1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22.
APP
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TomTom
PROPERTY INFORMATION
CK DESCRIPTION REV
BY
PR/IDOM
DATE
PR/IDOM
DR/IDOM
RN/IDOM
DR/IDOM
IFR - ISSUED FOR REVIEW
12/19/2025
IFP - ISSUED FOR PERMITTING 0-0
0-0A
02/06/2026
RN/IDOM
PROJECT LOCATION
PARCEL ID
064.14-2-14./WEB
ADDRESS
891 KLEM RD WEBSTER, NY 14580
ZONING DISTRICT
R-2
AREA
0.77 ACRES
NAME
ADDRESS
CONTACT
APPLICANT/OWNER
ROCHESTER GAS & ELECTRIC
3 CITY CENTER, 2ND FLOOR, 180 S. CLINTON AVE., ROCHESTER, NY 14604
RICARDO CORTES (585)-851-9162
AGENT/ENGINEER
IDOM ENGINEERING PLLC
330 SECOND AVE. S. SUITE 600 MINNEAPOLIS, MN 55401 USA
PHILIP RHODES prhodes@idom.com
CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA
WIND DESIGN
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
COVER SHEET SIMPLIFIED SITE PLAN LANDSCAPING PLAN & DETAILS 3D RENDERS GENERAL ARRANGEMENT ELEVATIONS A, B GENERAL ARRANGEMENT ELEVATIONS C, D GENERAL ARRANGEMENT ELEVATIONS E GRADING PLAN SHEET 001 GRADING PLAN SHEET 002 GRADING PLAN PROFILE - CUT GRADING PLAN PROFILE - FILL DRAINAGE PLAN EROSION CONTROL PLAN EROSION CONTROL NOTES & DETAILS SHEET 002 EROSION CONTROL NOTES & DETAILS SHEET 003 YARD LIGHTING AND SECURITY PLAN SHEET 001 YARD LIGHTING DETAILS SHEET 002 YARD LIGHTING DETAILS SHEET 003 FENCE DETAILS SHEET 003 FENCE DETAILS SHEET 004 GENERAL ARRANGEMENT REM 210865 RGE SUBSTATIONS - STATION 73 - KLEM BOUNDARY (22X34)
GROUND SNOW LOAD (LB/FT2)
40
SUBJECT TO DAMAGE FROM
SPEED (MPH)
TOPOGRAPHIC EFFECTS
SPECIAL WIND REGION
WINDBORNE DEBRIS ZONE
121
NO
NO
NO
SEISMIC DESIGN CATEGORY
D
WEATHERING
FROST LINE DEPTH
TERMITE
NEGLIGABLE
4 FT
NO
WINTER DESIGN TEMP
ICE BARRIER UNDERLAYMENT REQUIRED
FLOOD HAZARDS
AIR FREEZING INDEX
MEAN ANNUAL TEMP
5 °F
NO
-
1500 OR LESS
47.9 °F
INFO
MANUAL J DESIGN CRITERIA
ELEVATION
LATITUDE
WINTER HEATING
SUMMER COOLING
ALTITUDE CORRECTION FACTOR
371'
43°13'49"N
-
-
-
INDOOR DESIGN DESIGN TEMPERATURE COOLING TEMPERATURE
-
-
HEATING TEMPERATURE DIFFERENCE
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
ANSI D 2/6/2026
LOGO
PE STAMP
COOLING TEMPERATURE DIFFERNCE
WIND VELOCITY HEATING
WIND VELOCITY COOLING
COINCIDENT WET BULB
DAILY RANGE
WINTER HUMIDITY
SUMMER HUMIDITY
-
-
-
-
-
-
-
RG&E AVANGRID
COVER SHEET
SUBSTATION 73 BY
DR/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
09/19/2025
ROCHESTER, NY FILE: COVER SHEET.dwg REV
N/A 0-0
N
15 KV - BUS#2
34.5 KV - BUS#1
CONTROL ROOM
APP
COORDINATES AND NORTH ORIENTATION SHOWN HEREON ARE REFERENCED TO THE NEW YORK STATE PLANE COORDINATE SYSTEM, WESTERN ZONE, TRANSVERSE MERCATOR PROJECTION, NAD 83 (2011) EPOCH 2010.00.
2.
ELEVATIONS SHOWN HEREON ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (GEOID 18).
3.
UNDERGROUND UTILITIES SHOWN HEREON WERE PLOTTED FROM FIELD LOCATIONS, VISIBLE AT THE TIME OF SURVEY, AND UTILITY COMPANY RECORD DRAWINGS. THE LOCATIONS OF ALL UNDERGROUND UTILITIES SHOULD BE STAKED BY THE RESPECTIVE UTILITY COMPANY PRIOR TO ANY CONSTRUCTION.
4.
SURVEY FIELDWORK COMPLETED BY FISHER ASSOCIATES ON JANUARY 18, 2022 WITH 1 FOOT +/- OF SNOW COVER, SOME FEATURES AND STRUCTURES MAY BE MISSING AS A RESULT. ADDITIONAL PROPERTY EVIDENCE WAS COLLECTED BY FISHER ASSOCIATES ON AUGUST 16, 2022 UNDER CLEAR CONDITIONS. ADDITIONAL SURVEY FIELDWORK CONDUCTED BY FISHER ASSOCIATES ON JULY 30, 2025 UNDER CLEAR CONDITIONS.
BY
CK
1.
IFR - ISSUED FOR REVIEW
DESCRIPTION REV
DATE
PR/IDOM
PR/IDOM RN/IDOM
RN/IDOM DR/IDOM
DR/IDOM IFA - ISSUED FOR APPROVAL
0-0A
08/29/2025
PR/IDOM
0-0B
10/24/2025
RN/IDOM
RN/IDOM DR/IDOM
DR/IDOM
IFC - ISSUED FOR CONSTRUCTION 0-0
02/06/2026 IFP - ISSUED FOR PERMIT 0-1
12/19/2025
PR/IDOM
NOTES:
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
CLOSEST DISTANCE TO PROPERTY LINE NEW TO THE NORTH
TO THE EAST
TO THE SOUTHWEST
CONTROL BUILDING
29.5'
160.3'
40.6'
GIS BUILDING
29.7'
51.8'
68.8'
TRANSFORMER
67.0'
78.7'
19.3'
FENCE
13.7'
5.8'
9.1'
EXISITNG PROPERTY LINE/LEASE PARCEL LINE RIGHT-OF-WAY LINE
INFO
EASEMENT LINE FENCE LINE EDGE OF WOODS OR BRUSH SANITARY SEWER LINE W/MANHOLE & C.O.
INSTALL
CULVERTS, STORM SEWER LINE W/MH & CATCH BASIN WATER LINE W/HYDRANT, VALVE & VAULT
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
ANSI D 2/6/2026
LOGO
ELECTRIC LINE W/PULLBOX, METER & MANHOLE
RG&E AVANGRID
SITE PLAN
NATURAL GAS LINE W/METER, VALVE & LINE MARKER
SH 001 OF 002
OVERHEAD WIRES, ELECTRIC, TELEPHONE & CABLE LINE
SUBSTATION 73
UNDERGROUND TELEPHONE LINE W/MANHOLE UTILITY POLE, GUY, LIGHT POLE, WALK LIGHT & TOP MOUNT LIGHT
BY
DR/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
ROCHESTER, NY FILE: 73-0003-001 SH 001 REV
73-0003-001 0-1
226'-93 8" 5" 24'-1116
11" 7'-516
27'-43 8"
47'-23 8"
34'-10"
SYMBOL
QUANTITY
COMMON NAME
SCIENTIFIC NAME
MOVE
24
GOLDEN MOP THREADLEAF FALSE CYPRESS
CHAMAECYPARI S PISIFERA 'GOLDEN MOP'
NO
16
MR. BOWLING BALL ARBORVITAE
MR. BOWLING BALL ARBORVITAE
NO
18
EMERALD GREEN ARBORVITAE
THUJA OCCIDENTALIS 'EMERALD GREEN
NO
IMAGE
FENCE LIMIT
SWITCHGEAR BUS 2
SWITCHGEAR BUS 2
℄ TRANSFORMER
SWITCHGEAR BUS 1
5'-4"
℄ ST. SERVICE TRF. SS1
CONTROL ROOM
FENCE LIMIT
30'-0"
8'-65 8"
28'-0"
CONTROL ROOM
43'-1"
SWITCHGEAR BUS 1
N
PLANTING TABLE
LIMITS TO ROAD ROW RISER CIR 5111 & CIR 812
RISER CIR 5147 PROPERTY LINE
RISER CIR 5100 7" 23'-716
1" 5'-08
BOUNDARY OF PLANTING BED
15'-115 8"
1" 15'-112
1" 13'-816
FENCE LIMIT
34.5 KV - BUS#1
15 KV - BUS#2
STONE TABLE
CONTROL ROOM
GROUND/ 812 BUS TIE
821
2 TRF
MOBILE/ SPARE
GROUND/ SPARE 5147 5111 VT2 BUS TIE
VT1 SS1 820
2 TRF
1" 36'-216
TRF. SS1
STYLE
CATEGORY
GRADATION
QTY (CY)
COMMENT
11.1100
MIX TO BE WELL ROUNDED (NOT CRUSHED) WASHED AND SLIGHTLY REDDISH IN COLOR
MOBILE/ 5100 SPARE
FENCE LIMIT
SONORA STONE
ACCESS ROAD
2" MAX
15'-0"
5" 38'-1116
1" 4'-62
10'-15 8"
STONE TOPPING
IMAGE
H0
9" 18'-416
ACCESS ROAD
11" 67'-316
4'-2 1 16 "
1" 103'-64
H3
X0
H2
X1
X2
H1
X3
℄ TRANSFORMER
DATE
FENCE LIMIT
149'-35 8"
89'-77 8"
IDOM Engineering PLLC 330 Second Ave S.-Suite 600 Minneapolis, MN 55401 USA
NOTES:
REMOVE ENOUGH WHOLE BRANCHES, NOT JUST END TIPS, TO REDUCE FOLIAGE BY 1/3 (REVIEW PRUNING METHODS WITH RESIDENT ENGINEER PRIOR TO PRUNING); RETAIN NORMAL PLANT FORM; ALL PRUNING TO BE DONE AFTER PLANTING DURING WINTER, SPRING OR FALL; UNITE OR REMOVE CORDS AND PULL BACK BURLAP FROM TOP 1/3 OF BALL. PRUNING TO BE PERFORMED BY A CERTIFIED ARBORIST
INFO
PLANTS SHALL BEAR THE RELATIONSHIP TO GRADE RECOMMENDED BY SUPPLIER.
ANSI D 2/6/2026
1
SHRUB DETAIL
THIS SHT.
N.T.S.
1.
GRASS/TOP SOIL TO BE REMOVED TO MINIMUM OF 6" BELOW ADJACENT GRADE, AND THEN LANDSCAPE FABRIC LAYER AND STONE IS TO BE ADDED TO FINAL GRADE.
2.
SHRUB PLANTING SHALL OCCUR IN FAL BETWEEN SEPTEMBER 15 AND DECEMBER 1 OR IN THE SPRING BETWEEN MARCH 15 AND JUNE 1.
3.
A WATERING MAINTANANCE PLAN SHOULD BE SUBMITTED TO THE SATISFACTION OF THE PROJECT OWNER.
4.
STONE STYLE, TYPE, GRADATION AND COLOR SHALL BE SUBMITTED TO AVANGRID FOR WRITTEN APPROVAL PRIOR TO PLACEMENT.
PLANTS SHALL BEAR THE SAME RELATIONSHIP TO GRADE RECOMMENDED BY SUPPLIER. PLACE 3" OF COMPOST AROUND ALL SHRUBS. BASE OF TRUNK REMAINS EXPOSED.
0
5
10
PLANTS SHALL BEAR THE RELATIONSHIP TO GRADE RECOMMENDED BY SUPPLIER.
PLACE 3" OF COMPOST AROUND ALL SHRUBS. BASE OF TRUNK REMAINS EXPOSED.
LOGO
3" 3'-316
BY
RISER CIR 820 FENCE LIMIT
BASELINE NORTH/SOUTH
APP DESCRIPTION REV
CK
08/29/2025 HSC/IDOM IFR - ISSUED FOR REVIEW 0-0A
RL/IDOM
LG/IDOM
IGT/IDOM
10/24/2025 HSC/IDOM IFA - ISSUED FOR APPROVAL 0-0B
RL/IDOM
LG/IDOM IFC - ISSUED FOR CONSTRUCTION
RL/IDOM
LG/IDOM HSC/IDOM 2/6/2025
12/19/2025 HSC/IDOM
IFP - ISSUED FOR PERMITTING 0-0
0-0
RL/IDOM
RISER CIR 821
6" TOPPING STONE LAYER
6" TOPPING STONE LAYER
6" TOPPING STONE LAYER
WEED BARRIER FABRIC
WEED BARRIER FABRIC
WEED BARRIER FABRIC
IN SITU SOIL
IN SITU SOIL
THIS SHT.
N.T.S.
40
116"=1'-0"
PLACE 3" OF COMPOST AROUND ALL SHRUBS. BASE OF TRUNK REMAINS EXPOSED.
2
20
IN SITU SOIL
3 THIS SHT.
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
RG&E AVANGRID
LANDSCAPING PLAN SH 002 OF SH 002
N.T.S.
SUBSTATION 73 BY
HSC/IDOM
1/16"=1'-0"
CK
IGT/IDOM RL/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
ROCHESTER, NY FILE: 73-0003-002 SH 002.dwg REV
73-0003-002 SH 002 0-1
N PLATFORM COORDINATES GRADING POINT
370.70
G02
1,178,891.41 1,445,350.22
371.10
G03
1,178,889.68 1,445,304.40
370.90
G04
1,178,988.24 1,445,095.85
370.70
G05
1,179,029.55 1,445,115.38
370.70
G06
1,179,033.19 1,445,345.21
371.20
G07
1,178,896.23 1,445,345.22
371.60
G08
1,178,894.72 1,445,305.43
371.40
G09
1,178,990.62 1,445,102.51
371.20
G10
1,179,024.66 1,445,118.59
371.20
G11
1,178,995.46 1,445,099.27
371.00
G12
1,179,013.60 1,445,107.84
371.00
G13
1,179,010.49 1,445,067.66
369.90
G14
1,179,017.39 1,445,053.15
370.18
G15
1,179,031.46 1,445,044.56
370.48
G16
1,179,035.44 1,445,044.38
370.60
G17
1,179,044.97 1,445,033.98
MATCH EX.
G18
1,179,047.02 1,445,083.95
MATCH EX.
G19
1,179,036.62 1,445,074.36
370.40
G20
1,179,035.30 1,445,074.42
370.35
G21
1,179,026.72 1,445,080.11
370.07
G22
1,179,023.82 1,445,086.21
369.85
G23
1,178,976.28 1,445,233.41
372.00
G24
1,178,977.71 1,445,271.32
372.00
G25
1,178,939.45 1,445,272.80
372.00
G26
1,178,938.02 1,445,234.89
372.00
G27
1,178,986.67 1,445,228.47
371.90
G28
1,178,989.06 1,445,285.37
371.90
G29
1,178,931.30 1,445,228.04
371.80
G30
1,178,926.78 1,445,225.90
371.30
G31
1,179,012.53 1,445,160.17
372.00
G32
1,179,013.75 1,445,192.15
372.00
G33
1,178,995.76 1,445,192.83
372.00
G34
1,178,994.53 1,445,160.88
372.00
G35
1,179,012.87 1,445,222.76
372.00
G36
1,179,015.75 1,445,298.95
372.00
G37
1,179,000.55 1,445,299.52
372.00
G38
1,178,997.64 1,445,223.36
372.00
G39
1,178,880.58 1,445,344.97
370.75
G40
1,178,887.39 1,445,303.73
370.50
G41
1,179,026.20 1,445,159.66
371.70
G42
1,179,031.21 1,445,159.47
371.20
SAFETY NOTES
G43
1,179,031.42 1,445,298.37
371.70
1.
G44
1,179,036.42 1,445,298.19
371.20
G44 G20
G16 G19
G42
G05
G21
G15
1.
2.
COORDINATES AND NORTH ORIENTATION SHOWN HEREON ARE REFERENCED TO THE NEW YORK STATE PLANE COORDINATE SYSTEM, WESTERN ZONE, TRANSVERSE MERCATOR PROJECTION, NAD 83 (2011) EPOCH 2010.00.
G22 G12
4.
5.
G35 G32
G36 15 KV - BUS#2
34.5 KV - BUS#1
CONTROL ROOM
G13
ELEVATIONS SHOWN HEREON ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (GEOID 18).
G11 3.
G06 G41
G10
G14
UNDERGROUND UTILITIES SHOWN HEREON WERE PLOTTED FROM FIELD LOCATIONS, VISIBLE AT THE TIME OF SURVEY, AND UTILITY COMPANY RECORD DRAWINGS. THE LOCATIONS OF ALL UNDERGROUND UTILITIES SHOULD BE STAKED BY THE RESPECTIVE UTILITY COMPANY PRIOR TO ANY CONSTRUCTION. SURVEY FIELDWORK COMPLETED BY FISHER ASSOCIATES ON JANUARY 18, 2022 WITH 1 FOOT +/- OF SNOW COVER, SOME FEATURES AND STRUCTURES MAY BE MISSING AS A RESULT. ADDITIONAL PROPERTY EVIDENCE WAS COLLECTED BY FISHER ASSOCIATES ON AUGUST 16, 2022 UNDER CLEAR CONDITIONS. ADDITIONAL SURVEY FIELDWORK CONDUCTED BY FISHER ASSOCIATES ON JULY 30, 2025 UNDER CLEAR CONDITIONS. SURFACE CONTOURS AROUND THE PERIMETER OF THE PROPERTY WERE GENERATED FROM PUBLICLY AVAILABLE 2019 FEMA LIDAR POINT CLOUD ELEVATIONS. POINT CLOUD FILE 18TTN985880.las WAS DOWNLOADED FROM THE NYS GIS CLEARINGHOUSE AND PROCESSED THROUGH LEICA INFINITY USING A 75 PERCENT POINT REDUCTION AND "REFINED" INTERPOLATION MODEL. REMOVAL OF A LINE OF TREES ON THE EASTERLY PROPERTY LINE AND MAINTENANCE OF THE TRAIL ON THE PROPERTY TO THE WEST OF THE TRAIL CONDUCTED SINCE 2019 ARE NOT REFLECTED IN THE SURFACE.
G09 G34
G33
G37
G38 G28 G27
G23
G04
G24
B01 G29 G25
1. 2. 3. 4. 5.
6.
PR/IDOM
PR/IDOM
PR/IDOM
APP
RN/IDOM
RN/IDOM
RN/IDOM
CK
DR/IDOM
DR//IDOM
DR/IDOM
BY
12/19/2025
10/24/2025
09/19/2025
IFA - ISSUED FOR APPROVAL
IFA - ISSUED FOR APPROVAL
IFR - ISSUED FOR REVIEW
DESCRIPTION
0-0B
0-0A
REV
DATE
PR/IDOM RN/IDOM DR/IDOM 02/06/2026
7. 8.
9.
G01
G43
G31
IFP - ISSUED FOR PERMIT
ALL EXCAVATIONS, SHORING AND BRACING SHALL CONFORM TO OSHA REQUIREMENTS (29 CFR 1926). SLOPES STARTING 5' OUTSIDE THE SUBSTATION FENCE HAS BEEN DESIGNED WITH A MAXIMUM GRADE OF 5H:2V. UNLESS OTHERWISE APPROVED THE MATERIAL SHALL BE DEPOSITED AND SPREAD UPON COMPACTED MATERIAL IN FULL WIDTH LAYERS NOT MORE THAN 8 INCHES IN DEPTH, LOOSE MEASURE. THE CONTRACTOR WILL BE REQUIRED TO DEMONSTRATE THAT THE COMPACTION EQUIPMENT AND METHODS ARE OBTAINING SATISFACTORY COMPACTION. SATISFACTORY COMPACTION FOR THE PURPOSE OF THE DEMONSTRATION IS DEFINED AS NOT LESS THAN 98% OF ASTM D1557 MAXIMUM DRY DENSITY FOR GRAVEL FILL, GRAVEL SURFACE, SAND, SUBGRADE FILL. SATISFACTORY COMPACTION FOR THE PURPOSE OF THE DEMONSTRATION IS DEFINED AS NOT LESS THAN 95% OF ASTM D1557 MAXIMUM DRY DENSITY FOR GENERAL FILL. ALL CUT MATERIAL TO BE CONSIDERED AS CONTAMINATED MATERIAL AND NEEDS TO BE HAUL TO APPROVED LANDFILL. PRIOR TO WORK, THE CONTRACTOR SHALL, AT A MINIMUM, CONTACT "UDIG NY" TO IDENTIFY OR VERIFY SIZE, DEPTH AND LOCATIONS OF ALL UNDERGROUND UTILITIES WITHIN THE VICINITY OF THE WORK AREA. CONTRACTOR SHALL PROTECT UTILITIES FROM DAMAGE AND SHALL NOT DISTURB UNDERGROUND UTILITIES TO REMAIN. IN THE EVENT THAT A UTILITY IS DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK, THE DAMAGED UTILITY SHALL BE REPAIRED BY THE CONTRACTOR TO ITS PRE-CONSTRUCTION CONDITION AT NO ADDITIONAL COST TO THE OWNER. SHOULD UNCHARTED OR INCORRECTLY CHARTED PIPING OR OTHER UTILITIES BE ENCOUNTERED DURING EXCAVATION, CONTACT AVANGRID IMMEDIATELY FOR DIRECTION. SOIL MATERIAL SHALL BE FREE OF COMBUSTIBLE, ORGANIC DEBRIS AND FROZEN MATERIALS AS WELL AS ROOTS, TOPSOIL, LOAM, TRASH, SNOW, ICE, WOOD AND OTHER OBJECTIONABLE MATERIALS.
G26
G30 G08
G07 G02
G03
G39 G40
WORK WILL BE CARRIED OUT NEAR AND UNDER ENERGIZED TRANSMISSION LINES. EXTREME CAUTION IS REQUIRED AT ALL TIMES. THE CONTRACTOR SHALL STRICTLY FOLLOW ALL AVANGRID SAFETY REQUIREMENTS. FAILURE TO DO SO WILL RESULT IN TERMINATION.
73-0003-004 SH002 73-0003-004 SH003 73-0003-004 SH004
BASELINE COORDINATES
GRADING PLAN GRADING PROFILE - CUT GRADING PROFILE - FILL
CENTER POINT B01
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
ELEV
1,179,038.38 1,445,350.21
G18
0-0
EAST
G01
G17
0-0C
NORTH
NORTH
EAST
1,178,960.09 1,445,253.01
NEW EXISITNG PROPERTY LINE/LEASE PARCEL LINE RIGHT-OF-WAY LINE
INFO
EASEMENT LINE FENCE LINE EDGE OF WOODS OR BRUSH SANITARY SEWER LINE W/MANHOLE & C.O.
