Town Board Workshop
Town Board Minutes 2026.03.05

Minutes

March 5, 2026 · 22 min read · extracted text · View original

Webster Town Board

March 5, 2026

A workshop meeting of the Webster Town Board was called to order by Supervisor Scialdone at

6:30 p.m. at the Webster Town Board Meeting Room, 1002 Ridge Road, Webster, New York,

with the following officials present:

Supervisor ......................................................................... Alexander B. Scialdone

Councilman....................................................................................... John J. Cahill

Councilwoman...........................................................................Jennifer S. Wright

Councilman.............................................................................. Nicholas E. Hunter

Councilman................................................................................ Garrett J. Wagner

Attorney for the Town .........................................................................Kyle Taylor

Town Clerk .................................................................................. Danene M. Marr

Department Heads Present:

Community Development Director ................................................. Joshua Artuso

Finance Director ..................................................................................Paul Adams

Also in attendance was Anthony Casciani, Planning Board Chairman.

***

Joshua Artuso, Community Development Director, appeared before the Town Board to discuss

FEMA Flood Mapping changes along Empire Boulevard.

The Town of Webster administers the Federal Floodplain Regulations established by the Federal

Emergency Management Agency (FEMA) at the local level. In 2024, the Town updated its

Flood Damage Prevention Ordinance after FEMA revised flood mapping within the Town.

Following that update, a property owner challenged the floodplain designation affecting their

property and conducted an extensive technical review with consultants and flood engineers. The

owner applied to FEMA for a Letter of Map Revision (LOMR) to correct the floodplain

elevation shown on the Federal maps. After approximately a year and a half of analysis, FEMA

and the New York State Department of Environmental Conservation accepted the technical data

and determined that the original floodplain elevation mapping was incorrect.

As a result, the approved map revision lowers the floodplain elevation in the affected area by

approximately five feet and impacts several properties near Empire Boulevard, including areas

around the bowling alley, movie theater, and the former Creek’s Edge Farm Market near Country

Max, extending partly into the Town of Penfield. Because the Federal map has been revised, the

Town of Webster must amend its local code to reflect the change. The Town Board must hold a

Public Hearing and adopt the update by May 2026, in order to maintain compliance with the

National Flood Insurance Program, ensuring that residents living in floodplain areas remain

eligible to obtain federal flood insurance.

Councilwoman Wright asked if it could be shown on the map, specifically the change that is

taking place. Mr. Artuso articulated that updated engineering and survey work showed that the

previously mapped FEMA floodway in the Empire Boulevard area was too narrow, which

caused inaccurate floodplain elevations. Engineers collected new field data, analyzed

stormwater flows from the Town of Penfield, and evaluated the culvert beneath Empire

Boulevard, which had been replaced or enlarged in the past and affected downstream flooding

conditions.

1

03-05-2026

Webster Town Board

Based on this updated analysis, FEMA revised the floodplain elevation for the area from

approximately 425 feet above sea level to about 419–420 feet, a reduction of roughly five feet.

As a result, several properties that were previously within the 100-year floodplain, including the

movie theater property and nearby parcels have now been removed from the designated

floodplain, although floodplain areas still remain to the south.

Councilman Wagner asked how many homeowners are impacted by this change, and Mr. Artuso

responded there are no single-family residences impacted, they are all commercial properties

within the Town of Webster.

***

Anthony Casciani, Chairman of the Planning Board, appeared before the Town Board to discuss

the steps taken by the Planning Board regarding the proposed solar project.

Katie Soscia, Director of Project Development for Montante Solar, presented the proposed 6.6megawatt solar project on Xerox’s campus in the Town of Webster, seeking an Industrial Use

Permit. The project team, including representatives from Phillips Lytle (Kim Nason), Xerox

(Marcus Lathrop), and Haley & Aldrich (Janice Szucs), emphasized that the project meets all

criteria for approval.

The project timeline spans over three years, including environmental reviews with multiple

agencies and a formal review process with the New York State Department of Environmental

Conservation (DEC) starting in July 2025. The Town Board referred the project to the Planning

Board for a full site plan review, followed by sketch plan and preliminary site plan meetings.

Community concerns were addressed through meetings with the Meadows HOA, feedback

implementation, public outreach, and the creation of a project webpage. Final site plan approval

was pursued in early January, and the DEC review was completed by late February, with all

materials shared with the Town Board. The team has emphasized transparency and public

engagement throughout the process.

