PARKING SPACE SHALL NOT BE LESS THAN 20 FEET LONG AND NINE FEET WIDE, EXCLUSIVE OF ACCESS OR MANEUVERING AREA. (2) TRAFFIC LANES WITHIN PARKING AREAS SHALL BE AT LEAST 25 FEET IN WIDTH.

K:\2025 PROJECTS\25-0166 771 RIDGE RD\03 CAD\01 CONTRACT PLANS\02-SITE PLAN.DWG

SITE LAYOUT PLAN WEBSTER HIGHWAY SUPERINTENDENT

DATE

TRUCK TRACTOR

SHEET NUMBER

DRAWING NUMBER

2 of 4

C-200

TIRE DIAMETER

3.0' MONROE COUNTY WATER AUTHORITY

DATE

3.

4.

1.

TOPOGRAPHIC INFORMATION IS BASED UPON A TOPOGRAPHIC SURVEY DATED MONTH DAY, 2025. THE CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO THE COMMENCEMENT OF WORK AND NOTIFY THE DEVELOPER OF ANY DISCREPANCIES IMMEDIATELY.

THE CONTRACTOR SHALL CLEAN DEBRIS FROM ALL EXISTING STORM STRUCTURES WITHIN THE WORK LIMIT LINES. THE CONTRACTOR SHALL MAINTAIN TEMPORARY AND/OR PERMANENT STORM WATER DRAINAGE IN ALL AREAS FOR THE DURATION OF THE CONTRACT. THE CONTRACTOR SHALL PROTECT ALL EXISTING SITE AMENITIES NOT DESIGNATED FOR REMOVAL. THE CONTRACTOR SHALL REPAIR OR REPLACE ITEMS DAMAGED AS A RESULT OF HIS CONSTRUCTION ACTIVITIES, AS DETERMINED BY THE DEVELOPER AND AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES FOR THE DURATION OF THE CONTRACT. THE CONTRACTOR SHALL REPLACE ANY UTILITY WHICH BECOMES DAMAGED AS A RESULT OF HIS/HER CONSTRUCTION ACTIVITIES.

2.

6.

THE CONTRACTOR SHALL MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO THE SITE FOR THE DURATION OF THE CONSTRUCTION.

3.

7.

THE CONTRACTOR SHALL HAVE IN PLACE ALL BARRICADES, SIGNAGE, AND LIGHTS PERTAINING TO MAINTENANCE AND PROTECTION OF TRAFFIC BEFORE ANY EXCAVATION ACTIVITY TAKES PLACE.

LOOSE PILE MATERIAL THAT IS EXCAVATED FOR BUILDING CONSTRUCTION PURPOSES SHALL BE KEPT LOOSE PILED UNTIL IT IS USED FOR FOUNDATION BACKFILL OR FINAL GRADING AND PERMANENT VEGETATION.

4.

RUNOFF FROM STOCKPILED MATERIALS SHALL BE CONTAINED BY EROSION CONTROL MEASURES. STOCKPILED MATERIALS NOT MOVED WITHIN 30 DAYS SHALL BE SHAPED INTO A UNIFORM PILE AND SEEDED WITH A RAPID GERMINATING GRASS SEED MIX.

5.

8.

9.

ALL EXCESS EXCAVATION MATERIALS DETERMINED BY THE DEVELOPER TO BE REUSABLE BY THE CONTRACTOR FOR THIS CONTRACT, MAY BE STORED ON-SITE IN A LOCATION DETERMINED BY THE OWNER. CONTRACTOR SHALL STRIP AND STOCKPILE TOPSOIL WHERE POSSIBLE.

5.

CONTRACTOR STAGING AREAS ARE TO BE COORDINATED WITH THE DEVELOPER PRIOR TO START OF CONSTRUCTION. ALL DISTURBED AREAS SHALL BE RESTORED. ALL STAGING AREAS ARE TO BE WITHIN WORK LIMITS.

10. THE LOCATION OF UNDERGROUND UTILITIES SHOWN HEREON ARE INFERRED FROM SURFACE EVIDENCE, AND RECORD AND UTILITY PLANS. ACTUAL LOCATION AND DESCRIPTION MAY DIFFER. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES FOR STAKEOUT. TRUE LOCATIONS SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO ANY EXCAVATION OPERATIONS.