INSTALL
CULVERTS, STORM SEWER LINE W/MH & CATCH BASIN AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
WATER LINE W/HYDRANT, VALVE & VAULT
ANSI D 2/6/2026
LOGO
ELECTRIC LINE W/PULLBOX, METER & MANHOLE NATURAL GAS LINE W/METER, VALVE & LINE MARKER OVERHEAD WIRES, ELECTRIC, TELEPHONE & CABLE LINE
RG&E AVANGRID
NOT FOR CONSTRUCTION
GRADING PLAN SH 001 OF 008 SUBSTATION 73
UNDERGROUND TELEPHONE LINE W/MANHOLE UTILITY POLE, GUY, LIGHT POLE, WALK LIGHT & TOP MOUNT LIGHT
BY
DR/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
09/19/2025
ROCHESTER, NY FILE: 73-0003-004 SH 001 REV
73-0003-004 0-0
N PLATFORM COORDINATES GRADING POINT
370.70
G02
1,178,891.41 1,445,350.22
371.10
G03
1,178,889.68 1,445,304.40
370.90
G04
1,178,988.24 1,445,095.85
370.70
G05
1,179,029.55 1,445,115.38
370.70
G06
1,179,033.19 1,445,345.21
371.20
G07
1,178,896.23 1,445,345.22
371.60
G08
1,178,894.72 1,445,305.43
371.40
G09
1,178,990.62 1,445,102.51
371.20
G10
1,179,024.66 1,445,118.59
371.20
G11
1,178,995.46 1,445,099.27
371.00
G12
1,179,013.60 1,445,107.84
371.00
G13
1,179,010.49 1,445,067.66
369.90
G14
1,179,017.39 1,445,053.15
370.18
G15
1,179,031.46 1,445,044.56
370.48
G16
1,179,035.44 1,445,044.38
370.60
G17
1,179,044.97 1,445,033.98
MATCH EX.
G18
1,179,047.02 1,445,083.95
MATCH EX.
G19
1,179,036.62 1,445,074.36
370.40
G20
1,179,035.30 1,445,074.42
370.35
G21
1,179,026.72 1,445,080.11
370.07
G22
1,179,023.82 1,445,086.21
369.85
G23
1,178,976.28 1,445,233.41
372.00
NOTES:
G24
1,178,977.71 1,445,271.32
372.00
1.
G25
1,178,939.45 1,445,272.80
372.00
G26
1,178,938.02 1,445,234.89
372.00
G27
1,178,986.67 1,445,228.47
371.90
G28
1,178,989.06 1,445,285.37
371.90
G29
1,178,931.30 1,445,228.04
371.80
G30
1,178,926.78 1,445,225.90
371.30
G31
1,179,012.53 1,445,160.17
372.00
G32
1,179,013.75 1,445,192.15
372.00
G33
1,178,995.76 1,445,192.83
372.00
G34
1,178,994.53 1,445,160.88
372.00
G35
1,179,012.87 1,445,222.76
372.00
G36
1,179,015.75 1,445,298.95
372.00
G37
1,179,000.55 1,445,299.52
372.00
G38
1,178,997.64 1,445,223.36
372.00
G39
1,178,880.58 1,445,344.97
370.75
G40
1,178,887.39 1,445,303.73
370.50
G41
1,179,026.20 1,445,159.66
371.70
G42
1,179,031.21 1,445,159.47
371.20
G43
1,179,031.42 1,445,298.37
371.70
G44
1,179,036.42 1,445,298.19
371.20
G44 G20
G16 G19
G42
G05
G21
G15
G22
G06 G35
G41
G10
G14
G01
G43
G31
G12
G32
G36 15 KV - BUS#2
34.5 KV - BUS#1
CONTROL ROOM
G13
G11
G09 G34
2.
3.
4.
G33
G28 G23
APP
PR/IDOM RN/IDOM
CK BY DATE
PR/IDOM RN/IDOM
G24
G29
B01
ELEVATIONS SHOWN HEREON ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (GEOID 18).
G25
UNDERGROUND UTILITIES SHOWN HEREON WERE PLOTTED FROM FIELD LOCATIONS, VISIBLE AT THE TIME OF SURVEY, AND UTILITY COMPANY RECORD DRAWINGS. THE LOCATIONS OF ALL UNDERGROUND UTILITIES SHOULD BE STAKED BY THE RESPECTIVE UTILITY COMPANY PRIOR TO ANY CONSTRUCTION. SURVEY FIELDWORK COMPLETED BY FISHER ASSOCIATES ON JANUARY 18, 2022 WITH 1 FOOT +/- OF SNOW COVER, SOME FEATURES AND STRUCTURES MAY BE MISSING AS A RESULT. ADDITIONAL PROPERTY EVIDENCE WAS COLLECTED BY FISHER ASSOCIATES ON AUGUST 16, 2022 UNDER CLEAR CONDITIONS. ADDITIONAL SURVEY FIELDWORK CONDUCTED BY FISHER ASSOCIATES ON JULY 30, 2025 UNDER CLEAR CONDITIONS.
G26
G30 G08
SURFACE CONTOURS AROUND THE PERIMETER OF THE PROPERTY WERE GENERATED FROM PUBLICLY AVAILABLE 2019 FEMA LIDAR POINT CLOUD ELEVATIONS. POINT CLOUD FILE 18TTN985880.las WAS DOWNLOADED FROM THE NYS GIS CLEARINGHOUSE AND PROCESSED THROUGH LEICA INFINITY USING A 75 PERCENT POINT REDUCTION AND "REFINED" INTERPOLATION MODEL. REMOVAL OF A LINE OF TREES ON THE EASTERLY PROPERTY LINE AND MAINTENANCE OF THE TRAIL ON THE PROPERTY TO THE WEST OF THE TRAIL CONDUCTED SINCE 2019 ARE NOT REFLECTED IN THE SURFACE.
G07 G02
G03
G39 G40
ALL TOPSOIL, FILL, ORGANIC MATERIAL, DEBRIS, RUBBISH, FROZEN SOILS, MUCK, LOOSE, OR DISTURBED SOILS AND OTHER UNSUITABLE MATERIALS SHOULD BE REMOVED FROM AREAS OF PROPOSED CONSTRUCTION. QUANTITIES ARE FOR OWNER'S ASSET MANAGEMENT PURPOSES ONLY. CONTRACTOR IS RESPONSIBLE FOR DETERMINING QUANTITIES FOR CONSTRUCTION & BIDDING PURPOSES.
IFA -ISSUED FOR APPROVAL
IFR - ISSUED FOR REVIEW
DESCRIPTION REV
SAFETY NOTES
0-0A
09/19/2025
2.
0-0B
10/24/2025
DR/IDOM
PR/IDOM
DR/IDOM
PR/IDOM
RN/IDOM DR/IDOM 12/19/2025
G27
1.
IFA - ISSUED FOR APPROVAL
02/06/2026
DR/IDOM
RN/IDOM
5.
COORDINATES AND NORTH ORIENTATION SHOWN HEREON ARE REFERENCED TO THE NEW YORK STATE PLANE COORDINATE SYSTEM, WESTERN ZONE, TRANSVERSE MERCATOR PROJECTION, NAD 83 (2011) EPOCH 2010.00.
G37
G38
G04
IFP - ISSUED FOR PERMIT
ELEV
1,179,038.38 1,445,350.21
G18
0-0
EAST
G01
G17
0-0C
NORTH
1.
WORK WILL BE CARRIED OUT NEAR AND UNDER ENERGIZED TRANSMISSION LINES. EXTREME CAUTION IS REQUIRED AT ALL TIMES. THE CONTRACTOR SHALL STRICTLY FOLLOW ALL AVANGRID SAFETY REQUIREMENTS. FAILURE TO DO SO WILL RESULT IN TERMINATION.
73-0003-004 SH001 73-0003-004 SH003 73-0003-004 SH004
BASELINE COORDINATES
GRADING PLAN GRADING PROFILE - CUT GRADING PROFILE - FILL
CENTER POINT B01
NORTH
EAST
1,178,960.09 1,445,253.01
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
NEW
EXISTING GRASS AREA (26,533 S.F.)
EXISITNG
EXISTING SUBSTATION AREA (4,032 S.F.)
PROPERTY LINE/LEASE PARCEL LINE
EXISTING ASPHALT AREA (2,065 S.F.)
RIGHT-OF-WAY LINE
INFO
EASEMENT LINE FENCE LINE EDGE OF WOODS OR BRUSH SANITARY SEWER LINE W/MANHOLE & C.O.
INSTALL
CULVERTS, STORM SEWER LINE W/MH & CATCH BASIN AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
WATER LINE W/HYDRANT, VALVE & VAULT
ANSI D 2/6/2026
LOGO
ELECTRIC LINE W/PULLBOX, METER & MANHOLE NATURAL GAS LINE W/METER, VALVE & LINE MARKER OVERHEAD WIRES, ELECTRIC, TELEPHONE & CABLE LINE
RG&E AVANGRID
NOT FOR CONSTRUCTION
GRADING PLAN SH 002 OF 008 SUBSTATION 73
UNDERGROUND TELEPHONE LINE W/MANHOLE UTILITY POLE, GUY, LIGHT POLE, WALK LIGHT & TOP MOUNT LIGHT
BY
DR/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
09/19/2025
ROCHESTER, NY FILE: 73-0003-004 SH 002 REV
73-0003-004 0-0
N
15 KV - BUS#2 34.5 KV - BUS#1
APP CK BY
IFR - ISSUED FOR REVIEW
DESCRIPTION REV
DATE
PR/IDOM
PR/IDOM RN/IDOM
RN/IDOM DR/IDOM
DR/IDOM IFA - ISSUED FOR APPROVAL
0-0A
09/19/2025
PR/IDOM
0-0B
10/24/2025
RN/IDOM
RN/IDOM DR/IDOM
DR/IDOM
IFA - ISSUED FOR APPROVAL
02/06/2026 IFP - ISSUED FOR PERMIT 0-0
0-0C
12/19/2025
PR/IDOM
CONTROL ROOM
INFO
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
QUANTITIES ARE FOR OWNER'S ASSET MANAGEMENT PURPOSES ONLY. CONTRACTOR IS RESPONSIBLE FOR DETERMINING QUANTITIES FOR CONSTRUCTION AND BIDDING PURPOSES.
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
ANSI D 2/6/2026
LOGO
PE STAMP
RG&E AVANGRID
NOT FOR CONSTRUCTION
GRADING PLAN PROFILE - CUT SH 003 OF 008 SUBSTATION 73 BY
DR/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
09/19/2025
ROCHESTER, NY FILE: 73-0003-004 SH 003 REV
73-0003-004 0-0
N
15 KV - BUS#2 34.5 KV - BUS#1
APP CK
VARIES 12" 8" 7"
SUBGRADE FILL
YARD PLATFORM SECTION
DESCRIPTION
BY
PR/IDOM
DATE
PR/IDOM
RN/IDOM DR/IDOM
RN/IDOM DR/IDOM
09/19/2025
ASPHALT ROAD 3" NYSDOT TYPE 6F TOP COURSE 4" NYSDOT TYPE 3 BINDER AGGREGATE BASE COURSE NYSDOT TYPE 1 DGA MIRAFI HP270 SUBGRADE FILL UNDISTURBED SOIL UP COMPACT TO 95%
ACCESS ROAD SECTION
6" GRAVEL SURFACE COMPACT TO 98% 18" GRAVEL BASE/FILL SUBGRADE FILL
REV
IFR - ISSUED FOR REVIEW 0-0A
6" STONE TOPPING 18" GRAVEL BASE/FILL
GRAVEL ACCESS SECTION
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
0-0B
10/24/2025
PR/IDOM
IFA - ISSUED FOR APPROVAL
PR/IDOM
DR/IDOM 12/19/2025
RN/IDOM
DR/IDOM 02/06/2026
IFA - ISSUED FOR APPROVAL
0-0
0-0C
IFP - ISSUED FOR PERMIT
RN/IDOM
CONTROL ROOM
TYPICAL SECTIONS NOT TO SCALE
INFO
QUANTITIES ARE FOR OWNER'S ASSET MANAGEMENT PURPOSES ONLY. CONTRACTOR IS RESPONSIBLE FOR DETERMINING QUANTITIES FOR CONSTRUCTION AND BIDDING PURPOSES.
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
ANSI D 2/6/2026
LOGO
PE STAMP
RG&E AVANGRID
NOT FOR CONSTRUCTION
GRADING PLAN PROFILE - FILL SH 004 OF 008 SUBSTATION 73 BY
DR/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
09/19/2025
ROCHESTER, NY FILE: 73-0003-004 SH 004 REV
73-0003-004 0-0
N
D18
D17
D29
D28
D27
D22
D19
D26
D21
D25 D04
D16 15 KV - BUS#2
34.5 KV - BUS#1
CONTROL ROOM
D15 D01
D24
D20
D23 D12
D11
D02
D05
D07 D09 D08 D06
NOTES:
ELEVATIONS SHOWN HEREON ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (GEOID 18).
3.
UNDERGROUND UTILITIES SHOWN HEREON WERE PLOTTED FROM FIELD LOCATIONS, VISIBLE AT THE TIME OF SURVEY, AND UTILITY COMPANY RECORD DRAWINGS. THE LOCATIONS OF ALL UNDERGROUND UTILITIES SHOULD BE STAKED BY THE RESPECTIVE UTILITY COMPANY PRIOR TO ANY CONSTRUCTION.
4.
SURVEY FIELDWORK COMPLETED BY FISHER ASSOCIATES ON JANUARY 18, 2022 WITH 1 FOOT +/- OF SNOW COVER, SOME FEATURES AND STRUCTURES MAY BE MISSING AS A RESULT. ADDITIONAL PROPERTY EVIDENCE WAS COLLECTED BY FISHER ASSOCIATES ON AUGUST 16, 2022 UNDER CLEAR CONDITIONS. ADDITIONAL SURVEY FIELDWORK CONDUCTED BY FISHER ASSOCIATES ON JULY 30, 2025 UNDER CLEAR CONDITIONS.
5.
SURFACE CONTOURS AROUND THE PERIMETER OF THE PROPERTY WERE GENERATED FROM PUBLICLY AVAILABLE 2019 FEMA LIDAR POINT CLOUD ELEVATIONS. POINT CLOUD FILE 18TTN985880.las WAS DOWNLOADED FROM THE NYS GIS CLEARINGHOUSE AND PROCESSED THROUGH LEICA INFINITY USING A 75 PERCENT POINT REDUCTION AND "REFINED" INTERPOLATION MODEL. REMOVAL OF A LINE OF TREES ON THE EASTERLY PROPERTY LINE AND MAINTENANCE OF THE TRAIL ON THE PROPERTY TO THE WEST OF THE TRAIL CONDUCTED SINCE 2019 ARE NOT REFLECTED IN THE SURFACE.
IFP - ISSUED FOR PERMIT
IFA - ISSUED FOR APPROVAL
IFA - ISSUED FOR APPROVAL
IFR - ISSUED FOR REVIEW
DESCRIPTION
0-0
0-0B
0-0A
REV
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
PIPE TYPE
366.50
6
HDPE PERF.
366.50
365.81
6
HDPE
1.00%
367.34
366.50
6
HDPE PERF.
27
1.00%
366.50
366.23
6
HDPE
D07-D08
23
1.00%
365.73
365.50
4
D.I.P.
D09-D10
28
0.00%
367.60
367.60
6
HDPE PERF.
D10-D11
32
0.00%
367.60
367.60
6
HDPE PERF.
D11-D12
28
0.00%
367.60
367.60
6
HDPE PERF.
D12-D05
31
3.50%
367.60
366.50
6
HDPE
D12-D09
32
0.00%
367.60
367.60
6
HDPE PERF.
NEW
D13-D14
10
-2.00%
366.30
366.50*
2
PVC
EXISITNG
D15-D16
35
1.00%
367.85
367.50
12
RCP CL. IV
PROPERTY LINE/LEASE PARCEL LINE
D17-D18
3
1.00%
365.62
365.59
8
RCP CL. III
RIGHT-OF-WAY LINE
D19-D20
23
1.00%
365.75
365.52
4
D.I.P.
D20-D21
20
1.00%
365.52
365.32
4
D.I.P.
D21-D22
25
1.00%
365.32
365.07
4
D.I.P.
D23-D24
80
0.00%
366.90
366.90
6
HDPE PERF.
D24-D25
16
0.00%
366.90
366.90
6
HDPE PERF.
D25-D26
80
0.00%
366.90
366.90
6
HDPE PERF.
CULVERTS, STORM SEWER LINE W/MH & CATCH BASIN
D26-D27
4
1.00%
366.90
366.86
6
HDPE
WATER LINE W/HYDRANT, VALVE & VAULT
D23-D26
16
0.00%
366.90
366.90
6
HDPE PERF.
ELECTRIC LINE W/PULLBOX, METER & MANHOLE
D28-D29
10
-2.00%
366.30
366.50*
2
PVC
NATURAL GAS LINE W/METER, VALVE & LINE MARKER
*FROM THIS POINT PIPE EXTENDS VERTICALLY TO 12" ABOVE FINISH GRADE AND DRAINS OUT ONTO SPLASH PAD.
WORK WILL BE CARRIED OUT NEAR AND UNDER ENERGIZED TRANSMISSION LINES. EXTREME CAUTION IS REQUIRED AT ALL TIMES. THE CONTRACTOR SHALL STRICTLY FOLLOW ALL AVANGRID SAFETY REQUIREMENTS. FAILURE TO DO SO WILL RESULT IN TERMINATION.
73-0003-004 SH006 73-0003-004 SH007 73-0003-004 SH008
DRAINAGE DETAILS TRANSFORMER DRAINAGE PUMP STATION DETAILS GIS BASEMENT DRAINAGE PUMP STATION DETAILS
FENCE LINE EDGE OF WOODS OR BRUSH SANITARY SEWER LINE W/MANHOLE & C.O.
ANSI D 2/6/2026
D13
D14
PIPE DIA (IN)
EASEMENT LINE
INFO
D03
SAFETY NOTES
DRAINAGE ARROW
LOGO
D10
DRAINAGE PIPE INFORMATION 1.
0-0C
COORDINATES AND NORTH ORIENTATION SHOWN HEREON ARE REFERENCED TO THE NEW YORK STATE PLANE COORDINATE SYSTEM, WESTERN ZONE, TRANSVERSE MERCATOR PROJECTION, NAD 83 (2011) EPOCH 2010.00.
2.
APP CK BY
PR/IDOM
DATE
PR/IDOM
RN/IDOM DR/IDOM
RN/IDOM DR/IDOM
09/19/2025
PR/IDOM
10/24/2025
PR/IDOM
DR/IDOM 12/19/2025
RN/IDOM
DR/IDOM 02/06/2026
RN/IDOM
1.
OVERHEAD WIRES, ELECTRIC, TELEPHONE & CABLE LINE
SECTION
LENGTH (FT)
SLOPE
INITIAL FINAL INVERT (FT) INVERT (FT)
D01-D02
84
1.00%
367.34
D02-D03
69
1.00%
D04-D05
84
D05-D06
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
RG&E AVANGRID
NOT FOR CONSTRUCTION
DRAINAGE PLAN SH 005 OF 008 SUBSTATION 73
UNDERGROUND TELEPHONE LINE W/MANHOLE UTILITY POLE, GUY, LIGHT POLE, WALK LIGHT & TOP MOUNT LIGHT
BY
DR/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
09/19/2025
ROCHESTER, NY FILE: 73-0003-004 SH 005 REV
73-0003-004 0-0
1. 6" STONE TOPPING 1.1. CRUSHED STONE TOPPING SHALL BE OBTAINED FROM ROCK OF UNIFORM QUALITY AND SHALL CONSIST OF CLEAN, ANGULAR FRAGMENTS OF QUARRIED ROCK FREE FROM SOFT DISINTEGRATED PIECES OR OTHER OBJECTIONABLE MATTER. THE MINIMAL ELECTRICAL RESISTIVITY OF THE CRUSHED STONE IN WET CONDITIONS SHALL BE 3000 OHM-METER. 1.2. THE STONE TOPPING SHALL MEET THE FOLLOWING BLEND REQUIREMENTS:
4" DISCHARGE HOSE (FROM DEWATERING AREA)
SAND BERM PLAN
SAND BERM
4" DISCHARGE HOSE
10'-0" MIN
FLOW
FLOW
1
1
STRAW BALE BARRIER FLOW
6" MIN OF 3/4" CRUSHED STONE
DIRTBAG SEDIMENT CONTROL DEVICE BY AFC ENVIRONMENTAL, OR APPROVED EQUAL SECTION A-A
MIRAFI 140N OR APPROVED EQUAL
DIRT BAG MATERIAL BASED ON PARTICLE SIZE IN DIRTY WATER, I.E. FOR COARSE PARTICLES A WOVEN MATERIAL; FOR SILTS/CLAYS A NON-WOVEN MATERIAL.
2.
DO NOT OVER PRESSURIZE DIRT BAG OR USE BEYOND CAPACITY.
3.
LOCATE DISCHARGE SITE AS INDICATED ON SITE GRADING PLAN.
4.
DOWNGRADIENT RECEIVING AREA MUST BE WELL VEGETATED OR OTHERWISE STABLE FROM EROSION, E.G. FOREST FLOOR OR COARSE GRAVEL/STONE. DISCHARGE NOT PERMITTED WITHIN 75' OF A STREAM OR WETLAND.
2. OPEN EXCAVATIONS SHALL BE DEWATERED AND KEPT FREE OF STANDING WATER AND MUDDY CONDITIONS AS NECESSARY FOR THE PROPER EXECUTION OF THE WORK. THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE, AND MAINTAIN ALL DRAINS, SUMPS AND ALL OTHER EQUIPMENT REQUIRED TO PROPERLY DEWATER THE SITE. DEWATERING SYSTEMS THAT CAUSE A LOSS OF SOIL FINES FROM THE FOUNDATION AREAS WILL NOT BE PERMITTED.
COMPACTED COMMON BORROW FROM TRENCH EXCAVATION
SHORE TRENCH EXCAVATION AS REQUIRED TO MINIMIZE EXCAVATION AND IMPACTS TO ADJACENT UTILITIES, STRUCTURES OR PAVEMENT. TRENCHES SHALL BE CONSTRUCTED IN ACCORDANCE WITH OSHA REQUIREMENTS.
3. INSTALL DIVERSION DITCHES OR BERMS IF NECESSARY TO MINIMIZE THE AMOUNT OF CLEAN STORM WATER RUNOFF ALLOWED INTO THE EXCAVATED AREA.
12" MIN.
6"
#40
0-20
#200
0-5
GRAVEL BASE / FILL: GRAVEL BASE/FILL SHALL BE A CRUSHING STONE PASSING THE TWO (2) INCH SIEVE AND CONFORMING TO THE GRADATION REQUIREMENTS OF THE FOLLOWING TABLE:
90-95
1
2"
45-70
1
4"
30-55
#40
0-20
#200
0-5
4.
COMPACTED GRAVEL BASE/FILL
CLEAN ASTM D2487 GW, GP, SW, AND SP SOIL MATERIALS EXCAVATED FROM THE PROJECT SITE SHALL BE SUITABLE AS SUBGRADE FILL. ASTM SM, SC, ML, AND CL SOIL MATERIALS ARE NOT ACCEPTABLE. US STANDARD SIEVE SIZE
PERCENT BY WEIGHT PASSING SIEVE
1
4"
25-70
#40
0-30
#200
0-7
1 1
6" PERFORATED FLEXIBLE HDPE DRAIN
1'-0" TYP
=
=
1'-0" TYP
5.
