WEBSTER TOWN PLANNING BOARD MINUTES
Webster Town Board Meeting Room 1002 Ridge Road
7:00 p.m.
3 February 2026
ABSENT:
Anthony Casciani, Chairman Sven Vetter (will not start until April)
Mark Giardina, Secretary
Dave Malta, Vice Chairman
Derek Anderson
Peggy Maltman
Drazen Gasic
Katherine Kolich, Recording Secretary
Josh Artuso, Director of Community Development
Erika Corsi, Town Planner
Frank Ciardi, Attorney
Welcome to the first Planning Board meeting of the year, February 3, 2026.
Pledge of Allegiance/Roll Call
Summary overview of outcome:
SCHEDULED MATTERS
:
1. MAURICES-SIGN 1040 RIDGE ROAD
Michael Mammano
APPROVED AS PRESENTED
2. BEST BUY AUTO SALES-ADDITION-771 RIDGE ROAD
Allan Mallette
SKETCH REVIEW/FEEDBACK GIVEN
Increase the vegetative buffer along the west side of the property.
Show paving limits and parking striping on the plans.
Include a dumpster enclosure detail on the plans.
Include wall-pack lighting details on the building clevations and on Sheet C-301
(Lighting and Paving Details).
Site Data table to include total overall # of parking spaces
Add distance measurement. between existing and proposed buildings.
Add distance measurement of asphalt to east property line.
Provide overall landscape plan for site.
e ¢« @ @
Po. ft Pebruaray 3.2026 Planning Meeting
3. ABERDEEN ESTATES PHASE 2-HAZELHEAD LANE
Forest Creek Equity Corp
TABLED TO MARCH 3, 2026
4. ABERDEEN ESTATES PHASE 3-HAZELHEAD LANE
Forest Creek Equity Corp
TABLED TO MARCH 3, 2026
( Mark Giardina read each application into the record)
Located at 1040 Ridge Road. Applicant Michael Mammano of Clinton Signs
is requesting SIGN APPROVAL in association with a 69.7SF internally illuminated wall mounted
sign on a 13.9-acre parcel having SBL# 079.16-1-1.11 located in the HC High-Intensity
Commercial District under Section 265-7 of the Code of the Town of Webster.
Appearing before the board was (THE MIC FOR PODIUM HAS STATIC AND NOT LOUD
EN@UGH) Michael Mammano with Clinton Signs. We are seeking Maurices signs to be placed
on the old Dress Barn. It’s right on the store front. It does not exceed square footage; it’s
individual channels; internal LEDs.
Where is this going Mike?
It is the old Dress Barn.
There’s nothing in the back of it.
Just the letters.
Anybody, any questions or concerns?
They’ re going to take existing panels in the sign a well.
Which are already existing.
Michael! Mamniano: The panels already there.
Derek Anderson:
The Town of Webster Planning board considered the request by applicant Michael Mammano of
Clinton Signs to install a 69.7 square foot internally illuminated wall mounted sign located at
1040 Ridge Road on a 13.9-acre parcel having SBL #079.16-1-1.11.
The Planning Board classifies the proposed action to be a Type IT Action under Section
617.5(c)(2) of the State Environmental Review (SEQR) Regulations and therefore is not subject
10 further review.
P. 12 Teltiatay 3 2n2h Theaieeah NMheclraw
. - 7 c
;
RESOLUTION 25-001 Derek Anderson made a motion for FYPE
II SEQR which was seconded by Mark
Giardina.
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
RESOLUTION 26-002 Anthony Casciani made a motion for SIGN
APROVAL Located at 1040 Ridge Road.
Applicant Michacl Mamimano of Clinton
Signs is requesting SIGN APPROVAL in
association with a 69,7SF internally
illuminated wall mounted sign on a 13.9-acre
parcel having SBL#079.16-1-1.11 located in
the HC High-Intensity Commercial District
under Section 265-7 of the Code of the Town
of Webster. which was seconded by Dave
Malta.
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Located at 771 Ridge Road. Applicant Allan Mallette
is requesting SKETCH PLAN REVIEW in association with the construction of an approximately
2,826SF accessory structure for auto-mobile servicing on a 1.73-acre parcel having SBL# 079.17-
1-21.11 located in the MC Medium-Intensity Commercial District under Section 269-5 and Section
350-18 of the Code of the Town of Webster,
Appearing before the board was Ian Kuchman with McMahon Associates. 1 am here with the
representative from Best Buy Auto Sales at 771 Ridge Road. Right down the auto sales district of
Ridge Road. The applicant utilizes and operates an existing structure and they’re proposing as part
of the site plan an accessory structure in the rear of the existing principal structure of approximately
40 foot wide by 84 foot log 5 bay maintenance garage to service their existing client base and
customer base for auto sales.
a]
Pe. 13 Pebruaras 3.2026 Manning Moctiag
The site plan that we helped submit before you today provides a little bit more structure and clarity
on overall parking and striping plan. In addition to some accessory lighting in the back and
modified lighting in the front. ADA accessible parking in the front for where customers will be,
along with sewer tie in from the proposed accessory structure that will have four drains and facilities
for employees and will be plumbing in through the existing structure. No increase in impervious
area triggering any type of storm water requirements. The existing area in the back is gravel area
that’s currently being used for parking and car staging area. We received PRC comments from our
workshop a couple weeks ago. We’ ve gone through those comments, provided a response to those
comments.
I think at this point we are in sketch, right? So, that feedback has been taken. We've made
modifications to the site plans as you se here today as well. The building itself we do have building
plans from Modular Builder where the roof is going to be black. It’s going to be a steel metal
sucture. The roof will be black. The siding will be a combination of light aud dak gray. It will
be a timber post from style pole bam construction method. Regarding car haulers and traffic
patterns on the site, our applicant is not proposing any type of car haulers to be navigated through
the site.
Although it was initially shown with a template with out initial submission. You guys may have
seen that; our revision has removed that. It’s a used car operation. There are no car haulers that
are, you know, part of their operations and being utilized on the site. Everything bought at auction
and brought to the site for sales on a one-on-one basis. Other than that, I didn’t see anything else
in the comments from the PRC. I would like to open it up to the planning board and see what types
of comments you guys have.
You’re saying, you know, you’re not proposing any truck traffic, you know
deliveries. You’re not proposing it, but somehow these things kind of happen. J don’t know if it
will. I’m not saying that’s the case, but there was a truck parked out there a couple weeks ago,
unloading, so this becomes an issue and the car dealers there have all been pretty much the same. I
think it’s time that we need to really tighten up on these dealerships along there. That would be
number one. Number two, with the building, I don’t have a problem with the building going back
there. We even talked at PRC taking out that turnaround thing. That was hooky. That design, you
know. You’re not going to lose that many parking spaces. If anything, there was getting in and
getting out a vehicle, but you're saying they’ re brought in independently, cat, right? That's for sure?