6.

7.

11. BLASTING WILL NOT BE ALLOWED FOR ANY EXCAVATION FOR SITE WORK OR ANY INDIVIDUAL HOME CONSTRUCTION. 12. A RENEWABLE LETTER OF CREDIT WILL BE REQUIRED. 13. AFTER INSTALLATION A TWO (2) YEAR LANDSCAPE BOND IS REQUIRED FOR 10% OF THE LANDSCAPE COST.

8.

9.

GRADING NOTES:

CONTRACTOR SHALL TEMPORARY SEED AND MULCH ALL DIVERSION DITCHES AND ANY OTHER DISTURBED AREAS NOT SCHEDULED FOR IMMEDIATE ADDITIONAL WORK. REMAINING DISTURBED AREAS SHALL BE SEEDED WITH GROUND COVER AND MULCHED AS SOON AFTER THEIR DISTURBANCE AS CONSTRUCTION PRACTICES AND WEATHER WILL ALLOW. CONTRACTOR SHALL STABILIZE DISTURBED AREAS AND STOCKPILES WITHIN 7 DAYS OF LAST CONSTRUCTION ACTIVITY IN THAT AREA. DRAINAGE SYSTEMS AND EROSION AND SEDIMENT CONTROL DEVICES SHALL BE MAINTAINED AS FREQUENTLY AS NECESSARY A ND REPLACED IF NECESSARY UNTIL SUCH TIME AS A SUBSTANTIAL STAND OF VEGETATION HAS DEVELOPED AND POTENTIAL FOR EROSION NO LONGER EXISTS. THE CONTRACTOR SHALL MAINTAIN SITE CONDITIONS WHICH SHALL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THE CONTRACTOR SHALL KEEP CLEAN AND FREE SIDEWALKS, STREETS, AND PAVEMENTS FROM DIRT, MUD, STONE, DEBRIS, AND OTHER HAULED MATERIALS AS A RESULT OF HIS/HER WORK.

10. A STABILIZED CONSTRUCTION ENTRANCE LOCATED SHALL BE IN PLACE PRIOR TO WORK COMMENCING ON THE SITE. THE CONTRACTOR SHALL CONTROL DUST FROM SITE ACTIVITY TO THE SATISFACTION OF THE PROJECT DEVELOPER, OWNER, AND THE TOWN OF WEBSTER.

2.

THE LINE AND GRADE OF NEW PAVEMENT SHALL MEET EXISTING PAVEMENT FLUSH WHERE DESIGNATED TO MEET ON THE DRAWING.

3.

ALL FILL AREAS ARE TO BE COMPACTED WITH A SHEEP'S FOOT ROLLER. COMPACTION SHALL BE ACCOMPLISHED TO 95% OF THE MODIFIED PROCTOR.

11. SITE EROSION CONTROL MEASURES INCLUDE BUT ARE NOT LIMITED TO MEASURES SHOWN ON THE PLANS. CONTRACTOR SHALL IMPLEMENT OTHER MEASURES ORDERED BY THE DEVELOPER OR A VILLAGE REPRESENTATIVE NECESSARY TO CONTROL EROSION AND SEDIMENTATION ON SITE.

CONSTRUCTION SEQUENCE

1.

INSTALL STAGING AREA.

14. CHECK AND REPAIR SILT FENCE, AS NECESSARY.

2.

INSTALL STABILIZED CONSTRUCTION ENTRANCE.

15. SWEEP ADJOINING ROADWAYS, IF ANY TRACKING OF SOILS ONTO OFF-SITE PAVING OCCURS.

3.

FLAG THE WORK LIMITS, MARK AREAS TO BE PROTECTED.

4.

INSTALL ALL EROSION CONTROL DEVICES.

16. INSPECT AND CLEAN ALL TEMPORARY EROSION CONTROL STRUCTURES AFTER EACH RAIN STORM EVENT.

5.

CLEAR AND GRUB THE SITE.

6.