CRUSHED #2 STONE NYSDOT 703-0201 WRAPPED IN FILTER FABRIC, MIRAFI 140N OVERLAP TOP 12 INCHES, OVERLAP SHEETS 36 INCHES
D50=6" DIAMETER CRUSHED STONE, 15" DEEP WHERE SHOWN ON PLANS. INSTALL ON A WOVEN GEOTEXTILE. ROCK SHALL CONSIST OF SOUND, DURABLE ANGULAR ROCK THAT WILL NOT DISINTEGRATE BY EXPOSURE TO WATER OR WEATHER. FIELDSTONE, ROUGH QUARRY STONE, BLASTED LEDGE ROCK MAY BE USED. ROUNDED BOULDERS, COBBLES OR TAILINGS WILL NOT BE PERMITTED. STONE SIZES SHALL BE AS INDICATED ON THE DRAWINGS. THE GRADATION SHALL MEET THE GRADING REQUIREMENTS OF THE FOLLOWING TABLE:
PER OSHA
4'-0"
2'-0"
8" ORIFICE WITH TRASH RACK (SEE BELOW). SEE DRAINAGE PLAN FOR INVERT.
TRANSFORMER PULL BOX (PB-3 & PB-5) SEE DWG 73-0003-016
2'X4' PRECAST DRAINAGE INLET
SEE DRAINAGE PLAN
FINISH GRADE
8" OUTLET PIPE OPENING. SEE DRAINAGE PLAN FOR INVERT.
SIEVE DESIGNATION
PERCENT BY WEIGHT PASSING SQUARE MESH SIEVE
12 INCH
90-100
4 INCH
0-15
STONE TOPPING
6.
PERFORATED CLASS II HIGH-DENSITY POLYETHYLENE (HDPE), FITTINGS AND JOINTS CONFORMING TO AASHTO M252.
7.
REINFORCED CONCRETE PIPE (RCP), CPP DRAINAGE PIPING, ADS N12 OR APPROVED EQUAL.
8.
NON-WOVEN GEOTEXTILE FABRIC SHALL BE MIRAFI 140N OR APPROVED EQUAL. WOVEN GEOTEXTILE FABRIC SHALL BE MIRAFI 600X OR APPROVED EQUAL.
9.
2" DIAMETER STONE USED FOR STONE CHECK DAMS AND STABILIZED CONSTRUCTION ENTRANCES SHALL CONFORM TO THE REQUIREMENTS OF NYSDOT TABLE 703-4 SIZE DESIGNATION 2.
10. SAND BEDDING - NYS DOT SPECIFICATION 703-07-CONCRETE SAND GRADATION OF AGGREGATE FOR SAND SHALL BE CLEAN GRANULAR MATERIAL:
COMPACTED GRAVEL BASE/FILL
SAND US STANDARD SIEVE SIZE
PERCENT BY WEIGHT PASSING SIEVE
3
8"
100
#4
90-100
#8
75-100
#16
50-85
#30
25-60
#50
10-30
#100
1-10
#200
0-3
CRUSHED #2 STONE NYSDOT 703-0201 WRAPPED IN FILTER FABRIC, MIRAFI 140N OVERLAP TOP 12 INCHES, OVERLAP SHEETS 36 INCHES
6" 5'-0"
6"
MIN
6"
END CAP
ANIMAL GUARD 3"
1'-0"
SLOPE PER OSHA MIN
8" ORIFICE WITH STORMRAX SIDE MOUNT FLAT TRASH RACK 11 3 8"X11 3 8"X7 12".
NON-WOVEN GEOTEXTILE
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
30-55
112"
FINISH GRADE
RCP PIPE
AASHTO M252 PIPE
1% SLOPE
11. EMBANKMENT FILL SLOPES - ALL FILL SLOPE FACES SHOULD BE CONSTRUCTED AS LEVEL BENCHES WHICH ARE OVERBUILT TO FACILITATE COMPACTION. THE FINAL SLOPE FACE SHOULD BE CONSTRUCTED BY CUTTING BACK INTO THE COMPACTED CORE.
SECTION A-A
TRANSFORMER PULLBOX UNDERDRAIN DETAIL
RIPRAP CULVERT INLET/OUTLET PROTECTION
NOT TO SCALE
NOT TO SCALE
INFO
INSTALL ABOVE 12" THICK (MIN.) OF 3 4" COMPACTED CRUSHED STONE
1
MIN
3 1'-6"
3 1
73-0003-004 SH005 73-0003-004 SH007 73-0003-004 SH008
INLET DETAIL NOT TO SCALE
ANSI D 2/20/2026
4" LOAM, PERMANENT SEED, FERTILIZER & MULCH HELD IN PLACE WITH PLASTIC OR JUTE NETTING. (EROSION CONTROL BLANKET)
TYPICAL VEGETATED DRAINAGE SWALE
DRAINAGE PLAN DRAINAGE PUMP STATION DETAILS GIS BASEMENT DRAINAGE PUMP STATION DETAILS
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
LOGO
4"
NOT TO SCALE
MIN
D50= 6" DIA. RIPRAP
1
CABLE TRENCH UNDERDRAIN DETAIL
L = 11' 1'
VARIES
45-70
100
TEE
1
2"
2"
CABLE TRENCH SEE DWG 73-0006-006
8. WHEN TEMPORARY WORKS ARE NO LONGER NEEDED, THE CONTRACTOR SHALL REMOVE AND RETURN THE AREA TO A CONDITION SIMILAR TO THAT WHICH EXISTED BEFORE CONSTRUCTION. AREAS WHERE TEMPORARY WORKS WERE LOCATED SHALL BE GRADED FOR SIGHTLY APPEARANCE WITH NO OBSTRUCTION TO NATURAL SURFACE WATER FLOWS OR THE PROPER FUNCTIONING AND ACCESS TO THE WORKS OF IMPROVEMENT INSTALLED. THE CONTRACTOR SHALL EXERCISE EXTREME CARE DURING THE REMOVAL STAGES TO MINIMIZE THE LOSS OF SOIL SEDIMENT AND DEBRIS THAT WAS TRAPPED DURING CONSTRUCTION.
3'-0"
SECTION B-B
FLARED END SECTION
1
STONE TOPPING
7. FLOW TO THE SEDIMENT REMOVAL STRUCTURE MAY NOT EXCEED THE STRUCTURE'S CAPACITY TO SETTLE AND FILTER FLOW OR THE STRUCTURE'S VOLUME CAPACITY.
15"
DESCRIPTION REV
1' IFR - ISSUED FOR REVIEW 0-0A
1 1 NON-WOVEN GEOTEXTILE
1 D50= 6" DIA. RIPRAP
100
TYPICAL CULVERT TRENCH DETAIL
6. DEWATERING IN PERIODS OF INTENSE, HEAVY RAIN, WHEN THE INFILTRATIVE CAPACITY OF THE SOIL IS EXCEEDED, SHALL BE AVOIDED.
D
(D) X 3
APP CK
IFA - ISSUED FOR APPROVAL 0-0B
1
2"
5. DISCHARGE DEWATERING EFFLUENT TO AREAS AS INDICATED ON THE SITE GRADING PLAN. DISCHARGE SHALL BE IN SHEET FLOW.
D50= 6" DIA. RIPRAP RCP PIPE FLARED END SECTION
PERCENT BY WEIGHT PASSING SIEVE
PERCENT BY WEIGHT PASSING SIEVE
A
PLAN
US STANDARD SIEVE SIZE
US STANDARD SIEVE SIZE
H-20 TRAFFIC FRAME AND GRATE
BY
IFA - ISSUED FOR APPROVAL
3.
4" CRUSHED STONE
NOT TO SCALE
A
4"
TYPE A AGGREGATE FOR GRAVEL BASE SHALL ONLY CONTAIN PARTICLES OF ROCK, WHICH WILL PASS THE TWO (2) INCH SQUARE MESH SIEVE.
(ASTM C33, #67 STONE)
4. REMOVAL OF WATER FROM THE CONSTRUCTION SITE SHALL BE ACCOMPLISHED SO THAT EROSION AND THE TRANSPORTING OF SEDIMENT AND OTHER POLLUTANTS ARE MINIMIZED.
L = 11'
DATE
PR/IDOM RN/IDOM 09/19/2025 MAS/IDOM
PR/IDOM RN/IDOM 10/24/2025 MAS/IDOM
PR/IDOM RN/IDOM 12/19/2025 MAS/IDOM
PR/IDOM RN/IDOM 02/20/2026 MAS/IDOM
IFP - ISSUED PERMITTING ISSUEDFOR FOR PERMIT 0-0
0-0C
2.3.
SEE TRENCH SCHEDULE 3
NOT TO SCALE
B
50% BY WEIGHT
SLOPE PER OSHA REQUIREMENTS
A
DEWATERING SYSTEM DETAIL
RCP PIPE
3
TRENCH WIDTH
1'-6"
FLOW
B
50% BY WEIGHT
2. GRAVEL SURFACE 2.1. AGGREGATE FOR GRAVEL SURFACE SHALL BE CRUSHED GRAVEL OF HARD DURABLE PARTICLES FREE FROM VEGETABLE MATTER, LUMPS OR BALLS OF CLAY AND OTHER DELETERIOUS SUBSTANCES. 2.2. THE GRADATION OF THE PART THAT PASSES A TWO (2) INCH SIEVE SHALL MEET THE GRADING REQUIREMENTS OF THE FOLLOWING TABLE:
SEE TYPICAL PAVED APRON SECTION
MINIMUM DEPTH OF STONE VARIES
6" MIN OF 3/4" CRUSHED STONE
STRAW BALE BARRIER
EXISTING SURFACE
TRENCH SCHEDULE A ID (MIN.) 4"-12" 0'-10" 15" 0'-10" 18" 0'-10" 24" 0'-6" 30" 0'-6" 36" 0'-6"
PAVED/GRAVEL AREAS
4" LOAM & SEED AS REQ'D
6"
W
DIRTBAG
LAWN AREAS
MIN
FLO
1. THE CONTRACTOR SHALL INSTALL, MAINTAIN, AND OPERATE ALL CHANNELS, SUMPS, AND ALL OTHER TEMPORARY DIVERSION AND PROTECTIVE WORKS NEEDED TO DIVERT STREAM FLOW AND OTHER SURFACE WATER THROUGH OR AROUND THE CONSTRUCTION SITE. CONTROL OF SURFACE WATER SHALL BE CONTINUOUS DURING THE PERIOD THAT DAMAGE TO CONSTRUCTION WORK COULD OCCUR.
A
FLOW
FLARED END SECTION
112"
DEWATERING NOTES
FLOW
5.
BLEND RATIO
FLOW
A
1.
SIEVE DESIGNATION
RG&E AVANGRID
NOT FOR CONSTRUCTION
DRAINAGE DETAILS SHEET 006 OF 008 STATION 73 BY
NOT TO SCALE
RN/IDOM PR/IDOM DATE: 09/19/2025 CK
APP
REV
DESCRIPTION
DATE
BY
CK
APP
MAS/IDOM
AS NOTED NO.
ROCHESTER, NY FILE: 73-0003-004 SH 006 REV
73-0003-004 SH 006 0-0
LOD
LOD
D
LOD
N
LO
LOD
LOD
LO D
D
LO
D
LO
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
D LO
LOD
LOD
LOD
LOD
LOD
D LO LO
15 KV - BUS#2
D
34.5 KV - BUS#1
CONTROL ROOM
LO
LO
LOD
D
D
LO
3.
ELEVATIONS SHOWN HEREON ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (GEOID 18). UNDERGROUND UTILITIES SHOWN HEREON WERE PLOTTED FROM FIELD LOCATIONS, VISIBLE AT THE TIME OF SURVEY, AND UTILITY COMPANY RECORD DRAWINGS. THE LOCATIONS OF ALL UNDERGROUND UTILITIES SHOULD BE STAKED BY THE RESPECTIVE UTILITY COMPANY PRIOR TO ANY CONSTRUCTION.
LO
D
LO D
LO D
LOD
2.
COORDINATES AND NORTH ORIENTATION SHOWN HEREON ARE REFERENCED TO THE NEW YORK STATE PLANE COORDINATE SYSTEM, WESTERN ZONE, TRANSVERSE MERCATOR PROJECTION, NAD 83 (2011) EPOCH 2010.00.
LOD
D
1.
LO
D
APP CK DATE DESCRIPTION REV
BY
PR/IDOM RN/IDOM
PR/IDOM RN/IDOM
09/19/2025 IFR - ISSUED FOR REVIEW 0-0A
DR/IDOM
10/24/2025 IFA - ISSUED FOR APPROVAL 0-0B
DR/IDOM
PR/IDOM RN/IDOM
PR/IDOM RN/IDOM
DR/IDOM 12/19/2025 IFA - ISSUED FOR APPROVAL
DR/IDOM 02/06/2026 IFP - ISSUED FOR PERMIT 0-0
0-0C
LOD
D LO D
THE CONTRACTOR SHALL CONDUCT ACTIVITIES TO MINIMIZE DAMAGE TO OR INTERFERENCE WITH ADJACENT STRUCTURES AND OPERATIONS. ANY DAMAGE TO PROPERTY CAUSED BY CONTRACTOR NEGLIGENCE WILL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR
LO D LOD
LOD
2.
LO
LO
D
LOD
1.
D
LOD
SURFACE CONTOURS AROUND THE PERIMETER OF THE PROPERTY WERE GENERATED FROM PUBLICLY AVAILABLE 2019 FEMA LIDAR POINT CLOUD ELEVATIONS. POINT CLOUD FILE 18TTN985880.las WAS DOWNLOADED FROM THE NYS GIS CLEARINGHOUSE AND PROCESSED THROUGH LEICA INFINITY USING A 75 PERCENT POINT REDUCTION AND "REFINED" INTERPOLATION MODEL. REMOVAL OF A LINE OF TREES ON THE EASTERLY PROPERTY LINE AND MAINTENANCE OF THE TRAIL ON THE PROPERTY TO THE WEST OF THE TRAIL CONDUCTED SINCE 2019 ARE NOT REFLECTED IN THE SURFACE.
LO
LO
D
LO
LOD
5.
SURVEY FIELDWORK COMPLETED BY FISHER ASSOCIATES ON JANUARY 18, 2022 WITH 1 FOOT +/- OF SNOW COVER, SOME FEATURES AND STRUCTURES MAY BE MISSING AS A RESULT. ADDITIONAL PROPERTY EVIDENCE WAS COLLECTED BY FISHER ASSOCIATES ON AUGUST 16, 2022 UNDER CLEAR CONDITIONS. ADDITIONAL SURVEY FIELDWORK CONDUCTED BY FISHER ASSOCIATES ON JULY 30, 2025 UNDER CLEAR CONDITIONS.
D
LO
D
THE CONTRACTOR SHALL LEAVE THE PREMISES IN EQUAL OR BETTER CONDITION THAN THE CONDITION FOUND AT THE BEGINNING OF THE PROJECT. THE CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING AND SHALL REMOVE ALL REFUSE AND CONSTRUCTION DEBRIS FROM THE SITE. FAILURE TO DO SO WILL RESULT IN THE OWNER HIRING A THIRD PARTY TO CLEAN UP OR PERFORM REPAIRS AT THE EXPENSE OF THE CONTRACTOR.
LO
LOD
4.
LOD
LO D
D LOD LOD LOD
SAFETY NOTES 1.
WORK WILL BE CARRIED OUT NEAR AND UNDER ENERGIZED TRANSMISSION LINES. EXTREME CAUTION IS REQUIRED AT ALL TIMES. THE CONTRACTOR SHALL STRICTLY FOLLOW ALL AVANGRID SAFETY REQUIREMENTS. FAILURE TO DO SO WILL RESULT IN TERMINATION.
73-0003-005 SH002 73-0003-005 SH003
LOD
EROSION CONTROL NOTES & DETAILS EROSION CONTROL NOTES & DETAILS
LOD
LIMIT OF DISTURBANCE SILT FENCE
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
DRAINAGE ARROW NEW EXISITNG PROPERTY LINE/LEASE PARCEL LINE RIGHT-OF-WAY LINE
INFO
EASEMENT LINE FENCE LINE EDGE OF WOODS OR BRUSH SANITARY SEWER LINE W/MANHOLE & C.O.
INSTALL
CULVERTS, STORM SEWER LINE W/MH & CATCH BASIN AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
WATER LINE W/HYDRANT, VALVE & VAULT
ANSI D 2/6/2026
LOGO
ELECTRIC LINE W/PULLBOX, METER & MANHOLE NATURAL GAS LINE W/METER, VALVE & LINE MARKER OVERHEAD WIRES, ELECTRIC, TELEPHONE & CABLE LINE
RG&E AVANGRID
NOT FOR CONSTRUCTION
EROSION CONTROL PLAN SH 001 OF 003 SUBSTATION 73
UNDERGROUND TELEPHONE LINE W/MANHOLE UTILITY POLE, GUY, LIGHT POLE, WALK LIGHT & TOP MOUNT LIGHT
BY
DR/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
09/19/2025
ROCHESTER, NY FILE: 73-0003-005 SH 001 REV
73-0003-005 0-0
MULCH AND SEEDING SPECIFICATIONS EROSION CONTROL DURING WINTER CONSTRUCTION SUMMARY OF TEMPORARY AND PERMANENT MULCH APPLICATION REQUIREMENTS
CONSTRUCTION SEQUENCE 1.
2.
3.
4.
5.
6.
ESTABLISH CONSTRUCTION WORKSPACE LIMITS; IDENTIFY AND MARK SENSITIVE RESOURCES. PERFORM ALL WORK IN ACCORDANCE WITH NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL (CURRENT VERSION).
CONDITION TEMPORARY
TIMING
WITHIN 100 FEET OF STREAMS, WETLANDS AND IN LAKE WATERSHEDS
ALL DISTRIBUTED AREAS OF THE CONSTRUCTION WORKSPACE
INSTALL AND MAINTAIN SEDIMENT BARRIERS SUCH AS SILT FENCING AND/OR OTHER EROSION CONTROL BARRIERS ALONG THE DOWNHILL LIMIT OF WORK, AS SHOWN ON THE DRAWINGS. SEDIMENT BARRIER LOCATIONS MAY BE ADJUSTED IN THE FIELD BASED ON SITE CONDITIONS AS DETERMINED BY THE ENGINEERING INSPECTOR. WHERE SILT FENCE CANNOT BE TOED-IN PROPERLY DUE TO TREE ROOTS, ROCKS OR FROZEN GROUND, STRAW BALES OR AN EROSION CONTROL MIX BERM MAY BE SUBSTITUTED. SILT FENCING WILL BE INSTALLED AFTER CLEARING BUT PRIOR TO GRUBBING AND GRADING ACTIVITIES. ANY EROSION ISSUES DEVELOPED DURING CLEARING WILL BE TEMPORARILY STABILIZED AS NECESSARY.
ALL WORK AREAS EXPOSED ARE TO BE MULCHED DAILY EACH TIME SOIL IS DISTURBED
CLEAR TIMBER AND BRUSH; DO NOT GRUB UNTIL JUST PRIOR TO PRELIMINARY GRADING AND ESTABLISHMENT AND STABILIZATION OF TEMPORARY OR PERMANENT DRAINAGE COURSES.
ON ALL EXPOSED AREAS AFTER SEEDING TO STABILIZE THE SOIL SURFACE
PRIOR TO USAGE, CONSTRUCT AND STABILIZE THE CONSTRUCTION ENTRANCE ON THE EXISTING PERMANENT ACCESS ROAD WITH A STONE PAD, MUD RACK, OR OTHER MATERIALS USED TO REDUCE THE TRACKING OR FLOWING OF SEDIMENT OFF THE SITE AND MAINTAIN UNTIL CONSTRUCTION IS COMPLETED.
IF NO ACTIVITY IN EXPOSED AREAS FOR 7 DAYS, OR PRIOR TO A STORM EVENT
APPLY MULCH TO ALL EXPOSED AREAS IF NO ACTIVITY OCCURS WITHIN 14 DAYS. APPLY MULCH AND TEMPORARY SEEDING SOONER WHEN IT CAN BE ANTICIPATED THAT ACTIVITY IS NOT GOING TO OCCUR WITHIN 14 DAYS. NOVEMBER 1 - APRIL 15
CONCURRENT WITH INITIATION OF SITE GRADING, CONSTRUCT AND STABILIZE TEMPORARY DRAINAGE SWALES WITH TEMPORARY INLET AND OUTLET STRUCTURES TO MINIMIZE SEDIMENT IN SITE RUNOFF DURING THE CONSTRUCTION OF THE ROADWAY. DEWATER IN ACCORDANCE WITH DEWATERING NOTES BELOW.
8.
INSTALL PROPERLY SPACED STONE CHECK DAMS IN ANY SECTION OF DITCH WITHIN 24 HOURS OF FORMING, SHAPING OR ROUGH GRADING THAT SECTION OF DITCH.
9.
MINIMIZE THE AMOUNT OF DISTURBANCE AT ANY ONE TIME BY STAGING CONSTRUCTION AS MUCH AS PRACTICAL FOR EFFICIENT CONSTRUCTION OF THE FACILITY. NATURAL VEGETATIVE BUFFERS OR STRIPS SHOULD BE LEFT IN PLACE WHERE FEASIBLE TO AID IN SEDIMENT RETENTION AND REDUCE EROSION POTENTIAL.
STRAW MULCH OR
2 TONS/ACRES
WOOD FIBER MULCH
2000 LB./ACRES
STRAW MULCH OR WOOD FIBER MULCH STRAW MULCH OR WOOD FIBER MULCH
2 TONS/ACRES 2000 LB./ACRES 3
3 TONS/ACRES 2000 LB./ACRES
WOOD CHIP APPLICATION AREAS
PERMANENT GRASS AND/OR LEGUME SEEDING COVERED BY STRAW MULCH ON ALL AREAS THAT HAVE BEEN RESTORED TO FINAL GRADE. THIS DOES NOT APPLY TO AREAS STABILIZED BY OTHER MEANS SUCH AS JUTE MATTING OR PERMANENT EROSION CONTROL MIX.
CRIMPED STRAW MULCH OR PAPER MULCH OR WOOD FIBER MULCH
PERMANENT GRASS AND/OR LEGUME SEEDING COVERED BY STRAW MULCH ON ALL AREAS THAT HAVE BEEN RESTORED TO FINAL GRADE. THIS DOES NOT APPLY TO AREAS STABILIZED BY OTHER MEANS SUCH AS JUTE MATTING OR PERMANENT EROSION CONTROL MIX.