That’s the commitment.
And if not, then what?
lan Kuchman: We have other locations available so if in fact the hauler had to be used for transport,
we can route it to one of our other locations (THE RECORDING IS NOT CLEAR, ECHOS)
P, it Tebitiaias 4. 2020 Phaliaii Mechily
Okay, the other thing is your lot lines on there, I have no idea where. ..I’ ve been
back in there a couple of times now I’m totally lost. E don’t even know where I’m going back. The
cars are on the property or are they next door property or...I think somehow, we need to an I don’t6
think this can be done now with the snow, but that needs to be clarified. A definite line of where
they are and there should be a buffer in in between there, grass; a few trees, something because
we've got to start changing the way we’ re doing these places.
Are you talking about the west side of the property?
I’m talking about both sides of the property.
The lateral sides in the back?
Anthony Casciani. No, tiv, the (wo sides. The back is woods Uiat there you have a buffer. I don't
know if your cars are parked in that buffer or not. I mean, I don’t really know where the line is
there.
lan Kuchman: Yeah, we’re showing on our plans an establishment of an edge of pavement that’s
going to be new modified . That buffer can be reestablished with vegetation, and we can add on
our plan, So, ...
You’re talking the rear of the....
We’re talking about the west side.
East and west side.
Yeah, the west side is a little bit grey area right now. I think our applicant would be
willing to commit to establishing a grass area to separate our parking from our neighbors parking.
To the east, there is a pretty substantial existing pone there that provides natural buffer there. And
that pond straddles on the property line ...
| still think somewhere you’re going to have to survey the property in my
opinion anyway.
We can stakc it out for, put some stakes in there.
Know where these lot lines on the one side . That needs to have a strip of grass
and a few trees, something. We’ ve got to start fixing these places up, you know. One runs right
into the other. You don’t know who owns what other than the direction of cars are facing, you
know. So, I'd like to....that’s how 1 feel on it. 1 don’t know about the rest of the board, but I think
that is something that we should be looking at. I don’t know how you would do it. 1 mean, I can’t
do anything with it now obviously, but what are you planning to put this building up?
ae
;¢ TI
ee |
, ANAT OP, ' x .
COPE oY a (ho ob dethbebiayse v7 beaper
- rae .
In the spring.
So, okay, so suppose we put something in a resolution that goes along with it
that along with the approval that you get a...before you get a C of O for the building, that strip is
modified with a landscaped area. That would be spring time. Okay. I mean, you can’t do it now
obviously.
We will go to Thomas right next door.
Pm sorry.
Will go to Thomas next door.
There you go, he can plant some tices and fia it up. Something that fiaes it up
and distinguishes your property from the property to the west, you know, and I think that’s
something we need to be starting to do with these properties as they come in, too. Everybody’s
wanting to get more into it. What’s the height of that building? The height of that building isn’t
any higher than your existing building. is it?
No, it’s going to be a single story.
So, it’s like the level of the front building.
Yes.
Yeah, I think that should be marked off and then designate the buffer in the rear.
Because right now, I don’t know where the cars are parked and if they’re in or out of the buffer
personally.
I have a couple, So, you mention the impervious is increasing but you now, you’re
removing a tree on the west side and you’re also going into the vegetation areas on the east side.
The plans are not indicating a clear distinction of existing gravel area with what is proposed as
. So, because you could show your existing survey plot map with you know where your
limits of cxisting gravel is in comparison even on your sile plan. You now, where is thal gravel
stop with where you’re proposing new asphalt to be added on. You're only getting 5 feet on the
west side. It’s not going to give you much room for any vegetation. I’m also concerned that you
now you are putting ail these parking spaces in a 20 foot side setback on the west side. Is there a
variance needed for...
I think he’s allowed the 5 foot T think is okay because you got....1 think what’s
the total it has to be 15 foot, Josh?
I believe that’s a total of 20 foot.
De, 1G Pedromras 3.2 26 Phan Moeoctiig
Okay. So, if you have 5 there what do you have on the other side.
So, right now you are proposing new asphalt. The designated parking spaces in the
side setback on the west side. On your east side, you’re actually going into the existing 25, 20 foot
wide easement. So, that seems to be a utility, sewer, and water easement. You know, you have an
approval to be putting designated parking cars within that easement area. This is one of my
concerns on the east side.
Our understanding is that the goal is to not place a structure in the easement that
would totally encumber it from the use of lot 2 from accessing that utility easement. I think by
proposing asphalt that could be easily excavated, removed as part of any type of utility maintenance,
future utility maintenance that would provide the intended use of that easement. Take away from
that. That’s our justification on that.
(DID NOT UNDERSTAND WHAT WAS SAID)
They’re still saying they’re going to put that asphalt in that 20 foot easement.
I see where they are showing it in there but it’s...I don’t know what the width
of that is. What is the width of that? It is 20 feet.
These ones are square.
What is the setback between the asphalt and the property.
Yeah, that’s...
The setback is 20 feet also.
It looks like the asphalt is into it. So, it looks like, I’m going to guess there’s 15
feet of a buffer there and 5 on the other side...encompasses the
20. Derek Anderson: It just doesn’t have a 15.....(NOT ABLE TO HEAR)
Yeah, right. So, maybe a good idea to do would be to designated that on your
drawing showing that it protrudes into that buffer into the 20 foot by 5 foot, but you still have 15
plus the 5 on the west side. Gives you your 20 foot total buffer. Okay, so we should show that.
One of the questions I had was the proposed building in relation to the existing
building. is there an employee egress area in the back of the existing building?
lan Kuchman: Egress in the proposed building
What is the little bump out there? Josh, just south of your cursor there.
Pe. 17 Pebruaray 3.2026 Mannine Mecting
Oh, that’s a window.
(EVER YONE SPEAKING AT THE SAME TIME)
So that was egress for thata basement previous right now. It’s just a window.
Som it’s not an emergency egress currently?
fan Kuchman: Currently, no. Historically, yes.
I want to make sure there's enough space there in case it is an emergency. Somebody
can exit and that area is being maintained from snow accumulation because emergency egress. The
dumpster closure area, you’re showing asphalt stopping around the dumpster enclosure. Is there a
reason that it’s also not underneath the dumpster? Is there concrete there or what is being proposed
underneath the dumpster enclosure.
Yeah, I think we were assuming that that was going to be a concrete pad and we
could modify that.
You should include a dumpster included detail. I didn’t have one so they should be
again CMU blocks dumpster enclosure with a concrete pad.