ROUGH GRADE THE SITE, STOCKPILE TOPSOIL, AND CONSTRUCT SWALES.

7.

LEAVE THE SURFACE SLIGHTLY ROUGHENED AND VEGETATE AND MULCH IMMEDIATELY.

8.

CONSTRUCT UNDERGROUND UTILITIES. INSTALL SEDIMENT TRAPS IF REQUIRED.

9.

CONSTRUCT THE NEW BUILDING.

11. COMPLETE FINAL GRADING. INSTALL PERMANENT SEEDING AND PLANTINGS. 12. REFER TO EROSION CONTROL NOTES AND THE STORMWATER POLLUTION PREVENTION PLAN FOR SPECIFIC EROSION CONTROL MAINTENANCE TASKS AND SCHEDULES. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED TO THE SATISFACTION OF THE TOWN OF WEBSTER, REMOVE ALL TEMPORARY EROSION CONTROL DEVICES; AND FILL AND SEED THE TEMPORARY SEDIMENT BASINS.

CONSTRUCTION SITE WASTE MANAGEMENT

1.

DESIGNATE A WASTE COLLECTION AREA ONSITE THAT DOES NOT RECEIVE A SUBSTANTIAL AMOUNT OF RUNOFF FROM UPLAND AREAS AND DOES NOT DRAIN DIRECTLY TO A WATERBODY.

2.

CONSTRUCT A TEMPORARY LAND DIKE AROUND THE WASTE COLLECTION AREA TO PREVENT SITE WASTES FROM CONTRIBUTING TO STORMWATER CONTAMINATION.

3.

ENSURE THAT CONTAINERS HAVE LIDS AND ARE KEPT IN A COVERED AREA WHEN POSSIBLE.

4.

SCHEDULE WASTE COLLECTION APPROPRIATELY.

5.

CLEAN UP SPILLS IMMEDIATELY USING AN ABSORBENT MATERIAL SUCH AS SAWDUST OR KITTY LITTER.

6.

POST GUIDELINES FOR PROPER HANDLING, STORAGE, AND DISPOSAL OF CONSTRUCTION SITE WASTES. PROVIDE PROPER TRAINING TO ALL WORKERS ON THE SITE.

1.

2.

THE FOLLOWING PRACTICES WILL BE EMPLOYED TO MAINTAIN EROSION AND SEDIMENT CONTROLS: CONTRACTOR SHALL INSPECT EROSION AND SEDIMENTATION CONTROL MEASURES AT LEAST ONCE PER DAY, AND CLEAN WITHIN ONE WORKING DAY OF ANY RAINFALL EVENT OF 1/2" RAINFALL OR GREATER OR FOLLOWING SIGNIFICANT SNOW MELT. MAINTAIN ALL MEASURES IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, INITIATE IT WITHIN 24 HOURS OF REPORT.

3.

REMOVE BUILT UP SEDIMENT FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE FENCE.

4.

INSPECT SILT FENCE FOR DEPTH OF SEDIMENT AND TEARS, TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE POST, AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND.

5.

INSPECT SEDIMENT BASINS FOR DEPTH OF SEDIMENT. REMOVE BUILT-UP SEDIMENT WHENEVER THE CAPACITY OF THE BASIN HAS BEEN REDUCED BY FIFTY PERCENT OF THE DESIGN CAPACITY. THE BIORETENTION AREA WILL BE CLEANED PRIOR TO INSTALLATION OF UNDERDRAIN AND BIO-SOIL AT THE CONCLUSION OF CONSTRUCTION AND WILL BE TESTED TO ENSURE IT PERFORMS AS DESIGNED.

6. 7.

INSPECT TEMPORARY AND PERMANENT SEEDING AND PLANTING FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. THE BIO-RETENTION AREA WILL BE REQUIRED TO BE TESTED IN THE PRESENCE OF A TOWN EMPLOYEE PRIOR TO THE ISSUANCE OF A C OF O.

50'MIN.

HEIGHT OF FILTER = 16" MIN.

W

LO

F

O

FL

10'MIN.

8" MIN.

