WEBSTER PLANNING BOARD MINUTES
Webster Town Board Meeting Room 1002 Ridge Road
7:00 p.m.
5 May 2026
ABSENT:
Anthony Casciani, Chairman Dave Malta, Vice Chairman
Mark Giardina, Secretary
Peggy Maltman
Derek Anderson
Drazen Gasic
Sven Vetter
Katherine Kolich, Recording Secretary
Josh Artuso, Director of Community Development
Erika Corsi, Town Planner
Frank Ciardi, Attorney
Okay, it’s 7:00 here and we will get started here. Welcome to the Planning
Board meeting of May 5, 2026. We have 5 items on the agenda this evening with two
administrative matters. The first item on the agenda is 7 Brew the coffee operation they have
coming in but that has been tabled. They have to complete some more work before they do
come in so that particular one is tabled. Anyone that is here for that.
Pledge of Allegiance/Roll Call
Summary overview of outcome:
TABLED MATTERS
:
1. 7BREW-HARD RD
DOUG BEACHEL
APPLICATION WILL BETABLED TO JUNE 2, 2026. MEETING
PENDING RECEIPTOF TRAFFIC STUDY AND STORMWATER POLLUTION
PREVENTION PLAN. (SWPPP)
SCHEDULED MATTERS
:
2. PUBLIC STORAGE SIGN
KIRK WRIGHT AND MELISSA DRISKELL
APPROVED WITH CONDITIONS:
Easterly wall-mounted sign totaling 46.71 SF to be removed.
3. FINGER LAKE FEDERAL CREDIT UNION SIGN
ERIC BAKER
APPROVED WITH CONDITIONS:
Building number shall be added to the wayfinding sign EG-3.2 Side A.
Pg. 122 May 5, 2026 Planning Meeting
®
4. BLOOM & BLEND SIGN
ALYSSA CONNORS
TABLED TO JUNE 2, 2026
5. BELLA TERRA PHASE 3
TOM THOMAS/REPRESENTING AGENT MICHAEL MONTALTO
APPROVED AS PRESENTED
6. VERIZON WIRELESS CELL TOWER “WEBSTER NORTH”
ROBERT BURGDORF
FEEDBACK PROVIDED:
Planning Board requests the Town to hire 3" party RF Engineer for independent
review of Verizon’s gap coverage analysis
( Mark Giardina read each application into the record)
7-BREW: Located at Hard Road. Applicant Brew Team NY, LLC/Doug Beachel is requesting
PREMILINARY SITE PLAN APPROVAL (
PUBLIC HEARING
) in association with the
development of a 510 SF prefabricated double drive through only coffee stand on a 0.73-acre parcel
having SBL# 079.15-1-1.313 located in the HC High Intensity District under Sections 269-11 and
350-19 under the Code of the Town of Webster.
** APPLICATION WILL BE TABLED TO JUNE 2, 2026, MEETING PENDING
RECEIPT OF TRAFFIC STUDY AND STORMWATER POLLUTION PREVENTION
PLAN (SWPPP)**
Located at 665 Phillips Road. Applicants Kirk Wright and Melissa
Driskell are requesting SIGN APPROVAL associated with the installation of one (1) 43.6 SF
freestanding monument sign, and two (2) wall signs one at 46,7) SF and one at 6 SF on a 5.6-acre
parcel having SBL# 065.03-1-38 located in the IN Industrial District under Section 265-7 of the
Code of the Town of Webster.
Appearing before the board was Kirk Wright with Sign & Light Services. I am here for Public
Storage. Basic sign package and everything complies with town code. We are doing a small
monument sign out front and we are just doing a small 6 sq ft sign to identify the office and then
47 sq ft building mounted sign that will face Phillips Road.
The building sign is not illuminated. Flat cut letters on an aluminum panel. The office sign in
not illuminated and the monument sign I believe will have up lighting but not internally
illuminated.
Will the monument sign have a numerical number on it? And how big is that
number going to be so you can see it from the street.
Pg. 123 May 5, 2026 Planning Meeting
665 is identified and it is on the drawing. Let me see if it was a 6 inch or an 8 inch
letter.
6 inch.
Is the sign on the building, the 6 x 8 sign. You have the monument sign out
front and your putting one on the building too.
This 1s actually way toned down from what corporate usually does for public
storage. Usually there is an orange stripe continuous around the building. This is....again, we are
well below the square footage of what is allowed for us.
So, the owner of the building must have changed to storage because this when
it originally came in, we have a very specific fagade on the outside with the fake window and the
arches and this....you know, I agree with Tony and I’m sure the sign on the building is not
necessary because it covers up one of the architectural features that was really put in there as a
condition of approval of the original storage buildings to make it look more attractive for the
neighborhood. So, it’s blocking one of those fake windows. It was there for a purpose. I
wouldn’t think you would need the sign on the building itself with that monument sign right out
by the road.
I do have Cory here and he is with Public Storage, and he can speak better to the
corporate identifying the criteria.
I am the Public Storage Management Department. I oversee all of New York State.
The FCO sign here on the back is pretty typical of our brands and standards. I heard one of the
board members state that there was a concession with the previous owner about the arches of the
architectural element. Given the square footage requirements and your concern with the
architectural, if there was a compromise pertaining to placement, maybe we could find a happy
medium, we would present that to the members of the board.
Well, in my opinion, I don’t think it is necessary. I mean, you have the sign
right out in front. Which is a good looking sign, and it serves the purpose and over the door, I can
see that sign okay but the one on the building, as Derek just said, that was one of the things that
we went through when the gentleman came in for that site was to create that stone affect. The
pillars and so on and so forth. This doesn’t need a variance either, does it.
No
Does anyone have any thoughts on it.
The monument sign itself I think would suffice and I don’t know how the rest of
you feel.
Pg. 124 May 5, 2026 Planning Meeting
Board members all agreed.
Alright, the other signs I don’t see an issue with but again, with the sign out
by the road, the monument signs says it all right out there and I really don’t believe the one on
the building....it actually detracts from the building looking at the photograph here.
Okay, we will make that revision.