[an Kuchman: Do you prefer blocks as opposed_
(COULD NOT HEAR ALL) I am assuming blocks
When it’s complete, I think the other thing has to be done that has to be striped.
The parking we got has 9 foot spaces .
(NOT SPEAKING LOUD ENOUGH) Yes 9 x 12
That should be all striped out, so you know exactly how many cars there are
going to be on that site. Do you have a total on there now? I see 45 on one side and 17 on another.
T count 98 and will make that a little bit clearer.
(NOT CLEAR WHEN SPEAKING) Some of them customers.
Customers will be up front and back.
Alright, so the parking lot should be ultimately, ...you black topping everything
all over again or just adding on.
(NOT CLEAR WHEN SPEAKING) Black what’s currently...
Pe. 18 Fobruarey 3.2026 Planning Meeting
(NOT CLEAR WHEN SPEAKING) So it will be asphalt.
Yes. Part of it is already blacked out.
So bottom line, they should be marked out as parking spaces, so we don’t end
up with 300 cars jammed in there and say, Well, they fit, you know. Okay.
My last question, do you have an electrical going o the proposed building and water?
I’m not seeing any on the drawings, but I’m assuming the buildings will be sprinkler.
Water and electricity will piggy back off the old system.
It’s being done.
Yeah...
I think that came up at PRC. Somebody brought that up, didn’t they? Erica, do
you recall that about the water, bathroom in there or something?
Yeah, I did confirm that they’re going to have a bathroom in the shop.
They are exactly and originally there wasn’t.
Just one quick question on C100, it shows the approximate storm
(NOT CLEAR WHEN SPEAKING)
So that easement was shown on an old site plan. That was approved but was never
substantially completed. So that storm sewer was never routed through tat easement . So, the
easement that was proposed , I don’t know if it was ever filed. Trying to get to the bottom of that.
I don’t know if Erika can provide more clarity on that. We didn’t see anything in our research. The
way that storm runs now is that it runs under the driveway in the front of the site closer to the right
of way into our pond to the east. So, it was an easement that was conceptualized but it was never
actually . (NOT CLEAR WHEN SPEAKING)
If it is real, does the building go? (NOT CLEAR WHEN SPEAKING)
Yes. That easement would go through an abandonment process before we...
I spoke with the sewer department and reviewed a map for Ridge Road which did not
show any easement go through this area.
So, there’s ....assumption is it’s not there. Can that be taken off the map? How
do you that?
Pe. 19 Pobruaray 3. 2026 Planaing Mecting
Is that storm water? Where does that drain to?
That drains behind Thomas Landscaping to the east. It heads east.
Looking where the easement is (NOT SPEAKING LOUD ENOUGH) included
as far as Thomas once it gets off the site from Thomas actually
[an Kuchman: It goes into town sewers.
Well, why don’t we leave it to, you have to address whether that thing is active
or inactive?
Our physical field inspection shows that it is not active. It’s just a question of file
and what process you need to go through that exist. We’re just going to take it off.
Your storm sewer inlet ; site. (NOT SPEAKING LOUD ENOUGH)
Where does that actually drain.
The one off our site?
It just shows inlets. (NOT SPEAKING LOUD ENOUGH) Next _ That's
actually catch basin.
Just the lighting plan. I don’t think there’s enough wall packs on the proposed
building. We don’t have any foot candles indicated by dumpster enclosure or really in the rear of
the parking lot. So, you know, I’m thinking of snow plowing in the middle of the night, somebody’s
out there doing some work or garbage being picked up. Just so you have enough lighting in the
rear for safety.
Along with what we were discussing earlier o that west landscaping, that area
in there. Take your front and.......... you do have some grass in the front there. If I’m not mistaken.
(NOT CLOSE ENOUGH TO THE MIC, HARD TO HEAR HIM) There’s a good
9 to 10 foot sections distinguishes the front.
Just enhance that. You know, here’s why I’m bringing this up.
The new town zoning laws are going to ask for different things, different zoning
and this and that and at a meeting just last night, there’s a lot of this came up aboul street scape.
We need to get these things back in gear again. So, | am going to suggest that there be some
landscaping done in the front of that, We did that with the bank that’s going on the corner of Hatch
Road. They cooperated. They’re putting in a landscape berm. So, if you Just enhance it and f1x it
up, just show us a drawing of what you ca do with it. Something to improve the appearance along
Ridge Road. We got to start with this. Anyone else. All right, I guess you're just here for sketch
plans. Su, we're....1'm going to suggest again, the landscaping on the west side; asphalt not be in
ARN . ‘
Pe. 20 Pobruaray a “026 Mania Ni cddles
the buffer area but that piece that you got there’s...has to be 15 feet, you’ll be all right with that.
Address easement, whoever does that the town or you guys. I don’t know that and you are talking
about the lighting.
Wall packs on the on the proposed building.
Okay, lighting. You guys hearing me back there? Okay, lighting on that and
landscaping. Those are the key things you’re looking for. All right. Okay, I guess we’re all set
with that then.
SUMMARY
e Increase the vegetative buffer along the west side of the property.
e Show paving limits and parking striping on the plans.
e Include a dumpster enclosure detail on the plans.
e Include wall-pack lighting details on the building elevations and on Sheet C-301
(Lighting and Paving Details).
Site Data table to include total overall # of parking spaces
Add distance measurement. between existing and proposed buildings.
Add distance measurement of asphalt to east property line.
Provide overall landscape plan for site.
ABERDEEN ESTATES PHASE 2: Located at Hazelhead Lane. Applicant Forest Creek Equity
Corp. is requesting FINAL SITE PLAN AND SUBDIVISION APPROVAL in association with
the development of 20 single-family residential lots on a 17.10-acre parcel having SBL# 050.02-1-
23.11 located in the R-3 Single Family Residential District under Section 269-10, Section 296-18
and Section 350-12 of the Code of the Town of Webster.
Appearing before the board was Jared Hirt with Evans Fox (DID NOT SIGN IN) on behalf of the
applicant here tonight with Walter Baker with DSB Engineers. There was a letter issued by the
town On January 29, 2026 (SEE ATTACHED) which set forth some comments by PRC committee,
and we did submit response today from addressing comments that was set forth in that letter
January. I assume everyone on the board has received a copy of that. If not, I have a copy. Other
than that, 1 am I really her to be Walts candy. Most of the issues that are addressed
here are comments and concerns that Walk can address by way of Engineering.
Good evening, As the board may recall, we were first here back
in August of 2021 with preliminary overall approval and final for phase
1. So, overall approval
with 79 lots per the _ ___ per 100 foot by 120 minimum size depth of lots ad 22,000 square
feet in phase one which we received approval at that time was for the 23 lots which has been up
south road. You can see that it’s substantially under construction. We have approxtmately....we
have exactly 11 homes under construction are completely built. So, that leave us 12 more lots, and
the developer and the builder are moving along fairly well considering the first house was built.