W

EXISTING GROUND PERSPECTIVE VIEW

PLAN VIEW

36" MIN. FENCE POST WOVEN WIRE FENCE (MIN. 14 1/2 GAUGE W/ MAX. 6" MESH SPACING) WITH FILTER CLOTH FLOW

UNDISTURBED GROUND COMPACTED SOIL EMBED FILTER CLOTH A MIN. OF 6" IN GROUND. 4" SECTION VIEW

12'MIN.

MCMAHON LARUE

EXISTING PAVEMENT

ENGINEERS AND SURVEYORS 10'MIN.

1.

STONE SIZE

USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.

2.

LENGTH

NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD APPLY).

3.

THICKNESS - NOT LESS THAN SIX (6) INCHES.

4.

WIDTH

TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE.

5.

FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.

6.

SURFACE WATER

ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED.

1.

WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL EITHER "T" OR "U" TYPE OR HARDWOOD.

2.

FILTER CLOTH TO BE TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION. FENCE SHALL BE WOVEN WIRE, 12 1/2 GAUGE, 6" MAXIMUM MESH OPENING.

7.

MAINTENANCE

THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY.

3.

WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER- LAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT.

8.

WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE.

4.

PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUIVALENT.

9.

PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN.

5.

MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE.

2 1

SILT FENCE

U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE, NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION, NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE

DRAWING ALTERATION THE FOLLOWING IS AN EXCERPT FROM THE NEW YORK STATE EDUCATION LAW, ARTICLE 145, SECTION 7209 AND APPLIES TO THIS DRAWING " IT IS A VIOLATION OF THIS LAW FOR ANY PERSON UNLESS HE IS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF A LICENSED ENGINEER OR LAND SURVEYOR IS ALTERED, THE ALTERING ENGINEER OR LAND SURVEYOR SHALL AFFIX TO THE ITEM HIS SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION ".

19. EROSION CONTROL MEASURES SUCH AS SILT FENCE ARE TO BE PLACED 5' INTO THE PROJECT FROM ORANGE CONSTRUCTION FENCE, AND SHALL REMAIN IN EFFECT UNTIL DEEMED UNNECESSARY BY TOWN OF WEBSTER. 20. IN AREAS WHERE SOIL DISTURBANCE ACTIVITY HAS TEMPORARILY OR PERMANENTLY CEASED, THE APPLICATION OF SOIL STABILIZATION MEASURES MUST BE INITIATED BY THE END OF THE NEXT BUSINESS DAY AND COMPLETED WITHIN FOURTEEN (14) DAYS FROM THE DATE THE CURRENT SOIL DISTURBANCE ACTIVITY CEASED.

TEMPORARY/PERMANENT EROSION CONTROL MEASURES A.

TEMPORARY STABILIZATION -TOPSOIL STOCKPILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES THE APPLICATION OF SOIL STABILIZATION MEASURES MUST BE INITIATED BY THE END OF THE NEXT BUSINESS DAY AND COMPLETED WITHIN FOURTEEN (14) DAYS FROM THE DATE THE CURRENT THE CURRENT SOIL DISTURBANCE ACTIVITY CEASED. IF: SPRING OR SUMMER OR EARLY FALL, THEN SEED THE AREA WITH RYEGRASS (ANNUAL OR PERENNIAL) AT 30 LBS. PER ACRE (APPROXIMATELY 0.7 LB./1000 SQ. FT. OR USE 1 LB./1000 SQ. FT.) IF: LATE FALL OR EARLY WINTER, THEN SEED CERTIFIED 'AROOSTOOK' WINTER RYE (CEREAL RYE) AT 100 LBS. PER ACRE (2.5 LBS./1000 SQ. ANY SEEDING METHOD MAY BE USED THAT WILL PROVIDE UNIFORM APPLICATION OF SEED TO THE AREA AND RESULT IN GOOD SOIL TO SEED CONTACT. MULCH THE AREA WITH HAY OR STRAW AT 2 TONS/ACRE (APPROX. 90 LBS./1000 SQ. FT. OR 2 BALES). THE STRAW MULCH IS TO BE TACKED INTO PLACE BY A DISK WITH BLADES SET NEARLY STRAIGHT.

