Inspections.
A. Inspections.(1) The Town of Webster's Public Works Department or designated agent, as defined in § 289-2 , shall make inspections as hereinafter required and shall either approve that portion of the work completed or shall notify the applicant that the work fails to comply with the SWPPP. In addition, the Town of Webster reserves the right to enter the work site at any reasonable time for purposes of inspection. The SWPPP and the records of any inspections completed by the owner or his or her agent shall be maintained at the site in the site logbook from the date of initiation of construction activities to the date of final stabilization.
To obtain inspections, the applicant shall notify Town of Webster's Public Works Department at least 48 hours before the following activities occur:(a) Start of construction.(b) Erosion and sediment control measures have been installed and stabilized.(c) Site clearing has been completed.(d) Rough grading has been completed.(e) Final grading has been completed.(f) Close of the construction season.(g) Final landscaping.(h) Closeout inspection.(2) The above inspection timetable does not relieve the owner of the obligation under this or any other permit or regulation to conduct regular inspections as set forth in said permit and/or regulation.(3) If any violations are found, the applicant and developer shall be notified in writing of the nature of the violation and the required corrective actions.
No further earthwork shall be conducted on the site, except for site stabilization, until the violations are corrected and approved by the Town of Webster's Public Works Department.B. Property owner/developer inspections.(1) The applicant shall employ a responsible individual, as defined in § 289-2 of this article, who will oversee the implementation of the SWPPP on a daily basis. The responsible individual shall be on site at all times when construction or grading activity takes place and shall inspect and document the effectiveness of all erosion and sediment control practices. The applicant shall also employ the services of a qualified professional in erosion and sediment control who will inspect and document the effectiveness of all erosion and sediment control practices.
The documentation will be kept in a site logbook. Inspection reports will be completed every seven days and within 24 hours of any storm event producing 0.5 inch of precipitation or more. A monthly summary of reports will be copied to the site logbook and delivered to Town of Webster's Public Works Department within five days after the month's end.(2) The requirement to employ a qualified professional to inspect and document the effectiveness of all erosion and sediment control practices is not applicable to land disturbance activities five acres or less occurring on a single-family residence, which is not part of a larger common plan of development, or on an agricultural property.
In addition, these land disturbance activities must not discharge directly to a 303(d) impaired water body or must not be located in a total maximum daily load (TMDL) watershed.