And we went through and I know that’s your logo but and like I said in other
meetings also......you know, McDonalds use to have an arch...they don’t know how to make
hamburgers without the arch, you know what I mean. They still sell them so.... I prefer the sign
taken off the building, off the face of the east side.
Understood.
Just for clarification, if we move forward on it, are you willing to take the sign
off the building?
Yes, if that is the requirement by your town, absolutely.
Derek Anderson:
The Town of Webster Planning Board considered the request by Applicant Kirk Wright and
Melissa Driskell to install one (1) 43.6 SF freestanding monument sign, one 46.71 SF wall singe
and one 6 SF wall sign for Public Storage located at 665 Phillips Road on a 5.6-acre parcel having
SBL# 065.03-1-38, in the IN Industrial District.
The Planning Board classifies the proposed action to be a Type II Action under Section
617.5(c)(2) of the State Environmental Review (SEQR) Regulations and therefore is not subject
to further review.
RESOLUTION 26-017 Derek Anderson made a motion for TYPE II
SEQR which was seconded by Mark Giardina.
VOTE:
Mr. Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Pg. 125 May 5, 2026 Planning Meeting
Drazen Gasic:
Public Storage
WHEREAS the Town of Webster Planning Board (the “Planning Board”) has received an application
from Kirk Wright and Melissa Driskell (the “Applicants”) seeking Sign Approval associated with the
installation of the following signage on a 5.6-acre parcel identified as SBL# 065.03-1-38, located in
the IN Industrial District, at/near 665 Phillips Road, Town of Webster, New York, pursuant to Section
265-7 of the Code of the Town of Webster:
One (1) freestanding monument sign with a sign area of 43.6 square feet;
One (1) wall sign with sign areas of 6 square feet, respectively;
*WHEREAS, the Planning Board reviewed the application materials and plans submitted by the
Applicants, including the sign drawings titled Drawing No. 040126-R2 dated 04/01/26, and associated
supporting information, as presented to the Planning Board; and
WHEREAS, the Planning Board conducted its review of the proposed signage for compliance with
applicable provisions of the Code of the Town of Webster, including but not limited to § 265-7 , and
evaluated the proposal with respect to compatibility with the site, surrounding area, traffic safety, and
overall community character; and*
WHEREAS, atter due deliberation, the Planning Board finds that the proposed signage, as presented, is
acceptable and consistent with the intent of the Town’s sign regulations, subject to the conditions set forth
herein;
NOW, THEREFORE, BE IT RESOLVED that the Town of Webster Planning Board
hereby APPROVES the Applicants’ request for Sign Approval for the Public Storage property.
RESOLUTION 26-018 Drazen Gasic made a motion for PUBLIC
Located at 665 Phillips
Road. Applicants Kirk Wright and Melissa
Driskell are requesting SIGN APPROVAL
associated with the installation of one (1) 43.6
SF freestanding monument sign, and two (2)
wall signs one at 46.71 SF and one at 6 SF ona
5.6-acre parcel having SBL# 065.03-1-38
located in the IN Industrial District under
Section 265-7 of the Code of the Town of
Webster which was seconded by Mark
Giardina.
CONDITIONS:
e Easterly wall-mounted sign totaling 46.71 SF to be removed
VOTE:
Mr. Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Pg. 126 May 5, 2026 Planning Meeting
Okay you are all set. Thanks for taking that down. I think it keeps the
building looking nice.
FINGER LAKE FEDERAL CREDIT UNION SIGN: Located at 1055 Hatch Road. Applicant
Eric Baker is requesting SIGN APPROVAL associated with the installation of one (1) 66.8 SF
freestanding monument sign, and two (2) wall signs at 58.6 SF on a 2.26-acre parcel having SBL#
079.17-1-78.001 located in the MC Medium-Intensity Commercial District under Section 265-7 of
the Code of the Town of Webster.
Appearing before the board was Steve Stanley and I am here on behalf of Eric Baker working for
Vital Signs at 764 Ridge Road here in Webster. As the gentleman stated, we are proposing both
two wall mounted signs and a monument sign. The wall mounted sign will be front lit, illuminated
channel letters that will be mounted to an aluminum constructed shoe box cabinet, mounted directly
to the building. The icon is to be pushed through the acrylic on both of the building mounted signs.
The free standing sign will also be aluminum constructed cabinet with routed faces for the text and
pushed through acrylic for the icon.
Anybody, any...this is pretty typical for this type of an operation, having the
drive through signs and exit signs and so on.
The monument sign, is it is fixed sign? It doesn’t scroll or anything.
Correct.
The site plan, at least the version that I have, doesn’t’ show the setbacks from the
road. We need to make sure it meets the minimum 25 feet from both property lines since you are
at the corner.
Also add the address on that sign also.
For the design as provided to me the monument sign does not have the address on
there. Is that going to be a requirement.
Yes, that would be a requirement.
I would imagine I will have to get more details if that is a requirement to place that
on the sign. What is your recommendation for that.
My thinking is simple, down low. If you got snowed in or landscaped, then you
wouldn’t see it anyways but if you just had a small arch way at the top of it maybe.
What about if the sign is perpendicular to the road, having it on that front facing
part here, if your looking at the site plan on the part of the sign to the right.
Pg. 127 May 5, 2026 Planning Meeting
I would just like to bring to the boards attention that this particular property was
assigned a Hatch Road address, so I am not quite sure how the numbers fit with the existing
addresses along Ridge Road.
It has a Hatch Road address?
Oh, because the driveway goes out to Hatch Road.
Well, that messes it up. Any suggestions then? Then, just don’t bother putting
anything on there.
I think it would cause confusion.
How about on the building itself.
Unfortunately, I cannot speak to the fact that there are planning to have numbers on
the building if that would be the board concession I can take that feed back to the client and see
how they feel about that. I think that would be an easy concession.
Is there room on the small e.g. 3.2 side. Right at the entrance, it’s a directional
sign.
The e.g. 3.2?
Yeah. It’s the directional sign when you come in off of Hatch Road.
I think that would also be a very easy concession.
What are you talking Derek?
So, on the site plan, see down off the driveway coming off of Hatch Road. The
sign that €.283,20-.
It’s on the....you guys have the sign package. It would be the smaller directional
sign.