PROJECT:

771 RIDGE ROAD

PERMANENT STABILIZATION -DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES PERMANENTLY CEASE SHALL BE STABILIZED WITH PERMANENT SEED THRU THE APPLICATION OF SOIL STABILIZATION MEASURES INITIATED BY THE END OF THE NEXT BUSINESS DAY AND COMPLETED WITHIN FOURTEEN (14) DAYS FROM THE DATE THE CURRENT THE CURRENT SOIL DISTURBANCE ACTIVITY CEASED.. LIME AND FERTILIZER WILL BE APPLIED AS DETERMINED BY SOIL TESTS. SEEDING SHALL BE COMPLETED IN COMPLIANCE WITH THE "NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL."

PART OF TOWN LOT 59 TOWNSHIP 13 - RANGE 4 PHELPS AND GORHAM PURCHASE TOWN OF WEBSTER, MONROE COUNTY STATE OF NEW YORK

GENERAL SEED MIX

PROJ. NO: 25-0166

SPECIES COMMON WHITE TALL FESCUE RYEGRASS (PERENNIAL)

VARIETY CLOVERCOMMON KY-31/REBEL PENNFINE/LINN

LBS./ACRE 8 20 5

LBS/1000 SQ. FT. 0.20 0.45 0.10

1.

2.

AFTER SEEDING, THE SURFACE SHALL BE EVENLY RAKED WITH A FINE-TOOTH RAKE AND ROLLED WITH AN APPROVED ROLLER, WEIGHING REQUIREMENT MAY BE MODIFIED IF DEEMED APPROPRIATE BY THE LOCAL SOIL AND WATER CONSERVATION DISTRICT OFFICE. A MULCH OF CLEAN NEW CROP WHEAT OR OTHER APPROVED CROPS, FREE OF NOXIOUS WEED SEEDS, SHALL BE PLACED UNIFORMLY IN A CONTINUOUS BLANKET TO PROVIDE A COVER OF 3", LOOSE DEPTH. STRAW SHALL BE OF SUCH THICKNESS THAT IT CAN BE LEFT IN PLACE DURING CUTTING OPERATIONS.

HAY BALES OR COMPACTED EARTH BERM (SEE NOTE 3)

THE PERMANENT LAWN SEED MIX SHALL CONSIST OF: 65% KENTUCKY BLUEGRASS BLEND AT 2.0-2.6 LBS/1000 SQ. FT. 20% PERENNIAL RYE GRASS AT 0.6-0.7 LBS/1000 SQ. FT. 15% FINE FESCUE AT 0.4-0.6 LBS/1000 SQ. FT.

SIDE SLOPES (SEE BELOW)

EXISTING GROUND SURFACE DEPTH VARIES SEE NOTE 2

ALLAN MALLETTE 771 RIDGE ROAD WEBSTER, NY 14580

THE CONTRACTOR SHALL SUBMIT THE DESIGN, LOCATION AND SIZING OF THE CONCRETE WASHOUT AREA(S) WITH THE PROJECT'S EROSION AND SEDIMENTATION CONTROL PLAN AND SHALL BE APPROVED BY THE ENGINEER.

3.

SURFACE DISCHARGE IS UNACCEPTABLE. THEREFORE, HAY BALES OR OTHER CONTROL MEASURES, AS APPROVED BY THE ENGINEER, SHOULD BE USED AROUND THE PERIMETER OF THE CONCRETE WASHOUT AREA FOR CONTAINMENT.

4.

SIGNS SHOULD BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE CONCRETE AREA(S) AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. WASHOUT AREA(S) SHOULD BE FLAGGED WITH SAFETY FENCING OR OTHER APPROVED METHOD.

5.

SIDE SLOPES TO BE 2:1 OR 3:1 (NOMINAL) 10 MIL POLYETHYLENE SHEETING

4

CLIENT:

DATE

7.