Marcus Lathrop, Manager of Assessments and Environmental Operations at Xerox, explained

that the project area is a small portion of the larger Xerox campus in Webster, near the CND and

industrial waste landfills, with some nearby property now owned by Tessy Plastics. The

proposed solar area was carefully mapped to show distances to property lines and residential

areas.

Xerox operates under a New York State DEC Permit, which governs remediation, monitoring,

inspection, and notification requirements across the campus, including the landfills. All landfills

are closed and maintained under DEC-approved corrective actions and institutional controls. A

groundwater recovery trench collects water from the site, with monthly testing and reporting

provided to the Town of Webster and DEC. Marcus emphasized that all remediation and

environmental operations will continue without disruption from the solar project, ensuring

human health and environmental protections remain intact. All data and monitoring activities

have been ongoing for over 30 years, with DEC reviewing and approving all operations.

2

03-05-2026

Webster Town Board

Janice Szucs, from Haley & Aldrich, explained the technical environmental remediation

measures at the proposed solar project site on Xerox’s campus. The site includes two capped

landfills: an asphalt-capped hazardous waste landfill and a soil-capped C&D landfill with nonhazardous vegetative waste. Protective engineering measures include a bedrock trench (like a

French drain) to capture potential contamination, spanning the full width of the landfill, and a

network of monitoring wells to track groundwater conditions. Wells further from the landfill

have shown no contamination for over 10 years, while expected detections occur near the trench.

Groundwater is collected and treated at the Town of Webster’s Public Works Facility, with

contingency plans in place if alternative handling is needed.

The solar project was designed following New York State Department of Environmental

Conservation (DEC) guidance for landfill redevelopment, ensuring that all necessary studies and

protections are in place. This approach also aligns with state incentives for reusing landfill sites

for solar energy, supporting safe and sustainable land redevelopment.

Katie Soscia, from Montante Solar, detailed the environmental planning, regulatory compliance,

and construction approach for the proposed 6.6 MW Solar Project on Xerox’s Webster campus.

She explained that the project underwent an extensive review by the New York State DEC

beginning in July 2025. This review included civil designs, geoballast foundation plans,

stormwater management, landfill closure plans, geotechnical reports, and operations and

maintenance plans. DEC confirmed that the project complies with DMM4 guidance for solar

installations on closed landfills and does not interfere with ongoing remediation activities. She

emphasized that construction will avoid penetrating landfill soils, using geoballast gabion

baskets to secure the panels, with disturbances limited to access roads, utility poles, and a

concrete pad. Soil sampling will be conducted in accordance with DEC and Xerox remediation

plans.

The project also underwent due diligence with other agencies, including the US Army Corps of

Engineers, NY State Historic Preservation Office, US Fish and Wildlife, and the DEC Wetlands

Division. Wetland impacts are minimal, totaling less than 0.1 acres, and the Town Planning

Board issued a Type II action while the Town Engineer completed a Storm Water Pollution

Prevention Plan (SWPPP) review. The project consists of nearly 11,000 solar panels and 18

inverters, positioned strategically to maintain significant distances from nearby residences and

HOA trails, minimizing visual and operational impact.

To address community concerns about sightlines, the project team developed a landscape

screening plan. This plan adds approximately 200 feet of double-row Norway spruce and red

cedar trees along the northeast and northwest edges of the site, providing year-round coverage.

These plantings will be implemented by Xerox prior to major construction, ensuring visual

mitigation from surrounding areas. Overall, the project combines careful environmental

safeguards, regulatory compliance, responsible construction methods, and proactive community

engagement.

3

03-05-2026

Webster Town Board

The proposed solar project includes a host community agreement as a condition of site plan

approval, ensuring that the project pays the equivalent of full property taxes, with 50% of that

value paid in the first three years. A decommissioning plan and bond are incorporated to

guarantee the system’s removal at the end of its useful life or if it becomes non-operational for

over 12 months. This ensures that the Town of Webster is not financially responsible, and the

bond must maintain an A or higher rating.

The project also provides significant community benefits. It is an inclusive community solar

project, reserving 40% of its energy—approximately 2.66 MW—for low- to moderate-income

households, offering a guaranteed 10% discount on electricity through NAERTA and DPS

monitoring. Indirectly, the project helps reduce overall power costs by offsetting reliance on

high-pollution, inefficient fossil-fuel peaker plants that operate during peak energy demand.

Additionally, the project incorporates about 4,000 square feet of dedicated monarch butterfly

plantings, primarily milkweed, to support local pollinator habitats throughout the life of the

project.