The model was built last June and started the sales at that time. So, things are moving well, which
Pe. 2! Foebruaray 3.7026 Planning Meetin
Town of Webster
Community Planning and Development
| } IQG0 Ridge Road, Webster, NY 14580-2917 @ (585) 872-7032 @ WebsterNY.gov
January 29, 2026
Walter Baker
D.S.B Engineers & Architects, P.C
2394 Ridgeway Avenue
Suite 201
Rochester NY, 14626
Aberdeen Estates Phase 2 & 3
Walter,
The Town's Project Review Committee (PRC) has reviewed the plans submitted on January 13, 2026, and offers
the following comments:
ABERDEEN PHASE 2-
Review elevation issues for Lots 215-219. If shown correctly, basements may be sufficiently above grade to
trigger sprinkler requirements. Increasing final grades beyond what is shown could also create drainage or
temporary ponding issues between lots.
Phases 2 and 3 must be combined. They will not be approved as separate phases. Please contact Mark
Stein or Keith Mortimer directly to discuss.
Verify that all lot numbers are correct on every drawing. The plat map appears to contain numbering errors.
Show the locations of any known farm tile systems.
Add the following abbreviations to the legend: SA, ST, WS, CS, F.F., G.F.
Confirm whether clearing limits have been completed.
identify any trees proposed to remain within the clearing limits, if applicable.
Provide temporary fencing (e.g., orange construction fence, silt fence) to clearly delineate wetlands on Lots
209 and
210. Add the SWPPP construction sequence to the drawings.
Clarify and expand on the note stating, “Various lots may be subject to deeper than average basements...”.
Note 5 on the Grading Plan states that sediment traps and sinks deeper than 1.5 feet must be protected with
orange fencing. Show the locations of these features on the drawings.
The Grading Plan legend includes a symbol! (A) for “Deep Hole Location.” Confirm whether any deep hole
locations exist and show them on the plans if applicable.
Remove the SWPPP certification signature block. This requirement wilt be addressed through a separate
submission.
585-872-7032 © 585-872-1352 (fax)
Planning-Zoning@ci webster ny us # www.webstemy.gov/106/Community-Planning-Development
Town of Webster
Community Planning and Development
| b [000 Ridge Road, Webster, NY 14580-2917 @ (585) 872-7032 @ WebsterNY.gov
On the Grading Plan, revise the SPDES compliance note to replace “College” with “Town of Webster.”
Show pad and finished grade elevations at each proposed house. Finished grade elevations should be
labeled in boxes at each comer of the structure.
Re-evaluate drainage patterns and grading elevations for Lots 215-218.
Add drainage arrows showing flow paths to an approved catch basin, drainage swale, or stream. This may
be shown on a separate grading and drainage plan.
Several Phase 1 lots had downspouts that could not connect to the storm system. Address how this issue will
be avoided in Phases 2 and
3. Add a signature block to all drawings.
Any changes to driveway locations shown on the plans must be coordinated with Town of Webster staff to
avoid conflicts with cleanouts or manholes
Provide detailed landscaping plans for the berm along the southern property line. Specific plantings
(arborvitae) were previously committed to the adjacent property owner, but are not currently shown.
Show adjacent property lines and ownership information on all plans, as required by Town Code.
Provide clarification on project phasing and the expiration of final approvals.
Conservation easement boundaries must be physically marked in the field with bollards or similar features.
Lot 220: A storm manhole (DB13) with a south invert of 312.28 for a 30-inch main runs parallel to a sanitary
manhole (SA21) with a south invert of 312.73 for an 8-inch main. Clarify how the long sanitary laterals from
Lots 201 and 202 will cross the storm main. If routed over the storm line, laterals would be limited to
approximately three feet of cover on the far side of the road
ABERDEEN PHASE 3-
Provide spot elevations at all building corners.
Clarify grading details, as the current information is unclear.
Add grading and stormwater flow direction arrows, either on the same sheet or a separate plan.
Show distances from property lines to clearing limits in the cul-de-sac area. Existing pine trees in this area
must be preserved, as committed during the 2021 rezoning from R-2 to R-3.
Clearing limits must be clearly delineated and verined by Town staff prior to the start of any site work
Show adjacent property lines and ownership information, as required by Town Code.
585-872-7032 @ 585-872-1352 (fax)
Planning-Zoning@ci webster ny.us ® www.websterny gov/106/Community-Planning-Development
Town of Webster
Community Planning and Development
| ) 1000 Ridge Road, Webster, NY 14580-2917 @ (585) 872-7032 @ WebsterNY.gov
e Lot 318: Storm and sanitary laterals are shown crossing the road to the southwest, even though the mains
are located on the southeast side of the road. Revise plans to eliminate unnecessary iong laterals crossing
the roadway and water main.
¢ Between Lots 305 and 306, there appears to be approximately six inches of clearance between the 8-inch
sanitary main and the 24-inch storm main crossing from MH DB24. Confirm adequacy and compliance.
Any plan revisions made in response to the Project Review Committee's comments must be resubmitted to the
Department of Community Development for review.
Should you have any questions, don't hesitate to contact me at (585) 504-3996 or ecorsi@websterny.gov .
Sincerely,
Erika Corsi
Erika Corsi
Planner
Community Planning and Development
Josh Artuso, Director of Community Development
585-872-7032 © 585-872-1352 (fax)
Planning-Zoning@ci webster ny us @ www.websterny gov/106/ Community-Planning-Development
brings us to the point where we wanted to come in to get the final approval for phase 2 and also
phase
3. So, phase 2 consists of 20 lots and phase 3 will be the remaining 36 lots. The thinking of
the developer is that sales are going so well that he would like to get final approval for both sections,
2 &
3. As the board may recall, we submitted an application in December for this January meeting,
and we withdrew that based on the comments from the town PRC.
We were intending to come in with a total of 56 lots called it phase 2 with 2 construction phases.
Again, the developer thinking is that he wants to try to get pricing from site contractors. So,
hopefully with the number of lots we can get more of scales on pricing and comments that the
December application was they wanted us to separate it back to phase 2 and 3 and we came in for
phase 2 and phase 3 at the same time but basically there was some confusion on the town staff part.