DRAWN BY:

WASHOUT AREA(S) ARE TO BE INSPECTED AT LEAST ONCE A WEEK FOR STRUCTURAL INTEGRITY, ADEQUATE HOLDING CAPACITY AND CHECKED FOR LEAKS, TEARS, OR OVERFLOWS. (AS REQUIRED BY THE CONSTRUCTION SITE ENVIRONMENTAL INSPECTION REPORT) WASHOUT AREA(S) SHOULD BE CHECKED AFTER HEAVY RAINS. HARDENED CONCRETE WASTE SHOULD BE REMOVED AND DISPOSED OF WHEN THE WASTE HAS ACCUMULATED TO HALF OF THE CONCRETE WASHOUT'S HEIGHT. THE WASTE CAN BE STORED AT AN UPLAND LOCATION, AS APPROVED BY THE ENGINEER. ALL CONCRETE WASTE SHALL BE DISPOSED OF IN A MANNER CONSISTENT WITH ALL APPLICABLE LAWS, REGULATIONS, AND GUIDELINES.

BY:

PAYMENT FOR THIS ITEM IS TO BE INCLUDED UNDER THE GENERAL COST OF THE WORK FOR THE PROJECT, INCLUDING SITE RESTORATION.

CHECKED BY:

JYT

IFK

ISSUED:

SCALE:

JANUARY 13, 2026

N.T.S.

PROJECT STATUS

PRELIMINARY

Dig Safely. New York 811 www.digsafelynewyork .org

K:\2025 PROJECTS\25-0166 771 RIDGE RD\03 CAD\01 CONTRACT PLANS\03-04 DETAILS.DWG

REVISIONS

SIZE

THE WASHOUT MUST HAVE SUFFICIENT VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS INCLUDING, BUT NOT LIMITED TO, OPERATIONS ASSOCIATED WITH GROUT AND MORTAR.

SAND BAGS TO SECURE SHEETING (OR METHOD AS DIRECTED BY ENGINEER)

CONCRETE WASHOUT AREA

CONCRETE WASHOUT AREA(S) SHALL BE INSTALLED PRIOR TO CONCRETE PLACEMENT ON SITE. THE CONCRETE WASHOUT AREA SHALL BE ENTIRELY SELF-CONTAINED.

LOCATION

WASHOUT AREA(S) ARE TO BE LOCATED AT LEAST 50 FEET FROM ANY STREAM, WETLAND, STORM DRAINS, OR OTHER SENSITIVE RESOURCE. THE FLOOD CONTINGENCY PLAN MUST ADDRESS THE CONCRETE WASHOUT IF THE WASHOUT IS TO BE LOCATED WITHIN THE FLOODPLAIN.

VARIES SEE NOTE 2

6.

DATE

PLANS UNDER REVIEW NOT FOR CONSTRUCTION

18. THE ENTIRE PROJECT WILL BE RESTORED WITH 6" OF TOPSOIL.

AFTER SEEDING, EACH AREA SHALL BE MULCHED AS DESCRIBED ABOVE. ALL SLOPES GREATER THAN 3H:1V SHALL HAVE JUTE OR OTHER EROSION CONTROL FABRIC APPLIED.

ENGINEERING AND PLANNING

822 HOLT RD. WEBSTER, NEW YORK 14580 INFO@MCMAHON-LARUE.COM (585) 436 - 1080

STABILIZED CONSTRUCTION ENTRANCE

U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE, NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION, NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE

STEEP SLOPE SEED MIX SHALL CONSIST OF: 25% SLENDER WHEATGRASS 20% PERENNIAL RYEGRASS 20% KENTUCKY BLUEGRASS 20% ANNUAL RYEGRASS 15% HAIRY VETCH RATE = 20 LBS./ACRE

APPROVAL SIGNATURES :

MOUNTABLE BERM (OPTIONAL)

PROFILE

17. ALL SLOPES 1-ON-3 OR GREATER WILL BE STABILIZED WITH JUTE MESH AND RESTORED WITH "ERNST" NATIVE STEEP SLOPE MIX WITH RYE GRASS OR OTHER APPROPRIATE COVER.

B.