Marcus Lathrop, Manager of Assessments and Environmental Operations at Xerox,

emphasized its long-standing commitment to the Webster community to counter perceptions that

it is not community focused. He highlighted its extensive community outreach and volunteer

efforts, including support for United Way, the Rochester Museum & Science Center, school

programs with engineers teaching students, food drives like Operation Food Basket, and monthly

bag lunch initiatives.

Additionally, Xerox makes its campus available for community benefits, such as hosting e-waste

collection events, supporting the Wilmot Cancer Center’s Warrior Weekend, and providing

space for the Tour to Cure. The company stressed that these efforts, along with the safety

measures incorporated in the solar project, demonstrate their dedication to the community and

ensure the project will benefit residents without creating hazards.

Janice Szucs, from Haley & Aldrich, emphasized that health and safety have been the highest

priorities throughout the project’s design, construction, and operation phases. Compliance with

all safety and environmental regulations will continue, including routine inspections, monitoring,

and emergency response plans. The landfill cap has been designed with multiple layers to

protect against exposure, and solar panels are mounted on a ballasted racking system that allows

for maintenance or removal if needed. Groundwater monitoring systems, recovery wells, and

other critical infrastructure will remain fully accessible, and the project will not interfere with

them. Community engagement, including Town Board and HOA meetings, has been ongoing to

address questions and concerns.

Environmental and operational impacts have been carefully considered. Noise from inverters is

within Town code limits, and real-world factors like vegetation further reduce sound levels.

Environmental reviews show the project will offset CO2 emissions within three years and

provide long-term benefits. The project has been vetted by environmental agencies with no

negative feedback received. A dedicated project website and DEC contact information ensure

community transparency and access to further information.

4

03-05-2026

Webster Town Board

Kim Nason, from Phillips Lytle, concluded the presentation by emphasizing the request before

the Board: approval of the Industrial Use Permit and host community agreement for the solar

project. She highlighted that the project has undergone an extensive review process, including

Planning Board approvals, DEC oversight, and multiple rounds of public input. The Planning

Board recommended approval of the Industrial Use Permit, which is required under the Town’s

Solar Code for industrial district sites. Ms. Nason noted that the project meets all Industrial Use

Permit standards

it is well screened and buffered, fully monitored for landfill impacts, does not

create additional demand on Town resources, and avoids typical off-site impacts such as dust,

noise, or emissions. She concluded that the project represents a productive reuse of an otherwise

undevelopable industrial parcel and would generate revenue for the Town.

Councilman Cahill asked Anthony Casciani, Chairman of the Planning Board, if he has a copy of

the weight impact study, and it was answered that there is a copy and it will be provided.

Councilman Cahill asked if the existing cracks on the asphalt cap will be addressed prior to the

ballasts being added. Marcus Lathrop from Xerox, responded that the cracks are reviewed and

addressed as part of the annual maintenance. Then an additional inch and a half of asphalt will

be placed on top of the existing asphalt.

Councilman Cahill asked how the asphalt will continue to be maintained once the ballast and

solar structures are in place. Jancie Szucs, from Haley and Aldrich, responded that the structures

can be moved if required for maintenance of the asphalt. Katie Soscia also answered the team

has been considering adding an extra asphalt pad under the ballasted panels—about 1.5 inches

plus an additional 1.5 inches beneath the ballast. They indicated that this modification would

require DEC approval, but they are willing to pursue it if it addresses the Board’s concerns.

Councilman Cahill asked if Montante Solar has built other solar farms on asphalt capped

landfills. Katie Soscia answered that DEC covered landfills without an asphalt cap.

Councilwoman Wright asked if Montante’s previous solar projects were on industrial waste or

construction and debris landfills. Katie Soscia responded that she would provide a list of

different landfills that they are currently working on.

Councilman Wagner asked if there are thresholds in place and what the process would look like

if the asphalt cap cracks, is it a formal or informal plan. Janice Szucs responded that it is a

formally written plan that the cap is inspected on an annual basis, which is all part of the

submittals that went to the DEC.

Councilman Wagner asked if there is a timeframe with the DEC, if a crack is identified that

needs to be fixed, how long does Xerox or Montante have to fix said crack. Janice Szucs

responded that it has not been established with the DEC.

5

03-05-2026

Webster Town Board

Councilman Hunter indicated that current safety protocols have been in place for decades but are

there any additional precautions with the construction of the project to add in additional testing

through the wells throughout the property just to make sure for the sake of residents in the area

that there isn’t any contamination. Marcus Lathrop answered that the team conducts monthly

sampling of groundwater from the trenches to monitor VOC concentrations and detect trends.

