A. All applications for an energy-deriving tower permit and site plan approval shall be by written application on forms provided by the Town of Webster Department of Public Works.B. Each application for an energy-deriving tower shall be accompanied by a complete plan, drawn to scale, showing the location of the tower on site; the location of all structures, power lines or other utility lines within a radius equal to the proposed tower height; dimensions and sizes of the various structural components of the tower's construction; design data which shall indicate the basis of design; and certification by a registered professional engineer or manufacturer's certification that the tower was designed to withstand wind load requirements for structures as set forth in the New York State Uniform Fire Prevention and Building Code.C.

All applications for the construction of a tower to be used to derive energy will be referred to the Planning Board for site plan approval under the procedures set forth in Chapter 269 of the Code of the Town of Webster. In granting site plan approval, the Planning Board may impose other conditions and restrictions deemed necessary for the maintenance and safety of such towers.

Citation graph 1 link
Citation graph 1→ · ←0
Cited by

No other sections cite this one.