CRIMPED STRAW MULCH OR PAPER MULCH OR WOOD FIBER MULCH
2 TONS/ACRES 1500 LB./ACRES 4 2000 LB./ACRES
2 TONS/ACRES 1500 LB./ACRES 4 2000 LB./ACRES
1. STRAW MULCH MAY BE USED IN WETLAND AREAS. 2. DOUBLE RATE OF WOOD FIBER MULCH WHEN USED IN CRITICAL AREAS. 3. STRAW, OR HYDROMULCH (WOOD FIBER OR PAPER MULCH AS APPROPRIATE) WILL PROVIDE 90 PERCENT GROUND COVERAGE 4. PAPER MULCH IS ACCEPTABLE FOR USE DURING THE GROWING SEASON. ON SLOPES >30 PERCENT AND IN AREAS WHERE VEGETATION HAS NOT ESTABLISHED WELL, ADDITIONAL HAY MULCH WILL BE ADDED AS A WINTERIZING MEASURE.
2. WINTER EXCAVATION AND EARTHWORK SHALL BE COMPLETED SUCH THAT NO MORE THAN 1 ACRE OF THE SITE IS WITHOUT STABILIZATION AT ANY ONE TIME. 3. EXPOSED AREA SHALL BE LIMITED TO THOSE AREAS TO BE MULCHED IN ONE DAY PRIOR TO ANY SNOW EVENT. 4. CONTINUATION OF EARTHWORK OPERATIONS ON ADDITIONAL AREAS SHALL NOT BEGIN UNTIL THE EXPOSED SOIL SURFACE ON THE AREA BEING WORKED HAS BEEN STABILIZED, SUCH THAT NO LARGER AREA OF THE SITE IS WITHOUT EROSION CONTROL PROTECTION AS LISTED IN ITEM 2 ABOVE. 5. AN AREA SHALL BE CONSIDERED TO HAVE BEEN STABILIZED WHEN EXPOSED SURFACES HAVE BEEN EITHER MULCHED WITH STRAW AT A RATE OF 150 LB. PER 1000 S.F. (WITH OR WITHOUT SEEDING) OR DORMANT SEEDED, MULCHED AND ANCHORED SUCH THAT SOIL SURFACE IS NOT VISIBLE THROUGH THE MULCH. NOTE: AN AREA IS ALSO CONSIDERED STABLE IF SODDED, COVERED WITH GRAVEL (PARKING LOTS) OR STRUCTURAL SAND. 6. BETWEEN THE DATES OF OCTOBER 15 AND APRIL 1, LOAM OR SEED WILL NOT BE REQUIRED. DURING PERIODS OF ABOVE FREEZING TEMPERATURES THE SLOPES SHALL BE FINE GRADED AND EITHER PROTECTED WITH MULCH OR TEMPORARILY SEEDED AND MULCHED UNTIL SUCH TIME AS THE FINAL TREATMENT CAN BE APPLIED. IF THE DATE IS AFTER NOVEMBER 1 AND IF THE EXPOSED AREA HAS BEEN LOAMED, FINAL GRADED WITH A UNIFORM SURFACE, THEN THE AREA MAY BE DORMANT SEEDED AT A RATE OF 3 TIMES HIGHER THAN SPECIFIED FOR PERMANENT SEED AND THEN MULCHED. IF CONSTRUCTION CONTINUES DURING FREEZING WEATHER, ALL EXPOSED AREAS SHALL BE CONTINUOUSLY GRADED BEFORE FREEZING AND THE SURFACE TEMPORARILY PROTECTED FROM EROSION BY THE APPLICATION OF MULCH. SLOPES SHALL NOT BE LEFT UNEXPOSED OVER THE WINTER OR ANY OTHER EXTENDED TIME OF WORK SUSPENSION UNLESS TREATED IN THE ABOVE MANNER. UNTIL SUCH TIME AS WEATHER CONDITIONS ALLOW, DITCHES TO BE FINISHED WITH THE PERMANENT SURFACE TREATMENT, EROSION SHALL BE CONTROLLED BY THE INSTALLATION OF BALES OF STRAW, SILT FENCE OR STONE CHECK DAMS IN ACCORDANCE WITH THE STANDARD DETAILS SHOWN ON THE DESIGN DRAWINGS. NOTE: DORMANT SEEDING SHOULD NOT BE ATTEMPTED UNLESS SOIL TEMPERATURE REMAINS BELOW 50 DEGREES AND DAY TIME TEMPERATURES REMAIN IN THE 30'S. 7. MULCH NETTING SHALL BE USED TO ANCHOR MULCH IN ALL DRAINAGE WAYS WITH A SLOPE GREATER THAN 3% FOR SLOPES EXPOSED TO DIRECT WINDS AND FOR ALL OTHER SLOPES GREATER THAN 8%. VEGETATED DRAINAGE SWALES SHALL BE LINED WITH EXCELSIOR OR CURLEX. 8. MULCH NETTING SHALL BE USED TO ANCHOR MULCH IN ALL DRAINAGE WAYS WITH SLOPES GREATER THAN 15%. AFTER OCTOBER 1 THE SAME APPLIES FOR ALL SLOPES GREATER THAN 8%. 9. BETWEEN THE DATES OF OCTOBER 15 TO NOVEMBER 1, WINTER RYE IS RECOMMENDED FOR STABILIZATION. IF THE AIR AND SOIL PERMIT, DORMANT SEEDING IS EFFECTIVE.
MULCH ANCHORING REQUIREMENTS
10.IN THE EVENT OF SNOWFALL (FRESH OR CUMULATIVE) GREATER THAN 1 INCH DURING WINTER CONSTRUCTION PERIOD ALL SNOW SHALL BE REMOVED FROM THE AREAS OF SEEDING AND MULCHING PRIOR TO PLACEMENT.
ON SLOPES GREATER THAN 8 PERCENT, STRAW MULCH WILL BE FIRMLY ANCHORED INTO THE SOIL UTILIZING ONE OF THE FOLLOWING METHODS: -CRIMPING WITH A STRAIGHT OR NOTCHED MULCH CRIMPING TOOL (FARM DISCS WILL NOT BE ALLOWED); -TRACK WALKING WITH DEEP-CLEATED EQUIPMENT OPERATING UP AND DOWN THE SLOPE (MULCH CRIMPED PERPENDICULAR TO THE SLOPE) ON SLOPES <25 PERCENT; -APPLICATION OF MULCH NETTING; -APPLICATION OF 500 LB./ACRE OF WOOD FIBER MULCH OVER STRAW MULCH; AND -COMMERCIALLY AVAILABLE TACKIFIERS (EXCEPT WITHIN 100 FEET OF WATERBODIES OR WETLANDS).
12"
6"
10. STABILIZE ANY NEWLY GRADED SLOPE GREATER THAN EIGHT PERCENT OTHER THAN AREAS IDENTIFIED ON THE PLANS TO BE RIPRAPPED USING ANCHORED EROSION CONTROL BLANKETS OR OTHER APPROVED MULCHING TECHNIQUES WITHIN 24 HOURS. STABILIZE ANY SLOPE EXCEEDING EIGHT PERCENT AND BROUGHT TO FINAL GRADE WITHIN 24 HOURS USING THE APPROVED PERMANENT STABILIZATION MEASURES FOR SLOPES. STABILIZE ANY SECTION OF DITCH BROUGHT TO FINAL GRADE WITHIN 24 HOURS USING THE APPROVED PERMANENT STABILIZATION MEASURES FOR DITCHES.
1. WINTER CONSTRUCTION PERIOD: NOVEMBER 1 THROUGH APRIL 15. APPLICATION RATES
PERMANENT
STABILIZE PERMANENT ACCESS ROAD SURFACE, PARKING AREAS AND EQUIPMENT STORAGE AND LAYDOWN AREAS WITH MATTING, CRUSHED STONE OR GRAVEL SUBBASE AS NECESSARY TO MINIMIZE RUTTING AND AVOID PONDING.
7.
MULCH TYPE 1,2
11. DUST CONTROL METHODS WILL BE EMPLOYED AFTER GRADING AND PRIOR TO FINAL STABILIZATION TO PREVENT THE BLOWING AND MOVEMENT OF DUST THROUGH THE APPLICATION OF WATER AND/OR CALCIUM CHLORIDE TO REDUCE WIND EROSION. REPETITIVE TREATMENT WILL BE APPLIED AS NEEDED TO ACCOMPLISH CONTROL.
APP CK
13. REMOVE EXCESS SPOILS FROM SITE THAT WILL NOT BE USED FOR THE FINAL DESIGN AND STABILIZATION. STOCKPILED SOILS THAT REMAIN IN PLACE FOR 48 HOURS OR MORE WILL BE CONTAINED WITH SEDIMENT BARRIERS SUCH AS SILT FENCE, STRAW BALES OR EQUIVALENT. THE SEDIMENT BARRIERS SHALL BE ADEQUATELY LOCATED AND REINFORCED TO HANDLE A SIGNIFICANT RAIN EVENT AND THE POTENTIAL SLUMPING OF THE PILE. BETWEEN APRIL 16 AND OCTOBER 31, APPLY TEMPORARY SEED AND MULCH TO A STOCKPILE THAT IS NOT EXPECTED TO BE DISTURBED WITHIN 30 DAYS. APPLY ANCHORED MULCH DAILY, AS NEEDED, DURING WINTER CONSTRUCTION. TEMPORARY SEEDING IS NOT REQUIRED DURING WINTER CONSTRUCTION. 14. INSPECT AND REPAIR EROSION CONTROL MEASURES DAILY IN AREAS OF ACTIVE CONSTRUCTION; OTHERWISE WEEKLY AND AFTER RAINFALL OF ½ INCH OR GREATER WITHIN A 24-HOUR PERIOD. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE BARRIER.
CONDITION TEMPORARY SEEDING 3
DATE
BY DESCRIPTION
PR/IDOM RN/IDOM
REV
PR/IDOM RN/IDOM
IFR - ISSUED FOR REVIEW
09/19/2025 MAS/IDOM
10/24/2025 MAS/IDOM IFA - ISSUED FOR APPROVAL
0-0A
PR/IDOM
0-0B
PR/IDOM
12/19/2025 MAS/IDOM IFC - ISSUED FOR CONSTRUCTION 0-0
RN/IDOM
02/06/2026 MAS/IDOM IFP - ISSUED FOR PERMIT 0-0
RN/IDOM
12. APPLY TEMPORARY SEED AND MULCH TO ANY EXPOSED AREAS WHERE ACTIVITY IS NOT ANTICIPATED FOR 14 DAYS OR MORE, OR WHERE ACTIVITY HAS NOT OCCURRED WITHIN 14 DAYS. TEMPORARILY MULCH ANY EXPOSED AREAS WITHIN 100 FEET OF A WETLAND WHERE ACTIVITY IS NOT ANTICIPATED OR HAS NOT OCCURRED IN 7 DAYS.
SEED MIX SPECIFICATIONS SEED MIX COMPONENTS LB./ACRE 1 ANNUAL RYEGRASS 40 REDTOP 4 CREEPING RED FESCUE 40 40 TALL FESCUE 16 BIRDSFOOT TREFOIL WOODCHIP APPLICATION SEED MIX CREEPING RED FESCUE 20 REDTOP 4 30 TALL FESCUE 30 CROWNVETCH WETLAND SEED MIX RESOURCE AGENCY APPROVED 40 SUPPLEMENTAL WINTER SEED MIX 2 WINTER RYEGRASS 120 NOTES: 1. INCREASE SEEDING RATES 10% WHEN HYDROSEEDING 2. WINTER RYE WILL BE ADDED TO PERMANENT UPLAND MIX AT A RATE OF 120 LB./ACRE BETWEEN OCTOBER 1 AND APRIL 15
15. MONITOR PUBLIC ROADS FOR SIGNS OF TRACKING OR SPILLING OF SPOIL MATERIAL AND CLEANUP AS NEEDED. 16. COMPLETE FINAL GRADING AND STABILIZATION OF EARTHEN STRUCTURES SUCH AS DIVERSION BERMS, LEVEL SPREADERS AND SWALES THAT WILL CONTROL RUNOFF. 17. FINISH GRADE AND REPLACE TOPSOIL OR LOAM IN DISTURBED AREAS. SEED AND MULCH DISTURBED AREAS WITHIN 6 DAYS OF FINAL GRADING. 18. MAINTAIN ALL TEMPORARY EROSION CONTROLS AND SEDIMENT BARRIERS UNTIL VEGETATION HAS BEEN ESTABLISHED OVER 85-90% OF THE AREA TO BE REVEGETATED. RESEED SPARSELY VEGETATED AREAS. 19. REMOVE ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES ONCE THE SITE IS PERMANENTLY STABILIZED.
4.
SEED MIX NAME TEMPORARY SEED MIX PERMANENT UPLAND SEED MIX
PERMANENT SEEDING 3,4 UPLAND PORTIONS OF THE CONSTRUCTION AREA SLOPES > 3:1 WETLANDS WOODCHIP APPLICATION AREAS WINTER DORMANT SEEDING
3" 3A. 5.
1.
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-OSEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
SEED MIX
TEMPORARY SEED BETWEEN APRIL 16 AND OCTOBER 31 ONLY. DISTURBED AREAS OR SPOIL STOCKPILES WILL BE SEEDED IMMEDIATELY IF FURTHER DISTURBANCE IS NOT EXPECTED FOR 30 DAYS OR MORE.
ANNUAL RYEGRASS
DISTURBED AREA WILL BE SEEDED WITHIN 6 DAYS OF FINAL GRADING. DISTURBED AREA WILL BE SEEDED IMMEDIATELY AFTER SEEDBED PREPARATION. DISTURBED WETLANDS WILL BE SEEDED WITHIN 6 DAYS OF FINAL GRADING. DISTURBED AREA WILL BE SEEDED WITHIN 6 DAYS OF FINAL GRADING. DORMANT SEED BETWEEN OCTOBER 1 AND APRIL 15 ONLY. NO SEEDING WILL OCCUR IF SNOW DEPTHS EXCEED 1 INCH.
PERMANENT UPLAND MIX PERMANENT UPLAND MIX APPROVED BY RESOURCE AGENCY WOODCHIP APPLICATION SEED MIX PERMANENT UPLAND MIX PLUS WINTER RYEGRASS
1. WEATHER CONDITIONS PERMITTING. 2. AREAS THAT DO NOT SUCCESSFULLY REVEGETATE WITHIN APPROPRIATE PERIOD OF TIME WILL BE RESEEDED AS NECESSARY. 3. LOOSEN COMPACTED SOIL TO A MINIMUM DEPTH OF 4 INCHES. 4. TOP DRESS WITH 6 INCHES LOAM, AS NEEDED. IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
2.
3B.
SUMMARY OF SEEDING REQUIREMENTS TIMING 1,2
FERTILIZER AND LIMESTONE REQUIREMENTS.
6"
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF BLANKET EXTEDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS.
EROSION CONTROL BLANKET INSTALLATION NOT TO SCALE
INFO
IN GENERAL, FERTILIZER AND LIME APPLICATION RATES WILL FOLLOW THE GUIDELINES IDENTIFIED BELOW UNLESS SITE SPECIFIC SOIL TESTS IDENTIFY THE NEED FOR ALTERNATIVE FERTILIZER/LIME APPLICATION RATES. FERTILIZER WILL BE APPLIED TO UPLAND AREAS PRIOR TO SEEDING AT A RATE OF 800 POUNDS PER ACRE USING 10-20-20 (N-P205-K20) OR EQUIVALENT. GROUND LIMESTONE (EQUIVALENT TO 50 PERCENT CALCIUM PLUS MAGNESIUM OXIDE) WILL BE APPLIED AT A RATE OF 3 TONS PER ACRE. AN EQUIVALENT MIXTURE OF FERTILIZER AND LIME MAY BE APPLIED USING THE HYDROSEEDING METHOD. NO LIME OR FERTILIZER WILL BE APPLIED TO WETLANDS.
73-0003-005 SH 001 73-0003-005 SH 003
EROSION CONTROL PLAN EROSION CONTROL DETAILS
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
RG&E AVANGRID
ANSI D 2/6/2026
LOGO
PE STAMP
EROSION CONTROL NOTES & DETAILS SH 002 OF 003 STATION 73 BY
RN/IDOM PR/IDOM DATE: 09/19/2025 CK
APP
REV
DESCRIPTION
DATE
BY
CK
APP
MAS/IDOM
AS NOTED NO.
ROCHESTER, NY FILE: 73-0003-005 SH 002 REV
73-0003-005 0-0
50'MIN.
3'
5:1
EXISTING PAVEMENT
6"MIN.
FILTER CLOTH
EXISTING GROUND
10' TYP.
10' TYP.
B
PLAN VIEW
STAPLES (2 PER BALE)
STRAW BALE (TYP.)
IMPERMEABLE SHEETING PLAN
16"
COMPACTED SOIL
CONSTRUCTION SPECIFICATIONS
WOOD OR METAL STAKES (2 PER BALE) SECTION B-B
FILTER CLOTH-MIRAFI 100X STABLINKA T140N OR APPROVED EQUAL
1.
SECTION
2.
1. WOVEN WIRE FENCE TO BE FASTENED TO FENCE POSTS WITH WIRE TIES OR STAPLES.
POSTS:
STEEL "T" OR "U" TYPE OR 2" HARDWOOD.
3.
2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MIDSECTION.
FENCE:
WOVEN WIRE. 14 1/2 GA 6" MAX MESH OPENING.
4. 5.
FILTER CLOTH:
FILTER X, MIRAFI 100X. STABLINKA T140N OR APPROVED EQUAL.
4. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN BUILD-UP REACHES 1/3 THE HEIGHT OF THE FENCE.
PREFABRICATED UNIT:
USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
2.
NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD APPLY).
3.
THICKNESS - NOT LESS THAN SIX (6) INCHES.
4.
TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE.
5.
FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.
6.
ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED.
7.
THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY.
8.
WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE.
9.
PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN.
CAN BE TWO STACKED BALES OR PARTIALLY EXCAVATED TO REACH 3 FT DEPTH
CONSTRUCTION SPECIFICATIONS
3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVERLAPPED BY 6" AND FOLDED.
1.
1.
ENVIROFENCE OR APPROVED EQUAL
EXISTING PAVEMENT
10'MIN.
BINDING WIRE
STRAW BALE (TYP.) IMPERMEABLE SHEETING
3' TYP.
UNDISTURBED SOIL
MIN.
MIN.
B
MIN.
20"
MAX.
18" 6"
FLOW
ELEVATION
12'MIN.
12'MIN.
EMBED FILTER CLOTH 6" (MIN.) INTO GROUND
OW
10'MIN.
EXISTING GROUND
1/8" DIA. STEEL WIRE STAPLE DETAIL
36" MIN FENCE POSTS DRIVEN 16" MIN INTO GROUND
FL
50'MIN.
4"
WOVEN WIRE FENCE (MIN 14 1/2 GAUGE 6" MAX MESH SPACING)
6' TO 10' MAX CENTER TO CENTER
2"
STAKE (TYP.)
MOUNTABLE BERM (OPTIONAL)
PROFILE
LOCATE WASHOUT STRUCTURE A MINIMUM OF 100 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS, WETLANDS, BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC. SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT LEAST 4 INCHES OF FREEBOARD. TYPICAL DIMENSIONS ARE 10 FEET X 10 FEET X 3 FEET DEEP. PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL OR THICKER UV RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER DEFECTS THAT COMPROMISE IMPERMEABILITY OF THE MATERIAL. PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY. KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED). EMPTY OR REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DO NOT REUSE PLASTIC LINER. WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVED MANNER. PRIOR TO FORECASTED RAINSTORMS, REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVE HARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATED WASHOUT STRUCTURE UNTIL STRUCTURE IS REMOVED.
SILT FENCE DETAILS
CONCRETE WASHOUT AREA WITH STRAW BALES
STABILIZED CONSTRUCTION ENTRANCE
2016 NYS STANDARD SPECIFICATION FOR EROSION AND SEDIMENT CONTROL
NOT TO SCALE
2016 NYS STANDARD SPECIFICATION FOR EROSION AND SEDIMENT CONTROL FIGURE 2.1
FLOW
APP DESCRIPTION REV
DATE
BY
09/19/2025 MAS/IDOM IFR - ISSUED FOR REVIEW 0-0A
CK
PR/IDOM
PR/IDOM 10/24/2025 MAS/IDOM IFA - ISSUED FOR APPROVAL 0-0B
RN/IDOM
12/19/2025 MAS/IDOM IFC - ISSUED FOR CONSTRUCTION 0-0
RN/IDOM
PR/IDOM
02/06/2026 MAS/IDOM IFP - ISSUED FOR PERMIT 0-0
RN/IDOM
18 VARIES 1
VARIES 1
ANCHOR NETTING IN A 6" TRENCH
ROLL OUT STRIPS OF NETTING PARALLEL TO THE DIRECTION OF FLOW 1. EXCAVATE THE CHANNEL AND SHAPE IT TO AN EVEN CROSS-SECTION AS SHOWN. WHEN STAKING INDICATES A 0.2' OVERCUT AROUND THE CHANNEL PERIMETER FOR SILTING AND BULKING. 2. GRADE SOIL AWAY FROM CHANNEL SO THAT SURFACE WATER MAY ENTER FREELY. 3. APPLY LIME, FERTILIZER AND SEED TO THE CHANNEL AND ADJOINING AREAS IN ACCORDANCE WITH THE EROSION CONTROL PLAN. 4. SPREAD HAY OR STRAW MULCH AT THE RATE OF 100LB/1000 SF. 5. HOLD MULCH IN PLACE IMMEDIATELY AFTER SPREADING WITH A PLASTIC NETTING INSTALLED AS SHOWN.
JOIN STRIPS BY ANCHORING AND OVERLAPPING
SILT FENCE SEE TYP. DETAIL
STABILIZE ENTIRE PILE WITH VEGETATION OR COVER
1
SILT FENCE SEE TYP. DETAIL 3
16" GALVANIZED
DIRECTION OF TRAVEL
STEEL CABLE 6. START LAYING THE NET FROM THE TOP OF THE UPSTREAM END OF THE CHANNEL AND UNROLL IT DOWN GRADE. DO NOT STRETCH THE NETTING. 7. BURY THE UP SLOPE END AND STAPLE THE NET EVERY 12" ACROSS THE TOP END, EVERY 3 FT AROUND THE EDGES AND ACROSS THE NET SO THAT THE STRAW IS HELD CLOSELY AGAINST THE SOIL. HOWEVER, DO NOT STRETCH THE NETTING WHEN STAPLING. 8. NETTING STRIPS SHOULD BE JOINED TOGETHER ALONG THE SIDES WITH A 3" OVERLAP AND STAPLED TOGETHER. 9. TO JOIN ENDS OF STRIPS, INSERT A NEW ROLL OF NET IN A TRENCH AS WITH THE UP SLOPE END AND OVERLAP IT 18" WITH THE PREVIOUSLY LAID UPPER ROLL. TURN UNDER 6" OF THE 18" OVERLAP AND STAPLE EVERY 12" ACROSS THE END.
GEOTEXTILE UNDERLAYMENT STRAW BALES INSTALLATION NOTES:
2'
2' 20'
1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND STABLE.
NOTES:
2. MAXIMUM SLOPE OF STOCKPILE SHALL BE 2H:1V.
CONNECT LOOPS WITH 3 16" CABLE CLAMPS
1. ALL WOOD MEMBERS ARE 8" x 8" 2. PERIODICALLY REMOVE SEDIMENT THAT IS FORCED UP OR TRACKED ONTO MATS. 3. REPAIR OR REPLACE ANY DAMAGED MATS PRIOR TO ANY SUBSEQUENT USE.
3. UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH EITHER SILT FENCING OR STRAW BALES, THEN STABILIZED WITH VEGETATION OR COVERED.
GRASS LINED CHANNEL
TYPICAL SOIL STOCKPILE
TEMPORARY TIMBER MAT ROAD
2016 NYS STANDARD SPECIFICATION FOR EROSION AND SEDIMENT CONTROL
NOT TO SCALE
NOT TO SCALE
INFO
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
SLOPE OR LESS 2
"
6"
RN/IDOM
PR/IDOM
TEMPORARY LINER, STRAW MULCH HELD IN PLACE WITH PLASTIC OR JUTE NETTING
73-0003-005 SH 001 73-0003-005 SH 002
EROSION PLAN EROSION CONTROL NOTES
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
RG&E AVANGRID
ANSI D 2/6/2026
LOGO
PE STAMP
EROSION CONTROL NOTES & DETAILS SH 003 OF 003 STATION 73 BY
MAS/IDOM
AS NOTED
CK
RN/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
09/19/2025
ROCHESTER, NY FILE: 73-0003-005 SH 003 REV
73-0003-005 0-0
N
RGE 49A RISER FOR 414
RGE 49A1 RISER FOR 418
RGE 49 419/ 418 TIE POINT
RGE 48A RISER FOR 419
5
RGE 48
ST 8476 SW 74522 2426-9 N-LOOP
1
3
NOTE 2
2
4
APP CK DESCRIPTION REV
BY
RL/IDOM
DATE
RL/IDOM LG/IDOM
IGT/IDOM DR/IDOM IFR - ISSUED FOR REVIEW 0-0A
DR/IDOM IFA - ISSUED FOR APPROVAL 0-0B
08/29/2025
RL/IDOM
10/24/2025
RL/IDOM
DR/IDOM
LG/IDOM
DR/IDOM
IFC - ISSUED FOR CONSTRUCTION 0-0
12/19/2025
IFP - ISSUED FOR PERMITTING 0-0
02/06/2026
LG/IDOM
RGE 2426-5
RGE 2426-5A
1
1.
WORK WILL BE CARRIED OUT IN AND NEAR ENERGIZED ELECTRICAL EQUIPMENT. EXTREME CAUTION IS REQUIRED AT ALL TIMES. THE CONTRACTOR SHALL STRICTLY FOLLOW ALL AVANGRID SAFETY REQUIREMENTS. FAILURE TO DO SO WILL RESULT IN TERMINATION.
2.
EXISTING GUY WIRE TO BE RELOCATED DURING CONSTRUCTION.
3.
REFER TO 73-0003-001 SH 001 SITE PLAN REM FOR THE REMAINDER OF THE REMOVAL PLAN
1
RGE 2426-5B
FA-1 SH.1 210865 RGE SUBSTATIONS - STATION 73 TOPOGRAPHIC SURVEY EXISTING SITE CONDITIONS DWG NO. V-1 11161-107 LOCATION OF LARGE OIL CONTAINING DEVICES
RGE 2426-5C
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
REMOVE/RELOCATE EXISITNG
ELECTRICAL NOTES:
PROPERTY LINE/LEASE PARCEL LINE
1
34.5KV OVERHEAD LINE
FENCE LINE
2
TELECOMMUNICATION OVERHEAD WIRE
3
4KV UNDERGROUND LINE (SAND PADDING)
4
TRANSFORMER
5
UNDERGROUND MANHOLE FOR POWER CABLES
INFO
SANITARY SEWER LINE W/MANHOLE & C.O. CULVERTS, STORM SEWER LINE W/MH & CATCH BASIN WATER LINE W/HYDRANT, VALVE & VAULT ELECTRIC LINE W/PULLBOX, METER & MANHOLE
REMOVAL
NATURAL GAS LINE W/METER, VALVE & LINE MARKER AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
OVERHEAD WIRES, ELECTRIC, TELEPHONE & CABLE LINE
ANSI D 1/30/2026
LOGO
UNDERGROUND TELEPHONE LINE W/MANHOLE UTILITY POLE, GUY, LIGHT POLE, WALK LIGHT & TOP MOUNT LIGHT
RG&E AVANGRID
NOT FOR CONSTRUCTION
GENERAL ARRANGEMENT PLAN REMOVAL SUBSTATION 73 BY
DR/IDOM
1/16"=1'-0"
CK
LG/IDOM RL/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
ROCHESTER, NY FILE: 73-0002-001 REM.dw REV
73-0002-001 0-0
7'-0"
14'-4"
3'-0"
B
THIS SHEET
THIS SHEET
T/ BOND BEAM ELEV = +397'-2"
℄ TRANSFORMER FOUNDATION
3'-0"
B
1. 2. 3.
T/ BOND BEAM ELEV = +397'-2"
4. 5.
BOND BEAM FILLED WITH 3000 PSI GROUT
16'-8"
12'-8"
BOND BEAM FILLED WITH 3000 PSI GROUT
6.
12'-8"
0'-4"
1'-0"
7.
#6 @8"
8.
#6 @8"
24'-8"
24'-8"
9.
T/ BOND BEAM ELEV = +384'-6"
T/ BOND BEAM ELEV = +384'-6"
0-0
12'-0" THIS SHEET
1.
CONCRETE BLOCK 12"x16"x8" FILLED WITH 3000 PSI GROUT
CONCRETE BLOCK 12"x16"x8" FILLED WITH 3000 PSI GROUT
T/ CONC ELEV = +372'-6"
T/ CONC ELEV = +372'-6"
CONDUIT (4) x 6" PVC
2. 3. 4.
12" CRUSHED STONE 1'-6"
1'-6"
12" CRUSHED STONE
A THIS SHEET
1'-0"
1/4"=1'-0"
ANCHOR ROD
CLR.
-
CLEAR
DIA.
-
DIAMETER
D.I.
-
DUCTILE IRON
DWG
-
DRAWING
EQ
-
EQUAL/EQUALLY
FDN
-
FOUNDATION
1/4"=1'-0"
1/4"=1'-0"
FG
-
FINISHED GRADE
MAX.
-
MAXIMUM
O.C.
-
ON CENTER
PROJ.
-
PROJECTION
NAAMM
-
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS
TYP.
-
TYPICAL
1.
1" 0'-12 CLR.
2.
DESIGN CODE STRUCTURE CLASSIFICATION SITE LOCATION CALCULATED MAXIMUM BEARING PRESURE
#6 @16" 3'-0"
CK BY DATE
FIRE BARRIER PLAN LAYOUT
THIS SHEET
-
FIRE WALL CROSS SECTIONVB-B
36'-0" 54 #6 @8"
B-B
A.R.
FIRE WALL CROSS SECTION A-A
0'-4"
APP
OO/IDOM SN/IDOM 03/28/2025
PR/IDOM
OO/IDOM SN/IDOM 10/24/2025
PR/IDOM
OO/IDOM SN/IDOM
5'-7"
NYSBC 2020 (NY)
CATEGORY IV WESTER, NY 2600 PSF*
3. 4.
WIND LOADS:
0'-4"
DUCT (4) x 6 PVC
0'-2" CLR.
2'-6"
DESCRIPTION
#6 @12"
(7) # 6 TRANSVERSE BARS, T&B
(2) # 5 CORNER BARS.
BASIC WIND SPEED IMPORTANCE FACTOR EXPOSURE CATEGORY
# 6 @16"
121 MPH 1.15 C
5.
1'-6"
0'-3" CLR.
6.
REV
IFR - ISSUED FOR REVIEW 0-0A
IFA - ISSUED FOR APPROVAL
DUCT (4) x 6 PVC
0-0B
0-0
IFC - ISSUED FOR CONSTRUCTION
12/19/2025
PR/IDOM
3'-0"
0'-4"
IF REQUIRED BASED ON GROUNDWATER ELEVATON AT TIME OF CONSTRUCTION, EXCAVATION DEWATERING SHALL BE INSTALLED AND MAINTAINED TO PROVIDE FOR A DRY EXCAVATION THROUGHOUT GIS BASEMENT CONSTRUCTION ACTIVITIES TEMPORARY DEWATERING SYSTEM DESIGN, SUPPLY, PERMITTING & IMPLEMENTATION IS THE CONTRACTOR'S RESPONSIBILITY. REFERENCE PROJECT SPECIFICATIONS SECTION 312319. GROUNDWATER DISCHARGE FROM DEWATERING ACTIVITIES SHALLE BE COLLECTED, CONTROLLED, MONITORED, STORED, AND DISCHARGED IN ACCORDANCE WITH ALL GOVERNING ENVIRONMENTAL REQUIREMENTS AND AS DIRECTED BY THE OWNER.
4'-5"
A-A
THIS SHEET
4'-5"
A-A
CONSTRUCTION DEWATERING NOTES:
BOND BEAM FILLED WITH 3000 PSI GROUT 12'-0"
BOND BEAM FILLED WITH 3000 PSI GROUT
37'-0"
40'-4"
℄ TRANSFORMER FOUNDATION
CONCRETE COMPRESSIVE STRENGTH SHALL BE 4500psi (MIN.) @ 28 DAYS. REINFORCING SHALL BE ASTM A615 GR. 60 (60ksi YIELD). PROVIDE 3/4" CHAMFER ON ALL EXPOSED EDGES, UNLESS NOTED OTHERWISE. FOUNDATION & CONTAINMENT SHALL BE PLACED ON UNDISTURBED SOILS OVERLAIN BY 12" OF 3/4" CRUSHED STONE. BACKFILL AND COMPACT TO NOT LESS THAN 95% THEORETICAL MAXIMUM DENSITY AS DETERMINED BY ASTM D 1557. LEGEND OF ABBREVIATIONS USED ON THE DRAWING ARE PROVIDED FOR THE REVIEWER'S CONVENIENCE. IT IS ASSUMED A COMPREHENSIVE LIST OF THE ABBREVIATI0NS WILL BE PROVIDED AS PART OF THE SITE SPECIFIC, DETAILED DESIGN. STANDARD SOIL, BACKFILL AND GEOTEXTILE DEFINITIONS ARE PROVIDED IN IBERDROLA USA STANDARD TM 2.71.09 SUBSTATION YARD AND FENCING. CONSTRUCTION CONTRACTOR SHALL UTILIZE METHODS TO CONTROL HEAT OF HYDRATION FOR THE FOUNDATION. THE FOUNDATION AND THE BLOCK WALL WILL BE BUILT IN TWO DIFFERENT PHASES. TO ENSURE THAT THE DOWELS BARS DO NOT DISTURB BETWEEN ONE PHASE AND THE OTHER, REBAR COUPLERS WILL BE USED. IN THE FIRST PHASE THEY WILL BE SOAKED TO THE UPPER LEVEL OF THE FOUNDATION. COVERS SHOULD BE USED TO PROTECT THE THREADS OF THE REBAR COUPLER UNTIL THE SECOND PHASE OF CONSTRUCTION IS CONTINUED. THE REBAR COUPLER MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION MUST BE FOLLOWED, AND MAKE SURE THAT THE INDICATED TIGHTENING TORQUES ARE GIVEN.
RADIAL ICE CONCURRENT WIND SPEED
2.5 INCH* 60 MPH
7. 8.
CONCRETE MASONRY UNITS (CMU) SHALL COMPLY WITH ASTM STANDARD SPECIFICATION FOR LOAD-BEARING CONCRETE MASONRY UNITS (ASTMC90-16). LOAD-BEARING CMU SHALL BE NORMAL WEIGHT WITH MINIMUN NET AREA COMPRESSIVE STRENGTH OF 1900 PSI. MORTAR AND GROUT COMPONENTS: a. CEMENT SHALL BE PORTLAND CEMENT CONFORMING TO ASTM C150-16, TYPE I, II. b. AGGREGATES FOR MOTAR SHALL COMFORM TO ASTM C144-11. AGGREGATES FOR GROUT SHALL CONFORM TO ASTM C404-11. c. HYDRATED LIME SHALL CONFORM TO ASTM C51-11 d. WATER SHALL BE CLEAN AND FREE FROM DELETERIOUS SUBSTANCES. MASONRY MORTAR SHALL COMPLY WITH ASTM STANDARD SPECIFICATION FOR MORTAR FOR UNIT MASONRY (ASTM C270-14), TYPE M. MASONRY GROUT SHALL COMPLY WITH ASTM STANDARD SPECIFICATION FOR GROUT FOR MASONRY (ASTM C476-16) AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI WHEN SAMPLED AND TESTED IN ACCORDANCE WITH ASTM STANDARD TEST METHOD FOR SAMPLING AND TESTING GROUT (ASTM C1019-16). ADMIXTURES IN MORTAR OR GROUT SHALL NOT BE USED WITHOUT APPROVAL BY THE ENGINEER OF RECORD. LAY MASONRY UNITS SUCH THAT CELLS ARE IN VERTICAL ALIGNMENT. GROUT ALL MASONRY WALL SOLID. REINFORCING BARS SHALL COMPLY WITH ASTM A615-16, GRADE 60. CONCRETE MASONRY UNIT TO BE SPEC-BRIK JUMBO IN DELAWARE BLEND PRODUCED BY CONCRETE PRODUCTS GROUP OR APPROVED EQUIVALENT.
2'-6"
EARTHQUAKE LOADS:
IDOM Engineering PLLC 330 Second Ave S.-Suite 600 Minneapolis, MN 55401
VERTICAL REINFORCEMENT
BOND BEAM CORNER DETAIL - A SCALE: 1/2"=1'-0"
REINFORCEMENT OF THE WALL FOUNDATION
FIRE WALL DUCT CROSS SECTION
1/2"=1'-0"
1/2"=1'-0"
2 #4
0'-5"
ANSI D 12/17/2025
LOGO
GENERAIL ARRANGEMENT SITE PLAN FOUNDATION PLAN FOUNDATION DETAILS - TRANSFORMER FIREWALL ELEVATIONS
CONCRETE 4000 PSI
CONCRETE BLOCK 12"x16"x8"
DETAIL - B
73-0002-001 73-0003-001 73-0003-006 73-0003-008 SH 002
#6 @8"
CERAMIC FIBER BLANKET
0'-1"
1"=1'-0"
REFERENCE DRAWINGS:
CAULK
0'-1"
INFO
0'-1"
1'-2"
SS 0.155* S1 0.048* IMPORTANCE FACTOR 1.5* SITE CLASS E* SEISMIC DESIGN CATEGORY D*
1 2" MAXIMUM CONTROL
JOINT WIDTH
CAULK
3HR FIRE RATED MASONRY CONTROL JOINTS SCALE: 1"=1'-0"
MASONRY STANDARD WEIGHT LADDER TYPE JOINT REINFORCEMENT W/9 GA SIDE & CROSS RODS (HOT DIP GALVANIZED FINISH) @16" O.C. (EVERY OTHER MORTAR JOINT)
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
CONCRETE BLOCK 12"x16"x8" FILLED WITH 3000 PSI GROUT
NOTE:
RG&E AVANGRID
FOUNDATION DETAIL TRANSFORMER FIREWALL SH 001 OF SH 002
FOR JOINT REINFORCEMENT USE PRE-FABRICATED CORNER SECTIONS AT WALL CORNERS.
SUBSTATION 73
ROCHESTER, NY
FIRE WALL DETAIL BLOCK
BY
SN/IDOM
INDICATED FILE: 73-0003-008 SH 001.dwg
CK APP
OO/IDOM PR/IDOM
NO.
1/2"=1'-0" REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
REV
73-0003-008 SH 001 0-0
BOND BEAM FILLED WITH 3000 PSI GROUT
CONCRETE BLOCK 12"x16"x8" FILLED WITH 3000 PSI GROUT
CONCRETE 4000 PSI SEE JOINT DETAILS
1. 2. 3.
BOND BM W/2 #5 CONT W/3000 PSI GROUT
T/ BOND BEAM ELEV = +397'-2"
4. 5.
MASONRY VERTICAL REINFORCING # 6 @8" O.C.
6.
7.
MASONRY STANDARD WEIGHT LADDER TYPE JOINT REINFORCEMENT W/9 GA SIDE & CROSS RODS (HOT DIP GALVANIZED FINISH) @16" O.C. (EVERY OTHER MORTAR JOINT)
8. 9.
BOND BM W/2 #5 CONT W/3000 PSI GROUT
T/ BOND BEAM ELEV = +384'-6"
4'-6": LAP SPLICE
0-0
1.
2.
Ld= 3'-0"
3. 4.
SOUTH WALL ELEVATION SCALE: 1/4"=1'-0"
BOND BEAM FILLED WITH 3000 PSI GROUT
CONCRETE BLOCK 12"x16"x8" FILLED WITH 3000 PSI GROUT
ANCHOR ROD
CLR.
-
CLEAR
DIA.
-
DIAMETER
D.I.
-
DUCTILE IRON
DWG
-
DRAWING
EQ
-
EQUAL/EQUALLY
FDN
-
FOUNDATION
FG
-
FINISHED GRADE
MAX.
-
MAXIMUM
O.C.
-
ON CENTER
PROJ.
-
PROJECTION
NAAMM
-
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS
TYP.
-
TYPICAL
CONCRETE MASONRY:
APP
2.
CK
DESIGN DATA:
BY
DESIGN CODE
MASONRY STANDARD WEIGHT LADDER TYPE JOINT REINFORCEMENT W/9 GA SIDE & CROSS RODS (HOT DIP GALVANIZED FINISH) @16" O.C. (EVERY OTHER MORTAR JOINT)
DATE
PR/IDOM OO/IDOM SN/IDOM
DESCRIPTION
NYSBC 2020 (NY)
STRUCTURE CLASSIFICATION SITE LOCATION CALCULATED MAXIMUM BEARING PRESURE
CATEGORY IV WESTER, NY
3.
2600 PSF*
4.
BASIC WIND SPEED IMPORTANCE FACTOR EXPOSURE CATEGORY
121 MPH 1.15 C
5. 6.
4'-6": LAP SPLICE
ATMOSPHERIC ICE LOADS:
INFO
RADIAL ICE CONCURRENT WIND SPEED
7. 8.
2.5 INCH* 60 MPH
CONCRETE MASONRY UNITS (CMU) SHALL COMPLY WITH ASTM STANDARD SPECIFICATION FOR LOAD-BEARING CONCRETE MASONRY UNITS (ASTMC90-16). LOAD-BEARING CMU SHALL BE NORMAL WEIGHT WITH MINIMUN NET AREA COMPRESSIVE STRENGTH OF 1900 PSI. MORTAR AND GROUT COMPONENTS: a. CEMENT SHALL BE PORTLAND CEMENT CONFORMING TO ASTM C150-16, TYPE I, II. b. AGGREGATES FOR MOTAR SHALL COMFORM TO ASTM C144-11. AGGREGATES FOR GROUT SHALL CONFORM TO ASTM C404-11. c. HYDRATED LIME SHALL CONFORM TO ASTM C51-11 d. WATER SHALL BE CLEAN AND FREE FROM DELETERIOUS SUBSTANCES. MASONRY MORTAR SHALL COMPLY WITH ASTM STANDARD SPECIFICATION FOR MORTAR FOR UNIT MASONRY (ASTM C270-14), TYPE M. MASONRY GROUT SHALL COMPLY WITH ASTM STANDARD SPECIFICATION FOR GROUT FOR MASONRY (ASTM C476-16) AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI WHEN SAMPLED AND TESTED IN ACCORDANCE WITH ASTM STANDARD TEST METHOD FOR SAMPLING AND TESTING GROUT (ASTM C1019-16). ADMIXTURES IN MORTAR OR GROUT SHALL NOT BE USED WITHOUT APPROVAL BY THE ENGINEER OF RECORD. LAY MASONRY UNITS SUCH THAT CELLS ARE IN VERTICAL ALIGNMENT. GROUT ALL MASONRY WALL SOLID. REINFORCING BARS SHALL COMPLY WITH ASTM A615-16, GRADE 60. CONCRETE MASONRY UNIT TO BE SPEC-BRIK JUMBO IN DELAWARE BLEND PRODUCED BY CONCRETE PRODUCTS GROUP OR APPROVED EQUIVALENT.
SS 0.155* S1 0.048* IMPORTANCE FACTOR 1.5* SITE CLASS E* SEISMIC DESIGN CATEGORY D*
Ld= 3'-0"
IFR - ISSUED FOR REVIEW
BOND BM W/2 #5 CONT W/3000 PSI GROUT
T/ BOND BEAM ELEV = +384'-6"
REV
PR/IDOM OO/IDOM SN/IDOM
08/29/2025
-
WIND LOADS:
0-0A
0-0B
IFA - ISSUED FOR APPROVAL
10/24/2025
PR/IDOM OO/IDOM SN/IDOM 12/19/2025 IFC - ISSUED FOR CONSTRUCTION
A.R.
1.
MASONRY VERTICAL REINFORCING #6 @8" O.C.
IDOM Engineering PLLC 330 Second Ave S.-Suite 600 Minneapolis, MN 55401
0-0
CONCRETE 4000 PSI SEE JOINT DETAILS
BOND BM W/2 #5 CONT W/3000 PSI GROUT
T/ BOND BEAM ELEV = +397'-2"
IF REQUIRED BASED ON GROUNDWATER ELEVATON AT TIME OF CONSTRUCTION, EXCAVATION DEWATERING SHALL BE INSTALLED AND MAINTAINED TO PROVIDE FOR A DRY EXCAVATION THROUGHOUT GIS BASEMENT CONSTRUCTION ACTIVITIES. TEMPORARY DEWATERING SYSTEM DESIGN, SUPPLY, PERMITTING & IMPLEMENTATION IS THE CONTRACTOR'S RESPONSIBILITY. REFERENCE PROJECT SPECIFICATIONS SECTION 312319. GROUNDWATER DISCHARGE FROM DEWATERING ACTIVITIES SHALLE BE COLLECTED, CONTROLLED, MONITORED, STORED, AND DISCHARGED IN ACCORDANCE WITH ALL GOVERNING ENVIRONMENTAL REQUIREMENTS AND AS DIRECTED BY THE OWNER.
LEGEND OF ABBREVIATIONS:
CONCRETE FOUNDATION REINFORCING NOT SHOWN FOR CLARITY. SEE WALL SECTIONS ON SHEET 1
#6 DOWELS TO MATCH VERTICAL WALL REINFORCING (TYP.)