That would probably be as good as we can get.
Yes, I do believe if we were to put the address on the monument it would definitely
cause confusion which might cause some congestion with traffic and quick turn arounds and such.
There are two 3.2 s, you probably want to clarify which one. The lobby drive thru or
the access.
Pg. 128 May 5, 2026 Planning Meeting
Well, it would be the one that is right at the entrance going in there.
Oh, I see what your talking about. There is a sign A and a sign B. So, we would
want it on sign A.
Yes, that would be the best directional way of finding placement for that for sure.
Derek Anderson:
The Town of Webster Planning Board considered the request by Applicant Eric Baker to install
one (1) 66.8 SF freestanding monument, two 58.6 SF wall signs for Finger Lake Federal Credit
Union located at 1055 Hatch Road on a 2.26-acre parcel having SBL# 079.17-1-78.001 line the
MC Medium-Intensity Commercial District.
The Planning Board classifies the proposed action to be a Type II Action under Section
617.5(c)(9) of the State Environmental Review (SEQR) Regulations and therefore is not subject
to further review.
RESOLUTION 26-019 Derek Anderson made a motion for TYPE IT
SEQR which was seconded by Mark Giardina.
VOTE:
Mr. Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
Drazen Gasic:
Finger Lake Federal Credit Union Sign
WHEREAS the Town of Webster Planning Board (the “Planning Board”) has received an application
from Eric Baker (the “Applicant”) requesting Sign Approval pursuant to § 265-7 of the Code of the
Town of Webster associated with the installation of signage on a 2,26-acre parcel identified as SBL¥
079.17-1-78.001, located in the MC Medium-Intensity Commercial District, Town of Webster, New
York, for the following signage:
One (1) freestanding monument sign with a sign area of 66.8 square feet; and
Two (2) wall signs, each with a sign area of 58.6 square feet; and
WHEREAS, the Planning Board reviewed the application materials and plans submitted by the Applicant,
including the sign drawings and associated supporting information, as presented to the Planning Board;
and
WHEREAS, the Planning Board conducted its review of the proposed signage for compliance with
applicable provisions of the Code of the Town of Webster, including but not limited to § 265-7 , and
evaluated the proposal with respect to compatibility with the site and surrounding area, traffic safety, and
overall community character;
Pg. 129 May 5, 2026 Planning Meeting
NOW, THEREFORE, BE IT RESOLVED that the Town of Webster Planning Board
hereby APPROVES the Applicant’s request for Sign Approval for the Finger Lakes Federal Credit Union
property, subject to the following conditions:
¢ Building number is added EG-3.2 Side A
RESOLUTION 26-020 Diazen Gasic made a motion for SIGN
Located at 1055 Hatch Road.
Applicant Eric Baker is requesting SIGN
APPROVAL associated with the installation
of one (1) 66.8 SF freestanding monument
sign, and two (2) wall signs at 58.6 SF on a
2.26-acre parcel having SBL# 079.17-1-
78.001 located in the MC Medium-Intensity
Commercial District under Section 265-7 of
the Code of the Town of Webster which was
seconded by Mark Giardina.
CONDITIONS:
¢ Building number shall be added to the wayfinding sign EG-3.2 Side A.
VOTE:
Mr. Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
BLOOM & BLEND SIGN: Located at 790 Ridge Road. Applicant Alyssa Connors is requesting
me SIGN APPROVAL associated with the installation of a 32 SF wall sign on a 1.2-acre parcel
having SBL# 079.17-1-15.1 located in the CO Commercial Outdoor Storage District under Sections
265-7 of the Code of the Town of Webster.
APPLICANT NOT PRESENT
RESOLUTION 26-021 Mark Giardina made a motion to TABLE
APPLICATION TO JUNE 2, 2026 which
was seconded by Drazen Gasic.
VOTE:
Mr. Casciani AYE
Pg. 130 May 5, 2026 Planning Meeting
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
BELLA TERRA PHASE 3: Located at a new road, extended south of Bellora Way. Applicant
Tom Thomas and representing agent Michael Montalto of Costich Engineering are requesting
FINAL SITE PLAN AND SUBDIVISION APPROVAL in association with the development of
66-single-family residential lots on a 21.2-acre parcel having SBL# 065.02-1-40.225 located in the
LMR Low-Medium Residential District under Sections 269-10, Section 296-18 and 350-17 under
the Code of the Town of Webster.
Appearing before the board was Mike Montalto (DID NOT SIGN IN) with Costich Engineering
here this evening on behalf to Tom Thomas at 800 Phillips Road, LLC. As mentioned, we are here
this evening requesting final site plan subdivision application approval for section 3 of the Bella
Terra subdivision. This is the final section of Bella Terra residential subdivision. This project
received preliminary site plan approval in December of 2018 for approximately 83 acre parcel with
102 townhomes. The full environmental assessment form was submitted and a negative declaration
issued under SEQR in September of 2018 and final site approval plan was granted for section one
of April in 2019, Final site plan approval was granted for section 2 in May of 22024 section two
was currently under construction. Similar to the previous sections, the roads are to be private so is
water, sanitary, and sewer. They are all to be built to town standards as they were in previous
sections. So, if they ever should be or need to be dedicated, they could be. Army Corp of Engineer
permits were obtained for the culverts; for the stream cross they were installed as part of the section
2 and there is a current SPEEDYS permit active for the project and weekly SWPPP inspections are
currently being performed for section
2. There have been no changes to the utility alignment roadway; geometries or lot configurations
during the course of the project from the preliminary overall approval. When it was initially
granted, the final plans incorporate the actual building footprints that will be put on the individual
lots, and the earth work has been minorly tweaked to represent any of the earthwork that was done
in previous sections. Mass earthwork and any extra soils from utility built construction and
basement installations. At this point, I would like to......our map does show (NOT USING THE
MIC, hard to hear) showing the section in red and section one the completed section, 2A and 2B
construction and what’s (BACK AT THE MIC) depicted in red is section 3 which is the
final section of the subdivision. All internal road connections; all internal utility connections; all
storm water management ..........
Last piece of the puzzle.
Yes, last piece of the puzzle and I conclude my presentation and turn it over for
any questions the board may have.