EROSION CONTROL MAINTENANCE / INSPECTION PROCEDURES

EXISTING GROUND

FILTER CLOTH

12. CONTRACTOR SHALL INSPECT EROSION AND SEDIMENTATION CONTROL MEASURES ONCE PER WEEK, AND CLEAN WITHIN ONE WORKING DAY OF ANY RAINFALL EVENT OF 1/2" RAINFALL OR GREATER OR FOLLOWING SIGNIFICANT SNOW MELT.

13. REMOVE ACCUMULATED SEDIMENT FROM STORMWATER POND WHEN SEDIMENTS OCCUPY 50% OF THE VOLUME PROVIDED. THE BIORETENTION AREA WILL BE CLEANED PRIOR TO INSTALLATION OF UNDERDRAIN AND BIO-SOIL AT THE CONCLUSION OF CONSTRUCTION AND WILL BE TESTED TO ENSURE IT PERFORMS AS DESIGNED.

10. INSTALL BIO-RETENTION FEATURE,

5:1

6"MIN.

WOVEN WIRE FENCE (MIN. 14 1/2 GAUGE W/ MAX. 6" MESH SPACING)

CONTRACTOR SHALL ROUGH GRADE THE SITE. ALL FILL MATERIAL SHALL BE COMPACTED SUFFICIENTLY TO PREVENT PROBLEMS OF EROSION, AND WHERE THE MATERIAL IS TO SUPPORT STRUCTURES, IT SHALL BE COMPACTED TO A MINIMUM OF 95% OF MODIFIED PROCTOR TEST DENSITY WITH PROPER MOISTURE CONTENT. ALL CATCH BASIN INLETS SHALL HAVE STAKED SILT FENCE AROUND THEM TO PREVENT SEDIMENT FROM ENTERING THE STORM SEWER. ALL FIELD INLETS ARE TO HAVE STONE FILTER DAMS AS SHOWN IN THE EXCAVATED DROP INLET DETAIL.

36" MIN. LENGTH FENCE POSTS DRIVEN MIN. 16" INTO GROUND.

10' MAX. C. TO C.

THE CONTRACTOR SHALL REMOVE EROSION CONTROL MEASURES WHEN AN AREA IS PERMANENTLY STABILIZED, CONSTRUCTION IS COMPLETE, FINAL VEGETATIVE COVER HAS BEEN ESTABLISHED, AND IS APPROVED BY THE TOWN OF WEBSTER.

CONTRACTOR SHALL ADJUST THE RIMS OF ALL MANHOLES, CATCH BASINS, VALVE BOXES, AND ALL OTHER UTILITY SITE STRUCTURES TO MEET FINISHED GRADE IN AREAS REQUIRING REPAVING OR REGRADING AS PART OF THIS WORK INCLUDING THOSE THAT MAY NOT BE SHOWN ON THESE DRAWINGS.

1.

COPYRIGHT c by McMahon LaRue Associates: 2025

ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH N.Y.S. GUIDELINES FOR URBAN EROSION AND SEDIMENT CONTROL, AND LOCAL GOVERNING SOIL, WATER CONSERVATION AGENCY RECOMMENDATIONS AND STANDARDS AND THE NYSDEC STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES (GP 0-25-001). SILT FENCE WILL BE INSTALLED WITH A TRENCHER. ONLY AREAS NEEDED FOR CONSTRUCTION AS SHOWN ON THESE PLANS SHALL BE DISTURBED. NO OTHER TREES, SHRUBS, OR GRASSES ARE TO BE REMOVED FOR CONSTRUCTION. REMAINING VEGETATION SHALL BE PROTECTED TO PRESERVE THEIR AESTHETIC AND EROSION CONTROL VALUES. THE CONTROL OF EROSION AND SEDIMENTATION SHALL BE A CONTINUOUS PROCESS UNDERTAKEN AS NECESSARY PRIOR TO, DURING AND AFTER SITE PREPARATION AND CONSTRUCTION BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF EROSION CONTROL AND SEDIMENTATION CONTROLS AFTER GROUND COVER IS ESTABLISHED. LAWN AREA AROUND THE HOME SHALL BE STABILIZED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.

3'

20"MIN.

2.

ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF WEBSTER AND MONROE COUNTY DEPARTMENT OF HEALTH'S LATEST SPECIFICATIONS.