So, we separate it out and submitted 2 complete sets of plans. Phase 2 complete with 20 lots and
phase 3 complete with 36 lots and resubmitted after seeking final approval. Again, we’re trying
to....the developers intent is to hopefully get better pricing with both sections being good at the
same time with the contractor. And if that’s the case, he will obviously move forward going to
have one year to get all the approval and sign offs and get it to the county for filing for phase 2 as
weil as phase
3. So, we coinplied with the change from following two construction phases to
complete phase 2 and 3 plans. So, that’s the change from out January submittal to the February
submittal. And we did receive the other comments which made, as Jared mentioned, we’ve written
responses to that and there technical nature will comply with that you know construction....they
move forward 30 minute (NOT SPEAKING LOUD ENOUGH AND KEEPS
CUTTING IN AND OUT) all that make changes to the plan. Are there any questions?
Yeah, I have a couple. So, you mentioned that PRC comments were addressed, I
didn’t get any responses if they were submitted back today, I think it’s realistic for us to have time
to review them to incorporate them into the decision. One of the PRC comments was from
engineering department that they would like phase 2 & 3 combined not separated and there should
not be an approval granted as separate phases which seems kind of contradicting.
Yes, that was the first part of the comment as you see, the second part of the comment
was referred to the phase 2 and phase 3 and submitted both as the same time. Which we did.
So, you mean as an independent application right now ?
Yes. Separate application submitted.
One of the comments | had is it would be really good to see earthwork cut and fill
tables provided for both phase 2 and phase 3 so that we know you're equaling out or if you're
exporling out or importing in as part of your projects. T know some of the comments that
engineering had was with regards to basement exposure and whatnot. So, we could see earthwork
tables to show the proposed as part of the project.
All the foundations, every house is on virgin ground below the top soil. So, there’s
Pp. 22 Tebrualuy 3, 2026 Planing Meeting
nothing that is not fill material and so it’s pretty apparent when you look at the plants closely where
the original ground is proposed elevations standard you want to call it, 9 foot ~ 8 ft clear basement.
So, 9 feet with the first floor structure so the footers are actually 9 % feet underground so everything
complies with being on ground.
I think it would be helpful if you could identify finish elevations and then again, like
1 said, provide an earthwork (EVERYONE SPEAKING)
We do have it on the drawings.
(NOT SPEAKING LOUD ENOUGH INTO THE MIC) Yes, it’s in the legend. FF
meaning-First Floor and we also have what’s called a garage floor which is key for us to the pitch
of the driveway between the road and the driveway to the house. So, we call out first floor, garage
will basically....... from the first floor down to the basement floor level of 9 feet plus standard footer
depth.
Some of the lots had less than 100 foot minimum lot width.
I’m sorry....
I saw some of the lots less than the minimum.
That’s standard procedure. That’s in place on a curve. The front is going to be
a 100 foot wide. It tapers down, but the mean width of the lot does meet the requirements of 100
feet.
Correct. Front set back. So, it was a minimum because of the pie shaped lots and
minimum 55 feet at the right way but the setback it should be.
The plans themselves that you submitted aren’t compliment.
They were approved for preliminary approvals based on what you show. That’s
all legitimate. We don’t want to reinvent the wheel of this thing.
Well, detail doesn’t matter so. Some of the things on the road control plan, I would
like to see construction is proposed in concrete wash out areas which weren’t in there. I want to
see the limits of disturbance area identified. It’s very hard. Again, you have a very, you know, a
drawing set with a scale so it’s pretty hard to determine some of the line types that are used. It’s
hard to determine where your clearing limits are as part of the project. So, I would likely thicken it
up, make il really stand out where your proposed disturbance limit is part of your project.
I didn’t see and maybe it’s just because the size of scale, but I want to make sure that you have
enough sampling locations for the water main.
Meg. 23 bebruaray J, 2026 Planning Mecuag
Doesn’t the engineering take care of all that stuff, Josh? I think that is why we’ve
got town engineers.
That’s actually up to Monroe County
I am pointing it out on what I saw.
Actually, the plans will be submitted to Monroe County Water Authority which has
the jurisdiction over the water system, and we get comments from them. We obviously worked
with them for a number of years, and we comply with their requirements.
Are you proposing additional clearing as part of project or has been the clearing
already completed with phase one.
We show the clearing limit lines throughout the project. We have labeled various spots
around the project. And obviously we need to clear so that the house can go in. If there’s a tree
line, the tree lines are primarily on the east side of the project, and we show a clearing limit line
which is there for the construction of the homes as well as having adequate backyard space. 1 think
the home builder actually wanted us to have something like 120 feet from the front set back, so
you technically build a house. ..that’s about 40 ft deep. So, they get like an 80 foot backyard, but
we did have on there. So will add dimensions from the rear property line.
So, in other words, you don’t clear out the trees until the potential homeowner tells
you to.
No, we’re going to actually clear the limit line up front so first step in the erosion
control. Obviously, we have erosion control notes on the detail sheet that shows the sequence of
the clearing and grading site. We've cleared that limit. Will have a tree specialist come in and
clear all the trees that are within the clearing limit line. So, we established that already so that will
all be done at one time because it’s again, it’s economic scale to be done as a separate operation.
Get erosion control up first clear line and this way you don’t have to keep coming back and get an
increased price on each lot.
Do you know roughly how many acres you’re clearing?
I can’t say off hand.
If you wouldn’t mind adding to the plans the acres being cleared. I know you're
showing a clearing limit, but it would be good to see a hatch indicating where the current tree line
is and where you're clearing up to. So, visually we can see thal you are clearing to the point you're
supposed to be clearing.
(NOT SPEAKING LOUD ENOUGH, CAN NOT HEAR)............. shows all the
existing contours, proposed contours, existing tree line. ....... it’s all on there.
Pe. 2) bebruaray 3, 2020 Mlanning Niceting
I didn’t know just cuz you mentioned the contours, the grading seems like existing
contours are missing in a lot of areas. So, if you could maybe just check that you have proposed
contours typed back , your existing............
I looked it all over. It looked like they’ re all there, but I’ll try.
Make it clear.
Right.
I personally would like to see more landscaping introduced. I mean, I know you
have a tree per lot, but um....
1 he town code says one tree per lot in the backyard. Obviously, homeowners do their
own landscaping ts going to be the same as you see on every subdivision. Homeowners do their
own, especially at this price range. They’re going to be.......
Yeah, generally we don’t require residential lots to be landscaped.
BOTH PARTIES SPEAKING AT THE SAME TIME.
We did get the comment about the southern berm...... (NOT SPEAKING LOUD
ENOUGH, CAN NOT HEAR) and we did show the berm adjacent property owners of the south.
So, he has a complete hedgerow on his property line, but they are primarily deciduous trees, and so
arborvitae will give them a year round buffer.
I guess my last comment here is just regards to preserving on the southeast side
where this berm is and so if you keep going to the east and towards the wetland that it’s not to
disturb. Is there a reason that area couldn’t be excluded or protected and just leave the vegetation?