Pg. 131 May 5, 2026 Planning Meeting
I think the only issue have is...... Engineering was all okay with this? Josh,
Erika...
Yes
And they are up to date with everything in there.
Yes, there were a few minor things that can be dealt with at the pre-mylar review
stage.
Okay, that being the case, there really is...... this did receive overall preliminary
approval in 2018 or something
December of 2018.
These are all private roads in there, aren’t they.
Correct.
They are private roads but are they built to town standard when they built them.
Yes, roadways, utility, has been built to town standards and all details on the plans
but it is all private.
We don’t need to do a SEQR on this do we?
No, it was completed before.
Drazen Gasic:
Bella Terra Phase 3
WHEREAS, the Town of Webster Planning Board (the “Planning Board”) has received an application
from Tom Thomas (the “Applicant” ), with Michael Montalto of Costich Engineering as representing
agent, requesting Final Site Plan Approval and Subdivision Approval for the development of sixty-six
(66) single-family residential lots on a 21.2-acre parcel identified as SBL# 065.02-1-40,225, located in
the LMR Low-Medium Residential District, Town of Webster, New York, pursuant to § § 269-10 , 296-
18, and 350-17 of the Code of the Town of Webster; and
WHEREAS, the Planning Board reviewed the application materials, plans, and supporting
documentation submitted by the Applicant/representing agent, as presented to the Planning Board; and
WHEREAS, the Planning Board conducted its review of the proposed Final Site Plan and Subdivision
for compliance with the Code of the Town of Webster, including but not limited to § § 269-10 , 296-18, and
350-17, and considered the layout and design of the subdivision, proposed lots, roads, utilities, drainage
and stormwater management, and other site improvements, as applicable; and
Pg. 132 May 5, 2026 Planning Meeting
WHEREAS, after due deliberation, the Planning Board finds that the proposed Final Site Plan and
Subdivision, as presented, is acceptable and consistent with applicable Town requirements, subject to the
conditions set forth herein;
NOW, THEREFORE, BE IT RESOLVED, that the Town of Webster Pianning Board hereby
grants FINAL SITE PLAN APPROVAL and SUBDIVISION APPROVAL for Bella Terra Phase
3, subject to the following conditions:
CONDITIONS OF APPROVAL
* Conformance to Approved Plans: The project shall be constructed in substantial conformance
with the final plans and application materials as submitted to and approved by the Planning
Board. Any material change shall require further review and approval by the appropriate Town
authority, as determined by the Town.
e All Required Agency Approvals: The Applicant shall obtain all required permits and approvals
from the Town and any other agencies having jurisdiction prior to commencement of the related
work,
e Stormwater / Drainage Compliance: All stormwater management, erosion and sediment
control, and drainage facilities shall be designed and constructed in accordance with applicable
Town and New York State requirements, and to the satisfaction of the Town Engineer, as
applicable.
¢ Public Improvements and Inspections: All required public improvements shall be installed and
inspected in accordance with Town standards and procedures.
e As-Builts / Record Drawings: As-built plans/record drawings and any required certifications
shall be provided upon completion of required improvements, in a form acceptable to the Town
Engineer and/or Building Department, as applicable.
e Subdivision Plat Filing: The final subdivision plat shall be in recordable form and shall be
signed and filed in accordance with Town procedures and any applicable county requirements.
Any required legal instruments shall be provided in a form acceptable to the Town prior to plat
signing and/or filing, as applicable.
RESOLUTION 26-022 Drazen Gasic made a motion for FINAL
SITE PLAN AND _ SUBDIVISION
APPROVAL Located at a new road,
extended south of Bellora Way. Applicant
Tom Thomas and representing agent
Michael Montalto of Costich Engineering
are requesting FINAL SITE PLAN AND
SUBDIVISION APPROVAL in association
with the development of 66-single-family
residential lots on a 21.2-acre parcel having
SBL# 065.02-1-40,225 located in the LMR
Low-Medium Residential District under
Sections 269-10, Section 296-18 and 350-17
under the Code of the Town of Webster
which was seconded by Mark Giardina.
Please give Katherine a copy of what you have. It’s a little different from the
Pg. 133 May 5, 2026 Planning Meeting
one we have. And I think you did include subdivision approval in there also, right.
Right
From the standard list we usually have, that’s a little different. The price of
recreation fees, EVERYONE TALKING AT THE SAME TIME.
Okay, lets make it simple and include the standard requirements that we have
for final approval and that way, it includes parks and recs fees.
FINAL APPROVAL CHECKLIST
Subject to PRC comments.
Subject to Parks and Recreation fees (if applicable)
Subject to Preliminary Approval Conditions.
Subject to all applicable governmental fees.
Subject to Department of Public Works approval
Significant construction shall occur within one year, as deemed by the Planning Board to expire
on 5.5.27
7. The conditions of Preliminary and Final approval are depicted on the cover page of the final
designed plans.
8. The Engineer for the proposed project shall provide a Letter of Certification that all proposed
work was completed, as per Planning Board resolution of final approval before a Certificate of
Occupancy will be issued.
9. A Letter of Credit to the Town for the project shall include the fee for the Engineer’s final
certification inspection of the site.
10. All storm water facilities are to be constructed first
11. All downspouts to be connected to the storm sewer system.
12. Subject to resolution of the final approved minutes.
Pa tok pe
13. Approvals are subject to Drawing No: Dated:
VOTE:
Mr. Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
VERIZON WIRELESS CELL TOWER “WEBSTER NORTH”: Located at 1222 Wildflower
Drive. Applicant Robert Burgdorf for Bell Atlantic Mobile Systems d/b/a Verizon is requesting
SKETCH PLAN REVIEW in association with a 125-foot telecommunications tower with a 4’
lightning rod and associated ground-mounted equipment on a 14.2-acre parcel having SBL#
065.05-1-48 located in the R-3 Single Family Residential District under Sections 269-5 and 350-
12 of the Code of the Town of Webster.