EXISTING PAVEMENT

50'MIN.

16"MIN.

1.

EROSION CONTROL NOTES:

12'MIN.

GENERAL NOTES:

Call Before You Dig Wait The Required Time Confirm Utility Response Respect the Marks Dig With Care

DRAWING TITLE

CONSTRUCTION DETAILS SHEET NUMBER

DRAWING NUMBER

3 of 4

C-300

MCMAHON LARUE ENGINEERS AND SURVEYORS 822 HOLT RD. WEBSTER, NEW YORK 14580 INFO@MCMAHON-LARUE.COM (585) 436 - 1080

PLANS UNDER REVIEW NOT FOR CONSTRUCTION

DRAWING ALTERATION THE FOLLOWING IS AN EXCERPT FROM THE NEW YORK STATE EDUCATION LAW, ARTICLE 145, SECTION 7209 AND APPLIES TO THIS DRAWING " IT IS A VIOLATION OF THIS LAW FOR ANY PERSON UNLESS HE IS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF A LICENSED ENGINEER OR LAND SURVEYOR IS ALTERED, THE ALTERING ENGINEER OR LAND SURVEYOR SHALL AFFIX TO THE ITEM HIS SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION ".

PROJECT:

771 RIDGE ROAD

1" ITEM 403.19 TOP 2" ITEM 403.13 BINDER 1/4" PER FT.

THIS SIGN TYPICAL AT ALL ACCESSIBLE PARKING SPACES

12" x 18"

12" x 18"

R7-1 RED LEGEND & BORDER AND WHITE BACKGROUND SUB GRADE 1/4" PER FT.

9" ITEM 304.03 ( #2 CRUSHER RUN STONE )

R7-8 GREEN LEGEND & BORDER WHITE SYMBOL ON BLUE BOX, AND WHITE BACKGROUND

THIS SIGN TYPICAL AT ALL NO PARKING ACCESS AISLES BETWEEN ACCESSIBLE PARKING SPACES

PART OF TOWN LOT 59 TOWNSHIP 13 - RANGE 4 PHELPS AND GORHAM PURCHASE TOWN OF WEBSTER, MONROE COUNTY STATE OF NEW YORK PROJ. NO: 25-0166 CLIENT:

THIS SIGN TYPICAL AT ALL VAN ACCESSIBLE PARKING SPACES

12" x" 6"

ALLAN MALLETTE 771 RIDGE ROAD WEBSTER, NY 14580

STANDARD DUTY ASPHALT PAVEMENT NTS

DATE

"U" CHANNEL POST (2-LBS./FT)

REVISIONS

BY:

"U" CHANNEL POST (2-LBS./FT) 5'-0" (MIN.) 5'-0" (MIN.)

4" PIPE BOLLARD PAINTED TRAFFIC YELLOW, FILLED W/CONCRETE (IN PAVED AREAS)

4" PIPE BOLLARD PAINTED TRAFFIC YELLOW, FILLED W/CONCRETE (IN PAVED AREAS)

COPYRIGHT c by McMahon LaRue Associates: 2025

SLOPE TOP OF CONCRETE

SLOPE TOP OF CONCRETE

GROUND/PAVING GROUND/PAVING

SURFACE

SURFACE

DRAWN BY:

CHECKED BY:

JYT

IFK

ISSUED:

SCALE:

JANUARY 13, 2026

N.T.S.

PROJECT STATUS 3500 PSI P.C. CONCRETE

2'-0"

3500 PSI P.C. CONCRETE

2'-0"

PRELIMINARY DRAWING TITLE

3" 3" 1'-6" 1'-6"

APPROVAL SIGNATURES

ENGINEERING AND PLANNING

DATE

K:\2025 PROJECTS\25-0166 771 RIDGE RD\03 CAD\01 CONTRACT PLANS\03-04 DETAILS.DWG

TYPICAL NO PARKING IN ACCESS AISLE SIGN NTS

TYPICAL ACCESSIBLE PARKING SITE NTS

LIGHTING AND PAVING DETAILS SHEET NUMBER

DRAWING NUMBER

4 of 4

C-301

End of document