You know, you’re not clearing all the way, but is there any way to protect that area and limit the
amount of clearing that’s needed along that area?
BOTH PARTIES SPEAKING AT THE SAME TIME.
We'll take a look at....... protecting the limit lines as well.
Alright, where do we go with this? I] don’t know, how are these
comments. Josh, what do you think?
T think given the number and context of them, T would not advocated for the board to
approve them until the town has had an opportunity to actually review the plans that area reflecting
the comments that we got this evening.
And we just received these comments last Thursday.
Pe 25 bebruaray 4, U6 Planning Meeting
Right and we just received the responses at 5 o’clock this evening. So, no one has had
a chance to actually look at a plan that illustrates............ (did not finish sentence)
So, do we need....should we....what’s... what are they missing here. If....when
did we send these things out? Thursday you said.
They went out last week
So, Thursday, that’s Friday, Monday and Tuesday. So, how do you prepare.
That give you two day to prepare. We got something missing in here.
Well, there’s a lot going on and we do the best we can.
1 mean, the comments, at least in my opinion, are (NOL USING LHE MIC,
SO HARD TO HEAR) they’ re not changing plants themselves. So, it’s pretty routine
that the town or Planning Board issue approval, especially when we’re talking about adding in
property information. I mean, that’s the requests that are coming through. ...nothing of substance.
They’re all technical in nature.
I would respectfully disagree with some of that characterization. We did experience
some issues with the first phase that we’re trying to avoid replicating in subsequent phases. So, we
would really like an opportunity to evaluate the plans they’re provided.
I really don’t see a harm being one more month. Are you clearing right now or can
it wait a month.
] mean, we’re trying to gear up with some...I’I] call it miscommunication that’s already
put this back now six weeks. (NOT CLOSE ENOUGH TO THE MIC) So, we’re just trying to get
ahead of it and again, looking at comments, I’m not sure what comments are otherwise sensitive,
but....
I could just give an example for the Planning Board members that may not have been
around in 2021. This property was rezoned from R-2 to R-3 to allow it to move forward in this
configuration. Now, they agreed to keep the 100 foot lot sizes and make deeper lots to preserve
what small number of trees are on the site, so one of our comments was the town believe there
should be a conservation easement protecting the trees along the east side. That was what was used
to convince the Town Board to rezone the property. The comment we received back to that, to our
comment was there are no conservation requirements and that’s not an adequate response from the
town’s perspective.
Josh, | know you well. Perhaps not from a perspective, but it is from a legal perspective.
If you have preliminary approval and you cant begin imposing certain conditions and restrictions
in final that otherwise were not included in the preliminary putting in requiring the developer to put
in a conservation easement that otherwise was not required to preliminary approval is not proper.
Po. Zo bebruaray 3, 2u20 Phinning Meeung
So, [ mean I’m certainly willing to communicate and work with the town, but things like that can
not be imposed in final. Final is as you know, our plans that we have submitted are in compliance
with the preliminary approval scope and so what I’m looking at what has been provided to us, these
are technical adoptions. I mean asking us to again you know, clarify certain things to put in the
owners name and addresses of the neighboring lots, the signature block will be removed. I
mean, those are things that can be done relatively quick fashion and they’re not going to check and
they’re not going to affect the overall plan of the development of the subdivision.
Well, I believe that some indications that conservation of the trees was going to be a
part of the development. We just want to ensure that that remains. What is going to prevent any
of these future homeowners from removing those trees?
There’s no conservation easement. Are you aware of conservation easement?
No, but that was the crux of why the rezoning took place was there was a promise. I
mean, I could show you the minutes,
Ican not comment on that because I haven't see il. But what I’m saying is there wasn’t
one imposed as part of the preliminary or as part of the resub or the rezoning.
Frank, do you have any comments on that?
Well, first of all, let me ask, what is the urgency? Can we at this point answer today,
the questions that put forth by PRC. Why don’t we have an opportunity to have the board review
that in the middle I’ve ever seen (NOT SPEAKING LOUD ENOUGH) I live in
Webster ____ you are not going to do anything this month it gives just a brief
opportunity to review what you submitted today and thank you for submitting them today. I am
not familiar with what, you know, what happened in 2021 either. So, I mean, it gives us everybody
just a brief opportunity. I know you want to be nice to get pricing and getting everything done right
now but the goal is just to have this approved next month. | just don’t understand the urgency.
(NOT CLOSE ENOUGH TO MIC AND NOT SPEAKING LOUD ENOUGH) It’s not
necessarily....I understand where you’re coming from. It’s were going back to the point place
beginning where we started this process.
But you've answered those questions presumably right, today at 5. (NOT
SPEAKING LOUD ENOUGR) So, I mean it’s not the board I’m just....the question
is what’s the urgency for me to ask you.....you know, I’m not familiar what preliminary plans were
to answer Josh just question, you know, if there were minutes that were put before the board to
create a conservation plan I think that it would done but I would have to go back at look at it. T just
think the intent is to get this done just there were two pages of questions that need to be responded
to. I think it will work and hopefully they'll be satisfactory to vote on tonight.
BOTH PARTIES SPEAKING AT THE SAME TIME.
Vs.2/ bebruaray 3, 20260 Planning Mectiig
I’m listening to Josh and we actually....... there’s some outstanding things that
were supposedly been done prior to, that are still up.
Yes.
Suppose we get all these things logged out, whatever we’ ve got, that needs to
he done, so to speak. Is there a possibility to have a meeting before a month? Would it help?
BOTH PARTIES SPEAKING AT THE SAME TIME
I guess, well. Part of my concern is so we’re not talking about things that otherwise fall
outside of the purview of the board getting final approval... There are certain things that occur in
phase one which I don’t know what they are but whatever they are, that’s not relevant as to getting
final approval and my oniy concern is that we provided our responses and i understand you guys
have not had a chance to look at them but I don’t want to have responses provided the day before
the next day and the next meeting and then we’re back to work right and I understand you’re busy
so I’m not throwing salt but we get responses to where we then can address anything that might
still be outstanding so that when we come before the board let’s say next month, we’re not trying
to do the same thing right, and that’s my concern.
To Jared’s credit there was a mis communication on our part, and T take full
responsibility for the initial confusion relating to the two plans versus one, so I did that. We just
wat to make sure that we want to be sure everything is correct and there are no issue when you’ re
going out to construct the project that we experienced the first time around. That’s all I’m saying.
So, okay, the board could opt to approve it will all of these conditions but just know that the town
is going to take it’s time in doing a thorough review once we do get the revised plans if they do
decide to go that direction.
So, if we gave it...there’s two separate ones phase 2 and phase 3 basically the
same situation with both of them.