The landfill cap consists of multiple impermeable layers, not just asphalt, providing several

engineering controls to prevent contaminant migration. Regular testing of wells, including those

discharging to the POTW, ensures compliance with permits and protection of human health.

Councilwoman Wright reiterated that there isn’t a concern that there are no controls, but the

questions are more aligned to complications of maintaining the monthly controls with all of the

solar panel structures on top of the existing site. Marcus Lathrop answered that the project has

been designed that it is not going to impact those monthly controls.

Councilwoman Wright asked, once this request comes back to the Town Board, she would like

to see, where the panels are going to be laid out, where the access points will be, and what will

be done to replace trees that have to be taken out to accommodate the project. How will these

panels look on this uneven parcel of land. Katie Soscia indicated that she will provide the design

specifications on how they are handling the area with the topography.

Councilman Cahill asked how they will be handling the cutting of the trees. Katie Soscia

responded that they are clear cutting about 15 acres of trees, which will be removed. There will

be no soil disturbance so the smaller trees will be handled with a bush hog, and the larger trees

will have to be hand felled and the roots cannot be taken out.

Councilman Wagner asked for clarification, during a Planning Board final approval meeting,

there was a discussion about adding the 1.5 inches of asphalt on the cap, and at the time, the

response was the engineering team from Montante could look into it and that the response was

that it wasn’t needed. So, was the engineering redone to incorporate that 1.5 inch additional

layer? Katie Soscia responded that the DEC said the 1.5 inch spread over 2.5 acres was minimal,

that the DEC didn’t require Montante to redo the geotechnical testing.

Councilman Wagner asked how the solar array drip lines impact the asphalt cap. Janice Szucs

responded that based on the evaluation that was done with the geotechnical testing there were

safety factors that were involved, and settlement that was observed was within acceptable

tolerances.

Councilman Wagner asked how this project implementation would impact property values.

Marcus Lathrop responded that there was an article that residents were pointing to that had

property values across different situations, and that article actually showed that for Brownfields

where development happens, property values go up. Kim Nason noted that analyses, including

public feedback and standard application reviews, show the project will not negatively affect

property values. Screening, significant setbacks, and low noise levels ensure there are no

aesthetic or noise impacts typically associated with more intensive industrial uses.

Councilwoman Wright requested that when the team comes back to provide information about

property values or sales around those arrays to demonstrate that there is in fact no impact of

property values around those sites of other projects.

6

03-05-2026

Webster Town Board

Councilman Wagner asked that if the solar project does decrease the values of the properties, is

there any mechanism to adjust for that with the residents? Kim Nason stated that the solar

project is not expected to decrease property values, noting the large parcel, significant setbacks,

and industrial zoning. They emphasized that, while not a large-scale industrial development, the

project will generate revenue for the town through the host community agreement on a site that

would otherwise be undevelopable. Katie Soscia added that they would be happy to prepare a

response about property values the next time they present to the Board.

Councilman Wagner asked what happens to the solar farm if Xerox is no longer the owner of the

property, who would be responsible if it is not Xerox. Janice Szucs responded that as part of

Xerox’ Record Permit for the facility, they’re required to establish a financial reserve mechanism

(called financial assurance) for 30 years continued operation if Xerox is no longer in existence.

Kim Mason also added that the environmental easement that lays out the obligations for the site

for operation, maintenance, and monitoring requirements that runs with the land. So, if someone

else were to come in and acquire it, those obligations apply to them.

Supervisor Scialdone asked if they have an agreement with RG&R on hookup. Katie Soscia

responded that they do have an interconnection agreement executed with RG&E, but they will

not have a time of when it is going to be interconnected until Montante provides them a

construction start date. They are estimating a possible interconnection start date before

October 2027.

Supervisor Scialdone asked if they have environmental incidental insurance. Katie Soscia

responded that she will get back to the Board with more information on that topic.

Councilman Wagner asked what additional information still needs to be provided with the DEC

by Montante if this project moves forward. Katie Soscia answered, the project’s solar panels

have not yet been secured due to their high cost, and final approvals are needed first.

Preliminary panel specifications, including snow and wind load calculations, have been

submitted, and DEC has confirmed that minor differences in panel sizes will not significantly

affect the geotechnical report. Final drawings will be completed after approvals to ensure

accuracy.

Councilman Cahill asked how many time the DEC has been out to view the site for this project.

Marcus Lathrop answered that they were out to view the site last year in 2025.

***

There being no further business to come before the Board, the meeting was adjourned at

7:48 p.m.

____________________________________

Danene M. Marr, Town Clerk

7

03-05-2026

End of document