Pg. 134 May 5, 2026 Planning Meeting
Appearing before the board was Laura Smith with Nixon Peabody and I’m joined by
(DID NOT SIGN IN) of NB&C and Kathy Pomponio with Verizon. (DID NOT
SIGN IN) and together we are representing this application. As noted in the intro, the action before
the Planning Board is sketch plan and site plan. They are a number of approvals this project will
need, including from the Town Board and the Zoning Board of Appeals, but I did want to introduce
the entire project to you so you had a full scope of what the project will entail.
As we have noted in previous meetings, Verizon is a public utility for zoning purposes and it’s
licensed and regulated by the FCC and The Telecommunications Act of 1996. The area that this
antenna will service is known as the Webster north area. It is located in a single family residential
zoning district where telecommunications are permitted. And if I could, I’d like to draw your
attention to exhibit F of the application. That first page of the engineering necessity case. Josh,
I’m going to keep you on your toes.
So again, just as some background for the project, this area shown on that page, that first page of
exhibit F shows the current towers that are serving the Webster North area as well as that terrain
shown in red. Very close, just a couple pages up. Yes, that’s it. Exactly. Thank you. So, you’ll
note here there are three towers predominantly serving this Webster North area. The Webster North
area is outlined, circled in red and there is a Webster Park site, a Fourmile creek site, and a Webster
site all kind of triangulated around that red circle. This Webster North search area, this is the area
that has a significant gap in coverage. This is the area that we’re trying to serve. I do want to draw
your attention the...all of the area within this red circle is a residential neighborhood. You know,
so to the extent that there is a conversation of is there another district we could go into, is there a
higher intensity use in the area? That answer is no. We are trying to serve this residential area.
The only properties within this residential area are residential save for a town property that we first
attempted to lease from the town in order to place an antenna in this area. The town board has full
discretion whether or not to lease to any applicant as well including telecommunications. And if
you recall last summer the town declined to lease to Verizon. So, that has put us back into a search
area ring to look for an appropriate site. And brings us to the zoning application and that’s before
the planning board today.
And then if we could go four pages down, I’m sorry, one page up. This shows the existing low band
coverage. You'll see again I want to draw your attention to the Webster Park antenna, the Four
Mile Creek antenna and that Webster antenna as well as the Xerox antenna down to the southeast.
And you will see here in that residential neighborhood, we’re lacking coverage from the other
antennas that are serving this area, and it is a very low strength signal. And then Josh, if we could
do down one page. With the construction of this Webster North Tower, we would increase the
capacity and coverage for this residential neighborhood, really closing that gap in coverage. And
then if we could go down one morte, this is the existing midback coverage and is showing the
shading that you could get from the existing coverage and again demonstrating that there is
significant coverage gaps within that Webster North area.
And the next page again is showing us with the Webster North tower online. Now, we’ll go down
Pg. 135 May 5, 2026 Planning Meeting
one more. This is the existing midband coverage again showing significant orange areas to the
southwest of the site and no coverage to the northwest portion of the site. I’m sorry, northeast
portion of the site. So, again showing that there is a significant gap in coverage within this Webster
North area. And if we go down to the next page, it’s the proposed band coverage. Again, that same
coverage area showing with the Webster North Tower online.
So, with that understanding of where the coverage gap is, we then went through a pretty rigorous
site selection analysis, as we do for all of our sites. The only site that both met our RF needs and
they were willing to lease to us was the site that’s before you today, the 120...the 122 Wildflower
Lane. That site if I may next draw you attention to our site plan which is exhibit P. It shows that
it’s arelatively large parcel within this residential neighborhood and it allows for significant setback
from other residential properties as well from the road and shielding the property to the extent
possible with the existing tree coverage. So, we in addition to it being the most appropriate site for
our RF needs, the most appropriate site to meet town requirements, it works well from an aesthetic
point of view to help hid the equipment and to shield the tower to the extent that’s possible.
On that note, also I’m sorry Josh, I keep switching back and forth. I’m going to bring us to the
viewshed map that is, I’m sorry exhibit K. The viewshed map. So, here you’ll see a map of the
areas shaded in yellow that for that cross-hatching. Those are the areas that are anticipated to have
a view of tower. So, again, although we’re in a residential neighborhood, the areas that will actually
be able to see the tower is quite limited. Certainly, that will be affected when leaves are not on the
trees, but when leaves are on the trees when looking from a residential neighborhood up you know
for the most part if will be covered in the foliage. We also provided some photo simulations of
what the tower would lock like in the next following slides.
So, again, we’re here before you for this application to cover that significant coverage gap
demonstrated in the Webster North neighborhoods. This area...this remedy wil! serve and solve
that gap and again, we went through that very extensive site analysis. We began discussions with
the town to use the town parcel about two years ago, went through that process with the town.
Again, the town are fully within there right to decide not to lease to us as a tenant. But now back
before you, we’re here with a zoning application for the site as selected to solve that coverage gap.
So, with that E will pause and see if there’s any questions.
Well, initially you hade it at 125 feet, I think it was the first tower.
I’m sorry......
The first tower that you proposed on the town site, I think that was a 125 feet.
That could be correct. When we’re looking at installing towers, it’s the antenna center
line that were trying to solve for here.
I would assume and I will look at Nico Facey, but I assume that we’re about 10 feet further down
Pg. 136 May 5, 2026 Planning Meeting
in elevation which requires 135 feet so that we can reach that same antenna center line.
Because the code....our town code actually calls for a maximum height of 100
feet.
That’s correct.
And the first towers, that’s the range they all worked in. What happened. The
trees get taller.
Actually, the trees did get taller. That’s absolutely eight.
I remember we had the other cell tower the one proposed down on Lake Road
came in. I asked a question, I still don’t understand how that works, but could there not be two
lower towers somewhere, you know, out of the residential area. I mean, that’s a dense residential
area there.
I guess I’ll push back, right. Anywhere within that area that needs coverage is a
residential neighborhood, so you know, we’re not trying to hid the ball on you or pretend that we
are not acknowledging that it isn’t a residential neighborhood.
So, would two cell towers work?
It would not work. I’m sorry, I didn’t mean to interrupt you.
You know, like maybe by the park or somewhere or whatever.