The request is to have it in aa singular set of plans as one phase. So, we're not going
to call it phase 2 and
3. It’s phase 2 with 56 lots. That’s the towns request.
Yes, right not it?s phase ? ad phase 3
Correct. If the developer wants to move forward with approvals for both, just call it
phase
2. All lots, one phase. That’s our request. Because then when you have phase 2 and phase
3 plans, there’s construction sequence problems. They’re going to want to do building over here
and maybe a lot over here. The town is not interested in getting into a situation like that. That is our
concern. So, is it that he wants the flexibility to build any site, or they sequentially go phase 2 and
phase 3 because it still doesn’t really make a lot of sense.
Pe 28 Peitruaray 32020 Plioning Meoune
(NOT USING THE MIC, CAN HARDLY HEAR)......... otherwise you’re not going
to...you’re not going to skip from one lot and go all the way to the back. That’s not....... from
phase 2 standpoint you’ve got the depths set forth in the preliminary so getting 20 lots approved
but then also getting phase 3 approved would allow some scalability of bringing in and getting. ..for
example, infrastructure; clearing roads, things like that potentially al! at one time. But it doesn’t
mean you're going to start construction on a 300 above lot and skip over
2. Derek Anderson: So actually my (NOT SPEAKING LOUD ENOUGH, CAN HARDLY HEAR)...
What’s that...
If it weren’t for the grey area of conservation easement on the tree, (NOT
SPEAKING LOUD ENOUGH) I would agree.... but because there’s this grey area, I would say
table it tu Uie neal weeling. Nu iced to pet any iteai resulved because Thave sume iecollection of
conversations articles in the newspaper from the............ original...... there is a public perception
that there is an environmental easement that protects the trees as much as possible and if that’s
something that wasn’t recorded, we would have to find a way to correct that. We quite often see on
plans recent, particularly on Ridge Road............... example of this, here’s a parcel it has on it,
line work showing proposed easement and find out it’s never been.......... and that happens quite
often. Oh, it’s just listed on the plan as proposed even though it’s approved, the work proposed is
stuck on the plan and so it’s never actually filed. And then years later, people come back and look
at it and say, Oh, it doesn’t say easement, it says...back then it was proposed. The reality is it
should have been filed whether or not................... We have seen it on several other projects
actually over the years or these types of conditions they disappear. And J think in this case
remembering the conversations about it and the conversation on the town board side for zoning
area that this is a significant item that needs to get resolved before wee move forward on it at all.
And the follow up on that too in response to the PRC comments, from my standpoint, we have not
received a response. No, just...you say you emailed them after 5....
] respect that.
BOTH PARTIES SPEAKING AT THE SAME TIME
None whatsvever, They might be in my inboa...P?m not obligated to check my
emails 5 minutes before the meeting and read through all this stuff that got submitted at the last
minute. There is a time frame. Maybe there was a screw up of telling when things were supposed
to be put in, but we need time to read any kind of response to................ So, from my perspective,
they don’t exist. I have not seen them. We don’t even have printed copies here
I] can certainly give you a copy.
BOTH PARTIES SPEAKING AT THE SAME TIME.
Derek Anderson:...really should be tabled completely.
Py 29 Tobiiiatas 1, 7026 Miesdiiiies Nios
Okay, why don’t we do this then, we consider tabling this but for when you
come in again, what are we coming in under? One phase or two and three? I’m seeing two letters.
One letter says from December and says combine the work into a single phase 2 and 2 B or revert
to the original phasing under which the town would review phase 2 and phase 2 separately. Then
the next letter I have, from January, phase 2 and 3 must be combined, so what are we doing? (SEE
ATTACHED LETTERS)
So, as I tried to explain earlier, I think what the initial intention of the first comment
was to submit for phase 2 at this time with the assumption that phase 3 would be coming in the
future. So, I think that’s where the miscommunication came from. What we intended to say is
either combine all the lots into a singular plan set or move forward with phase 2 now and phase 3
when you’re done with
2. That was the intent of the original comment, and it was not clear. Like
I said, { apologize for any ambiguity.
I make a suggestion and see, so I talked to Walt and Walt could not get revised plans
addressing PRC comments, so they’re just not comments okay, to the town by the end of next
week....Idon’t....How much time does the town need to review. What I’m thinking is can we have
a meeting to discuss those prior to the last public hearing.
A meeting internally with towns staff?
Yeah. I mean or if you review them and say, hey Jared, we’re going to go that’s one
but there’s other issues. For example: we’ ve raised the conservation easement question that is going
to result in dialogue. Right, so I would like to. That is my concern about not voting and getting the
table is...... ] just want to make sure that we’re getting things addressed between now and next
week and so we can commit to the town that we’ll have revised plans to you by the end of next
week that address the PRC comments. Okay, and then I guess what I’m looking for from a town
stand point is your review of giving us comments back if there are any and that if there’s going to
be some concern or issue raised regarding.........
(NOT SPEAKING LOUD ENOUGH) Why don’t we...that’s fine I mean,
obviously....can’t do it but right. Josh and I can go over that if you have referring question after
the meeting and we can hammer it out in the next couple of weeks and then you know, we would
have to have a public meeting, right?
No, public hearing.
It not a hearing, so we can have a special meeting...
BOTH PARTIES SPEAKING AT THE SAME TIME.
| don’t know what you would accomplish with a couple weeks.
Fam willing to be flexible.
Po WO Petrus 3 7826 Pi HenY Meelis
D.S.B.
ENGINEERS & ARCHITECTS, P.C.
2394 Ridgeway Avenue, Suite 201, Rochester, New York, 14626
(585) 271-5230
271-3488 E-mail: waltfbaker@outlook.com
February 2, 2026
Erica Corsi
Planner
Comununity Planning aud Development
Town of Webster
1000 Ridge Road, Webster, NY, 14580
Response to review comments dated Januaty 29, 2026, for Aberdeen Estates, Phase 2
and Phase 3
Erica,
This letter is in response to the review comments received January 29, 2026, for the above-
mentioned project. The following responses are consistent, where appropriate, with comments
bearing the same number or order.
Aberdeen Phase 2:
© All the Lots 215-219 are set with basement footers on virgin ground not on fill material. As
for the rear yard grading, the proposed contours are at 2% with the grades between the lots
all directed to the rear property line drainage swales and inlets. We will add drainage swale
contours between each of the property lines.
e Phase 2 & 3 full Plan sets were submitted at the direction of the Town’s PRC review
comments of 12-24-2025. The contractor will be required to either combine the work
into a single Phase 2 (without 2A and 2B) “construction sections” or revert to the
otiginal phasing, under which the Town would review Phase 2 and Phase 3
separately. We have submitted the two complete separate sets of plans Phase 2 & 3 as the
Town (PRC) directed on 12-24-2025. We are asking for final approval of the two separate
sets of plans.