T/ CONC ELEV = +372'-6"
CONCRETE COMPRESSIVE STRENGTH SHALL BE 4500psi (MIN.) @ 28 DAYS. REINFORCING SHALL BE ASTM A615 GR. 60 (60ksi YIELD). PROVIDE 3/4" CHAMFER ON ALL EXPOSED EDGES, UNLESS NOTED OTHERWISE. FOUNDATION & CONTAINMENT SHALL BE PLACED ON UNDISTURBED SOILS OVERLAIN BY 12" OF 3/4" CRUSHED STONE. BACKFILL AND COMPACT TO NOT LESS THAN 95% THEORETICAL MAXIMUM DENSITY AS DETERMINED BY ASTM D 1557. LEGEND OF ABBREVIATIONS USED ON THE DRAWING ARE PROVIDED FOR THE REVIEWER'S CONVENIENCE. IT IS ASSUMED A COMPREHENSIVE LIST OF THE ABBREVIATI0NS WILL BE PROVIDED AS PART OF THE SITE SPECIFIC, DETAILED DESIGN. STANDARD SOIL, BACKFILL AND GEOTEXTILE DEFINITIONS ARE PROVIDED IN IBERDROLA USA STANDARD TM 2.71.09 SUBSTATION YARD AND FENCING. CONSTRUCTION CONTRACTOR SHALL UTILIZE METHODS TO CONTROL HEAT OF HYDRATION FOR THE FOUNDATION. THE FOUNDATION AND THE BLOCK WALL WILL BE BUILT IN TWO DIFFERENT PHASES. TO ENSURE THAT THE DOWELS BARS DO NOT DISTURB BETWEEN ONE PHASE AND THE OTHER, REBAR COUPLERS WILL BE USED. IN THE FIRST PHASE THEY WILL BE SOAKED TO THE UPPER LEVEL OF THE FOUNDATION. COVERS SHOULD BE USED TO PROTECT THE THREADS OF THE REBAR COUPLER UNTIL THE SECOND PHASE OF CONSTRUCTION IS CONTINUED. THE REBAR COUPLER MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION MUST BE FOLLOWED, AND MAKE SURE THAT THE INDICATED TIGHTENING TORQUES ARE GIVEN.
CONCRETE FOUNDATION REINFORCING NOT SHOWN FOR CLARITY. SEE WALL SECTIONS ON SHEET 1
0
73-0002-001 73-0003-001 73-0003-006 73-0003-008 SH 001
5
GENERAIL ARRANGEMENT SITE PLAN FOUNDATION PLAN FOUNDATION DETAILS - TRANSFORMER FIREWALL PLAN & SECTION
10
15 SCALE: 1 4"=1'-0"
20
30
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
ANSI D 12/18/2025
LOGO
PE STAMP
RG&E AVANGRID
FOUNDATION DETAIL TRANSFORMER FIREWALL
#6 DOWELS TO MATCH VERTICAL WALL REINFORCING (TYP.)
SH 002 OF SH 002
EAST/WEST WALL ELEVATION
SUBSTATION 73
1/4"=1'-0"
BY
SN/IDOM
1/4"=1'-0"
CK
OO/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
ROCHESTER, NY FILE: 73-0003-008 SH 002.dwg REV
73-0003-008 SH 002 0-0
NOTES:
DESIGN DATA:
4'-6"
18'-2"
DESIGN CODE
ASCE 7-16
STRUCTURE CLASSIFICATION SITE LOCATION
CATEGORY IV WEBSTER, NY
ALLOWABLE SOIL BEARING SLIDING FRICTION GROUND WATER ELEVATION FROST PENETRATION
1432 PSF TAN(33) 3'-2'' BGS 48 IN
WIND LOADS:
8'-10"
BASIC WIND SPEED EXPOSURE CATEGORY
130 MPH C
ATMOSPHERIC ICE LOADS
2'-121"
RADIAL ICE CONCURRENT WIND SPEED
N/A N/A
EARTHQUAKE LOADS SS S1 IMPORTANCE FACTOR SITE CLASS SEISMIC DESIGN CATEGORY
A
0.155 0.048 1.5 E D
1.
CONCRETE COMPRESSIVE STRENGTH SHALL BE 4500psi @ 28 DAYS.
2.
REINFORCING STEEL SHALL BE ASTM A615 GR. 60 (60ksi YIELD) DEFORMED, BILLET STEEL BARS.
3.
ANCHOR BOLTS HIT-RE 500 V3 + HAS-E-55 (ASTM F1554 Gr.55) 10.5''' LONG.
4.
ASTM A563 HEAVY HEX NUTS & F436 WASHERS SHALL BE HOT-DIP GALVANIZED. A MINIMUM OF (2) WASHERS PER ANCHOR ROD TO FACILITATE SECURING ANCHOR PLATES.
5.
PLATES AND HOT ROLLED MEMBERS SHALL BE ASTM A992 GR. B.
6.
PROVIDE 3 4" CHAMFER ON ALL EXPOSED EDGES UNLESS NOTED OTHERWISE.
7.
ALL REINFORCING BARS TO BE MINIMUM OF 3" CLEAR FROM FACE OF CONCRETE EXPOSED TO EARTH, UNLESS NOTED OTHERWISE.
8.
1.
9.
QUANTITIES PROVIDED IN THIS SCHEDULE ARE THEORETICAL BASED ON THE DETAILS SHOWN ON THE DRAWINGS WITH NO CONSIDERATION GIVEN TO CONSTRUCTION MEANS & METHODS. CONTRACTOR IS RESPONSIBLE FOR FINAL QUANTITIES REQUIRED FOR COMPLETE INSTALLATION. REGARDING DRILL PIER CONCRETE QUANTITIES SHOWN. FINAL AS RECORDED VOLUME OF PLACED CONCRETE SHALL BE NOT LESS THAN THE VALUES NOTED HEREIN.
SHEET 2
2'-0"
ELECTRICAL CABLE PENETRATION. SEE DETAIL 3, SHEET 2
11'-4"
18'-0"
25'-6"
STEEL BASE FRAME EDGE
2'-0"
BASE PLATE AND CONTAINER CONNECTION. SEE DETAIL 2, SHEET 2
1'-0"
2'-0" 3'-5"
3'-5"
3'-5"
3'-5"
3'-5"
2'-8"
2'-0"
13'-378"
1'-0"
6"
5'-4"
3'-5"
2'-121"
3'-5"
821"
3'-5"
32'-0"
APP CK
3/8"=1'-0" BY
B SHEET 2
DESCRIPTION
2 LAYERS OF 1'' RIGID INSULTATION (ASTM C578 TYPE IV 1'' STAGGERED AND TAPE JOINTS)
(101)
#6@12''
(102)
#6@12''
BILL OF MATERIAL
± 0'-0" FINISH FLOOR -0'-8" FINISH GRADE 10"
4" DOWN STYROFOAM, HIGH LOAD 40 EXTRUDED POLYSTYRENE INSULATION EXTEND MIN 48" OUTSIDE FOUNDATION, TYP. ALL AROUND
1'-6"
REV
STONE TOPPING
UNITS
EXCAVATION
125.40
C.Y.
CRUSHED STONE
44.78
C.Y.
BLINDING CONCRETE
14.75
C.Y.
VAPOR BARRIER
1,195.00
FT2
2 LAYERS STAGGERED ASTM C578 TYPE VI 1"
405.00
FT2
PROTECTIVE COVERING
100.00
FT2
CONCRETE
32.00
C.Y.
1,040.00
FT2
4" 1'-0"
INFO
8"
4"
EXTRUDED POLYSTYRENE INSULATOR
73-0002-001 73-0003-001 73-0003-006 73-0002-004 73-DD-001-004
LIST OF ROUND STEEL BARS Gr60 BAR SHAPE CODE
ANSI D 12/16/2025
15 MIL VAPOR BARRIER LOGO
QUANTITY
DESCRIPTION
PROTECTIVE COVERING
1'-0"
PR/IDOM OO/IDOM 08/29/2025 JCG/IDOM
PLAN VIEW
DATE
PR/IDOM OO/IDOM 10/25/2025 JCG/IDOM
IFR - ISSUED FOR REVIEW
5'-4"
39'-5"
CONTAINER BASE FRAME CHANNEL C15X33.9
0-0A
0-0B
IFA - ISSUED FOR APPROVAL
PR/IDOM OO/IDOM
25'-4"
0-0
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
0-0
IFC - ISSUED FOR CONSTRUCTION
12/19/2025 JCG/IDOM
8'-9"
DIMENSIONS (ft, inch)
BAR MARK
BAR TYPE
BAR SIZE (#)
ROD WEIGHT T (lb/ft)
NUMBER OF BARS
LENGHT OF EACH (ft, inch)
A
B
C
101
B
6
1.50
66
19'-8"
1'-1"
17'-6"
1'-1"
1949.60
102
B
6
1.50
38
33'-8"
1'-1"
31'-6"
1'-1"
1921.56
TOTAL (lbs)
3,871.15
TOTAL WEIGHT (lbs) AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
TYPE B
4'-0"
2'-0"
1'-0"
4"
A
DETAIL
SHEET 2
1"=1'-0"
RG&E AVANGRID
FOUNDATION DETAIL CONTROL HOUSE ENCLOSURE
C B
1
GENERAL ARRANGEMENT SITE PLAN FOUNDATION PLAN ARCHITECTURAL DESIGN CONTROL HOUSE ENCLOSURE FDN Calc
SHEET 001 OF 002 STATION 73 JCG/IDOM CK OO/IDOM APP PR/IDOM DATE: 08/29/2025 BY
REV
DESCRIPTION
DATE
BY
CK
APP
AS NOTED NO.
ROCHESTER, NY FILE: 73-0003-010 SH 001.dwg REV
73-0003-010 SH 001 0-0
NOTES:
CONTROL BUILDING C15X33.9 BASE FRAME
CONTROL BUILDING C15X33.9 BASE FRAME
CLR.
2"
(101) #6@12''
1'-6"
(102) #6@12''
1'-6" CRUSHED STONE
± 0'-0" FINISH FLOOR -0'-8" FINISH GRADE
2 LAYERS OF 1" RIGID INSULATION (ASTM C578 TYPE VI 1") STAGGERED AND TAPE JOINTS
DESIGN CODE
ASCE 7-16
STRUCTURE CLASSIFICATION SITE LOCATION
CATEGORY IV WEBSTER, NY
ALLOWABLE SOIL BEARING SLIDING FRICTION GROUND WATER ELEVATION FROST PENETRATION
1432 PSF TAN(33) 3'-2'' BGS 48 IN
2'-0"
BLINDING CONCRETE
1'-0"
1'-0"
4"
3"
15 MIL VAPOR BARRIER
CLR.
WIND LOADS:
4" DOWN STYROFOAM, HIGH LOAD 40 EXTRUDED POLYSTYRENE INSULATION EXTEND MIN 48" OUTSIDE FOUNDATION, TYP. ALL AROUND
4'-0"
1
COMPACTED CRUSHED STONE 1' COMPACTED TO 95%
30'-0"
1'-0"
BASIC WIND SPEED EXPOSURE CATEGORY
1'-0"
32'-0"
ATMOSPHERIC ICE LOADS
SHEET 1
2'-0"
130 MPH C
RADIAL ICE CONCURRENT WIND SPEED
N/A N/A
4'-0" EARTHQUAKE LOADS
40'-0"
A
3/8"=1'-0"
SHEET 1
2"
CLR.
(102) #6@12''
DETAIL 2 SHEET 2
2'-0"
REINFORCING STEEL SHALL BE ASTM A615 GR. 60 (60ksi YIELD) DEFORMED, BILLET STEEL BARS.
3.
ANCHOR BOLTS HIT-RE 500 V3 + HAS-E-55 (ASTM F1554 Gr.55) 10.5''' LONG.
4.
ASTM A563 HEAVY HEX NUTS & F436 WASHERS SHALL BE HOT-DIP GALVANIZED. A MINIMUM OF (2) WASHERS PER ANCHOR ROD TO FACILITATE SECURING ANCHOR PLATES.
5.
PLATES AND HOT ROLLED MEMBERS SHALL BE ASTM A992 GR. B.
6.
PROVIDE 3 4" CHAMFER ON ALL EXPOSED EDGES UNLESS NOTED OTHERWISE.
7.
ALL REINFORCING BARS TO BE MINIMUM OF 3" CLEAR FROM FACE OF CONCRETE EXPOSED TO EARTH, UNLESS NOTED OTHERWISE.
8.
1.
9.
QUANTITIES PROVIDED IN THIS SCHEDULE ARE THEORETICAL BASED ON THE DETAILS SHOWN ON THE DRAWINGS WITH NO CONSIDERATION GIVEN TO CONSTRUCTION MEANS & METHODS. CONTRACTOR IS RESPONSIBLE FOR FINAL QUANTITIES REQUIRED FOR COMPLETE INSTALLATION. REGARDING DRILL PIER CONCRETE QUANTITIES SHOWN. FINAL AS RECORDED VOLUME OF PLACED CONCRETE SHALL BE NOT LESS THAN THE VALUES NOTED HEREIN.
± 0'-0" FINISH FLOOR -0'-8" FINISH GRADE
1'-0" 4"
CLR.
3"
15 MIL VAPOR BARRIER
BLINDING CONCRETE
2.
(101) #6@12''
2 LAYERS OF 1" RIGID INSULATION (ASTM C578 TYPE VI 1") STAGGERED AND TAPE JOINTS 4" DOWN STYROFOAM, HIGH LOAD 40 EXTRUDED POLYSTYRENE INSULATION EXTEND MIN 48" OUTSIDE FOUNDATION, TYP. ALL AROUND
0.155 0.048 1.5 E D
CONCRETE COMPRESSIVE STRENGTH SHALL BE 4500psi @ 28 DAYS.
CONTROL BUILDING C15X33.9 BASE FRAME 1'-6"
CONTROL BUILDING C15X33.9 BASE FRAME CRUSHED STONE
SS S1 IMPORTANCE FACTOR SITE CLASS SEISMIC DESIGN CATEGORY
1.
COMPACTED CRUSHED STONE 1' COMPACTED TO 95% 1'-0"
16'-0"
1'-0"
4'-0"
18'-0"
2'-0" 4'-0"
26'-0"
B
SECTION B-B
SHEET 1
3/8"=1'-0" 0-0
FILLET WELDING FE70. THROAT 58''
CONTAINER BASE FRAME CHANNEL C15X33.9
STIFFENER INSIDE THE CHANNEL #21''
FILLET WELDING FE70. THROAT 58''
3'
2 HIT-RE 500 V3 + HAS-E-55 (ASTM F1554 Gr.55) 1/2 9 DRILL PLATE 16 '' DRILL CONCRETE 0.875''
2 # 6''
10 21''
2 # 6''
2 HIT-RE 500 V3 + HAS-E-55 (ASTM F1554 Gr.55) 1/2 9 DRILL PLATE 16 '' DRILL CONCRETE 0.875''
2 # 6''
2''
3''
4 21'' 6 21''
4'
CONTROL HOUSE FUNDATION SLAB
5''
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
2 # 6''
BASE PLATE 6 21'' x 5'' x 34''
STIFFENER INSIDE THE CHANNEL #21''
INFO
2 # 6'' IN THE TOP 5'' OF THE SLAB
8''
APP CK BY DESCRIPTION REV
DATE
PR/IDOM
PR/IDOM OO/IDOM
OO/IDOM
IFR - ISSUED FOR REVIEW 0-0A
08/29/2025 JCG/IDOM
IFA - ISSUED FOR APPROVAL 0-0B
10/25/2025 JCG/IDOM
IFC - ISSUED FOR CONSTRUCTION 0-0
12/19/2025 JCG/IDOM
OO/IDOM
PR/IDOM
CONTAINER BASE FRAME CHANNEL C15X33.9
1'-1''
CONTAINER BASE FRAME CHANNEL C15X33.9
REFERENCE DOCUMENTS:
8'-6''
73-0002-001 73-0003-001 73-0003-006 73-0002-004 73-DD-001-004
BASE PLATE 6 21'' x 5'' x 34''
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
ANSI D 12/16/2025
LOGO
PE STAMP
2
DETAIL
3
DETAIL
SHEET 1
1"=1'-0"
SHEET 1
1"=1'-0"
GENERAL ARRANGEMENT SITE PLAN FOUNDATION PLAN ARCHITECTURAL DESIGN CONTROL HOUSE ENCLOSURE FDN Calc
RG&E AVANGRID
FOUNDATION DETAIL CONTROL HOUSE ENCLOSURE SHEET 002 OF 002
0-0
STATION 73 JCG/IDOM CK OO/IDOM APP PR/IDOM DATE: 08/29/2025 BY
REV
DESCRIPTION
DATE
BY
CK
APP
AS NOTED NO.
ROCHESTER, NY FILE: 73-0003-010 SH 002.dwg REV
73-0003-010 SH 002 0-0
CL FND
FOUNDATION DIMENSIONS
B 2" PVC CONDUIT SEE CONDUITS NOTES
DESCRIPTION
A
BOLT CIRCLE
DIA
LIGHTING POLE FOUNDATION
CL FND
LENGTH
2'-0"
H
9'-6"
6"
FOUNDATION REINFORCEMENT "X"
6#6
"Y"
#4@6" (Spirals)
ANCHOR BOLT DETAILS A
BOLT CIRCLE
B
6 3/8"
6 3/8"
DIA
9''
LENGTH
1"
BILL OF MATERIALS
PROJ.
3'-4"
LE
4''
CONCRETE REBAR (YD3) (LB)
3'
1.11
267
QTY
1
ASCE 7-16
STRUCTURE CLASSIFICATION SITE LOCATION
CATEGORY IV WEBSTER, NY
GROUND WATER ELEVATION FROST PENETRATION
3.2' 48''
PROJ.
VENDOR
PROJECTION
TOP TEMPLATE. DETAIL 4
LE
130 MPH C
SS S1 IMPORTANCE FACTOR SITE CLASS SEISMIC DESIGN CATEGORY
T.O.C.
SPIRAL WITH A 180° HOOK AND 1 12 TURNS LAP LENGTH IN TOP
A
2
TYPICAL LEVELING NUT BASE PLATE DETAIL
TYPICAL ANCHOR BOLT W LEVELENG NUT DETAIL
4'-0"
THIS SHEET
CONDUIT NOTES:
APP
b
Db
MINIMUN BENDING RADIUS OF CONDUITS IS EQUAL TO 24 INCHES.
11''
4.
CONDUIT HEIGHT ABOVE CONCRETE BASES SHALL BE 1 INCH.
6 38''
5.
ALL CONDUIT ENDS AT THE TOP OF CONCRETE BASES SHALL BE NON METALLIC AND PLUGGED INMEDIATELY AFTER PLACEMENT AND BEFORE CONCRETE IS POURED. CONDUITS IN WHICH WIRE OR CABLE IS INSTALLED SHALL REMAIN CAPPED OR PLUGGED.
6.
BELL ENDS SHALL BE INSTALLED ON ALL PVC CONDUITS EXPOSED AT THE TOP OF CONCRETE BASES BEFORE INSTALLATION OF CABLE OR WIRE. ENDS OF CONDUIT INSTALLED BELLOW GRADE FOR FUTURE USE SHALL BE NON METALLIC AND PLUGGED.
BOLT CIRCLE 9'' 11''
SEE
D D= 4
VERTICAL REINFORCEMENT BAR CK
C
7.
CONDUCTORS SHALL BE NEATLY COILED AND THE COILS TIED TOGETHER
8.
THE MINIMUM DEPTH OF CONDUIT EXITING THE CONCRETE BASE SHALL BE 24 INCHES FOR LIGHTING CIRCUIT CONDUITS.
IFR - ISSUED FOR REVIEW
DESCRIPTION REV
5.
EACH SET OF FOUNDATION ANCHOR ROD CLUSTERS SHALL BE DELIVERED TO SITE AS A CAGED ASSEMBLY. THIS INCLUDES SETTING TEMPLATES AND ANCHOR PLATES PROPERLY FASTENED TO FACILITATE IMMEDIATE INSTALLATION WITHIN THE FOUNDATION FORM WORK. ANCHOR PLATES AND SETTING TEMPLATES SHALL BE ASTM A36 STEEL, THICKNESS SHALL BE 1 4" AND SHALL BE FINISHED WITH 2 COATS OF SHOP PRIMER. HOLES SHALL BE PROVIDED IN BOTH TOP AND BOTTOM PLATES TO PERMIT CONCRETE PLACEMENT AND CONSOLIDATION. SETTING TEMPLATES NOT CAST IN PLACE SHALL BE DISCARDED AFTER CONCRETE HAS SET-UP.
6.
PROVIDE 3 4" CHAMFER ON ALL EXPOSED EDGES UNLESS NOTED OTHERWISE.
7.
ALL REINFORCING BARS TO BE MINIMUM OF 3" CLEAR FROM FACE OF CONCRETE EXPOSED TO EARTH, UNLESS NOTED OTHERWISE.
8.
SPLICES SHOULD BE AVOIDED IF POSSIBLE. TYPE 2 MECHANICAL SPLICES IN ACCORDANCE WITH ACI SHALL BE PROVIDED. VERTICAL SPLICE LOCATIONS SHALL BE PLACED BELOW THE MID-POINT OF THE ACTUAL DRILLED SHAFT DEPTH.
9.
4 SPIRAL SHALL OVERLAP 24" MINIMUM. THE SPIRAL IN THE TOP MUST TERMINATE WITH 1 12 EXTRA TURNS AND A STANDARD 180° HOOK. THE SPIRAL IN THE BOTTOM MUST TERMINATE WITH 1 12 EXTRA TURNS.
3 DIAMETER
THIS SHEET
SPIRAL WITH A 180º HOOK AND 1 12 TURNS LAP LENGTH IN BOTTOM
4
TOP EMPLATE. 1/4''
THIS SHEET
3/4'' = 1'-0''
6''=1'-0''
ELEVATION TYPICAL DRILLED PIER FOUNDATION
SPIRAL WITH A 180° HOOK AND 1 12 TURNS LAP LENGTH IN THE TOP
DETAIL 3. HOOK
16. BEFORE THE START OF THE PILE INSTALLATION, A LOCALIZED EXCAVATION UP TO 4 FEET DEEP WILL BE CARRIED OUT AND BACKFILLED ACCORDING TO NOTE 16. ONCE THE BACKFILL HAS BEEN COMPLETED AND COMPACTED TO THE APPROPRIATE LEVEL, THE PILE WILL BE INSTALLED.
A.R. B.C. BFG CLR DIA. DWG. EQ FDN. (FG) O.C. PROJ TBD TYP. S.P. UNO
DIAMETER
SPIRAL WITH 1 12 TURNS LAP LENGTH IN THE BOTTOM
SPIRAL REINFORCEMENT
15. FROST-RESISTANT GRANULAR BACKFILL SHALL CONFORM TO NYSDOT SECTION 304, TYPE 2 (ITEM 4) OR EQUIVALENT AGGREGATE WITH ≤ 8% PASSING THE NO. 200 (0.075 MM) SIEVE, LL ≤ 20% AND PI ≤ 4% (ASTM D4318). MAXIMUM PARTICLE SIZE: 2 IN. GRADATION PER TABLE 304-1, ADJUSTED FOR REDUCED FINES CONTENT. PLACE IN LIFTS ≤ 8 IN LOOSE THICKNESS AND COMPACT TO 95% OF MAXIMUM DRY DENSITY (ASTM D698) WITH MOISTURE WITHIN ±2% OF OPTIMUM. COMPACTION CONTROL BY ASTM D6938 WITH INITIAL ASTM D1556 CORRELATION. DO NOT PLACE ON FROZEN, SATURATED, OR UNSTABLE SUBGRADE; PROTECT FROM FREEZING AND MAINTAIN POSITIVE DRAINAGE.
EQUIPMENT REFERENCE:
N.T.S.