That’s a great question. So, if you see again on when I was showing you where the
towers are located, there is already a tower in the park. There is already a tower at our four mile
creek site and there is already a tower at the Webster site and the Xerox site. So, if you recall from
our prior application, the way that the cell phone towers work, it’s almost as if you have a flashlight
and where the light shines, that is where the cell coverage goes. Very rudimentary obviously but
it’s a good kind of analysis for it. If you start crossing beams with other towers, then that interferes
with how that other tower is working and how that other tower is serving the facilities. So, it really
needs to be kind of juxtaposed in between the existing towers to ensure that we’re both closing the
existing coverage gap as well as not interfering with the towers that are currently serving the area.
It would be interesting to know what like AT & T or T-Mobile or whatever
some of the other carriers, do they get reception in that area.
And candidly, the Telecommunications Act looks at carrier by carrier. So, while there
might be coverage by another carrier is candidly irrelevant in the analysis of the zoning application
before you.
Pg. 137 May 5, 2026 Planning Meeting
Well, the reason I’m thinking is whatever they’ re coming off of, whatever tower
they’re coming off of, could Verizon collocate their tower?
Our very first place is always collocation. We always look to collate. It is what is
required in your code. It is what makes the most business sense for Verizon. There is no existing
tall structure or no existing tower within the search area we’re trying to serve.
I guess just a quick question to kind of piggy back on the code and the 100 foot, I
guess maximum that we already have. Can this be done at a 100 foot? Is it...you know, I don’t
know.
Yea, it can. That 135 is the minimum height that is necessary to fill the coverage gap
and that is played with quite a bit with our RG Engineers. Again, to be candid with you, if we
could have a site that didn’t require a variance, that is a more straightforward zoning application,
the 135 is the minimum that’s necessary to close this coverage gap.
Okay, alright. We’re novices at this. We don’t fully understand other than what
we’re being told and understandable. I think we’ve discussed this with the town. I think what we
need to do is to have...our code allows for this. ..is to have an outside consultant come in and review
your numbers, your calculations on everything and pass that information to us because you’re
saying yes, it needs to be a 135 feet and of all the towers we’ ve had, I don’t know any we’ ve had
to make 135 feet. I think that’s what we’re going to need to do. Would you guys agree to that.
I have a two part question if I might. I know you’ ve mentioned you’ ve looked at other
properties in the area. When I look at this photo view and considering it’s a half mile radius, we
are right on the edge of the Village Wastewater Treatment plant. Has that been considered? Not
only is it less than a half mile from where you’re proposing, it’s a higher elevation which may not
require you to have as tall an antenna. The other thing I'd like you to consider or at least better
understand is that cell towers aren’t the only solution. There’s smaller utility pole mounted
antennas, There’s roof mounted antennas. There’s utilization of satellite communications and I
don’t know if Verizon has considered any of those things in the process of locating this.
Thank you. Those are both great questions. I will note that under Exhibit G is our
site selection analysis. We did look at the wastewater treatment plant. Again, to be fully transparent
with the board, if we can’t find collocation, we do look for property in order to enter more into a
partnership with the municipality as we were trying to do with the other site, in this location. The
wastewater treatment plant declined to contract with us. And if you look at ...Josh, page 11 of 13
of that site selection analysis. Yeah, it’s the next exhibit down. Yep, that one and then page 11 of
that. So, this shows the candidates that we approached and either were had to be rejected due to
RF. So, for example, K,J, and H were not close enough in the search range to solve the RF coverage
gap. And then our candidate before you, that’s candidate C. I believe A is the town property and
then...yeah, I’m sorry. Candidate A is the sewer property at the near...the town pump station.
So, excuse me. This is what you’re showing here that does not alight with this
Pg. 13% May 5, 2026 Planning Meeting
drawing.
I’m sorry, I jumped to Exhibit G.
I agree but the circle is more to the north and the west on this. At least that is how it
appears. You did approach the waste water treatment piant.
Correct.
And the village declined.
Yes. All of the items...all of the properties shown on page 11 of exhibit F. Those are
the properties that we approached and either declined to contract with us or did not meet the RF
needs.
So then regarding the alternate technologies.
Yeah, so the small cell technology, what is needed here is a backbone. It needs to
support a larger geographical area than the small cell is meant to design. Small cells have a radius
of about 50 yards or 50 feet of service. They’re really band-aids for areas in an existing network
that just need to be patched over. For example, they’re often on Wegmans’ because when you’re
at Wegmans, there’s too much capacity going to at Wegman’s and there needs to be booster there.
The area that we are looking to serve is much much too large to be served with small cells. This
needs a macro backbone to help really bring the coverage gap to aclose. And then if there are those
small spots that then need to be filled in with small cells, that is what the small cell technology is
meant to do. It’s meant to fill in the gaps...fill in small gaps that need that booster or have capacity
issues because of high volume use.
I appreciate that. I think of it more like a mesh router system where one router in your
house bis broadcasting. It has spots that are blank or don’t have perception. Where a mesh allows
you to distribute it in a much more effective matter with smaller nodes. So, I’m not an expert in
telecommunication’s. I was just using that for an analogy. But I would like to at least understand
that.
I think that those are some good points and that is precisely why I feel...Josh,
we all felt that an outside consultant is the way to go because those are things that we’ve talked
about, we’ ve read about, people in the neighborhood have read the same things that we’ ve read, but
we don’t know what works and what doesn’t work. So, I think....
Yeah, I mean especially with this being the third one it’s like there’s an influx of it.
So, it would be best in our part to have the secondary resource evaluated from our perspective to
just to educate us even further. One of the things that you just mentioned out of curiosity is age
which is the sewer plant was taken out of consideration because of RG need parameters.
What is the RG need? Is it just s spectrum, a range?
Pg. 139 May 5, 2026 Planning Meeting
Oh, ...you’re night. [ apologize. Idid mislabel the sewer plant. That is too far out
of the search ring. So, we do look, especially when it’s municipal properties, we will run some
properties outside of the search ring to see if it is viable from an RF perspective to fill that coverage
gap. And candidly, this is my own ignorance of why it’s yes or why it’s no, but RF is the final
decider of whether or not putting a tower at that location will solve the coverage gap.