® The Plat Plan for Phase 2 “Overall Plat Plan” lot numbers outside of Phase 2 had an
incorrect layer shown, it will be corrected.
¢ We will verify the locations of any known farm tile in the Phase 2 area with the selected site
contractor prior to construction.
We will add the noted abbreviations to the legend as requested.
Page 1 of 3
¢ The clearing limits are shown on the plans for home rear lot areas and will be staked ptior to
the clear operation.
© §6Alltrees will be removed within the noted clearing limits.
© We will add Orange Construction fence as well as Silt Fence to protect the wetland on Lots
209 & 210
© <A SWPPP construction sequence will be added to the Grading Plan.
e All the Lots are set with basement footers on virgin ground not on fill material, including
Lots 215-219. The Grading and General Note #6 on the Grading Plan is a general note and
does not apply to any lots in this Phase and will be removed.
¢ “Note #5” on the Grading and General Notes on the Grading Plan is a general note for
sediment traps and sinks deeper than 1.5 feet. If during construction or at the direction of
the Town Inspector sediment traps and/or silt sinks require protection with orange fencing,
it will be provided.
¢ No deep hole locations exist, and the legend will be revised.
e The SWPPP signature block will be removed.
e The note will be changed.
e Additional grade elevations will be shown around each house labeled with boxes as
requested.
¢ Lots 215-218 all backyard drainage flows to the reat property line at 2% then flows are
within 2 lot line swale toward a field inlet and into the storm sewer system.
¢ Drainage arrows will be shown whete appropriate as requested.
¢ Phase 2 and 3 storm laterals are located in front of each lot as noted,
¢ The signature block will be added to all the drawings.
e A note to that requirement will be added to the plans.
¢ ‘The Arbotvitaes will be added to the south berm on Lots 203-207 on the Grading and
Erosion Control Plan.
¢ Property ownership will be shown on all plans.
* The project construction phasing will follow the Grading and Erosion Control Notes as
outlined on Plan Sheet 7 of 9,
* There are not any conservation areas on the project.
e We now have the surveyor’s as-built of the storm and sanitary sewers and we can adjust the
storm system to increase the separation distance for Lot 201 lateral crossing of the sanitary
main.
Aberdeen Phase 3
e Spot elevations will be shown around each house labeled with boxes as requested.
Page 2 of 3
¢ Additional grade elevations and contours will be shown as requested.
© Grading and stortn flow arrows will be added as request.
¢ Distance from Property lines to clearing limits will be added to the plans for the cul-de-sac
lots.
¢ The Clearing limits as shown on the plan will be staked in the field prior to any construction
activity.
¢ Ail adjacent property lines and ownership will be shown on all plans.
© Lot 318 Storm and Sanitary laterals will be relocated from Hazelhead Lane sewer mains to
the mains on Craggan Heights to avoid road crossings.
« Lhe crossing will be reviewed and addressed as noted.
If you have any additional concerns or comments, you may contact me at 271-5230.
Thaok you,
r
! [id
i Ad =
3 -
ve fe 1,28 fu——
‘ a Pd
Walter F. Baker
Engineering Manager
D.S.B. Engineers & Architects, P.C.
Page 3 of 3
All right. Why don’t we just....we could have a meeting, the tree of us, and you can
answer any questions with us and then we’ll make sure that anything that they want, anything you
have to complete can happen before the next planning board meeting.
I think what we need to do is get all these concerns that the town has, J mean, I
know we got this one....it’s like a freaking newspaper, everyday new additions come out here. Um,
let’s get them all documented down. One sheet of paper, go over it. What does the town actually
need and end it. We can’t...... you know, I have to agree with them partly. I mean, you know,
once you got the approvals, why did it get this far? There was things lacking and if you got this far
with it ...how?
I mean, Josh, other than what has been put forth in the two letters that were
presumably answered, there’s nothing more that you know off the top of your head right and that
is pretty mucli is Whal we need tu have abewered. Su, Pdon't....7 would presume afier tonight this
will be....the questions that they have unless it’s a question with regards to their answer. There
won’t be any new things in the cards.
Not that Tam aware of
See like showing locations of any know , why is this coming out
now. This should have been done way back when. See what I’m saying?
It’s interesting because phase ! had a massive issue with spring popping up water in
the middle of the construction site. And there’s evidence of another in the phase 3 area.
Alright, then that justifies tabling this thing and going through this. Get all the
paperwork together, all on a sheet of paper and say here, resolve this. Put it on your drawings. The
town looks at it and that’s it; you should be all set.
Yes, I'd be happy to facilitate scheduling directly with the engineering department so
all the technical details can be hashed out directly between the town engineer and the project
engineer.
Jared Hirt T think we have PRC comments and oui response. We just uced to memorialize those
and the plan essentially. Correct?
Correct,
ALL BOARD MEMBERS SPEAKING
If the board would like copies to see response and also PRC comments. Anybody want
copies? (JARED GAVE ALL MEMBERS COPIES OF LETTERS)
Poo Sd Tobitatay 3 20° Mastiine Mocs
;
RESOLUTION 25-003 Anthony Casciani made a motion to
TABLE APPLICATION TO MARCH 3,
2026 which was seconded by Mark
Giardina.
= Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
ABERDEEN ESTATE PHASE 3: Located at Hazelhead Lane. Applicant Forest Creek Equity
Corp. is requesting FINAL SITE PLAN AND SUBDIVISION APPROVAL in association with
the development of 36 single-family residential lots on a 52.44-acre parcel having SBL# 050.02-1-
23.11 located in the R-3 Single-Family Residential District under Section 269-10, Section 296-18,
and Section 350-12 under the Code of the Town of Webster.
APPLICATION WAS TABLED.
RESOLUTION 25-004 Anthony Casciani made a motion to
TABLE APPLICATION TO MARCH 3,
2026 which was seconded by Mark
Giardina.
Mr. Casciani AYE
Mr. Malta AYE
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
tee
32 bebruaray 3, tuze P
Approval of minutes for: January 6, 2026
(GIARDINA/MALTA-ANDERSON/ABSTAINED)
With no other applications before the Board this evening Anthony Casciani concluded tonight’s
meeting at 8:15 PM.
Respectfully Submitted,
? t
Dated 3/ 3 [ £6
Mark Giardina, Secretary
Katherine Kolich, Recording Secretary
Signed
MAR 4°26 an9:28
FILED WEBSTER THA CLK
HAR 4°26 aN9:23
‘D WEBSTER TWN CLK
ig. 33 [cbliaiay 3, 2026 Planning Mecting