DIAMETER
14. NUMBER OF FOUNDATIONS REQUIRED: 1. POSITION IN ACCORDANCE WITH FOUNDATION PLAN DRAWING.
10. CONTRACTOR TO VERIFY ALL EMBEDEMENT ARE INSTALLED IN PLACE PRIOR TO POURING CONCRETE.
FIELD VERIFY LOCATION OF CONDUIT.
HOLOPHANE CATALOG #RTSS2559B
DIAMETER
13. IF BEDROCK IS ENCOUNTERED, NOTIFY THE ENGINEER FOR FURTHER DIRECTION.
18. QUANTITIES PROVIDED IN THIS SCHEDULE ARE THEORETICAL BASED ON THE DETAILS SHOWN ON THE DRAWINGS WITH NO CONSIDERATION GIVEN TO CONSTRUCTION MEANS & METHODS. CONTRACTOR IS RESPONSIBLE FOR FINAL QUANTITIES REQUIRED FOR COMPLETE INSTALLATION. REGARDING DRILL PIER CONCRETE QUANTITIES SHOWN. FINAL AS RECORDED VOLUME OF PLACED CONCRETE SHALL BE NOT LESS THAN THE VALUES NOTED HEREIN.
9.
3"
BY
IFA - ISSUED FOR APPROVAL
0-0A
NUTS AND WASHERS SHALL BE PER AASHTO M314-90 OR ASTM F1554 – HOT DIP GALVANIZED.
17. PIER CONSTRUCTION WILL BE IN ACCORDANCE WITH ACI 336.1 & 336.3
1 Ø116 '' 1'' BOLT
THIS SHEET
DATE
PR/IDOM
THE FINAL OR TERMINATING CONCRETE BASE IN A CONDUIT RUN SHALL HAVE A 6'' EXIT HEIGHT STUB INSTALLED FOR FUTURE CABLING USE. THE EXIT STUB SHALL BE SIZED AS USED THROUGHOUT THE CONDUIT RUN AS THE ENTRANCE OF THE BASE.
3.
H
PR/IDOM
2.
PIER EDGE
NGT T LE
08/29/2025 JCG/IDOM OSO/IDOM
CONDUIT SIZES AND LOCATION SHALL BE AS SHOWN ON THE PLANS.
180°
IGH
10/24/2025 JCG/IDOM OSO/IDOM
VERTICAL REINFORCEMENT AXIS
A STR
"X" EQUALLY SPACED IN A CIRCULAR CAGE
0-0B
4.
12. CENTRALIZERS AND BAR BOTTOM CHAIR SUPPORTS SHALL BE USED TO LOCATE, POSITION & HOLD THE REINFORCING CAGE AND SHALL BE SHAFTSPACER & BARBOOTS BY FOUNDATION TECHNOLOGIES, INC OR APPROVED EQUAL.
1.
6 38''
1' SCHEDULE
1'
SPIRAL REINFORCEMENT (LAP SPLICE LENGTH = 48Db)
SEE NOTE 15
THIS SHEET
4Db .5" or 2 ) (MIN
LENGTH
B
PR/IDOM
STEEL ANCHOR BOLTS SHALL BE PER AASHTO M314 OR ASTM F1554 - GRADE 55, HOT DIP GALVANIZED.
11. IN ACCORDANCE WITH SECTION 1704.9 OF THE IBC, CONSTRUCTION OF THE DRILLED SHAFT FOUNDATIONS SHALL ONLY BE PERFORMED IN THE PRESENCE OF THE GEOTECHNICAL ENGINEER TO OBSERVE FOR COMPLIANCE WITH VERIFICATION AND INSPECTION TASKS INDICATED ON TABLE 1704.9 IF IBC, CONTRACT DOCUMENTS, AND APPROVED CONSTRUCTION SUBMITTALS. THE GEOTECHNICAL ENGINEER SHOULD OBSERVE ITEMS INCLUDING BUT NOT LIMITED TO: PROPER BEARING MATERIAL HAS BEEN REACHED, THE DEPTHS ARE AS REQUIRED BY DESIGN, GOOD CLEANOUT OF SOFT AND LOOSE MATERIAL AT THE BOTTOM OF THE SHAFT, THE EXCAVATION IS DRY (OR ADEQUATE HEAD OF SLURRY AND QUALITY SLURRY IS MAINTAINED AT ALL TIMES (IF THE SLURRY IS USED)), REINFORCING STEEL IS CLEAN AND PROPERLY PLACED, INCLUDING NUMBER AND SIZE OF REQUIRED REBAR, CONCRETE IS PLACED CONTINUOUSLY AND CASING RETRACTED IN A METHOD TO MAINTAIN BOREHOLE STABILITY AND NOT RESULT IN SEGREGATION OF CONCRETE.
THIS SHEET
THIS SHEET
12/19/2025 JCG/IDOM OSO/IDOM
3.
10. IF A DRILLED PIER LOCATION IS WITHIN 3 PIER DIAMETERS (CENTER TO CENTER) OF AN ADJACENT PIER, DRILLING CANNOT COMMENCE UNTIL THE ADJACENT PIER CONCRETE HAS BEEN IN PLACE FOR NOT LESS THAN 24 HOURS.
HOOK DETAIL ACCORDING TO VENDOR
HEAVY HEX NUT
6'' 6"
STONE TOPPING
0.155 0.048 1.5 E D
HEAVY HEX NUT FLAT WASHER
1
IFC - ISSUED FOR CONSTRUCTION
REINFORCING SHALL BE ASTM A615 GR. 60 (60ksi YIELD) DEFORMED, BILLET STEEL BARS.
N/A N/A
EARTHQUAKE LOADS
BASE PLATE
ANCHOR BOLTS. DETAILS 1, 2.
2'' PVC CONDUIT SEE CONDUITS NOTES
0-0
2.
WIND LOADS:
RADIAL ICE CONCURRENT WIND SPEED
FLAT WASHER
3/4"=1'-0"
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
CONCRETE COMPRESSIVE STRENGTH SHALL BE 4500psi @ 28 DAYS.
HEAVY HEX NUT
ANCHOR BOLT PLAN
-
ANCHOR ROD BOLT CIRCLE BELOW FINISHED GRADE CLEAR DIAMETER DRAWING EQUAL/EQUALITY FOUNDATION FINISHED GRADE ON CENTER PROJECTIONS TO BE DETERMINED TYPICAL SPACING / SPACED UNLESS NOTED OTHERWISE
73-0002-001 73-0003-001 73-0003-006 73-0006-004 73-DD-001-006
ANSI D 12/16/2025
A THIS SHEET
3/4"=1'-0"
"X" EQUALLY SPACED IN A CIRCULAR CAGE
B THIS SHEET
3/4"=1'-0"
3 (C LE " AR )
3 (C LE " AR )
3 (C LE " AR )
INFO LOGO
1.
ATMOSPHERIC ICE LOADS
CL ANCHOR BOLT
H
DESIGN CODE
BASIC WIND SPEED EXPOSURE CATEGORY
LENGTH ANCHOR BOLTS SHALL BE ORIENTED PARALLEL AND PERPENDICULAR TO THE ROADWAY
NOTES:
DESIGN DATA:
DRILLED PIER FOUNDATION SCHEDULE
"X" EQUALLY SPACED IN A CIRCULAR CAGE
C THIS SHEET
GENERAL ARRANGEMENT SITE PLAN FOUNDATION PLAN TRENCH AND CONDUIT PLAN LIGHTING POLE FOUNDATION CALC
INSTALL "X" EQUALLY SPACED IN A CIRCULAR CAGE
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
RG&E AVANGRID
FOUNDATION DETAILS LIGHTING POLE
SECTION C
PLAN, ELEV, SECTIONS & DETAILS
3/4"=1'-0"
STATION 73 BY
JCG/IDOM
3/4"=1'-0"
CK
OSO/IDOM PR/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
ROCHESTER, NY FILE: 73-0003-012.dwg REV
73-0003-012 0-0
APP CK DESCRIPTION
DATE
BY
PR/IDOM OO/IDOM
PR/IDOM OO/IDOM
SN/IDOM
POST SIZE DEPENDS ON FENCE HEIGHT, WEIGHT AND WIND LOADS. SEE IMPASSE II POST SIZING CHART.
2.
IN THE SECTIONS INDICATED IN 73-0006-001 SH 001 FENCE AND ROAD PLAN IT WILL BE INSTALLED PRIVACY SCREENING, MADE OF 18GA. PREFORMED SLATS.
3.
VALUES SHOWN ARE NOMINAL AND NOT TO BE USED FOR INSTALLATION PURPOSES. SEE PRODUCT SPECIFICATION FOR INSTALLATION REQUIREMENTS.
REFERENCE DRAWINGS REV
08/29/2025 IFR - ISSUED FOR REVIEW
IFA - ISSUED FOR APPROVAL 0-0B
1.
73-0002-001 73-0003-001 SH 001 73-0003-006 73-0006-001 SH 001 73-0006-001 SH 002 73-0006-002 SH 004
GENERAL ARRANGEMENT SITE PLAN FOUNDATION PLAN GROUNDING PLAN FENCE AND ROAD PLAN FENCE DETAILS
INFO
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis,MN 55401 USA
0-0A
11/07/2025
SN/IDOM
PR/IDOM OO/IDOM SN/IDOM
PR/IDOM OO/IDOM SN/IDOM
12/19/2025
02/06/2026 IFP - ISSUED FOR PERMITTING
IFC - ISSUED FOR CONSTRUCTION 0-0
0-0
NOTES:
INSTALL RG&E AVANGRID
ANSI D 14/08/2025
LOGO
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
FENCE DETAILS SH 003 OF SH 004 SUBSTATION 73 SN/IDOM CK OO/IDOM APP PR/IDOM DATE: 08/29/2025 BY
REV
DESCRIPTION
DATE
BY
CK
APP
N.T.S. NO.
ROCHESTER, NY FILE: 73-0006-002 SH 003 REV
73-0006-002 SH 003 0-0
"S" "G" "G"
GATE WIDTH (FT.)
"L"
"L"
"S"
LENGTH INSULATION CONCRETE REBAR THRESHOLD (FT.) (FT.) VOLUME WEIGHT (FT.) (CU YDS) (LBS.)
20
18
28
2.70
337
10350
NOTES:
THREADED INSERTS FOR LIFTING EYEBOLTS
1. CONCRETE FOR THRESHOLD MAY BE PRE-CAST OR CAST IN PLACE. 2. CHAMFER ALL EXPOSED EDGES 1".
GATE STOP
3. 2" MINIMUM COVER ALL GRADE 60 REBAR. 4. CONCRETE SHALL BE MINIMUM 4500 P.S.I. AT 28 DAYS. 5. RIGID INSULATION: EXTRUDED POLYSTYRENE INSULATING BOARD CONFORMING TO AASHTO M230, TYPE V. 6. MAX. CLEARANCE TO GATE SHALL BE 2".
A
REFERENCE DRAWINGS:
THIS SH. GENERAL ARRANGEMENT SITE PLAN FOUNDATION PLAN GROUNDING PLAN FENCE AND ROAD PLAN FENCE DETAILS
THIS SH.
B
73-0002-001 73-0003-001 SH 001 73-0003-006 73-0006-001 SH 001 73-0006-001 SH 002 73-0006-002 SH 003
PLAN 3 THIS SH.
SUBSTATION GATE CONCRETE THRESHOLD DETAIL N.T.S.
15'
2'-0"
1'-0"
2'-0"
6"
2"
FINAL GRADE
12"
10"
FINAL GRADE
#6 BAR-6" O.C. BOTH WAYS
0-0A
DESCRIPTION
12"
DATE
BY
CK
4"
APP
5'-0" THRESHOLD
12" MIN. GRAVEL BASE 3" THICK RIGID INSULATION
A REV
PR/IDOM
PR/IDOM OO/IDOM
OO/IDOM
08/29/2025
SN/IDOM
11/07/2025
IFR - ISSUED FOR REVIEW
GATE POST
SECTION
THIS SH. N.T.S.
GRAVEL BASE
B
SECTION
THIS SH. N.T.S.
INFO
IDOM Engineering PLLC 330 Second Ave. S. Suite 600 Minneapolis, MN 55401 USA
0-0B
IFA - ISSUED FOR APPROVAL
SN/IDOM
PR/IDOM OO/IDOM
OO/IDOM
12/19/2025
SN/IDOM 02/06/2026
IFC - ISSUED FOR CONSTRUCTION 0-0
0-0
IFP - ISSUED FOR PERMITTING
SN/IDOM
PR/IDOM
INSULATION
INSTALL RG&E AVANGRID
ANSI D 1/30/2026
LOGO
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
FENCE DETAILS SH 004 OF 004 SUBSTATION 73 BY CK
PR/IDOM DATE: 08/29/2025 APP
REV
DESCRIPTION
DATE
BY
CK
APP
SN/IDOM OO/IDOM
N.T.S. NO.
ROCHESTER,NY FILE: 73-0006-002 SH 004 REV
73-0006-002 SH 004 0-0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.3
0.3
0.4
0.4
0.4
0.5
0.5
0.5
0.6
0.5
0.4
0.3
0.3
0.3
0.3
0.4
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.6
0.5
0.4
0.5
0.4
0.5
0.5
0.7
0.7
0.7
0.8
0.9
0.9
1.0
1.1
0.8
0.9
0.8
0.8
0.9
0.9
0.9
1.0
1.0
1.1
1.1
1.1
1.0
1.0
0.9
0.9
0.9
0.9
0.8
0.7
0.8
0.8
0.8
0.7
0.6
0.5
0.4
0.3
0.3
0.2
0.2
0.1
0.1
0.1
0.0
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.3
0.4
0.4
0.5
0.5
0.6
0.6
0.7
0.8
0.8
0.8
0.7
0.5
0.4
0.5
0.5
0.6
0.7
0.7
0.6
0.6
0.6
0.7
0.7
0.8
0.8
0.8
0.7
0.7
0.7
0.7
0.8
1.0
1.0
1.0
1.0
1.1
1.2
1.3
1.4
1.1
1.2
1.1
1.2
1.2
1.3
1.4
1.4
1.4
1.5
1.5
1.5
1.4
1.3
1.3
1.3
1.3
1.3
1.2
1.0
1.2
1.1
1.1
0.9
0.8
0.6
0.5
0.4
0.3
0.2
0.2
0.2
0.1
0.1
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.3
0.4
0.4
0.5
0.6
0.7
0.7
0.8
0.9
1.0
1.1
1.1
1.0
0.8
0.7
0.6
0.7
0.9
1.0
0.8
0.8
0.8
0.9
1.0
1.0
1.1
1.1
1.0
1.0
1.0
1.0
1.1
1.1
1.4
1.4
1.4
1.5
1.6
1.7
1.8
1.5
1.6
1.4
1.5
1.7
1.8
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.8
1.7
1.8
1.8
1.7
1.6
1.4
1.6
1.5
1.4
1.2
1.0
0.8
0.6
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.3
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.3
1.4
1.5
1.5
1.4
1.1
0.9
0.9
0.9
1.1
1.0
1.0
1.1
1.3
1.4
1.5
1.5
1.2
1.3
1.3
1.4
1.4
1.4
2.1
2.0
2.0
1.9
2.0
2.1
2.3
1.9
2.0
1.7
1.9
2.1
2.3
2.4
2.4
2.4
2.4
2.4
2.3
2.3
2.3
2.2
2.2
2.2
2.1
2.0
1.8
2.0
1.9
1.6
1.4
1.2
0.9
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.3
0.3
0.4
0.5
0.5
0.6
0.7
0.8
1.0
1.1
1.3
1.6
1.8
2.0
2.2
2.2
1.9
1.3
1.1
1.0
1.1
1.2
1.3
1.6
1.8
1.9
1.9
1.4
1.6
1.8
1.8
1.6
3.2
3.2
2.9
2.6
2.5
2.5
2.7
2.2
2.4
1.9
2.3
2.6
2.8
2.9
2.9
2.9
2.7
2.6
2.6
2.5
2.7
2.7
2.6
2.4
2.4
2.4
2.2
2.4
2.1
1.8
1.6
1.3
1.1
0.8
0.7
0.5
0.4
0.3
0.2
0.1
0.1
2.7
2.7
2.6
2.5
2.7
2.4
1" 4'-616 1.9
1.6
1.4
1.1
1.0
0.7
0.6
0.4
0.3
0.2
0.1
0.1
2.5
2.4
2.6
2.6
2.5
2.5
2.0
1.8
1.4
1.3
1.0
0.8
0.6
0.4
0.3
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.8
1.3
1.2
1.2
1.2
0.9
0.7
0.5
0.4
0.3
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
1.0
1.0
1.3
1.1
0.8
0.7
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
1.1
1.7
1.4
1.1
0.9
0.7
0.6
0.4
0.3
0.2
0.2
0.1
0.1
0.0
0.0
0.0
2.0
1.7
1.4
1.1
0.9
0.7
0.6
0.5
0.3
0.3
0.2
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.3
0.3
0.4
0.5
0.6
0.6
0.8
0.9
1.0
1.3
1.5
1.8
2.3
2.5
0.1
0.1
0.2
0.2
0.2
0.3
0.3
0.4
0.5
0.5
0.6
0.8
0.9
1.1
1.4
1.6
2.0
2.4
0.1
2.6
2.9
11'-813 16" 2.8
2.8
2.5
1.8
13'-83 8" 1.7
1.3
1.2
1.3
1.5
1.7
2.0
2.1
2.2
1.4
1.9
2.1
2.2
2.0
1.6
5.8
5.7
4.5
3.5
3.0
2.9
3.0
3.1
2.6
2.2
11'-5" 2.6
2.9
2.0
1.5
1.5
1.7
2.0
2.1
2.4
1.8
1.4
1.8
2.3
2.3
1.8
1.5
11.6
10.9
7.4
4.8
3.7
3.3
3.3
3.5
2.8
2.1
2.5
2.9
0.0
0.0
0.0
0.0
19.1
16.9
9.6
5.3
3.5
2.9
3.0
2.7
1.8
0.0
0.0
0.0
0.0 ROOM 0.0 CONTROL
0.0
0.0
19.1
16.9
9.7
5.3
3.6
3.1
3.2
3.4
2.3
0.0
0.0
0.0
0.0
0.0
10.6
10.1
6.8
4.4
3.4
3.1
3.4
3.6
2.4
0.0
0.0
0.0
2.7
C-01
0.2
0.2
0.2
0.3
0.3
0.4
0.5
0.6
0.7
0.9
1.0
1.2
1.5
1.7
2.0
2.4
2.8
2.8
2.7
2.5
2.0
1.7
1.7
0.1
0.2
0.2
0.2
0.3
0.4
0.4
0.6
0.7
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.5
2.5
2.2
2.2
2.1
0.2
0.2
0.3
0.3
0.4
0.5
0.6
0.8
1.0
1.2
1.4
1.6
1.7
1.8
1.8
1.9
2.1
2.2
2.3
2.3
2.3
1.8
2.1
1.9
0.0
0.0
2.1
2.3
2.5
0.0
0.0
2.4
2.5
0.0
0.0
0.0
0.3
WL-05 0.0
C-02 2.5
0.0
0.0
0.4
0.5
0.6
0.7
0.9
1.1
1.3
1.5
1.6
1.6
1.6
1.6
1.7
1.9
2.1
2.3
2.4
2.4
2.6
2.2
0.0
0.0
0.0
0.0
0.3
0.4
0.5
0.6
0.7
0.9
1.1
1.3
1.4
1.4
1.4
1.4
1.5
1.6
1.8
2.1
2.3
2.5
2.5
2.5
1.9
1.4
1.3
1.8
0.0
GROUND/ 812 BUS TIE
0.0
0.0
0.0
4.8
4.9
4.1
3.4
3.1
3.2
3.5
3.5
3.7
2.3
2.5
2.2
3.8
3.8
3.7
3.5
3.5
3.6
3.9
4.3
4.5
C-03
3.2
3.2
3.0
2.7
2.6
2.8
2.9
3.0
2.9
3.3
3.2
3.3
3.1
2.8
2.6
2.4
2.7
2.8
3.0
2.9
0.0
0.0
0.7
0.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
A-03
0.0
11'-1115" 16
B-02
15 KV - BUS#2
GROUND/ SPARE 5147 5111 VT2 BUS TIE
MOBILE/ 5100 SPARE
MOBILE/ SPARE
VT1 SS1 820
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.7
2.3
2.2
2.0
2.0
1.9
1.9
2.6
5.5
5.4
5.7
B-04
821
0.0
34.5 KV - BUS#1
B-01
2 TRF
3.7
4.0
3.6
2 TRF
5.4
A-04
0.0
B-03
1" 17'-102 4.4
3.5
2.8
2.6
2.5
2.0
1.7
1.3
1.1
0.8
0.6
0.5
0.4
0.3
0.2
0.1
0.6
0.7
0.8
1.0
1.1
1.2
1.2
1.2
1.3
1.4
1.5
1.8
2.0
2.2
2.3
2.3
2.3
1.6
1.7
2.2
2.2
2.4
2.4
2.9
3.0
3.1
3.1
3.3
3.6
4.0
4.3
4.5
4.1
4.3
2.8
2.9
2.6
2.5
2.4
2.3
2.3
2.3
3.2
6.3
6.0
6.2
5.8
4.7
4.0
3.1
3.1
2.6
2.1
1.6
1.3
1.1
0.9
0.7
0.5
0.4
0.3
0.2
0.2
0.5
0.6
0.7
0.8
0.9
0.9
1.0
1.0
1.1
1.1
1.2
1.5
1.7
2.0
2.1
2.1
2.1
1.6
1.7
1.9
2.0
2.1
2.0
2.4
2.5
2.7
3.0
3.2
3.6
4.2
4.6
4.9
4.5
4.7
3.0
3.1
3.1
2.9
2.8
2.8
2.9
2.8
3.4
6.2
6.8
6.7
6.2
5.3
4.3
3.4
3.2
2.6
2.0
1.6
1.3
1.0
0.8
0.6
0.5
0.4
0.3
0.2
0.2
0.5
0.6
0.7
0.7
0.8
0.8
0.9
0.9
1.0
1.2
1.4
1.6
1.7
1.8
1.7
1.4
1.6
1.7
1.7
1.7
1.9
2.1
2.2
2.5
2.8
3.2
3.7
4.2
4.8
5.2
4.9
5.0
3.4
3.5
3.5
3.4
3.2
3.4
3.4
3.5
3.4
7.2
7.2
7.4
6.7
5.6
4.5
3.5
3.2
2.6
2.0
1.5
1.2
1.0
0.8
0.6
0.5
0.4
0.3
0.2
0.2
0.5
0.6
0.6
0.7
0.7
0.8
0.8
1.0
1.1
1.3
1.4
1.4
1.4
1.2
1.3
1.4
1.4
1.4
1.6
1.8
2.0
2.3
2.7
3.3
3.9
4.4
5.1
5.6
5.5
5.4
4.1
4.2
4.2
4.0
3.7
3.7
4.1
4.2
4.2
7.8
8.3
8.4
7.4
5.9
4.6
3.5
3.1
2.4
1.8
1.4
1.1
0.9
0.7
0.6
0.4
0.3
0.3
0.2
0.2
0.5
0.5
0.6
0.6
0.7
0.8
0.9
1.0
1.1
1.1
1.1
1.0
1.1
1.1
1.1