So, even if we were to place a tower there and it addresses half of the concern of that
RF need, you still wouldn’t place it in that location, for example, since it doesn’t address the entire
Bap.
That’s correct. And to the extent T also want to note again, to recall that there is a
tower, the Xerox Tower that’s to the southeast of that location and when we’re looking at the
network, it is both filing the coverage gap that’s existing and also looking at non-interference. So,
when an RF is looking at a site, they’re looking at both. Does that fill the coverage gap and or does
it interfere with the neighboring site. I can’t speak to which one of those or both of those items is
the reason the RF rejected it. We can certainly get that information, but when RF is reviewing this,
they are the final say on what is sufficient for the network in order to protect it’s integrity and also
to ensure that the coverage gap is filled.
One of my last questions was just, something that Tony mentioned and I don’t know
if you meant it jokingly or not, but when he said, you know, initially the towers were 100 feet and
now they’re up to 135 and it’s because of the tree heights have increased. Repurposing the existing
towers by increasing the height of those towers, would that potentially address and cover the areas
that have gaps now?
They would not address this coverage gap. This coverage gap is really too far from
those existing towers. Again, going back to that flashlight idea, the higher you get up, the weaker
the signal is. The weaker that light is. There’s also foliage and topography that can interrupt that
flow of the cell coverage. Which is why you know, again we were somewhat joking but candidly
it is the foliage on the tree. This is such...... RF that is emitted from these towers is such a low
frequency that it is very low power. It candidly can’t travel that far. So, when we’re looking at
filling that coverage gap, there is a distance that just can’t be overcome by the radio frequency. It’s
a very low power and the higher frequency you go up, the shorter amount of distance it can go.
Just for the record, a lot of the neighbors in the area, we have received letters, 1
did have them. I’ve read them. It won’t do us any good to read them out loud her tonight, but we
do have them and appreciate it. J think the way to move this thing forward is to simply request that
the town hire a consulting firm that the town’s choice, not their choice. And it gets reviewed by an
independent RF specialist, engineers, whoever they are, and give us their results before we move
on with this. Does that sound fair to you folks, too? There’s nothing else we can do at this point.
And tonight is not a public hearing. It’s just..........
Pg. 140 May 5, 2026 Planning Meeting
SOMEONE IN THE AUDIENCE SPEAKING OUT
I will tell you what, it is not a public hearing, but if you’ve got something you
want, why don’t you go ahead on up and let....just give us your name.
Barbara Robbins at 1205 Wildflower Drive: Just a question as to why none of the other cell carriers
are having this issue and it is only Verizon that we're hearing about. 1 know one of the gentlemen
who lives by me and wrote the letter into the editor of the Webster Herald. He’s actually driven
around our neighborhoed and sees that there are additional boosters for other cell providers that
are on some of the lines. And all of the people that are dealing with these other providers do not
seem to have any of the issues that the Verizon customers have had. I’ve been going around the
neighborhood for the last 5 days with a petition and so I’ve been speaking one on one with a lot of
my neighbors to find out who they have that wasn’t part of the petition to ask them, but they've been
very open about that. And the only ones who have said that they have any type of cell phone
coverage issues are Verizon customers. And they have stated that, you know, the few people that
have WI-FI in their house, they just make sure that they connect into that and going in. Once they
get outside of their homes and they get onto the main roadways, they go up to three bars. Why is
that? Within the house there's a problem. But outside on the road there's no issue. So, these other
boosters those other companies are using must be working in the neighborhood and they’re not
putting up you know 135 feet -139 with the antenna.
You have some good points there. I think that’s something that we'll know.
I have a lot of them that I'll be providing.
Okay, that will be great. That’s something we don’t again, we don’t understand.
We can turn that over to the people that do end up ultimately reviewing this and have them address
that.
Okay, thank you.
If you’ ve got that, you want to hand it up....
I am going to finish putting together because we've been sitting here and I’ve
been getting more information, and I have been putting together more questions. The road that
needs to be created to get back to where this cell tower, is it going to be a double lane? Is it going
to be a single lane? How is it going to be maintained? Is it going to be maintained as if it was on
an individual's property or is somebody from the town or from Verizon going to maintain it. Those
are all questions, you know. As far as easements. How far back is this road going to be relationship
to everybody's property?
If you ... can once you can send that to the town. Those are some good points.
Pll get the signatures and (Ul put it together. Who should I send it specifically
to?
Pg. 141 May 5, 2026 Planning Meeting
You can give it to Josh or Erika.
I am the project manager with Verizon Wireless. I can answer, I can answer at
least some of your questions right now. The reason that AT &T and T-Mobile are not having the
same issues as Verizon, there’s more than one answer to that. Number one, our networks are
different. Where, you know, AT&T’s network is not exactly the same as Verizon’s network or T-
Mobile’s network. The other biggest difference is the fact that Verizon owns the majority of the
market share across upstate New York. And so, there’s a capacity issue. So, if you saw some of
the exhibits that Laura and Josh were putting up earlier, the surrounding sites have sectors that are
at capacity because we have 70% of the market share in this area and the remaining 30% is split
between AT&T and T-Mobile. So, we have a very large capacity of network usage on our system
that is draining the system. So, this...part of the reason is coverage, and part of the reason is
capacity, but we have to solve that problem because we have so many users on our system and that
is the biggest reason right there.
As far as the height is concerned the surrounding towers in Webster are larger than....they’re higher
than 100 feet. So, the height of the tower is driven by what we’ re trying to solve within the coverage
gap and the capacity issues. It’s also driven by height, the height of the trees, we have to see through
the trees and the foliage in order for the signal to penetrate. And as far as the questions regarding
site plan and I mean that’s something that the planning board is all going to review the
site plan within our application. All of those questions area currently within our site plan
application before the planning board.
Can I just ask one more question. Sorry, cuz it came up as capacity. Is the capacity
maxed out on cell phone use as in calling or does the towers also provide capacity or usage for like
residential home, commercial home data usage as well?
It’s both.
So, by advertising then internet services like the new internet service that you have
you’ ve maxed out your capacity.
I can’t answer that question on internet service but as far as coverage and capacity
this tower is going to solve both of those problems for both data and phone usage.
Right, but I guess you know from an emergency response concern everything which
again is the real service from a utility scale of these towers.
Emergency responses and public safety is of utmost importance.
Correct, but that’s call, cell phone not necessarily...
It’s also data. I mean, if you’ve got an ambulance and you’ve got a medical
emergency at your home and the provider, the emergency service provider is trying to transmit
telemetry to the hospital, that is also a data issue. And we welcome you hiring a third party
Pg. 142 May 5, 2026 Planning Meeting
consultant. I mean, we’re all for it. As long as that person is qualified and they’re not gouging,
you know, from a cost perspective, then we welcome it.
And for the record, by getting an outside consultant, our code allows this board
to hire someone, and the bill goes back to the applicant. So, your tax dollars are not involved in
this. Just for the record that’s all. I think that is the way we’ve got to travel with this. Anybody
else?
Yeah, I actually looking at the documents, not only from this application, but the
previous application. I fully understand the coverage and the data issues that they have and why
this tower is actually at 135 feet. But you’re trying to maintain a level from a sight line from tower
to tower that’s pretty much level. I know this site here on the map it shows that stream going by it.
And if it’s anything like that stream that’s up by the villages wastewater plant. This is one of the
lower parts on the town. So, you wind up with a higher tower elevation to be able to see the towers
on either side. So, having a fixed tower of 100 feet, but you’re on ground elevation that goes from
elevation 300, elevation 400 that center line changes whenever you are in the town. So, this thing
has to be able to see and talk to other towers.
That’s exactly right. It is the antenna center line that is the solution kind of regardless
of the elevation of the ground where we need to be is where the center line will be at this elevation
at 135 feet that....you’re exactly right. It’s the antenna center line.
Frankly, all these application we have have made 100% sense on why it’s been
located where it’s at. And while it’s nice to have the outside consultant come into the RF, I’m not
sure that that’s money well spent by the town and passed on to the applicant. I understand these
diagrams.......
SPEAKING AT THE SAME TIME. The gap exists because of the usage. So,
they’re capped out. They’re capped out because they have the market capability. They have the
larger usage, and they need to introduce a tower so they can meet that demand. But why isn’t the
demand being capped as in you’re allocating like a percentage of ............. BOTH PARTIES
SPEAKING AT THE SAME TIME.
So, you’ re allowed to select a cell phone company right, you can tell somebody
they are not allowed to have Verizon in this particular area because they don’t have the coverage .
You can’t have that kind of a cap. But the diagram that they have to me, personally, makes 100%
sense on what you’ re trying to do.
Again, let’s Josh has been doing research on it, and we’ve got what was it 150
days or something that you have to have to have some sort of an accomplishment or whatever.
Are you referring to the...] think you’ re referring to the shot clock.
Yes
Would you be able to speak a little bit to that.
Pg. 143 May 5, 2026 Planning Meeting
So, you’re exactly right. There ts a shot clock that municipalities are required to make
a determination based on when the application was submitted. This application was submitted
March 10" which means that a full decision so that mean both site plan approval; the height variance
that’s required as well as the telecommunication special permit from the town board would all have
to be issued on or before August 7”. Candidly, you know, if we get to a situation that it’s just a
few days over, we often extend the shot clock. It’s not meant to be punitive, but it is meant to allow
a project to move forward and serve the area. And you know, again, we have been working on this
particular site for a number of years. So, to the fullest extent that we can move forward and serve
this area and serve this community is exactly what shock clock is meant to provide.
Okay. All right. With that, I guess we’ ll leave it up to the engineering department
to come up with a firm that can do the research on this and report along with what you’ ve presented
and give us some numbers that we can work with.
Get it back before the July or even earlier.
We are happy to do June.
Josh, I think you wanted something by a certain date from what I’m recalling.
Yes, we’re looking at a few weeks.
FEEDBACK PROVIDED:
e Planning Board requests the Town to hire 3“ party RF Engineer for independent review
of Verizon’s gap coverage analysis
ADMINISTRATIVE MATTER:
e Dinks N’ Links - Planning Board made a motion to declare its intent to be Lead
Agent for SEQR.
I think Derek has prepared a resolution for that.
Derek Anderson:
TOWN OF WEBSTER PLANNING BOARD RESOLUTION
DINKS N’ LINKS
SEQR — INTENT TO ESTABLISH LEAD AGENCY
05/05/2026
MOTION FOR INTENT TO ESTABLISH LEAD AGENCY
WHEREAS Town of Webster Planning Board (Planning Board) considered the request by
Applicant, Joe Catalani to consiruct a 41,000 SF indoor/outdoor recreational facility for Dinks
N’ Links located next to 900 Five Mile Line Road on a proposed 10.4-acre lot consisting of
Pg. 144 May 5, 2026 Planning Meeting
portions of SBL# 079.10-1-2.3 (9.38-acres) and a 1.08-acre portion of SBL#079, 10-1-1.11 in the
HC High Intensity Commercial District
NOW, THEREFORE BE IT FURTHER RESOLVED that the Planning Board has determined
that the Action is an Unlisted Action.
NOW, THEREFORE, BE IT: RESOLVED that the Planning Board determined that the action is
subject to a coordinated review pursuant to Part 617.6(b) of SEQR and that it is the most
appropriate agency for making the determination of significance. The Planning Board therefore
intends to designate itself lead agency for the proposed action.
RESOLUTION 26-023 Derek Anderson made a motion to declare
LEAD AGENCY for SEQR which was
seconded by Mark Giardina.
Mr, Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
¢ Approval of minutes for: April 7, 2026. Motion: (GIARDINA/CASCIANI)
Mr. Casciani AYE
Mr. Malta ABSENT
Mr. Giardina AYE
Mr. Anderson AYE
Mrs. Maltman AYE
Mr. Gasic AYE
Mr. Vetter AYE
With no other applications before the Board this evening Anthony Casciani concluded tonight’s
meeting at 8:10 PM.
Respectfully Submitted,
A/S ) Dated o &
Mark Giardiga, Secretary .
Katherine Kolich, Recording Secretary - a leone ad CLK
Pg. 145 May 5, 2026 Planning Meeting
Signed