1.1
1.3
1.5
1.8
2.1
2.6
3.1
3.9
4.6
5.5
6.1
6.1
6.0
4.9
5.0
4.9
4.3
4.1
4.1
4.7
5.0
5.1
8.7
9.3
9.1
7.8
6.1
4.6
3.4
2.8
2.1
1.6
1.2
1.0
0.8
0.6
0.5
0.4
0.3
0.2
0.2
0.1
0.4
0.5
0.5
0.6
0.7
0.7
0.8
0.9
0.9
0.8
0.9
0.8
0.8
0.9
1.0
1.3
1.6
2.0
2.5
3.1
3.8
4.8
5.9
6.6
6.5
6.4
5.6
5.8
5.5
4.5
4.3
4.4
5.3
5.7
5.8
8.7
9.5
9.2
7.8
6.0
4.6
3.3
2.5
1.8
1.4
1.1
0.9
0.7
0.6
0.5
0.4
0.3
0.2
0.2
0.1
0.4
0.4
0.5
0.5
0.6
0.6
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.9
1.1
1.4
1.8
2.4
3.0
3.8
5.0
6.4
7.5
7.5
6.9
5.9
6.1
5.8
4.5
4.3
4.4
4.8
6.1
5.9
8.7
9.4
9.0
7.5
5.9
4.5
3.2
2.3
1.7
1.2
1.0
0.8
0.6
0.5
0.4
0.3
0.3
0.2
0.2
0.1
0.3
0.4
0.4
0.5
0.5
0.5
0.5
0.5
0.5
0.6
0.6
0.7
0.9
1.2
1.6
2.2
2.9
3.8
5.1
6.8
8.2
8.5
7.9
5.5
5.5
4.8
0.0
0.0
0.0
0.0
5.3
5.4
8.3
9.0
8.8
7.5
5.7
4.2
3.1
2.3
1.6
1.2
0.9
0.7
0.6
0.5
0.4
0.3
0.2
0.2
0.2
0.1
0.3
0.4
0.4
0.4
0.4
0.4
0.4
0.5
0.5
0.6
0.8
1.0
1.4
1.9
2.8
3.9
5.3
7.0
8.5
9.1
8.6
5.2
5.2
4.7
0.0
0.0
0.0
0.0
4.9
5.2
7.4
8.1
8.1
7.0
5.3
3.9
2.9
2.3
1.6
1.2
0.8
0.7
0.5
0.4
0.4
0.3
0.2
0.2
0.1
0.1
0.3
0.3
0.3
0.4
0.4
0.4
0.5
0.6
0.7
0.9
1.2
1.8
2.7
3.9
5.2
6.7
8.3
9.0
8.8
5.1
5.1
4.6
0.0
0.0
0.0
0.0
4.9
5.1
6.3
6.8
7.0
6.2
4.9
3.7
2.8
2.2
1.6
1.1
0.8
0.6
0.5
0.4
0.3
0.3
0.2
0.2
0.1
0.1
0.3
0.3
0.3
0.4
0.4
0.5
0.7
0.9
1.3
1.8
2.7
3.8
5.1
6.8
8.3
8.9
8.4
5.2
5.2
4.6
0.0
0.0
0.0
0.0
4.9
5.2
5.5
5.6
5.8
5.3
4.4
3.4
2.6
2.1
1.6
1.1
0.8
0.6
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.3
0.4
0.4
0.5
0.7
0.9
1.3
1.9
2.6
3.5
4.8
6.5
7.8
8.2
7.6
5.7
5.8
5.4
4.0
3.7
3.8
4.2
5.6
5.7
4.5
4.9
4.9
4.4
3.7
3.1
2.4
1.9
1.4
1.0
0.7
0.5
0.4
0.3
0.3
0.2
0.2
0.1
0.1
0.1
0.4
0.5
0.7
0.9
1.4
1.9
2.6
3.4
4.5
5.9
6.9
7.0
6.5
5.3
5.4
5.1
4.0
3.7
3.8
4.8
5.3
5.4
3.9
4.2
4.1
3.8
3.1
2.6
2.2
1.7
1.3
0.9
0.6
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.7
0.9
1.4
1.9
2.4
3.2
4.1
5.1
5.8
5.9
5.7
4.5
4.6
4.4
4.0
3.4
3.5
4.2
4.5
4.6
3.4
3.6
7'-0"
0.5
3.4
19'-315 16"
19'-0"
18'-8" 0.4
3.3
A-02
A-01 0.2
1" 11'-112
PL-01 2.9
6'-55 8"
0.1
1" 6'-816
0.1
8'-3"
0.0
7'-53 8"
N
3.5
3.2
2.7
2.2
1.8
1.4
1.1
0.8
0.6
0.4
0.3
0.2
0.2
0.2
0.1
0.1
0.1
0.1
1.3
1.8
2.3
3.0
3.6
4.3
4.9
5.0
4.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.9
3.0
3.0
2.7
2.4
1.9
1.5
1.2
0.9
0.7
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
2.1
2.6
3.0
3.7
4.2
4.3
4.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.5
2.6
2.5
2.3
2.0
1.6
1.3
1.0
0.8
0.6
0.5
0.3
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
2.6
3.2
3.5
3.6
3.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.1
2.2
2.1
2.0
1.7
1.4
1.1
0.9
0.7
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
2.7
3.0
3.1
3.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.8
1.8
1.8
1.7
1.4
1.2
1.0
0.8
0.6
0.5
0.3
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.0
2.6
2.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.5
1.6
1.5
1.4
1.2
1.0
0.9
0.7
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.3
1.3
1.3
1.2
1.1
0.9
0.7
0.6
0.5
0.3
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.1
1.1
1.0
1.0
0.9
0.8
0.7
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.9
0.9
0.8
0.8
0.8
0.7
0.6
0.4
0.3
0.3
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.8
0.7
0.7
0.7
0.7
0.6
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.7
0.6
0.6
0.6
0.6
0.5
0.4
0.3
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.6
0.5
0.5
0.5
0.5
0.4
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.4
0.4
0.3
0.3
0.2
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.3
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.2
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
73-DD-023-001 73-0006-009 SH 002 - 003 73-0002-001 73-0003-001 73-0006-010
YARD LIGHTING CALCULATION YARD LIGHTING DETAILS GENERAL ARRANGEMENT SITE PLAN YARD LIGHTING WIRING DIAGRAM
WL-01
TILT KEY
LEGEND:
180°
BASELINE EAST/WEST
WL-02
PL-02
6'-5"
REFERENCE DRAWINGS:
NEW FENCE LINE NEW STEEL LIGHTING POLE
PL-03 90°
ANIMAL FENCE LINE
WL-03
CENTER LINE
RL/IDOM
APP
LG/IDOM
CK DESCRIPTION REV
DATE
BY
RL/IDOM LG/IDOM
IFR - ISSUED FOR REVIEW
08/29/2025
IFA - ISSUED FOR APPROVAL
0-0A
IDOM Engineering PLLC 330 Second Ave S.-Suite 600 Minneapolis, MN 55401 USA
0-0B
10/24/2025
DR/IDOM
RL/IDOM
DR/IDOM
RL/IDOM
DR/IDOM
LG/IDOM
02/06/2026
12/19/2025 IFC - ISSUED FOR CONSTRUCTION
IFP - ISSUED FOR PERMITTING 0-1
0-0
DR/IDOM
LG/IDOM
PROPERTY LINE
YARD LIGHTING SCHEDULE "POLE ITEM MARK"
"MOUNTING DETAILS"
"TILT (DEGREES)"
PANEL/CCT
LUMINAIRE
LABEL
MOUNTING
"MOUNTING HEIGHT"
PL-01
PAA
POLE
25'-0"
PAM
L01
10
AC1-CCT 109
PL-02
PAB
FIREWALL
23'-0"
-
L02
0
AC1-CCT 109
PL-03
PAB
FIREWALL
23'-0"
-
L02
0
AC1-CCT 109
WL-01
PAC
FIREWALL
22'-0"
-
L02
10
AC1-CCT 113
WL-02
PAC
FIREWALL
22'-0"
-
L02
10
AC1-CCT 113
WL-03
PAC
FIREWALL
22'-0"
-
L02
10
AC1-CCT 113
WL-04
PAC
FIREWALL
22'-0"
-
L02
10
AC1-CCT 113
WL-05
PAC
"CONTROL ROOM BLDG,"
10'-0"
-
L02
10
AC2-CCT 219
C-01
KLK
"CONTROL ROOM BLDG,"
10'-0"
-
-
0
AC2-CCT 219
C-02
KLK
"CONTROL ROOM BLDG,"
10'-0"
-
-
0
AC2-CCT 219
C-03
KLK
"CONTROL ROOM BLDG,"
10'-0"
-
-
0
AC2-CCT 219
A-01
KLK
"SWITCHGEAR 34.5KV BLDG,"
11'-0"
-
-
0
AC2 CCT 221
A-02
KLK
"SWITCHGEAR 34.5KV BLDG,"
11'-0"
-
-
0
AC2 CCT 221
A-03
KLK
"SWITCHGEAR 34.5KV BLDG,"
11'-0"
-
-
0
AC2 CCT 221
A-04
KLK
"SWITCHGEAR 34.5KV BLDG,"
12'-0"
-
-
0
AC2 CCT 221
B-01
KLK
"SWITCHGEAR 12.5KV BLDG,"
11'-0"
0
AC2 CCT 222
KLK
"SWITCHGEAR 12.5KV BLDG,"
11'-0"
0
AC2 CCT 222
KLK
"SWITCHGEAR 12.5KV BLDG,"
11'-0"
0
AC2 CCT 222
KLK
"SWITCHGEAR 12.5KV BLDG,"
12'-0"
B-02
INFO
0°
B-03 B-04
STATISTICS DESCRIPTION MAX
SIMBOL
AVG,
MAX,
MIN.
MAX,/MIN.
AVG./MIN,
NORTH SIDE YARD
+
2.4 fc
21.3 fc
0.1 fc
213.0:1
24.0:1
ROADWAY
+
2.8 fc
8.8 fc
0.6 fc
14.7:1
4.7:1
SOUTH SIDE YARD
+
3.1 fc
9.2 fc
0.4 fc
23.0:1
7.8:1
"WORKING ZONE TRANSFORMER"
+
4.9 fc
6.2 fc
6.2 fc
1.8:1
1.4:1
YARD LIGHTING SCHEDULE SYMBOL
-
-
-
-
-
-
-
-
LABEL
KLK
PAC
PAB
PAA 0
AC2 CCT 222
QTY.
11
5
2
1
CATALOG NUMBER
DESCRIPTION
" LITHONIA LIGHTING WDGE2 LED P2 27K 70CRI T4M"
WDGE2 LED WITH P2 PERFORMANCE PACKAGE, 2700K, 70CRI, TYPE 4 MEDIUM OPTIC
"HOLOPHANE HEXF1 P2 4K T3M FG"
EXPLOSION PROOF LED LOW BAY & FLOOD, P2 PERFORMANCE PACKAGE. 4000K CCT, TYPE V DISTRIBUTION, DIFFUSED GLASS LENT
"HOLOPHANE MGLEDM P11 40K WR"
WIDE ROAD WALL MOUNTED LIGHTING LUMINARIES, MONGOOSE MEDIUM, P11, 4000K
"HOLOPHANE RL1.1LA083.NR.G "
R-LINE STREETLIGHTING LUMINARIES
LAMP
LED
LED
LED
LED
"NUMBER LAMPS"
"LUMENS PER LAMP"
LLF
1
1,836
1.00
1
1
1
5,050
9,641
11,064
1.00
1.00
1.00
WATTAGE
19
WL-04
BASELINE NORTH/SOUTH
EXISTING POLE
40
60
60
0
5
10
15 20 SCALE: 3 32"=1'-0"
ANSI D 2/6/2026
LOGO
2.
WORK LIGHTING CONTROL OPTIONS ARE ON / OFF.
3.
FIRE WALL YARD LIGHTS AND ROAD LIGHT CONTROLLED WITH PHOTOCELL.
0.0
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
LIGHTING CALCULATIONS WERE PERFORMED USING VISUAL 2020, VERSION R2.
40
INSTALL PE STAMP
1.
30
RG&E AVANGRID
YARD LIGHTING AND SECURITY PLAN SH 001 OF 003 SUBSTATION 73 BY
MT/IDOM
3/32"=1'-0"
CK
LG/IDOM RL/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
ROCHESTER, NY FILE: 73-0006-009 SH 001_For Permitting.dwg REV
73-0006-009 SH 001 0-1
E-E
B-B
73-0006-009 SH 003
THIS SHEET
BILL OF MATERIAL FOR 73-0006-009 SH 002 & SH 003 QTY,
MARK
36'-8"
D-D 73-0006-009 SH 003
WAJ
WAJ WAJ
PAA
PAE
19'-0"
PAD
WAB
WAB
PAA
1
R-LINE STREETLIGHTING LUMINAIRE
PAB
2
WIDE ROAD WALL MOUNTED LIGHTING LUMINAIRE WITH UNIVERSAL MOUNT
HOLOPHANE MGLEDM P2 40K WR
PAC
4
EXPLOSION PROOF LED LOW BAY & FLOOD, P2 PERFORMANCE PACKAGE, 4000 CCT, TYPE V DISTRIBUTION, DISFFUSED GLASS LENS
HOLOPHANE HEXF1 P2 4K P5M FG
PAD
6
HOFFMAN ENCLOSURE, 6'' X 4'' X 4'', NEMA 12/3R/4/4X, SOLID COVER, HINGED
HOFFMAN A6044CHNFSS
PAE
4
ENCLOSURE, 12"x12"x6", HINGED COVER, NEMA 3R, W/MOUNTING PANEL, INTERNAL PANEL 12x12
HOFFMAN A12R126HCR A12N12P
PAM
1
ROUND TAPERED STEEL POLE
HOLOPHANE #RTS2559B
BFA
450 FT
CONDUCTOR. WIRE, #10 SOOW PORTABLE CORD, 3/C BLACK/WHITE/GREE
SOUTHWIRE
WAB
400 FT
CONDUIT, RGS, 2" SCHEDULE 40
CARLON BY DESCRIPTION
WAC
2
2" CONDUIT FITTING RGS, 90 BEND, SCHEDULE 40
CARLON
WAD
110
RIGID CONDUIT. 2" STEEL STRAP, PUSH-ON STYLE
RACO 2088
WAG
21
CONDUIT FITTING, SEALING LOCKNUT, FOR 2"
GARVIN LNS-200
WAH
21
CONDUIT FITTING, INSULATED BUSHING, FOR 2" CONDUIT SCHEDULE 40
GARVIN IBT-200
WAI
21
2" RGS WATERTIGHT HUB
MYERS STG6
WAJ
8
LB RIGID/EMT 2" COVER/GASKET ALUMINUM
THOMAS&BETTS CILBA2
° PAB BFA PAD
PAD WAI
WAI
WAD WAB
WAD
WAB
℄ TRANSFORMER FOUNDATION
WAB
25'-2"
25'-0"
22'-7"
PAD
PAE
22'-7"
PAE
PAD
22'-0"
PAB
PAM
REFENCE HOLOPHANE RLI,1,LA083,NR,G
PAC
PAB
PAC
10
PAC
10°
℄ TRANSFORMER FOUNDATION
WAJ
PAD
6'-5"
10
°
WAJ
DESCRIPTION
WAB
PAE PAC
PAC
A-A THIS SHEET
PAD
7'-0"
YARD LIGHTING WIRING HAND-HOLE
73-0006-009 SH. 001
WAJ WAJ
DETAIL STEEL POLE MOUNTING PERIMETER LIGHTING ONLY
F-F
C-C
73-0006-009 SH 003
THIS SHEET
L02 73-0006-009 SH. 001
1/4"=1'-0"
A-A
DETAIL FIRE WALL LUMINAIRES MOUNTING DETAIL
THIS SH.
APP CK
PAB
BY
BFA
BFA
WAI WAG WAH
PAD
DATE
PAD
WAD
WAD
WAB
WAB
WAI WAG WAH
73-0006-009 SH 001 73-0006-010 73-0006-009 SH 003
22'-0"
DESCRIPTION
RL/IDOM IGT/IDOM
REV
RL/IDOM IGT/IDOM
08/29/2025 MAS/IDOM IFR - ISSUED FOR REVIEW
11/24/2025 MAS/IDOM IFA - ISSUED FOR APPROVAL
0-0A
RL/IDOM
6'-5"
PAB
IDOM Engineering PLLC 330 Second Ave S.-Suite 600 Minneapolis, MN 55401
0-0B
RL/IDOM
LG/IDOM IFC - ISSUED FOR CONSTRUCTION 0-0
LG/IDOM IFP - ISSUED FOR PERMITTING 0-1
12/19/2025 MAS/IDOM
VIEW A-A LATERAL FIREWALL LIGHTING MOUNTING DETAIL SCALE: 1/4"=1'-0"
SCALE=3/16"=1'-0"
19'-0"
02/06/2026 MAS/IDOM
1'-6"
PAE
WAJ
L01
PAE
1'-6"
FINISH GRADE
WAI
WAI
WAC
WAC
CONCRETE PIER
0
WAI
5
YARD LIGHTING AND SECURITY PLAN YARD LIGHTING WIRING DIAGRAM YARD LIGHTING DETAILS
10
15 SCALE: 3 16"=1'-0"
WAI
INFO
WAJ WAB
PAE
WAD
WAJ
WAJ
WAB
WAD
WAG WAH WAI
0
5
10
15 SCALE: 1 4"=1'-0"
20
30
WAJ
INSTALL
WAJ
ANSI D 2/6/2026
B-B LOGO
30
PAE
WAI WAJ
20
THIS SH.
VIEW B-B OUTSIDE FIREWALL LUMINAIRE MOUNTING DETAIL SCALE: 1/4"=1'-0"
C-C THIS SH.
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
PE STAMP
VIEW C-C OTSIDE FIREWALL LUMINAIRE MOUNTING DETAIL
RG&E AVANGRID
YARD LIGHTING DETAILS SH 002 OF 003
1/4"=1'-0"
STATION 73 BY
MAS/IDOM
AS NOTED
CK
IGT/IDOM RL/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
ROCHESTER, NY FILE: 73-0006-009 SH 002_For Permitting.dwg REV
73-0006-009 SH 002 0-1
PAB
°
PAC
PAC
10
°
10
PAC
10°
BFA PAD
BFA
PAD WAI
WAI
BFA
PAD
PAD
WAI
WAI WAD
WAD
WAD
25'-2"
WAB
22'-0"
WAB
WAB WAB
WAD
WAD
WAI WAI
1" 4'-1116
WAI
WAJ
PAE
WAJ
1'-6"
PAE
1" 4'-1116 WAD
WAI
WAB
PAE
PAE
WAJ
WAJ
D-D 73-0006-009 SH 002
E-E
VIEW D-D FIREWALL LIGHTING
73-0006-009 SH 002
1/4"=1'-0"
IGT/IDOM 08/29/2025 MAS/IDOM
CK
IGT/IDOM 11/24/2025 MAS/IDOM
WAI
WAB
WAG
BFA WAI
WAH
WAG WAH
PAD BY
LG/IDOM
PAC
PAD WAD WAD
DATE
LG/IDOM
12/19/2025 MAS/IDOM
BFA
02/06/2026 MAS/IDOM
1/4"=1'-0"
APP
RL/IDOM
RL/IDOM
RL/IDOM
RL/IDOM
PAC
VIEW E-E FIREWALL LIGHTING
IFP - ISSUED FOR PERMITTING
IFC - ISSUED FOR CONSTRUCTION
IFA - ISSUED FOR APPROVAL
IFR - ISSUED FOR REVIEW
DESCRIPTION
0-1
0-0
0-0B
0-0A
REV
1.
BILL OF MATERIALS IN 73-0006-009 SH 002
REFERENCE DRAWINGS:
WAB
73-0006-009 SH 001 73-0006-010 73-0006-009 SH 002
YARD LIGHTING AND SECURITY PLAN YARD LIGHTING WIRING DIAGRAM YARD LIGHTING DETAILS
IDOM Engineering PLLC 330 Second Ave S.-Suite 600 Minneapolis, MN 55401
WAD
WAD
WAB
PAE
WAI
WAJ
0
5
10
15 SCALE: 3 16"=1'-0"
WAG
20
30
INFO
WAH
0
F-F 73-0006-009 SH 002
5
15 SCALE: 1 4"=1'-0"
VIEW F-F FIREWALL LIGHTING
20
30
INSTALL
1/4"=1'-0"
AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
RG&E AVANGRID
ANSI D 2/6/2026
PE STAMP
LOGO
10
YARD LIGHTING DETAILS SH 003 OF 003 STATION 73 BY
MAS/IDOM
AS NOTED
CK
IGT/IDOM RL/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
08/29/2025
ROCHESTER, NY FILE: 73-0006-009 SH 003_For Permitting.dwg REV
73-0006-009 SH 003 0-1
E1
E1´
SWITCHGEARS TOP 19' - 5 3/4" CONTROL HOUSE TOP 16'-1 11/16'"
SWITCHGEAR LEVEL 3'-6" CONTROL ROOM LEVEL 0'-8" GROUND LEVEL 0'-0"
E01
LONGITUDINAL INTERIOR ELEVATION SCALE:1/8"=1'-0"
E2
E2´
FIREWALL TOP 25'-7"
SWITCHGEARS TOP 19'-5 5/16"
25'-7"
CONTROL HOUSE TOP 16'-0 3/4"
FENCE TOP 9'-0"
APP CK BY DATE
TRANSVERSAL INTERIOR ELEVATION SCALE:1/8"=1'-0"
DESCRIPTION
E02
REV
RL/IDOM IGT/IDOM
RL/IDOM IGT/IDOM
02/20/2026 HSC/IDOM IFP - ISSUED FOR PERMITTING
10/24/2025 HSC/IDOM IFA - ISSUED FOR APPROVAL
0-1
CONTROL ROOM LEVEL 0'-8" GROUND LEVEL 0'-0"
IDOM Engineering PLLC 330 Second Ave S.-Suite 600 Minneapolis, MN 55401
0-0B
IGT/IDOM
RL/IDOM
IGT/IDOM
IFC - ISSUED FOR CONSTRUCTION 0-0
12/19/2025 HSC/IDOM
IFP - ISSUED FOR PERMITTING 0-0
02/12/2026 HSC/IDOM
RL/IDOM
SWITCHGEAR LEVEL 3'-6"
5
10
INFO
0
15 20 SCALE: 18"=1'-0"
30
INSTALL AVANGRID ENGINEERING CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION Property of AVANGRID
RG&E AVANGRID
ANSI D 2/20/2026
LOGO
PE STAMP
PERMITING ELEVATIONS
STATION 73 HSC/IDOM
1/8"=1'-0"
CK
IGT/IDOM RL/IDOM
NO.
APP
REV
DESCRIPTION
DATE
BY
CK
APP
ROCHESTER, NY
BY
08/29/2025
PERMITTING ELEVATIONS.dwg REV